Loading...
HomeMy WebLinkAbout20070517 Ver 1_CAMA Application_20070322r, ~, ~,~ 1 ~~i~ 20070.51`7 ~~~~ ~~ NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr.; Secretary March 20, 2007 MEMORANDUM: TO: Ms. Cyndi Karoly Environmental Biological Supervisor Division of Water Quality FROM: SUBJECT: Applicant: Project Location: Proposed Project: Doug Huggett Major Permits Processing Coordinator CAMA/DREDGE & FILL Permit Application Review Gerald Hanifan ~~~~od~~ MAR 2 2 2007 t7ENk -WATER gUALITY V1~TU~JD3 A,~-D STOR6ANATER BRANCH Carteret County, 125 Camp Morehead Drive, adjacent to Bogue Sound, in Morehead City. Proposes to construct a 295' pier extension with a platform, and 2 boatlifts on an existing pier. Please indicate below your agency's position or viewpoint on the proposed project and return this form by April 10, 2007. If you have any questions regarding the proposed project, please contact Ryan Davenport at (252) 808-2808. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX: 252-247-33301 Internet: ,nrww.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper !!I!la~or P~rmi# Fie Sche~lulc DCM $ DWQ $ Development Type Fee (14300 1601 435100093 1625 6253) (24300 1602 435100095 2341) I. Private; non-commercial development that does not involve he filling or excavation of any etlands or open water areas: $250 100% ($250) 0% ($0) II. Public or commercial development that does not involve he filling or excavation of any I etlands or open water areas: $400 I 100% ($400) I 0% ($0) III. For development that involves he filling and/or excavation of up to 1 acre of wetlands and/or open ater areas, determine if A,B, C, or D below applies: I III(A). Private, non-commercial development, if General Water Quality Certification No. 3490 (See attached) can be applied $250 100% ($250) 0% ($0) III(B) Public or commercial development, if General Water Quality Certification No. 3490 (See attached) can be applied. $4OO 100% ($400) 0% ($0) III(C). If General Water Quality Certification No. 3490 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: $400 60% ($240) 40% ($160) III(D). If General Water Quality Certification No. 3490 (see attached) cannot be applied: $400 60% ($240) 40% ($160) IV. Development that involves the filling and/or excavation of more han one acre of wetlands and/or open water areas $475 60% ($285) 40% ($190) DIVISION OF COASTAL MA,.NAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Gerald Hanifan 2. LOCATION OF PROJECT SITE: 125 Camp Morehead Dr. adjacent to Bogue Sound in Morehead City, Carteret County Photo Index - 2000: 41-520 grid (N-15)(0-15) 2006: 41-8042 grid (J-11)(K-11) State Plane Coordinates - X: 2654097.707 Y: 362829.633 Rover # J022715A LAT 34°43'38.103 LON 76°49'22.305 3. INVESTIGATION TYPE: CAIvIA 4. ~.~ INVESTIGATIVE PROCEDURE: Dates of Site Visit - 2/27/07 Was Applicant Present -No 5. PROCESSING PROCEDURE: Application Received - CC 3/13/07 Office -Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan -Morehead City Land Classification From LUP -Residential/Conservation (B) AEC(s) Involved: Public Trust Area, Estuarine Water (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing - On-site septic Planned - N/A (F) Type of Structures: Existing - 295' Dock, Home Planned -Dock Extension, Platform, Boatlift (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: DREDGED FILLED OTHER (A) Open Water N/A N/A 2125 ft2 Incorp. 