HomeMy WebLinkAboutNCC202921_ESC Approval Submitted_20200716 I r � ROY COOPER Governor MI CHAEL S.REGAN ;:;:r Secretary BRIAN WRENN NORTH CAROLINA Director Enviropmental Quality, . July 7, 2020 LETTER OF APPROVAL WITH MODIFICATIONS AND PERFORMANCE RESERVATIONS l EBH Homes, LLC ATTN: Mr. Clifton Hamlin P.O. Box 323 Candler, NC 28754 RE: Project Name: HIGGINS BRANCH RD SUBDIVISION Acres Approved: 3.0 Project ID: MADIS-2020-005 County: Madison City: Beech Glen Address: 426 Higgins Branch Rd. River Basin: French Broad Stream Classification: Higgins Branch -WS-II; HQW Submitted By: Brooks Engineering Associates - Mr. Mark Brooks, P.E. Date Received by LQS: June 8, 2020 Plan Type: Residential Dear Mr. Hamlin, This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications and Performance Reservations. A list of the modifications and performance reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received,you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at ®� .., North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Asheville Regional Office 1 2090 U.S.Highway 70 1 Swannanoa,North Carolina 28778 uoan-iuwouw � !� Qnpubnonlof Entlmnowntal Qualify 828.296A500 Letter of Approval with Modifications and Performance Reservations EBH Homes, LLC ATTN: Mr. Clifton Hamlin July 7, 2020 Page 2 of S deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at Annette.Iucas@ncdenngov or Paul Clark at Paul.clark@ncdenr.goy. If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 4B.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land- disturbance, as called for on the application plan, not A'to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee.You are requested to file an amended form if there is any change in the information included on the form. In addition,it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. S' cerel red Walker, P.E. Express Engineer Land Quality Section Letter of Approval with Modifications and Performance Reservations EBH Homes, LLC ATTN: Mr. Clifton Hamlin July 7, 2020 Page 3 of 5 Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet Modifications and Performance Reservations ec: Mr. Mark Brooks, P.E. (mbrooksftbrooksea.com) cc: Regional Office file Letter of Approval with Modifications and Performance Reservations EBH Homes, LLC ATTN: Mr. Clifton Hamlin July 7, 2020 Page 4 of 5 For final plan approval please provide to this office the requested documents listed below. MODIFICATIONS REQUIRED FOR APPROVAL Project Name: HIGGINS BRANCH RD SUBDIVISION Project ID: MADIS-2020-005 County: Madison 1. Revise construction sequence so that work along the stream corridor is stabilized at the end of each work day since the receiving stream is designated WS-II, High Quality Waters. All work along the corridor should be stabilized before extending the road uphill. €15A NCAC 04B .0106 (a)(2)} 2. Align energy dissipaters so that they discharge parallel to the stream where feasible, and provide buffer between outlet and top of stream bank. {G.S. 113A-57.(3)1 3. Design erosion control measures and conveyances for 25-year storm event since sight drains to HQW. 115A NCAC 04B .0108} 4. Note in plan that equipment, fuel, and paving materials should be stored at minimum 50 ft. from storm drains and the top of bank except during working conditions. Equipment should be kept in clean good working condition while working within stream buffer. {G.S. 113A-57.(4)1 S. Note in plan to mark the stream buffer in the field. (15A NCAC 04B .0106 (a)(1)1 6. Provide adequate erosion protection at inlets of skimmer basins where the diversion ditches discharge. {G.S. 113A-57.(3)1 7. Provide pre-construction runoff values for the proposed site. Post-construction shall not exceed pre-construction runoff by more than ten percent without additional design considerations. 115A NCAC 04B .0109 (a)} 8. Verify with local and county planning authority that no additional post-construction stormwater requirements are needed. i Letter of Approval with Modifications and Performance Reservations EBH Homes, LLC ATTN: Mr. Clifton Hamlin July 7, 2020 Page 5of5 PERFORMANCE RESERVATIONS Additional measures may be required -The developer is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site. Each sediment storage device must be inspected after each storm event. Special consideration should be given to working during dry weather conditions and same day stabilization along the stream buffer corridor. Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 1SA NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities cD r* � �• iZ � o ® MW• �' c� i-� 0 c ►� wY rD CD �'• `! CDCD CD C • �' i�-� c�. Fs+ rD rD o41 CD EA If , 110 0 0 � 0 o owl 446 N • y ' oi-w