Loading...
HomeMy WebLinkAboutNCC203063_ESC Approval Submitted_20200720Cro PITT COUNTY PLANNING & DEVELOPNIENT DEPARTMEN •DEVELOPTNIENT SERVICES BUILD ING 1717 W5"' STREET 'z S�Ee. 0 GREENVILLE, NORTH CAROLINA 27834-1696 TTLEPHONE: (252) 902-3250 FAX: (252) 830-2576 1 UMMMUMM 1700 Tottenham Court Winterville, NC 28590 Dear Sir/Madam: DAMES F. MODES, AICP DIRECrOR This is to advise you that the Pitt County Technical Review Committee conditionally approv the soil erosion and sedimentation, control plan and stormwater plan for MONTEVALLO SECTI 1 I PIUSE 1 on June 10, 2020. Conditions and requirements as a part of this approval are attach I below. Copies of the draft minutes from the meeting will be available upon request prior to tt, next Technical Review Committee meeting. As stipulated on the financial responsibility form, you are responsible for ensuring complian] with all aspects of the approved plan and the Pitt County Soil Erosion and Sedimentation Contr Ordinance. Your primary objectives include, but are not limited to, preventing off si sedimentation, preventing sediment from entering watercourses, and establishing vegetation all disturbed areas within 7-14 calendar days, following, any completion of a phase of grading. As of April 1, 2019, all new construction activities are required to complete and submit electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under t 1i NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior the commencement of any land disturbing activity on the above named project. The NOI fo may be accessed at deg.nc.,gov/NCG0I. Please direct questions about the NOT form to Anne t Lucas at Annette. lucas(d'mcdenr. ggy or Paul Clark at Paul. clark(&,nedenr. gov. After you submit complete and correct NOI Form, a COC will be emailed to you within three business days. Please be aware that your project will be covered by requirements of the NPD Construction Stormwater General Permit NCG010000. Please become familiar with all t requirements and conditions of this permit in order to achieve compliance. I . No further permits for building or other construction will be issued. 2. The authority to continue construction, other than for erosion control measures, will be terminated. Penalties of up to $5000 per day may begin to accrue. Failure to immediately comply upon notice of noncompliance will result in injunctive and/or criminal action. 4. This erosion control plan shall expire three years following the date of approval if no land disturbing activity has been undertaken, 5. The Division of Water Quality may pursue legal action against you in order to enforce requirements of the NPDES, Phase 11 permit. 6. The Pitt County Soil Erosion and Sedimentation Control Ordinance authorizes County officials to inspect sites to ensure compliance with the Sedimentation Pollution Control Act, Title 15A NCAC 4B .0 11 8(a) requires that a copy of the approved erosion control plan be on file at the job site, Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan, North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I 13A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act, Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided, You are requested to file an amended form if there is any change in the information included on the form, Land disturbance shall not begin until a preconstruction meeting has taken place. Please provide a copy of the certificate of coverage prior to beginning any land disturbance If you need her information or assistance, please contact me at (252) 902-3250. Sincerely, / VV*f XAV� Thomas Shrader Planner III MONTEVALLO SECTION I PHASE 1: Located on Ayden Golf Club Road in the Town of Ayden 1. Install stone apron at the end of FES#3 2. Any ditches/drainage filled will need to be identified on all future plans or plats. 3. Land disturbing activity may occur after a pre -construction meeting, but construction cannot occur until approval of a construction plan from the Town of Ayden, * Soils located on site include Os, Pg, Ly, and WaB and possess the following characteristics: * Seasonal high water table (Ly, Os, Pg) * Flooding or Ponding (Pg & Os) * Unstable for trenching, 4 feet or more (0s) * Swift Creek Watershed * Soils are prime farmland or have statewide importance for farming. Development will remove the site from agricultural production. * Existing subsurface drain tiles are onsite. A map is on file and available. The following agencies have reviewed the SESC/Construction Plan for MONTEVALLO SECTION I PHASE 1 and have no comments: a Pitt County Engineering