HomeMy WebLinkAbout20070517 Ver 1_CAMA Application_20070322r, ~,
~,~
1 ~~i~ 20070.51`7
~~~~ ~~
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr.; Secretary
March 20, 2007
MEMORANDUM:
TO: Ms. Cyndi Karoly
Environmental Biological Supervisor
Division of Water Quality
FROM:
SUBJECT:
Applicant:
Project Location:
Proposed Project:
Doug Huggett
Major Permits Processing Coordinator
CAMA/DREDGE & FILL Permit Application Review
Gerald Hanifan
~~~~od~~
MAR 2 2 2007
t7ENk -WATER gUALITY
V1~TU~JD3 A,~-D STOR6ANATER BRANCH
Carteret County, 125 Camp Morehead Drive, adjacent to Bogue Sound, in
Morehead City.
Proposes to construct a 295' pier extension with a platform, and 2 boatlifts on an
existing pier.
Please indicate below your agency's position or viewpoint on the proposed project and return this form by
April 10, 2007. If you have any questions regarding the proposed project, please contact Ryan Davenport
at (252) 808-2808. When appropriate, in-depth comments with supporting data are requested.
REPLY: This agency has no objection to the project as proposed.
This agency has no comment on the proposed project.
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This agency objects to the project for reasons described in the attached comments.
SIGNED DATE
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-808-2808 \ FAX: 252-247-33301 Internet: ,nrww.nccoastalmanagement.net
An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper
!!I!la~or P~rmi# Fie Sche~lulc
DCM $ DWQ $
Development Type Fee (14300 1601 435100093 1625 6253) (24300 1602 435100095 2341)
I. Private; non-commercial
development that does not involve
he filling or excavation of any
etlands or open water areas: $250 100% ($250) 0% ($0)
II. Public or commercial
development that does not involve
he filling or excavation of any
I
etlands or open water areas: $400 I 100% ($400) I 0% ($0)
III. For development that involves
he filling and/or excavation of up to
1 acre of wetlands and/or open
ater areas, determine if A,B, C, or
D below applies: I
III(A). Private, non-commercial
development, if General Water
Quality Certification No. 3490 (See
attached) can be applied $250 100% ($250) 0% ($0)
III(B) Public or commercial
development, if General Water
Quality Certification No. 3490 (See
attached) can be applied. $4OO 100% ($400) 0% ($0)
III(C). If General Water Quality
Certification No. 3490 (see
attached) could be applied, but
DCM staff determined that
additional review and written DWQ
concurrence is needed because of
concerns related to water quality or
aquatic life: $400 60% ($240) 40% ($160)
III(D). If General Water Quality
Certification No. 3490 (see
attached) cannot be applied: $400 60% ($240) 40% ($160)
IV. Development that involves the
filling and/or excavation of more
han one acre of wetlands and/or
open water areas $475 60% ($285) 40% ($190)
DIVISION OF COASTAL MA,.NAGEMENT
FIELD INVESTIGATION REPORT
1. APPLICANT'S NAME: Gerald Hanifan
2. LOCATION OF PROJECT SITE: 125 Camp Morehead Dr. adjacent to Bogue Sound
in Morehead City, Carteret County
Photo Index - 2000: 41-520 grid (N-15)(0-15)
2006: 41-8042 grid (J-11)(K-11)
State Plane Coordinates - X: 2654097.707 Y: 362829.633 Rover # J022715A
LAT 34°43'38.103 LON 76°49'22.305
3. INVESTIGATION TYPE: CAIvIA
4. ~.~ INVESTIGATIVE PROCEDURE: Dates of Site Visit - 2/27/07
Was Applicant Present -No
5. PROCESSING PROCEDURE: Application Received - CC 3/13/07
Office -Morehead City
6. SITE DESCRIPTION:
(A) Local Land Use Plan -Morehead City
Land Classification From LUP -Residential/Conservation
(B) AEC(s) Involved: Public Trust Area, Estuarine Water
(C) Water Dependent: Yes
(D) Intended Use: Private
(E) Wastewater Treatment: Existing - On-site septic
Planned - N/A
(F) Type of Structures: Existing - 295' Dock, Home
Planned -Dock Extension, Platform, Boatlift
(G) Estimated Annual Rate of Erosion: N/A
Source - N/A
7. HABITAT DESCRIPTION:
DREDGED FILLED OTHER
(A) Open Water N/A N/A 2125 ft2 Incorp.
