HomeMy WebLinkAbout670044_Compliance Evaluation Inspection_20200713Division of Water Resources
Facility Number ( - O Division of Soil and Water Conservation
O Other Agency
Type of Visit: (2) Compliance Inspection O Operation Review O Structure Evaluation O Technical Assistance
Reason for Visit: ® Routine O Complaint O Follow-up O Referral O Emergency O Other O Denied Access
Date of Visit: Arrival Time:J Departure Time: County:
Farm Name:AJC&_"\(A�w, Owner Email:
Owner Name:
Mailing Address:
Physical Address:
Facility Contact:
Title:
Phone:
Onsite Representative: V11 A'e-6t Integrator:
Certified Operator:
Back-up Operator:
Location of Farm:
Swine
Wean to Finish
Wean to Feeder
Feeder to Finish
Farrow to Wean
Farrow to Feeder
Farrow to Finish
Gilts
Boars
Other
Other
Latitude:
Region:
Phone: " 110 3 31 9'2- 1 q
Certification Number:
Certification Number:
Design, Current . Design Current
Capacity Pop. Wet Poultry Capacity. Pop.
Layer
Non -Layer
Design Current
Dry Poultry Canacitv Pon.
Layers
Non -Layers
Pullets
Turkeys
Turkey Poults
Other
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)?
Longitude:
.Design Current
Cattle. Capacity Pop.
Dairy Cow
Dairy Calf
Dairy Heifer
Dry Cow
Non -Dairy
Beef Stocker
Beef Feeder
Beef Brood Cow
❑ Yes C2 No ❑ NA ❑ NE
❑ Yes ❑ No E21<A ❑ NE
❑ Yes ❑ No lA ❑ NE
d. Does the discharge bypass the waste management system? (If yes, notify DWR) ❑Yes ❑ 0LrNA ❑ NE
2. Is there evidence of a past discharge from any part of the operation? ❑ Yes gNo
1V ❑ NA ❑ NE
3. Were there any observable adverse impacts or potential adverse impacts to the waters ❑ Yes ❑ NA ❑ NE
of the State other than from a discharge?
Page 1 of 3 21412015 Continued
Facility Number: -Q q Date of Inspection: t
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes Q No NA ❑ NE
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier: 1
Spillway?:
Designed Freeboard (in):
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed? [—]Yes No ❑ NA ❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE
waste management or closure plan?
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑Yes VNN ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need [:]Yes EJ'No ❑ NA ❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ZNo❑ NA ❑ NE
❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area
12. Crop Type(s):
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes
Ea'�No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
-
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable
❑ Yes
YNO
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available?
❑ Yes
No
❑ NA
❑ NE
20. Does the facilityfail to have all components of the CAWMP readily available? If yes, check
❑ Yes
O No
❑ NA
❑ NE
the appropriate box.
❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements
❑ Other:
21. Does record keeping need improvement? If yes, check the appropriate box below.
❑ Yes
No
❑ NA
❑ NE
❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis
❑ Waste Transfers
❑ Weather Code
❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey
22. Did the facility fail to install and maintain a rain gauge?
❑ Yes
❑ NA
❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment?
❑ Yes
No
❑ NA
Q NE
Page 2 of 3
21412015 Continued
11 Facility Number: jDate of Inspection: %
24. Did the facility fail to calibrate waste application equipment as required by the permit? . ❑ Yes o ❑ NA ❑ NE
�No 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes Q No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ❑ No �NA ❑ NE
Other Issues -,�
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes L �-d No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
29. At the time of the inspgcction did the facility pose an odor or air quality concern? ❑ Yes EJ'No ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
34. Does the facility require a follow-up visit by the same agency?
❑ Yes �To ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA f NE
❑ Yes
❑ Yes
❑ Yes
No ❑ NA ❑ NE
�P�o ❑ NA ❑ NE
NO ❑ NA ❑ NE
Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. I
Use drawings of facility to better explain situations (use additional pages as necessary).
Reviewer/Inspector Name:
Reviewer/Inspector Signature:
Page 3 of 3
Phone: a to
Date: I '1
2421 S