LETTER OF APPROVAL WITH MODIFICATIONS
AND PERFORMANCE RESERVATIONS
l
EBH Homes, LLC
ATTN: Mr. Clifton Hamlin
P.O. Box 323
Candler, NC 28754
RE: Project Name: HIGGINS BRANCH RD SUBDIVISION
Acres Approved: 3.0
Project ID: MADIS-2020-005
County: Madison
City: Beech Glen
Address: 426 Higgins Branch Rd.
River Basin: French Broad
Stream Classification: Higgins Branch -WS-II; HQW
Submitted By: Brooks Engineering Associates - Mr. Mark Brooks, P.E.
Date Received by LQS: June 8, 2020
Plan Type: Residential
Dear Mr. Hamlin,
This office has reviewed the subject erosion and sedimentation control plan and hereby
issues this Letter of Approval with Modifications and Performance Reservations. A list of the
modifications and performance reservations is attached. This plan approval shall expire
three (3) years following the date of approval, if no land-disturbing activity has been
undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform
adequately, a revised plan will be required (G.S. 113A-54.1)(b).
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is received,you will receive the COC via email. You MUST obtain the COC prior
to commencement of any land disturbing activity. The eNOI form may be accessed at
®� .., North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources
Asheville Regional Office 1 2090 U.S.Highway 70 1 Swannanoa,North Carolina 28778
uoan-iuwouw � !�
Qnpubnonlof Entlmnowntal Qualify 828.296A500
Letter of Approval with Modifications and Performance Reservations
EBH Homes, LLC
ATTN: Mr. Clifton Hamlin
July 7, 2020
Page 2 of S
deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at
Annette.Iucas@ncdenngov or Paul Clark at Paul.clark@ncdenr.goy. If the owner/operator
of this project changes in the future, the new responsible party is required to apply for
his/her own COC.
Title 15A NCAC 4B.0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance-oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land-disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land-
disturbance, as called for on the application plan, not A'to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee.You are requested to file an amended form if there is any
change in the information included on the form. In addition,it would be helpful if you notify
this office of the proposed starting date for this project. Please notify us if you plan to have
a preconstruction conference.
Your cooperation is appreciated.
S' cerel
red Walker, P.E.
Express Engineer
Land Quality Section
Letter of Approval with Modifications and Performance Reservations
EBH Homes, LLC
ATTN: Mr. Clifton Hamlin
July 7, 2020
Page 3 of 5
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
Modifications and Performance Reservations
ec: Mr. Mark Brooks, P.E. (mbrooksftbrooksea.com)
cc: Regional Office file
Letter of Approval with Modifications and Performance Reservations
EBH Homes, LLC
ATTN: Mr. Clifton Hamlin
July 7, 2020
Page 4 of 5
For final plan approval please provide to this office the requested documents listed below.
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: HIGGINS BRANCH RD SUBDIVISION
Project ID: MADIS-2020-005
County: Madison
1. Revise construction sequence so that work along the stream corridor is stabilized at
the end of each work day since the receiving stream is designated WS-II, High
Quality Waters. All work along the corridor should be stabilized before extending
the road uphill. €15A NCAC 04B .0106 (a)(2)}
2. Align energy dissipaters so that they discharge parallel to the stream where feasible,
and provide buffer between outlet and top of stream bank. {G.S. 113A-57.(3)1
3. Design erosion control measures and conveyances for 25-year storm event since
sight drains to HQW. 115A NCAC 04B .0108}
4. Note in plan that equipment, fuel, and paving materials should be stored at
minimum 50 ft. from storm drains and the top of bank except during working
conditions. Equipment should be kept in clean good working condition while
working within stream buffer. {G.S. 113A-57.(4)1
S. Note in plan to mark the stream buffer in the field. (15A NCAC 04B .0106 (a)(1)1
6. Provide adequate erosion protection at inlets of skimmer basins where the
diversion ditches discharge. {G.S. 113A-57.(3)1
7. Provide pre-construction runoff values for the proposed site. Post-construction
shall not exceed pre-construction runoff by more than ten percent without
additional design considerations. 115A NCAC 04B .0109 (a)}
8. Verify with local and county planning authority that no additional post-construction
stormwater requirements are needed.
i
Letter of Approval with Modifications and Performance Reservations
EBH Homes, LLC
ATTN: Mr. Clifton Hamlin
July 7, 2020
Page 5of5
PERFORMANCE RESERVATIONS
Additional measures may be required -The developer is responsible for the control of
sediment on-site. If the approved erosion and sedimentation control measures prove
insufficient, the developer must take those additional steps necessary to stop sediment
from leaving this site. Each sediment storage device must be inspected after each storm
event. Special consideration should be given to working during dry weather conditions
and same day stabilization along the stream buffer corridor.
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 1SA NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
cD r* � �• iZ � o
® MW• �' c� i-�
0 c
►� wY rD
CD
�'• `!
CDCD
CD
C
• �' i�-�
c�. Fs+ rD rD o41
CD
EA
If ,
110
0 0 � 0
o
owl
446
N • y '
oi-w