1675 ft2 shaded
(D) Total Area Disturbed: 2125 ft~
(E) Primary Nursery Area: No
(F) Water Classification: SA Open: Yes
8. PROJECT SU:~IYI<~RY: The applicant is proposing to construct a 295' pier extension
with aplatform, -and 2 boatlifts onto an existing pier.
Gerald Hannifan ~
Page 02
9. Narrative Description:
The Gerald Hanifan project is located at 125 Camp Morehead Dr. in Morehead City, Carteret
County. Camp Morehead Dr. is found by turning south off of Hwy. 24 in the western part of the
county and into Camp Morehead subdivision. The site lies on the northern side of Bogue Sound
in this area and next door to a similar major permit recently issued to Gregory Moore.
The subject property is .6 acres in its entirety and averages 16' in elevation above NHW.
Currently on the high ground portion of the site is a single. family home and a bulkhead with
rip rap. Extending off the bulkhead is an existing 280.'X5' pier and 153.75ft2 platform.
Along the shoreline of Bogue Sound is a 60' fringe of Coastal Marsh that contains Salt
Meadow Grass (~artina patens) and Smooth Cordgrass (Spartina alterniflora). The high
ground portion of the track is vegetated with Loblolly Pine (Pinus taeda), Wax Myrtle
(Myrica cerifera) and Live Oak (Quercus virainiana). Aerial photographs and site visits
indicate that SAV's do exist in the area. The shoreline has a total length along the NHW line
of 120ft. There are single-family homes with private docks on both sides of the proposed
project.
The Division of Water Quality classifies this area as SA waters. This area is not a Primary
Nursery Area. This portion of Bogue Sound is open to the taking of shellfish. Morehead
City's Land Use Plan dated 1999 classifies this area as Residential and Conservation within
the AEC's. There are no shellfish leases in this area.
10. Project Description:
In order to access deeper water the applicant is proposing to construct a 5'X295' addition to
the existing pier. Located at the end of the pier would be a 200ft~(10'X20') ""C" platform with
two cradle boatlifts that are 13'X13' each. The proposed dock would have a total of 2 slips.
SAV's did not appear to exist in the area of the boatlifts. Bogue Sound is approximately 1
mile wide in this area and the 575' pier would extend 510' into the water body from the marsh
edge. Water depths around the proposed dock average -1.75'NLW and O'NLW at the enci of
the existing dock. Afoot of water depth would be gained from 400' to 500'. The combined
platform area of the dock would be 253.75ft2 on a 120' shoreline. Substrate composition is
mostly sand. Riparian lines are drawn 90° from the channel and appear to coincide with aerial
photography showing the channel configuration. The dock would me positioned 30' from
each riparian corridor.
11. Anticipated Impacts:
This proposed dock would result in 2,125ftz of open water incorporated while shading 1,675ftz
and providing docking for 2 boats. An increase in turbidity will occur while setting pilings.
There should be no hazard to navigation resulting from this project, as there are other docks of
equivalent length along the same shoreline. No coastal marsh would be filled or excavated
during this project. There is potential to impact SAV's with docking ingress and egress due to
shallow bottom.
Ryan Davenport :Morehead City 3/1-1/07
• ,
07.0517 ~:~1.