1675 ft2 shaded (D) Total Area Disturbed: 2125 ft~ (E) Primary Nursery Area: No (F) Water Classification: SA Open: Yes 8. PROJECT SU:~IYI<~RY: The applicant is proposing to construct a 295' pier extension with aplatform, -and 2 boatlifts onto an existing pier. Gerald Hannifan ~ Page 02 9. Narrative Description: The Gerald Hanifan project is located at 125 Camp Morehead Dr. in Morehead City, Carteret County. Camp Morehead Dr. is found by turning south off of Hwy. 24 in the western part of the county and into Camp Morehead subdivision. The site lies on the northern side of Bogue Sound in this area and next door to a similar major permit recently issued to Gregory Moore. The subject property is .6 acres in its entirety and averages 16' in elevation above NHW. Currently on the high ground portion of the site is a single. family home and a bulkhead with rip rap. Extending off the bulkhead is an existing 280.'X5' pier and 153.75ft2 platform. Along the shoreline of Bogue Sound is a 60' fringe of Coastal Marsh that contains Salt Meadow Grass (~artina patens) and Smooth Cordgrass (Spartina alterniflora). The high ground portion of the track is vegetated with Loblolly Pine (Pinus taeda), Wax Myrtle (Myrica cerifera) and Live Oak (Quercus virainiana). Aerial photographs and site visits indicate that SAV's do exist in the area. The shoreline has a total length along the NHW line of 120ft. There are single-family homes with private docks on both sides of the proposed project. The Division of Water Quality classifies this area as SA waters. This area is not a Primary Nursery Area. This portion of Bogue Sound is open to the taking of shellfish. Morehead City's Land Use Plan dated 1999 classifies this area as Residential and Conservation within the AEC's. There are no shellfish leases in this area. 10. Project Description: In order to access deeper water the applicant is proposing to construct a 5'X295' addition to the existing pier. Located at the end of the pier would be a 200ft~(10'X20') ""C" platform with two cradle boatlifts that are 13'X13' each. The proposed dock would have a total of 2 slips. SAV's did not appear to exist in the area of the boatlifts. Bogue Sound is approximately 1 mile wide in this area and the 575' pier would extend 510' into the water body from the marsh edge. Water depths around the proposed dock average -1.75'NLW and O'NLW at the enci of the existing dock. Afoot of water depth would be gained from 400' to 500'. The combined platform area of the dock would be 253.75ft2 on a 120' shoreline. Substrate composition is mostly sand. Riparian lines are drawn 90° from the channel and appear to coincide with aerial photography showing the channel configuration. The dock would me positioned 30' from each riparian corridor. 