From: Jessica Delo <jdelo@specenviro.com>
Sent: Tuesday, July 14, 2020 1:59 PM
To: Johnson, Alan
Cc: Marian Rubin
Subject: [External] FW: SAW-2020-01092 Redevelopment of Concord Motor Speedway (No
Permit Required)
• 1 External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
ort.s am nc. ov
Mr. Johnson,
We have received correspondence from Corps on the Concord Motor Speedway Project (DWR 20-0822) and
they have stated no permit is required. Please see Mr. Bryan Roden -Reynolds email bellow. Is there any
additional information you need from us regarding this project?
Thank you,
Jessica
From: Stephen P Castleman <scastleman@specenviro.com>
Sent: Tuesday, July 14, 2020 11:33 AM
To: Roden Reynolds, Bryan K CIV (US) <Bryan.K.RodenReynolds@usace.army.mil>
Cc: Jessica Delo <Idelo@specenviro.com>
Subject: Re: SAW-2020-01092 Redevelopment of Concord Motor Speedway (No Permit Required)
Bryan - thank you very much. We will file this and instruct the applicant and engineering team to monitor the work.
Have a nice day.
Thanks
Steve
On Jul 14, 2020, at 11:10 AM, Roden Reynolds, Bryan K CIV (US)
<Bryan.K.Roden Reynolds@usace.army.mil> wrote:
Mr. Castleman,
Based on the new Navigable Waters Protection Rule, an ephemeral channel is not considered
jurisdictional. Therefore, no Section 404 Permit is required. However, if your project changes then
further action may be required prior to starting construction.
PLEASE NOTE:
-This Department of Army determination does not relieve the permittee of the responsibility to obtain
any other Federal, state, or local approvals/permits. The permittee may need to contact appropriate
state and local agencies before beginning construction.
Thanks,
Bryan Roden -Reynolds, PWS
Regulatory Project Manager
U.S. Army Corps of Engineers
Wilmington District
Charlotte Regulatory Field Office
8430 University Executive Park Drive
Charlotte, NC 28262
Office: (704)510-1440
From: Stephen P Castleman <scastleman@specenviro.com>
Sent: Tuesday, June 30, 2020 8:35 AM
To: Roden Reynolds, Bryan K CIV (US) <Bryan.K.RodenReynolds@usace.army.mil>
Cc: Stephen P Castleman <scastleman@specenviro.com>
Subject: [Non-DoD Source] SAW-2020-01092 Redevelopment of Concord Motor Speedway
Good morning Bryan — hope you are well,
We submitted the PCN for this project, but you will find in your review that the impacts have been
limited to ephemeral features identified during our field reconnaissance. I am wondering if, given the
recent WOTUS definition developments, there is a need for you to review/issue the PCN?, or if another
type of correspondence is needed/warranted.
The associate in our office assigned to this project is out of pocket for a period and I wanted to touch
base as early in the process as possible. Please feel free to call me at 205-612-2021 if I can provide
further information or answer any questions.
Thank you and I look forward to talking to you soon,
Sfe v-e�
Steve Castleman, PG - CPESC
President
Consulting Division I Spectrum Environmental, Inc.
Join me in supporting Rainbow Omega
Blockedhttps://www.rainbowomega.org/
<image005.jpg>
<imageo o 1.png>I 205-651-0876 1205-612-2021
<imageo02.png4scastl� eman(d)specenviro.com
<imageo O3.pngABlock�pecenviro.com
<imageo04.png485 Spectrum Cove, Alabaster, AL
35007