~~~~^~
Form DChi-)`iP-1 ~ ,, ~l ~ i.:.:t ~i ~ ,
~.~; ,
m j a • .:
~~
AP~~
(To be campleted by alt applicants) ~li C? i ~; ii:;;c~:~j Ll t~/ ~ t,; j'`,/'
1. APPLICANT
a. Landowner:
Name (1F,c(A~D yi~'/'~~~A~J
Address `z J C~1/•'~i /hC/<'f%~%/i: ~> 7i2
Ciry ~~'~~~~'~ C/ /~r' State N~
Zip ZS%SJ Day Phone
b. City, town, community or landma.~k
c. Strezt address or secondary road number
d. Is proposed work within city limits or planning
jurisdiction? ~ Yes No
e. Name of body of water nearest project (e.g. river,
cr~k, sound, bay) .&~~~~'~~
~; Z- Zoo -7yov
Fax
b_. Authorized Agent:
Name /-_~'
Address fro ~c'~ ~~ SS
City ~~'~f-itir'~D ~/'i State /IJC,
Zip Z,Y~SJ Day Phone 7S Z -71(• ~iL`~
Fax
c. Project name (i~f any)
h'O7E: Prrnct wi11 6e ittued in nerve of 4vti.Ln.ner(s), anlior
protect name.
2. LOCATION OF PROPOSED
PROJECT
3. DESCR~'I`ION A,ti`D PLA~fi~ED USE
OF PROPOSED PROJECT
a. '~ List all development a.aivities you propose (e.g.
_ building a home, motel, marina, bulkhead, pier, and
excavation and/or filling activiti;~s.
~ i3o~ - ~/~ ; r
r ~^s~ll A /N
b. Is the proposed a.:tivity maintenance of an existing
project, new work, er bo~n~ /'JCh/
c. Will the project be for public, private or commercial
use? Pr--_~~?-F
d. Give a brief description of purpose, use, methods of
constructio^ and daily operations of proposed
proje~-t. if more spare is ^eaded, please attach
additional pages.
--~
. i/
a. County cJA~~~'f l
Form DCM-MP-1
4. LAND AND WATER
CHARACTERISTICS
a. Size'of entire tract ~ ~~S ``~~~
b. Size of individual lot(s) ~~• ASS G~ ~~' -
Approximate elevation of tract above MI-IW or
NWL "" /`~ r
d. Soil types} and texture(s) of tract
e. Vegetation on tract ~
C,cs~ DS~Af//"l ~~,c~S
f. Man-made features now on tract ~~~_
-~~~, r ~.~ "' ~,niic~Gf'C:l -s.,.c';' '~.crlii,Cc ~/f~
g. What is the CAMA Land Use Plan land
classification of the site? (~~~ ~ ~~ 1~d ~~ P~^~1
Conservation Transitional
_~C- Developed Community
Rural Other
h. How is the tract zoned by local government?
i. Is the proposed project consistent with the applicable
zoning? X Yes No
(~t,ach ,oning eonq~lionce cerrific~tc, ijapplicnbleJ
j, Has a professional archaeological assessment been
done for the tract? Yes X No
If yes, by whom? '~
k. Is the project located in a National Registered
Historic District or does it involve a National
Register listed or eligible property?
Yes ~_ No
], Are there wetlands 4n the site? X Yes No
Coastal (marsh) C Other ,~
if yes, has a delineation been nducted? ~` -
(,ittach docu,.~nrntion, if available) S/~l -/t''r.1-,~~E~. 1
m. Describe existing wastewater treatment facil/ities.
~Gf ~ j ~ ~ ~ w/•' S if ~toisHfr i [ S~-l•~~
n. Describe location and type of discharges to waters
of the state. (For example, surface runoff, sanitary
wastewater, industrial/commercial effluent, "wash
down" and residential discharges.)
o. Describe existing drinking water supply source.
Cr~~ '~
5. ADDITIONAL INFORMATION
In addition to the completed application form, the
following items must be submitted:
• A copy of the deed (with state application only) or
other instrument under which the applicant claims title
to the affected properties. If the applicant is not
claiming to be the owner of said property, then
forward a copy of the deed or other instrument under
which the owner claims title, plus written permission
from the owner to carry out the project.
• An accurate, dated work plat (including plan view
and cross-sectional drawings) drawn to scale in black
ink on an 8 1/2' by 11" white paper. (Refer to
Coastal Resources Commission Rule 7!.0203 for a
detailed description.)