11. Anticipated Impacts: This proposed dock would result in 2,125ftz of open water incorporated while shading 1,675ftz and providing docking for 2 boats. An increase in turbidity will occur while setting pilings. There should be no hazard to navigation resulting from this project, as there are other docks of equivalent length along the same shoreline. No coastal marsh would be filled or excavated during this project. There is potential to impact SAV's with docking ingress and egress due to shallow bottom. Ryan Davenport :Morehead City 3/1-1/07 • , 07.0517 ~:~1. ~~~~^~ Form DChi-)`iP-1 ~ ,, ~l ~ i.:.:t ~i ~ , ~.~; , m j a • .: ~~ AP~~ (To be campleted by alt applicants) ~li C? i ~; ii:;;c~:~j Ll t~/ ~ t,; j'`,/' 1. APPLICANT a. Landowner: Name (1F,c(A~D yi~'/'~~~A~J Address `z J C~1/•'~i /hC/<'f%~%/i: ~> 7i2 Ciry ~~'~~~~'~ C/ /~r' State N~ Zip ZS%SJ Day Phone b. City, town, community or landma.~k c. Strezt address or secondary road number d. Is proposed work within city limits or planning jurisdiction? ~ Yes No e. Name of body of water nearest project (e.g. river, cr~k, sound, bay) .&~~~~'~~ ~; Z- Zoo -7yov Fax b_. Authorized Agent: Name /-_~' Address fro ~c'~ ~~ SS City ~~'~f-itir'~D ~/'i State /IJC, Zip Z,Y~SJ Day Phone 7S Z -71(• ~iL`~ Fax c. Project name (i~f any) h'O7E: Prrnct wi11 6e ittued in nerve of 4vti.Ln.ner(s), anlior protect name. 2. LOCATION OF PROPOSED PROJECT 3. DESCR~'I`ION A,ti`D PLA~fi~ED USE OF PROPOSED PROJECT a. '~ List all development a.aivities you propose (e.g. _ building a home, motel, marina, bulkhead, pier, and excavation and/or filling activiti;~s. ~ i3o~ - ~/~ ; r r ~^s~ll A /N b. Is the proposed a.:tivity maintenance of an existing project, new work, er bo~n~ /'JCh/ c. Will the project be for public, private or commercial use? Pr--_~~?-F d. Give a brief description of purpose, use, methods of constructio^ and daily operations of proposed proje~-t. if more spare is ^eaded, please attach additional pages. --~ . i/ a. County cJA~~~'f l Form DCM-MP-1 4. LAND AND WATER CHARACTERISTICS a. Size'of entire tract ~ ~~S ``~~~ b. Size of individual lot(s) ~~• ASS G~ ~~' - Approximate elevation of tract above MI-IW or NWL "" /`~ r d. Soil types} and texture(s) of tract e. Vegetation on tract ~ C,cs~ DS~Af//"l ~~,c~S f. Man-made features now on tract ~~~_ -~~~, r ~.~ "' ~,niic~Gf'C:l -s.,.c';' '~.crlii,Cc ~/f~ g. What is the CAMA Land Use Plan land classification of the site? (~~~ ~ ~~ 1~d ~~ P~^~1 Conservation Transitional _~C- Developed Community Rural Other h. How is the tract zoned by local government? i. Is the proposed project consistent with the applicable zoning? X Yes No (~t,ach ,oning eonq~lionce cerrific~tc, ijapplicnbleJ j, Has a professional archaeological assessment been done for the tract? Yes X No If yes, by whom? '~ k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes ~_ No ], Are there wetlands 4n the site? X Yes No Coastal (marsh) C Other ,~ if yes, has a delineation been nducted? ~` - (,ittach docu,.~nrntion, if available) S/~l -/t''r.1-,~~E~. 1 m. Describe existing wastewater treatment facil/ities. ~Gf ~ j ~ ~ ~ w/•' S if ~toisHfr i [ S~-l•~~ n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) o. Describe existing drinking water supply source. Cr~~ '~ 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: • A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. • An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2' by 11" white paper. (Refer to Coastal Resources Commission Rule 7!.