PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 52- - 13 County: %JOAMCS
Facility Name:-PV41,J/E *1"-'
Certified Operator Name: 5T kYZ-q /4+L4J Operator # 994(s-f/3
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/identifier (ID): #
Spillway (Yes or No): A10
Level (inches): 17
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
✓ Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval from the Division of Water Resources prior to transfer of
waste to a site not covered in the facility's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste:
-7- 13 -20
I hereby certify that I have reviewed the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the information is accurate and correct.
D115,001E AAIU-i
Facility Owner/Manager (print)
Facility OwnerfManager (signature)
PoA Cover Page 2121/00
Lj
Phone: 9�A'6 p�'7
Date: 7,/-3 - Lo
Jul 15 2020 12:12PM Selby Land Concepts 2529646775
page 3
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/identifier (ID): 52-13 Donnie Mills
2. Current liquid volume in 25 yr.124 hr. storm storage & structural freeboard
a. current liquid level according to marker 17.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 21.5 inches
c. line b - line a (inches in red zone) = 4.5 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 89376 ftZ
e. line c/12 x line d x 7.48 gallonslft3 250700 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 116329 ft3
h. current herd # F-3-5-2--01 certified herd #1 3000
actual waste produced = current herd # x line g = 136493 ft3
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 6/22/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
PoA (30 Day) 2121100
C�ft3
54250 ft3
237793 gallons
0.86 Ibs/1000 gal.
420.1 Ibs. PAN
Jul 15 2020 12:12PM Selby Land Concepts 2529646775 page 4
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD ANDJOR 25 YR_/24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES
FOR FACILITY
1.
Structure ID: 52-13 Donnie Mills
fine m = 420.1 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line m =
lb PAN
6.
Structure ID:
line m =
lb PAN
n.lines 1+2+3+4+5+6= 420.1lbPAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
aGRinn nn M()T I LST Figs nC TO WI-HIrN PAN rANNnT RE APPLIED DURING THIS 30 DAY PERIOD.
o tract #
p. field #
q. crop
r acres
s remaining IRR
2 PAN balance
(lb/acre)
It. TOTAL PAN
BALANCE FOR
FIELD jibs.)
u application window'
76
Pull #1
Bermuda
3.64
210.00
764.4
311-9/30
76
Pull #2
Bermuda
5.74
250.00
1435.0
311-9130
76
Pull #3
Bermuda
5.74
185.00
1061.9
31l-9130
'State current crop ending application date or next crop application oeglnning aare Tor avairaoie
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 3261.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
PoA (30 Day) 2121100