Please note that original drawings are preferred and
only high quality copies will be accepted. Blue-line
prints or other larger plats are acceptable only if an
adequate number of quality copies are provided by
applicant. (Contact the U.S. Army Corps of
Engineers regarding that agency's use of larger
drawings.) A site or location map is a part of plat
requirements and it must be sufficiently detailed to
guide agency personnel unfamiliar with the area to the
Form DCh1-hiP-1
~1~0i'~lp~~~ pity ~~i t~
numbers, landmarks, and the It e. ~, ,,, u6;:~~ ~E~~~FICATIOti' AND PER~IISSION
.~_ ;,~.
l~ a`L.,~.~,
N-.., ;
= E ~ ;~ ~~
site. Include highway or secondary road (SR)
~k ~~ -~hea~ ~•~
TO ENTER ON LAND
A Stormwater Certification, if one is necessary.
• A list of the names and complete addresses of the
adjacent waterfront (riparian) landowners and
signed return receipts as proof that such owners
have received a copy of the application and plats
by certified mail. Such landowners must be advised
that they have 30 days in which to submit comments
on the proposed project to the Division of Coastal
Iv{anagement. Upon signing this form, the applicant
further certifies that such notice has been provided.
rr ~j ~
'N ~~
• A list of previous state or federal permits issued for
work on the project tract. Include permit numbers,
permittee, and issuing dates.
v t~, ~i ~L ~ 1 ,
I understand that any permit issued in resporue to this
application will allow only the development described in
the application. The project will be subject to conditions
and restrictions contained ~~ the permit.
I certify that to the best of my )cnowledge, the proposed
activityzomplies with the State of North Carolina's
approved Coastal b{anagement Program and will be
conducted in a manner consistent with such program.
Name ~-,k'f~~~r-~!'cr2F I certify that I am authorized to grant, and do i.n fact,
Address /Zi ~~•"'~'~/%c~~Fi,~fi~~ ~.4i~c ',~n7~~ic'/» «' grant perrrussion to representatives of state and federal
,~,~,~,~~ ~r . „`~~ ~~~~-~3;~,,,j-. L~~, k,,;~;~, N~ i;; ',review agencies to enter on the aforementioned lands in
~.~; ~:: N~• Z7t.r~<., connection with evaluating information related to this
I,l~e ~/,cL/n~~ f'~< < permit application and follow-up monitoring of the
Address ill ~~•:~ i,~~'f.~ftif~ ~Q. ~lnic. ,L G(^s N- 6'~ project.
t `i~QIFr4ft'~' C.i '~Nc ~~SS"~ S:/'Fe'
•7~,,r~,j-! I further certify that the information provided in this
Name application is truthful to the best of my knowledge.
Address
Phone
This is the ~~rl day of YF~F.,~^~i~~A-1cY~C~,
• A check made payable to the Department of
Environment, Health, and Natural Resources
(DEHtv"R) to cover the costs of processing the
application.
• A signed AEC hazard notice for projects in
oceanfront and inlet areas.
• A statement of compliance with the N.C.
Environmental Policy Act (N.C.G.S. 113A - 1 to
10) If the project involves the expenditure of public
funds or use of public land's, attach a statement
documenting compliance with the North Carolina
Environmental Policy Act.
.~-~
Print Name ~c1~'/-2i ~~'
Signature _~~--1'/---~~
(~tuw,ur or ~/u:nari;ed ./gtru
Please indicate attachments pertaining to your proposed
proje~~t.
_ DCh{ Mp-2 Ezcavatio^ and Fill Information
DCh{ MP-3 Upland Development
_
DCtri MP-4 Structures Information
_ DCI`i b~-5 Bridges and Culverts
DCI`i IviP-6 Marina Development
14'OTE: Please sign and date etch attachment in the
space provided a< the borrom of each form.
