Loading...
HomeMy WebLinkAbout20200922 Ver 1_199212UG-S_20200527LEGEND PROPOSED TRANSMISSION POLE 115kV TRANSMISSION RODANTHE BRIDGE EXISTING TRANSMISSION POLE TO BE REMOVED EXISTING DISTRIBUTION POLE SOUTH END BORE ROUTE PLAN AND PROFILE FOR TO BE RETAINED CAPE HATTERAS ELECTRIC COOPERATIVE Fil COMMUNICATIONS PEDESTAL O WATER METER PROPOSED GUY AND ANCHOR COMBINATION PROPOSED OVERHEAD TRANSMISSION AND UNDERGROUND 2+00.00 DIRECTIONAL BORE STATIONING (PLAN VIEW) Uc Uc UNDERGROUND 115 kV ELECTRIC (CHEC) RODANTI 1NCE, — TO BE INSTALLED UNDERGROUND COMMUNICATIONS C UX — TO BE INSTALLED 01 E E OVERHEAD 115 kV ELECTRIC (CHEC) — TO BE INSTALLED E E ON —BRIDGE 115kV ELECTRIC (CHEC) LOCATION: U.S. HIGHWAY 12, NAGS HEAD TO - TO BE INSTALLED BY OTHERS E x OVERHEAD 115kV ELECTRIC (CHEC) RODANTHE, NORTH CAROLINA - TO BE RETAINED TIP PROJECT: B-2500B E S x OVERHEAD SECONDARY ELECTRIC — TO BE RETAINED END PROJECT Pamlico Sound SITE Atlantic Ocean RODANTHE VILLAGE LIMITS r BEGIN PROJECT VICINITY MAP N.T.S. R/W I EDGE OF NCDOT RIGHT—OF—WAY EDGE OF EXISTING CHEC TRANSMISSION RIGHT—OF—WAY CHEC UTILITY IMPACT AREA BOUNDARY EDGE OF EARTHEN DRIVE BUOYANT HDPE PIPE TO BE FLOATED PROPOSED RISER STRUCTURE PERIMETER FENCE PROPERTY LINE UNDERGROUND WATER LINE TEL TEL UNDERGROUND TELEPHONE LINE N UNDERGROUND TELEVISION LINE J� UNDERGROUND RESIDENTIAL ELECTRICAL V LINE WITH SERVICE PEDESTALS SHORELINE —� - EXISTING CONTOURS, 1 FT INTERVAL PROPOSED UNDERGROUND DIRECTIONAL BORE TIMBER MATTING Do0 C GRAVELED CONSTRUCTION AREA MARSH/WETLANDS r SEPTIC FIELD BRIDGE RIP RAP APRON PROPOSED CHEC TRANSMISSION RIGHT—OF—WAY KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. VARIES (48" MIN.) i" FBR • (4 TOTAL) 2>, FBR • • 0 4" COMM (2 TOTAL) DIRECTIONAL BORE DETAIL N.T.S. LEGEND PROPOSED ACTIVE CIRCUIT CONDUCTOR IN CONDUIT PROPOSED SPARE CIRCUIT CONDUCTOR IN CONDUIT 0 PROPOSED GROUNDING CONDUCTOR IN CONDUIT NOTE: 1. MAINTAIN NO LESS THAN 24" SEPARATION BETWEEN CONDUIT SURFACE AND FOREIGN UTILITIES. 2. HDPE CONDUIT AS SPECIFIED OR APPROVED BY ENGINEER. 30 30 25 25 20 20 15 15 10 10 5 5 0 0 -5 -5 -10 -10 0+00 1 +00 2+00 3+00 4+00 5+00 6+00 7+00 36" RCP EQUALIZER ® STA. 4+51.07, BOTTOM INVERT EL= 3.15' EXISTING SURFACE PROFILE WETLAND AREA NOTE: MAINTAIN 4'-0" MINIMUM CLEARANCE BETWEEN ALL UG UTILITIES AND BORE LINE BORE PIT BEGIN 10'Wx10'Lx5'D � DIRECTIONAL BORE STA. 2+69.57 W W W W W W PROFILE VIEW SCALE: 1=30' HORIZ., 1 "=6' VERT. NOTES: 1. FOREIGN UTILITIES MAY EXIST ALONG PROPOSED ROUTE. 