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the Form DCh1-hiP-1 ~1~0i'~lp~~~ pity ~~i t~ numbers, landmarks, and the It e. ~, ,,, u6;:~~ ~E~~~FICATIOti' AND PER~IISSION .~_ ;,~. l~ a`L.,~.~, N-.., ; = E ~ ;~ ~~ site. Include highway or secondary road (SR) ~k ~~ -~hea~ ~•~ TO ENTER ON LAND A Stormwater Certification, if one is necessary. • A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Iv{anagement. Upon signing this form, the applicant further certifies that such notice has been provided. rr ~j ~ 'N ~~ • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. v t~, ~i ~L ~ 1 , I understand that any permit issued in resporue to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained ~~ the permit. I certify that to the best of my )cnowledge, the proposed activityzomplies with the State of North Carolina's approved Coastal b{anagement Program and will be conducted in a manner consistent with such program. Name ~-,k'f~~~r-~!'cr2F I certify that I am authorized to grant, and do i.n fact, Address /Zi ~~•"'~'~/%c~~Fi,~fi~~ ~.4i~c ',~n7~~ic'/» «' grant perrrussion to representatives of state and federal ,~,~,~,~~ ~r . „`~~ ~~~~-~3;~,,,j-. L~~, k,,;~;~, N~ i;; ',review agencies to enter on the aforementioned lands in ~.~; ~:: N~• Z7t.r~<., connection with evaluating information related to this I,l~e ~/,cL/n~~ f'~< < permit application and follow-up monitoring of the Address ill ~~•:~ i,~~'f.~ftif~ ~Q. ~lnic. ,L G(^s N- 6'~ project. t `i~QIFr4ft'~' C.i '~Nc ~~SS"~ S:/'Fe' •7~,,r~,j-! I further certify that the information provided in this Name application is truthful to the best of my knowledge. Address Phone This is the ~~rl day of YF~F.,~^~i~~A-1cY~C~, • A check made payable to the Department of Environment, Health, and Natural Resources (DEHtv"R) to cover the costs of processing the application. • A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public land's, attach a statement documenting compliance with the North Carolina Environmental Policy Act. .~-~ Print Name ~c1~'/-2i ~~' Signature _~~--1'/---~~ (~tuw,ur or ~/u:nari;ed ./gtru Please indicate attachments pertaining to your proposed proje~~t. _ DCh{ Mp-2 Ezcavatio^ and Fill Information DCh{ MP-3 Upland Development _ DCtri MP-4 Structures Information _ DCI`i b~-5 Bridges and Culverts DCI`i IviP-6 Marina Development 14'OTE: Please sign and date etch attachment in the space provided a< the borrom of each form. ~~ornz t<~C(~/~-It7P-~ (Cottsft'uctiott wit>~itt Public `ll't°€~t. f'aAt•e~c) i~)orehead City ~Cv~ i~~~; ~~l~~d City DCfyo~ Attach this form to Joint Application for CAMA Prlajor e. Mooring buoys N~' Permit, corm DGM-MP-I. F1e sure to complete all (1) ._...__ Commercial _~Comrrtunity .____ Private other sections of the Joint Application which relate to (2) Number this proposed project. (3) Description of buoy (Color, inscription, size, anchor, etc.) a. Dock(s) and/or Pier(s) (1) ~ Commercial Community ~ Private (2) Number / (3) Length. ~,~~'F/'~~' C-X~s~„Nv ~PiF~' (4) Width of water body (4) Width S~~ ~ (5) Distance buoy(s) to be placed beyond (5) Finger Piers Yes ...