~~ornz t<~C(~/~-It7P-~
(Cottsft'uctiott wit>~itt Public `ll't°€~t. f'aAt•e~c)
i~)orehead City ~Cv~ i~~~; ~~l~~d City DCfyo~
Attach this form to Joint Application for CAMA Prlajor e. Mooring buoys N~'
Permit, corm DGM-MP-I. F1e sure to complete all (1) ._...__ Commercial _~Comrrtunity .____ Private
other sections of the Joint Application which relate to (2) Number
this proposed project. (3) Description of buoy
(Color, inscription, size, anchor, etc.)
a. Dock(s) and/or Pier(s)
(1) ~ Commercial Community ~ Private
(2) Number /
(3) Length. ~,~~'F/'~~' C-X~s~„Nv ~PiF~' (4) Width of water body
(4) Width S~~ ~ (5) Distance buoy(s) to be placed beyond
(5) Finger Piers Yes ...~ No shoreline
(i) Number
(ii) Length f. Mooring structure (boatli mooring pilings, etc.)
(iii) Width (1) ,Commerce Community ~ Private
(6) Platform(s) ~C _ Yes No (2) Number Z
(i) Number ~ (3) Length /Z ' ~~t~ ~~
(ii) Length Zc~' (4) Width ~ Z -~ 6 '
(iii) Width ,~[7
(7) Number of slips proposed Z g. Other (Gve corry+ltle description)
(8) Proximity of structure to adjacent riparian ~/l'
property 1 roes ~ / ~ ~ FA~~~ r~y~
(9) Width of water body o~~T~(_ T~evo ~.
(10) Water depth at waterward end_of pier at
MLW or NWL ''~' ~~ ~/!~ /_r.~/'S~~~~~~
b. Boathouse (including covered lifts) /t-// ~~ %~~ ~~~~'~
(1) Commercial Private /
(2) Length ~~f%~'~> ~,(~iv~r,4"i~/
(3) Width ApplScant or Project Name
c. Groin (e.g. wood, sheetpile, etc.)N/~- S nai„re
(1) Number ~ ~ _ ~
(2) Length(s) i~ L ~ ~~
Date
d. Breakwater (e.g. wood, sheetpile, etc.) /PJ~
(1) Length
(2) Average distance from MHW, NWL or
. wetlands
(3) IVtaximum distance beyond MHW, NWL or
wetlands
Revised 03/95
Gerald B. Hamfan Jr
Jennifer D. Hanifan
125 Campmorehead Dr
Morehead City, N.C.
28557
December 29 2006
Mr. Ted Tingel /Mr. Charles S. Jones
NC Department Of Environment and Natural Resources
Division of Coastal Management
400 Commerce Drive
Morehead City, N.C., 28557
Dears Sirs,
® ~ ,z
~~~ ~ .
.~
~~~'
~~ ~~~;,
-2
I~~ `~~~
j~ ,
~~ !~
~: ~~
- -. - '~ 6 ; e ~J
We herby authorize Turner Marine Construction to represent us and apply for CAMA
permits to develop our property located at 125 Campmorehead Dr., Morehead City,
North Carolina. This authorization extends to all permits and authorizations required by
local, state, and federal agencies that may be required as part of the permitting process.
If you have any questions or concerns please contact us at 252-726-9994.Thank you for
your time and consideration.
Si
ld B.~{-Ianifan Jr.
c2~-
nifer D. ~ nifan
Ir
~
° ~
co
°
\ ~ Lr_
N N O
N N .-
~ ~ W
W Lit W
W ~ ~
~
~
Jenes '~,'.x'b~
trt '
~~
~'i513Le For~R
6 ~ '~
~ ~ ~~ rieMal~ ~'
'' uo~ ' ~ ~ ~'4 rapahoe ..~+°' ~
~, ~ ~~
r ^~ '~
h f
i
~
~
~ r
~
~~
~ .~av
.,~,
~ ~
nresott
K ~
a ~,.
{~~,
F ~ ,~~ ~
F
~ 181 ;
•
~~ x
r ~Ax~~ ~::
`~ 'a ~.:.,r. .,.
ism&atatink~~ Merrimon
'~L yy,',~{u~{ yr{I ~ ~ 1~~ ty 91j~ F~ ~n
~ j~
1 ~+
~
~ `~
py
~~~
f ~~
~~ y ~; ~ ~~~~
~'
.. {
~
~
~
~~ e , awe
.~
~~
-r-
s ,~
~ 4
"~,}~',,~ ~ Creek
e
~
~~.rhl ~ ~ e "~, ~,~`Y~.. River
'Ts
~
'., ~~
Ho ~
5 r s'.,~~~~i~~
p
~1e
~ ~ ttn, 9etu
n , ~;~
~
~
>
~~ ~ ~~ ~..
