HomeMy WebLinkAbout20200927 Ver 1_Percussive activity_20200716Blasting will be most likely required to complete the proposed work during Fall 2020 - Fall 2022.
Geotechnical investigations have been performed along the project corridor, but the specific
locations where blasting might be necessary are not yet known. Pre -drilling will be performed
once construction begins and the blasting plan will be developed as necessary. The blasting
plan will be provided upon request once completed.
There are no red HUCs within 0.25 mile from the study area.