2. BORE PIT DIMENSIONS ASSUMED 10'W x 10'L x 5'D. 3. DANGER! ENERGIZED POWER CABLES MAY EXIST ALONG PROPOSED ROUTE! o�i v��i �o�i Novi Novi �o �i Novi Novi �o�i �o �(o PROPOSED C� PERIMETER FENCE I� h EXISTING CHEC STRUCTURE TO TRANSMISSION STRUCTURE BE REMOVED PRIOR TO WORK i I I: 2+17.79 0+00.00 , 1 +00.00 2+00.00 E HE � HE / HE PROPOSED CHEC REPLACEMENT TRANSMISSION PROPOSED CHEC 3 STRUCTURE NEW RISER / STRUCTURE X R=100.00' L=15.19' CH=15.18' CHB=N88° 03' 35"W k A=008.70° � W 0 30 15 7.5 0 30 1 "= 30' O� O� Ou O O� O� O� Ol 0 0 0 0 0 0 0 PC: 2+20.16 CPROPOSED\ O O O O PT: 2+35.35 COMMUNICATIONS O O O Q STUB OUT \/ \/ \/ (2) 4" HDPE BORE PIT 10'Wx10'Lx5'D — - R=100.00' L=31.63' CH=31.50'_j CHB=N74° 38' 46"W A=018.12° R=100.00: L=13.14 CH=13.13' CHB=N69° 20' 55"W A=007.53° BORE BENEATH 36" RCP EQUALIZER, MINIMUM 4' BELOW GRADE. FIELD VERIFY DEPTH. PLAN VIEW SCALE: 1=30' o�ovo PC:� 4+65.36 ul 10' MINIMUM RADIAL PT: 4+79.57 SEPARATION BETWEEN O GUARDRAIL AND BORE ROUTE - _ --- --- ----- PC: 5+44.81 +00.60 _ PT: 5+63.17 Z / � _ 6+00.00 an M% �7_ n R=100.00' M �/ R=100.00' L=18.36' L=14.21' CH=18.33' MIN CH=14.19' CHB=N86° 40' 56"W CHB=N77° 21' 10"W A=010.52° A=008.14° CAM — _ — — 10— 9 8 7+00.00 ' 6 on -- / —5 - - _ 4 PT: 7+00.81 R=100.00' L=4.20' M/� CH=4.20' TCHB=S86° 56' 18"W A=002.41' PC: 6+96.61 CONFIRM EXISTING ELECTRICAL UG UTILITY REMOVED PRIOR TO WORK. KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. VARIES (48" MIN.) i" FBR • (4 TOTAL) 2>, FBR • • 0 4" COMM (2 TOTAL) DIRECTIONAL BORE DETAIL N.T.S. LEGEND PROPOSED ACTIVE CIRCUIT CONDUCTOR IN CONDUIT PROPOSED SPARE CIRCUIT CONDUCTOR IN CONDUIT O PROPOSED GROUNDING CONDUCTOR IN CONDUIT NOTE: 1. MAINTAIN NO LESS THAN 24" SEPARATION BETWEEN CONDUIT SURFACE AND FOREIGN UTILITIES. 2. HDPE CONDUIT AS SPECIFIED OR APPROVED BY ENGINEER. 30 30 25 25 20 20 15 15 L10 10 5 5 0 0 -5 -5 -10 -10 7+00 8+00 9+00 10+00 11 +00 12+00 13+00 14+00 15" RCP ®STA. 7+41.15, FIELD VERIFY RIP -RAP INVERT ELEVATION UNKNOWN, DEPTH, BORE MINIMUM 4' WETLAND AREA TOP OF CONCRETE VAULT TOP OF CONCRETE VAULT FIELD VERIFY BELOW GRADE EL.= 3.36' EL.= 3.23' EXISTING SURFACE PROFILE Y W W NOTE: MAINTAIN 4'-0" MINIMUM CLEARANCE BETWEEN ALL UG DIRECTIONAL BORE ENTRY UTILITIES AND BORE LINE THROUGH LOWER CONCRETE VAULT WINDOW ® STA. 10+75.59, EL.= —2.81' NOTES: 1. FOREIGN UTILITIES MAY EXIST ALONG PROPOSED ROUTE. 2. BORE PIT DIMENSIONS ASSUMED 10'W x 10'L x 5'D. 3. DANGER! ENERGIZED POWER CABLES MAY EXIST ALONG PROPOSED ROUTE! )zs zc_)zS io �o NCDOT TIP PROJECT _ B-2500B GRAVELED O CONSTRUCTION AREA i O7; � O� 4�� BRIDGE APPROACH SLAB lb 10— fffi�E? O, END BENT 1 L= 4.20' CH=4.20' ICHB=S86° 56' 18"W M/N M/21 A=002.41 ° PC: 6+96.61 BORE BENEATH 15 RCP, MINIMUM 4' BELOW GRADE. FIELD VERIFY DEPTH. I CONFIRM EXISTING ELECTRICAL UG UTILITY REMOVED PRIOR TO WORK. BENT 1 I PC: 8+62.36 2-/1 FIELD VERIFY RIP -RAP DEPTH, BORE MINIMUM 4' BELOW GRADE PROFILE VIEW SCALE: 1=30' HORIZ., 1 "=6' VERT. PAMLICO SOUND PROPOSED CONDUIT LADDER RACK +/- 21' LENGTH (BY OTHERS) MIN /a 11+13.94 /8 / 1/8 BUOYANT HDPE BORE PIPE TO PT: 10+82.45 BE FLOATED BETWEEN BRIDGE BENT 5 M PILES IN PAMLICO SOUND PRIOR TO PULLING THROUGH — — — EXISTING 