~ .
'a~a,~"
iY11 TI~1` 4. ~_, ~"
_ S { , w ~~'
t:1Y ~ •Stat1011 r ~ v'~ `~.~~ 17i
pdway Park \.
/'~~^~l
Carteret'
i
Broad Creek -` B aufort '~+ a ;~
Oniio~ Hubert 24 ~ M hea City Gloucester
Swensboro o ~ ~ gue Atle Beach~_~ Harkers Island
cape Carteret ~alter.Peth ~-1~-+
ona ~ ~ ed~PoaA Emer` ald Isle ~ ` ~z„ ~ tLook
a 58 ~ ..
~ ~ ~,
17 - ~ ~_ ~
campt~,t,e ReS~~~, ~ « PROJECT LOCATION
ape Lookout
ek 1
,r ; ~ DIRECTIONS:
FROM MOREHEAD CITY TAKE NWY 24 WEST
'~,
APPROXIMATLY 2 MOLES. TEJRN LEFT ONTO
C MP MOREHEAD DRIVE. FOLLOW R0,4D
A
AROUND TO 125 CAMP MOREHEAD DRIVE.
:W~ GrJ2 >rK Re1 oir~o0t.;
SITE LOCATION
4'7' 0~5 1 7
Z
O
F--
0
Q ~.
~ ~
J
Q ~
O Q
m U
~ O
Z
~
~
^
V I
W
Z
w ~`
~
I-
x U
W
Y
U
O
o
~.
}-fnrnU
0] t~ Cn Z
W N
Z~N~
~
Q Q ~
W
O Q tN Z
N
W ~
> ,~
.stn
~o~
~~~~~ ~ ° °
tL' Q= N
_ Zw I
rEB 2 6 2007 ~ °
_ ° U N
~ I
Morehead City DCM ~ Q z N
~ U W
~ ~
N ~
~f
NOTES: 1. WATER DEPTHS TAKEN AT
LOW TIDE ON 2/16/07.
2. SURVEY INFORMATION TAKEN FROM
PLAT BY JAMES I. PHILLIPS DATED
9/17/98.
O
O
EEGE~ID
RIPARIAN LWE~ - - ~ - -
..-.-
NORMAL HIGH WATER LINE - - -
284'
204'' .~..~.~.~~~..~.~.~.~
EDGE OF MARSH TO END DOCK ' ' 'MARSK " ' ' '
STEPS ••--
o.o'
EXISTING FIXED DOCK
EXISTING SITTING AREA
153.75 SQUARE FEET
Xo.o' WATER DEPTHS
NORMAL HIGH WATER
_ MARSH
,i,
NORTH
SCALE: 1 "=30'
• • • • MARSH -
0
0
r
~ o ~
\ ~,
N N O
N N N
WILLIAM HALL ~ o '~ w
127 P MOREHEAD DRIVE ~ Q
MO ~C 28557 ~ °
a Z
M~~ 5 0
PROP~E~~'0)LI ~ ~
a
Mo~~h~a ~ Q
s os°4o'1~5~'~a~ _ r_ ~ Z
---------~= _~ g
217.04. ~ ~.
Q W .
o~
m
EXISTING z ?
LARGE ROCKS
z x
W w
W
GERALD HANIFAN, JR. Y
125 CAMP MOREHEAD DRIVE o
MOREHEAD CITY, NC 28557 °
0.855 ACRE
EXISTING
TIMBER BULKHEAD
_ _ S _04°37' 12" E _ _
147.45'
GREGORY MOORE
121 CAMP MOREHEAD DRIVE
MOREHEAD CITY, NC 28557
M
m ~ z
m
W N
c.~ ~ I ~.=
z ~ ~
W
~ M d
w
o Q ~
Z
N
w~
> ,n
~~
°~
~° o
0
Q W Z N
~" w I
z~~o
= O U N
~ i
~Q.QN
~ Q W N
W U W
O ~
~O
N ~
r-
NOTES: 1. WATER DEPTHS TAKEN AT
LOW TIDE ON 2/16/07.