~ No shoreline (i) Number (ii) Length f. Mooring structure (boatli mooring pilings, etc.) (iii) Width (1) ,Commerce Community ~ Private (6) Platform(s) ~C _ Yes No (2) Number Z (i) Number ~ (3) Length /Z ' ~~t~ ~~ (ii) Length Zc~' (4) Width ~ Z -~ 6 ' (iii) Width ,~[7 (7) Number of slips proposed Z g. Other (Gve corry+ltle description) (8) Proximity of structure to adjacent riparian ~/l' property 1 roes ~ / ~ ~ FA~~~ r~y~ (9) Width of water body o~~T~(_ T~evo ~. (10) Water depth at waterward end_of pier at MLW or NWL ''~' ~~ ~/!~ /_r.~/'S~~~~~~ b. Boathouse (including covered lifts) /t-// ~~ %~~ ~~~~'~ (1) Commercial Private / (2) Length ~~f%~'~> ~,(~iv~r,4"i~/ (3) Width ApplScant or Project Name c. Groin (e.g. wood, sheetpile, etc.)N/~- S nai„re (1) Number ~ ~ _ ~ (2) Length(s) i~ L ~ ~~ Date d. Breakwater (e.g. wood, sheetpile, etc.) /PJ~ (1) Length (2) Average distance from MHW, NWL or . wetlands (3) IVtaximum distance beyond MHW, NWL or wetlands Revised 03/95 Gerald B. Hamfan Jr Jennifer D. Hanifan 125 Campmorehead Dr Morehead City, N.C. 28557 December 29 2006 Mr. Ted Tingel /Mr. Charles S. Jones NC Department Of Environment and Natural Resources Division of Coastal Management 400 Commerce Drive Morehead City, N.C., 28557 Dears Sirs, ® ~ ,z ~~~ ~ . .~ ~~~' ~~ ~~~;, -2 I~~ `~~~ j~ , ~~ !~ ~: ~~ - -. - '~ 6 ; e ~J We herby authorize Turner Marine Construction to represent us and apply for CAMA permits to develop our property located at 125 Campmorehead Dr., Morehead City, North Carolina. This authorization extends to all permits and authorizations required by local, state, and federal agencies that may be required as part of the permitting process. If you have any questions or concerns please contact us at 252-726-9994.Thank you for your time and consideration. Si ld B.~{-Ianifan Jr. c2~- nifer D. ~ nifan Ir ~ ° ~ co ° \ ~ Lr_ N N O N N .- ~ ~ W W Lit W W ~ ~ ~ ~ Jenes '~,'.x'b~ trt ' ~~ ~'i513Le For~R 6 ~ '~ ~ ~ ~~ rieMal~ ~' '' uo~ ' ~ ~ ~'4 rapahoe ..~+°' ~ ~, ~ ~~ r ^~ '~ h f i ~ ~ ~ r ~ ~~ ~ .~av .,~, ~ ~ nresott K ~ a ~,. {~~, F ~ ,~~ ~ F ~ 181 ; • ~~ x r ~Ax~~ ~:: `~ 'a ~.:.,r. .,. ism&atatink~~ Merrimon '~L yy,',~{u~{ yr{I ~ ~ 1~~ ty 91j~ F~ ~n ~ j~ 1 ~+ ~ ~ `~ py ~~~ f ~~ ~~ y ~; ~ ~~~~ ~' .. { ~ ~ ~ ~~ e , awe .~ ~~ -r- s ,~ ~ 4 "~,}~',,~ ~ Creek e ~ ~~.rhl ~ ~ e "~, ~,~`Y~.. River 'Ts ~ '., ~~ Ho ~ 5 r s'.,~~~~i~~ p ~1e ~ ~ ttn, 9etu n , ~;~ ~ ~ > ~~ ~ ~~ ~.. ~ . 'a~a,~" iY11 TI~1` 4. ~_, ~" _ S { , w ~~' t:1Y ~ •Stat1011 r ~ v'~ `~.~~ 17i pdway Park \. /'~~^~l Carteret' i Broad Creek -` B aufort '~+ a ;~ Oniio~ Hubert 24 ~ M hea City Gloucester Swensboro o ~ ~ gue Atle Beach~_~ Harkers Island cape Carteret ~alter.Peth ~-1~-+ ona ~ ~ ed~PoaA Emer` ald Isle ~ ` ~z„ ~ tLook a 58 ~ .. ~ ~ ~, 17 - ~ ~_ ~ campt~,t,e ReS~~~, ~ « PROJECT LOCATION ape Lookout ek 1 ,r ; ~ DIRECTIONS: FROM MOREHEAD CITY TAKE NWY 24 WEST '~, APPROXIMATLY 2 MOLES. TEJRN LEFT ONTO C MP MOREHEAD DRIVE. FOLLOW R0,4D A AROUND TO 125 CAMP MOREHEAD DRIVE. :W~ GrJ2 >rK Re1 oir~o0t.; SITE LOCATION 4'7' 0~5 1 7 Z O F-- 0 Q ~. ~ ~ J Q ~ O Q m U ~ O Z ~ ~ ^ V I W Z w ~` ~ I- x U W Y U O o ~. }-fnrnU 0] t~ Cn Z W N Z~N~ ~ Q Q ~ W O Q tN Z N W ~ > ,~ .stn ~o~ ~~~~~ ~ ° ° tL' Q= N _ Zw I rEB 2 6 2007 ~ ° _ ° U N ~ I Morehead City DCM ~ Q z N ~ U W ~ ~ N ~ ~f NOTES: 1. WATER DEPTHS TAKEN AT LOW TIDE ON 2/16/07. 