From:Steenhuis, Joanne
Sent:Thursday, July 16, 2020 4:00 PM
To:Herndon, T. Mason; Shaver, Brad ; Lane, Stephen
Subject:RE: U-4751 Site 40 Revision
Mason,
The DWR has reviewed your plan to revise the issue at the proposed hammerhead turn around. The DWR has no issue
to the changes you have proposed. The drawing will be added to the file. Thank you.
From: Herndon, T. Mason <tmherndon@ncdot.gov>
Sent: Thursday, July 16, 2020 2:31 PM
To: Shaver, Brad <Brad.E.Shaver@usace.army.mil>; Steenhuis, Joanne <joanne.steenhuis@ncdenr.gov>; Lane, Stephen
<stephen.lane@ncdenr.gov>
Subject: U-4751 Site 40 Revision
Jimmy asked me to meet him out on U-4751 this morning to look an issue they have where SR4 ties into Plantation Rd
which is Site 40 on the revised permit drawing that is attached (Permit Drawing 42 of 83). The problem is where they
constructed the hammerhead turn around where Plantation Rd will terminate West of SR4. The radius for the
hammerhead is so tight to the JS we have a 1.5:1 slope right of to the edge of pavement, therefore we need to add rip
rap bank stabilization in this radius to hold the slope. The rip rap will extend from the preexisting driveway pipe back to
where the radius terminates which is approximately 18 ft. Site 40 was permitted for 20 ft of permanent impacts for a
pipe that conveys stormwater from the lateral ditch along SR4 under Plantation Rd into the JS. The plans called for a rip
rap pad which is not warranted and has been eliminated. The only impacts at this site is where the 24” pipe stubs out
into the JS. With the 2ft of pipe at the original Site 40 and the proposed additional 18 ft of banks stabilization the total
impacts for this site will not change and remain 20 ft as was authorized. The screen shot below is a blowup of the area
and work described above.
SR4 and the hammerhead turn around have been paved and we need to get this radius stabilized with rip rap before we
have a heavy rain event that could washout this area. Since there is no increase in impacts. Please let me know if we
are good to proceed with this work as a field adjustment that can be documented with this e-mail and attached permit
drawing.
Thanks!
1
Mason Herndon
Environmental Program Supervisor
Division 3
NCDOT- Division of Highways
910-341-2036 office
910-604-0050 mobile
tmherndon@ncdot.gov
5501 Barbados Blvd
Castle Hayne, NC 28429
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
2
, '
k /
/ //: AS - // k.
A< /V / cif / .• 2
+\ A , / JS : // WARD C.DRAPAL,
`a ~+V� - _ N/ / /�pr _�V • Proposed i81fof /�
�� �� // �► ' banksta1ilizatio
I..--ate , k_ LL
JS ~e- 'JS ♦ EST.
GE9 �..
__JS~14 i At •
4/ /A .; Rip pad eliminated.
Impacts 2ft for pipe.i .
t_., `,, / / ,/,' .. /