2. SEE SHEET 5 & 6 OF 6 FOR
PROFILE ELEVATION.
3. TOTAL LINEAR FEET OF SHORELINE
TOTALS 123.75'.
~. ~ 4. NO SUB-AQUATIC VEGETATION FOUND
AROUND AREA WHERE TEE AND BOAT.
LIFTS WILL BE LOCATED.
5. FULL DISTANCE OF DOCK WILL NOT EXTEND ANY
FURTHER THAN COMMUNITY .DOCKS LOCATED AT
BAY VIEW ON GLENN ABBY, OR CAMP MOREHEAD.
~ 0
1.75' .1'
1.75' .1
O
O
LEGEND
RIPARIAN LINE
PROPOSED BOAT LIFT 510,
SEE SHEET 4 OF 6 FROM MARSH EDGE TO END OF TEE
400'
o.o' ~ '~ Xo.o'
X0.0' 0.0'
'OSED TEE
SQUARE FEET
PROPOSED BOAT LIFT..
1.1' WATER DEPTHS
x
-- -- -
NORMAL HIGH WATER
MARSH
~1 SLIP NUMBER
END EXISTING DOCK
BEGINNING OF PROPOSED
~I,
i NORTH
SCALE: 1 "=50'
NORMAL HIGH WATER LINE • ' ' ' ' ' ' • •
••MARSH •• • • •
EXISTING SITTING AREA
153.75 SQUARE FEET •.•.• •MARSH•
Q'~'051T.
HALL
~D DRIVE
~~~~~
S O6'4~Qa" E _ .
~~~ ~~ 7.04'
~ EXISTI~G'~
LARGE ROCKS
~
O ~
cp
\ O
~ L~
~ _
N O
N N I'')
w w w
w Q ~
n
~
GERALD HANIFAN, JR. .
125 CAMP MOREHEAD DRIVE
~ MOREHEAD CITY, NC 28557
0.855 ACRE
EXISTING
TIMBER BULKHEAD
~__ S 04'37_'__12" E___
147.45'
GREGORY MOORE
121 CAMP MOREHEAD DRIVE
MOREHEAD CITY, NC 28557
~z
0
~_-
0
. ~
~a
~ z
J ~
Q w
o~
m cn
~ .o
w
z ~
o ~
~ a.
z ~
w ~
~ w
x
w
Y
U
O
-
M
m m N Z
c~ ~ i r"
~ ~ ~
~
w
o Q ~
z
N
w
> ~
~
~ ~
~. p a0
~
p N
O
~
Q z N
z ~ of
_ ~
~ (~ N
~
W
Q I
N
~ Q w N I'
W U W
U ~ I
~ O
N ~
r
~
o
cQ
_„ ~ ~
N w
O
~
N N ~}'
• ~
,~
, W W
~- W
_
cn
5
_D w Q
2x8 DECKING ~
z
o
. o z .
.
~
Morel
® o 0
~ Q
. W
~
/ „
5 8 GALV.
2x8 STRINGERS
2x8 GIRDERS _
~,
~ J ~
THRU BOLTS Q
NHW~ o z
mg
~ ~-
q Z~
PILING o -'
~ o
w
z z
0
O ~ Q
~
w w
NLW Y w
~
w ~, ~
o
~ 0
~ MUD INE
~
. 0.
-- ~
}-mmU
47m~Z
~
1
W C
C7 ~i 1I-
/ \
~EL'Ma
. Q ~ ~ ~
~ Z
N W
~ Q ~ Z
~ N
W ~
~ ~
~ ~
~ ~ ~
'~ N O
~ O
U
Z ~
~
Z N
~
` w
S ECTI 0 f~ A-A i
-
Z ~ ~ p
=~ ~ N
_ .._..TH SCALE: 1/2"=1'-0" Q ~ w N
r
SCALE: 1 "=6' w~W
~
~
~
N ~
r-