54" DIAMETER BENT 6 BORE HOLE. +/- 725 FEET OF CYLINDER PILE PIPE TO BE FLOATED. BENT M/� 1 +00.00 ❑ ❑ ❑ ❑ E O BENT 8 Et7 E ❑O❑ � _ W �— ;� ) / L - J O 9+00.00 EXISTING CONCRETE VAULT JT�(1 R=300.00' (SEE DETAIL SHEETS PP4 ` E ��" L=99.00' & PP5 PROPOSED 6'W x SPAN LENGTH V TIMBER MATTING TO O ° LCH=98.55' ) UTILITY IMPACT AREA PREVENT SHORELINE �� M/N M/N CHB=S77° 08' 24"W—M/a PIPE SCOURING DURING HDPE MINIMUM 5' BETWEEN BORE mim— A=018.91 ° M/a AA�a ROUTE AND EDGE OF M/a NCDOT RIGHT-OF-WAY � � R=300.00'14/ -/ L=103. ,7' MA CH=103.15' CHB=S77° 35' 10"W \ A=019.80° PAMLICO 30 15 7.5 0 30 M/ .� ; SOUND APPROXIMATE SEPTIC , FIELD LOCATION 1 7 1 "= 30' PROPOSED 6'W x SPAN LENGTH UTILITY IMPACT AREA EXISTING 50'L x 30'W CHEC UTILITY IMPACT AREA M/8 M/N M/N BENT 2 BENT 3 BENT 4 ❑ ❑ PC: 9+83.45 / PT: 9+66.03 Z �� ❑ N ❑ °+ 1y PLAN VIEW SCALE: 1=30' KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. 2'0 Ground Rod Hole 66'z24' Standard ckout Panel 66'x24" Standard Knocko Panel 66'x24• Standard Knocko Panel V—D" 6' Strap o a o I East Jordan %V ELECTRIC Q V4600-5 Ton x 6j" Swift Lift Anchors (� / 4 Req'd For lifting O Q ........................................................................ erior Coated w/ CS90 VIR Meadows 1600-5 Ring & "Electric" Cover 36"0x 12' Grade Ring (Typ) Ivanized Steel Lader `Grounding Strap Yrts P)� 2"0 Ground Rod Hole --� �-- (2 Typ) DESIGN NQTES: D1. REINFORCEMENT: — H-20 BRIDGE LOADING (TRAFFIC RATED) — REINFORCING STEEL SHALL BE GRADE 60 PER ASTM—A615 D2. CONCRETE: — 4000 PSI ® 28 DAYS — MATERIAL TO MEET CURRENT ACI 318 STANDARD D3. EARTHCOVER: 0'-5' MAX D4. DIMENSIONAL TOLERANCE f1" D5. 1 1/8" BUTYL RUBBER SEALANT IN JOINTS CONTRACTOR NOTES: C1. VERIFY ALL HOLE LOCATIONS & ELEVATIONS C2. EXTERIOR IS COATED w/ WR MEADOWS SEALMASTIC WEIGHTS AS FOLLOWED: — TOP: 21,500 LBS. MAX — BASE: 22,200 LBS. MAX 12"x12' Frame & Grate Over 12' Square x 4" Deep Sump Plastic Coated Pulling Irons (4 Typ) 10' x 10' x 6.5' E M H MANHOLE DETAIL N.T.S. war. 3'=3" 6'-6" 7'-10' 3'-3" 8" CUSTOMER: DATE: I WEIGHT: PSI: 4000 STRUCTURE: 10' x 10' EMH QUANTITY' PROJECT MGR: Brandon Kahm OF DRAWN BY: JOB: Towerview Precinct STRUCTURE ID: SECTION: Base PM REVIEW: MGR REVIEW: Filename: SA01-Engineering\02-Custom Production\Mid Atlantic Infrastructure System\Towerview Precinct- Duke Univeersity\Towerview P 132' 120p 6" 30' I o 2"0 Ground_____0 j O0 Rod Hole � L 54" i f 72" I L[:]:::�— rams and Grate I I 54" j I 18" 8 Ton x 6j" Swift Lift Ancho I 18m 4 Req'd For lifting T _(Typ.)� I 300 I 7 18" © I I1 18" (Typ.) o I 1_—(TYP.)