2. SURVEY INFORMATION TAKEN FROM PLAT BY JAMES I. PHILLIPS DATED 9/17/98. O O EEGE~ID RIPARIAN LWE~ - - ~ - - ..-.- NORMAL HIGH WATER LINE - - - 284' 204'' .~..~.~.~~~..~.~.~.~ EDGE OF MARSH TO END DOCK ' ' 'MARSK " ' ' ' STEPS ••-- o.o' EXISTING FIXED DOCK EXISTING SITTING AREA 153.75 SQUARE FEET Xo.o' WATER DEPTHS NORMAL HIGH WATER _ MARSH ,i, NORTH SCALE: 1 "=30' • • • • MARSH - 0 0 r ~ o ~ \ ~, N N O N N N WILLIAM HALL ~ o '~ w 127 P MOREHEAD DRIVE ~ Q MO ~C 28557 ~ ° a Z M~~ 5 0 PROP~E~~'0)LI ~ ~ a Mo~~h~a ~ Q s os°4o'1~5~'~a~ _ r_ ~ Z ---------~= _~ g 217.04. ~ ~. Q W . o~ m EXISTING z ? LARGE ROCKS z x W w W GERALD HANIFAN, JR. Y 125 CAMP MOREHEAD DRIVE o MOREHEAD CITY, NC 28557 ° 0.855 ACRE EXISTING TIMBER BULKHEAD _ _ S _04°37' 12" E _ _ 147.45' GREGORY MOORE 121 CAMP MOREHEAD DRIVE MOREHEAD CITY, NC 28557 M m ~ z m W N c.~ ~ I ~.= z ~ ~ W ~ M d w o Q ~ Z N w~ > ,n ~~ °~ ~° o 0 Q W Z N ~" w I z~~o = O U N ~ i ~Q.QN ~ Q W N W U W O ~ ~O N ~ r- NOTES: 1. WATER DEPTHS TAKEN AT LOW TIDE ON 2/16/07. 2. SEE SHEET 5 & 6 OF 6 FOR PROFILE ELEVATION. 3. TOTAL LINEAR FEET OF SHORELINE TOTALS 123.75'. ~. ~ 4. NO SUB-AQUATIC VEGETATION FOUND AROUND AREA WHERE TEE AND BOAT. LIFTS WILL BE LOCATED. 5. FULL DISTANCE OF DOCK WILL NOT EXTEND ANY FURTHER THAN COMMUNITY .DOCKS LOCATED AT BAY VIEW ON GLENN ABBY, OR CAMP MOREHEAD. ~ 0 1.75' .1' 1.75' .1 O O LEGEND RIPARIAN LINE PROPOSED BOAT LIFT 510, SEE SHEET 4 OF 6 FROM MARSH EDGE TO END OF TEE 400' o.o' ~ '~ Xo.o' X0.0' 0.0' 'OSED TEE SQUARE FEET PROPOSED BOAT LIFT.. 1.1' WATER DEPTHS x -- -- - NORMAL HIGH WATER MARSH ~1 SLIP NUMBER END EXISTING DOCK BEGINNING OF PROPOSED ~I, i NORTH SCALE: 1 "=50' NORMAL HIGH WATER LINE • ' ' ' ' ' ' • • ••MARSH •• • • • EXISTING SITTING AREA 153.75 SQUARE FEET •.•.• •MARSH• Q'~'051T. HALL ~D DRIVE ~~~~~ S O6'4~Qa" E _ . ~~~ ~~ 7.04' ~ EXISTI~G'~ LARGE ROCKS ~ O ~ cp \ O ~ L~ ~ _ N O N N I'') w w w w Q ~ n ~ GERALD HANIFAN, JR. . 125 CAMP MOREHEAD DRIVE ~ MOREHEAD CITY, NC 28557 0.855 ACRE EXISTING TIMBER BULKHEAD ~__ S 04'37_'__12" E___ 147.45' GREGORY MOORE 121 CAMP MOREHEAD DRIVE MOREHEAD CITY, NC 28557 ~z 0 ~_- 0 . ~ ~a ~ z J ~ Q w o~ m cn ~ .o w z ~ o ~ ~ a. z ~ w ~ ~ w x w Y U O - M m m N Z c~ ~ i r" ~ ~ ~ ~ w o Q ~ z N w > ~ ~ ~ ~ ~. p a0 ~ p N O ~ Q z N z ~ of _ ~ ~ (~ N ~ W Q I N ~ Q w N I' W U W U ~ I ~ O N ~ r ~ o cQ _„ ~ ~ N w O ~ N N ~}' • ~ ,~ , W W ~- W _ cn 5 _D w Q 2x8 DECKING ~ z o . o z . . ~ Morel ® o 0 ~ Q . W ~ / „ 5 8 GALV. 2x8 STRINGERS 2x8 GIRDERS _ ~, ~ J ~ THRU BOLTS Q NHW~ o z mg ~ ~- q Z~ PILING o -' ~ o w z z 0 O ~ Q ~ w w NLW Y w ~ w ~, ~ o ~ 0 ~ MUD INE ~ . 0. -- ~ }-mmU 47m~Z ~ 1 W C C7 ~i 1I- / \ ~EL'Ma . Q ~ ~ ~ ~ Z N W ~ Q ~ Z ~ N W ~ ~ ~ ~ ~ ~ ~ ~ '~ N O ~ O U Z ~ ~ Z N ~ ` w S ECTI 0 f~ A-A i - Z ~ ~ p =~ ~ N _ .._..TH SCALE: 1/2"=1'-0" Q ~ w N r SCALE: 1 "=6' w~W ~ ~ ~ N ~ r-