HomeMy WebLinkAboutNCC203003_ESC Approval Submitted_20200717 P,PE,�
1873 WATER RESOURCES
tiC
November 21, 2018
David Stallings
Shenandoah Homes
3724 National Drive, Suite 220
Raleigh, NC 27612
Re: Letter of Plan Approval
Project Name: The Point @ Lake Castleberry
Project Location: 4213 Green Level West Road
Project Number: 17-021
Submitted By:. Curry Engineering
Date Submitted: December 1, 2017
The Soil Erosion and Sedimentation Control Plan (S&E) you submitted has been reviewed and
accepted. The Town of Apex (Town) hereby issues this Letter of Plan Approval. The Town's S&E
program is performance oriented, requiring protection of the natural resources and adjoining
properties. If at any time during this project it is determined by Town staff that the approved
S&E Plan is inadequate to meet the Town's S&E ordinance, this office may require revisions to
the S&E Plan and its implementation to ensure compliance with the S&E ordinance (Section 5-
154).
In accordance with Section 5-158 of the Town's S&E ordinance, you are hereby notified that
this office has the right to periodically inspect any land-disturbing activities to ensure
compliance with the approved S&E Plan and ordinance. You are to notify this office twenty-
four (24) hours before starting work. You are also required to keep the working drawings on
site.
Stormwater runoff generated from sites disturbing more than one (1) acre is permitted
pursuant to the National Pollution Discharge Elimination System (NPDES) administered in North
Carolina by the Division of Water Quality(DWQ). Attached is the General Stormwater NPDES
Permit, NCG010000, reissued on August 1, 2016. You are responsible for complying with the
General Permit requirements and are subject to enforcement actions by DWQ for any violations
of the General Permit.
TOWN OF APEX
The Peak of Good Living
PO Box 25o Apex, NC 27502 1 (919) 362-8166 1 www.apexnc.org
Letter of Plan Approval
Page 2 of 2
The Contractor will be permitted to clear only as necessary to install the required S&E
measures. Once the required S&E measures are installed, contact Public Works staff to
schedule an on-site inspection. A Certificate of Compliance will be issued after a site
inspection is completed to ensure that the S&E measures are installed per the approved S&E
Plan. Please note that a Certificate of Compliance is required prior to receiving a grading
permit from the Building Inspections Division.
The approval of an S&E Plan is conditioned on the applicant's compliance with Federal and
State water quality laws, regulations, and rules. In addition, the Town's NPDES Phase II permit
requires site contractors to control construction site wastes that may cause adverse water
quality impacts. Please have your site contractor review the attached Town Construction Site
Waste Management Plan to become familiar with the requirements. Town staff will inspect
your site to ensure these waste management practices are being implemented. You will need
to provide evidence of compliance if applicable.
I look forward to working with you on this project and if you have any questions, please call
(919) 249-1166.
Regards,
Stan Fortier, PE
Stormwater & Utility Engineering
TOWN OF APEX
The Peak of Good Living
PO Box 25o Apex, NC 27502 1 (919) 362-8166 1 www.apexnc.org