�---1--------i----------------�— " \.Grounding Strap Plastic Coated Pulling Irons (4 Typ) 8" 30" q QUALITY CHECKS: FORM CLEANLINESS FORM OIL REINFORCEMENT AS SPECIFIED Exterior Coated w/ CS90 WR Meadows 8 Ton Swift Lift 2"x12"x4" (4 Typ. for Stripping) Frame and Grate tr _� --�-------------- \\," Inserts (12 Typ) Grounding Straps CHAIRS AND/OR WHEELS MESH IN JOINT STEPS/INSERTS CONCRETE COVER >1/2 2"0 Ground I r— Rod Hole (2 Typ) 66"x24' Standard 47" Knock1t Panel 39" LIFTERS n BILL OF MATERIALS TOP (5.51) Cu. Yds. of Concrete (2) 2" O Ground Rod Holes (1009) Lbs. of #5 Rebar (12) 1/2" Inserts (8) 8 Ton Swift Lift (--) 4x4 Mesh (1) 12" x 12" x4" KO j (4) j Plastic Coated Pulling Irons (4) 66" x 24" KO Panels (1) Grounding Strap nct MANHOLE DETAIL N.T.S. #5 Bar 8" 0. Length:10' Qty:: #5 L—Bar 8" O.C. Length:3'-8"x1'-6" Qty:68 #5 J—Bar 8" O.C. Length: 10'-9"x10'-9"x1'-6" Qty:10 — — — — — ---------------- ---_ 4x4 Mesh Behind KO REINFORCEMENT HOURS Production Shop Yarding Pour Rebar Cost /2" U /2" i T. W PREPOUR: _ POST POUR. - KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. CUSTOMER: DATE STRUCTURE: 10' x 10' EMH JOB: Towerview Precinct STRUCTURE ID: WEIGHT: 22,049 PROJECT MGR: Brandon Kahm SECTION: Top PSI: 4000 QUANTITY: OF DRAWN BY - PM REVIEW: MGR REVIEW: BILL OF MATERIALS - TOP (5.51) Cu. Yds. of Concrete (1) Grounding Strap (1009) Lbs. of #5 Rebar (12) 112" Inserts (4) 8 Ton Swift Lift (--} 4x4 Mesh (1) 36" 0 KO (1) Inserts For Ladder (4) 66" x 24" KO Panels Filename: S:\01-Engineering\02-Custom Production\Mid Atlantic Infrastructure System\Towerview Precinct- Duke Univeersity\Towerview Pr cinct 132" 120" 6° -• 6r ...._._. — ----- --I---- ---, 300 Irounding Strap j I I ® 42" 66"x24" 0,360 72" :1-I- KO [; Standard 120" 132" ;1 I C Knockout Panel (Typ.) ;1 I 42" :.1 18"Lin 1 I:: Tan x 64" Swift Lift (TYP•) (4 Typ.) I E: T ® o I I 18" I 30" I I L(TYP) __-- I ---------------------�----- r-:------------ Exterior Coated w/ CS90 WR Meadows 8" 8. k: ...................................... ...................................... ::•:1 I 11::: 30" 47" I "Inserts 1 1;:; 39" '`1 I 12 TYP) 11�'� I I � QUALITY CHECKS: I CHAIRS AND/OR WHEELS LIFTERS FORM CLEANLINESS I MESH IN JOINT FORM OIL REINFORCEMENT AS SPECIFIED STEPS/INSERTS CONCRETE COVER >1/2 MANHOLE DETAIL N.T.S. #5 Bar 8" Length:10' Qt; #5 L—Bar 8" 0. Length:3'-8"x1'—I Qty:e #5 J—Bar 8" O Length: 10'-9"x10'-9"x1'— Qty: REINFORCEMENT Production Shop Yarding Pour Rebar Cost /2" /2" 1I" DATE: PREPOUR: POST POUR: G7Djnding StrQpmr- 90 DEGREE #5 BARS CONNECTING DOWEL BARS TO EACH OTHER WITHIN SEAL POUR Immirts 3+P) Bel Lndar ZI _J .. 1' 1' WIDE CONCRETE SEAL POUR W/ 4,500 PSI CONCRETE #5 STAINLESS STEEL REBAR EPDXIED 10" INTO EXTERIOR WALL ON MANHOLE BOXES. PLACED 2' ON —CENTER ON EACH BOX CREATING 1' ON CENTER WHEN BOXES ARE JOINED. MANHOLE BOX SEAL POUR DETAIL N.T.S. T GrDunding stmpq;z-- c n izad Sk,-el L=dar maerts .) WOOD BLOCKOUT TO MAINTAIN CONDUIT OPENING DURING SEAL POUR. MATERIALS — GRADE 60 STAINLESS STEEL REBAR — PILGRIM EM5-2 EPDXY — 4,500 PSI CONCRETE KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law.