Loading...
HomeMy WebLinkAbout20200919 Ver 1_Corps email on 2-28-20 site meeting_202007151 Kevin Martin From:Dailey, Samantha J CIV USARMY CESAW (USA) <Samantha.J.Dailey@usace.army.mil> Sent:Monday, March 2, 2020 9:34 AM To:Kevin Martin Subject:SAW-2019-02038 Wiggins Mill Park Site Visit Notes Good morning Kevin, Per our site visit (28 Feb 2019), please make the following changes to the above referenced map/table, and return via email: 1) The marginal wetland, identified as flags A-G, and located between wetland 73 and 48, is jurisdictional and should be depicted as such; 2) The marginal wetland located, located along the open water, is jurisdictional and should be depicted as such; and 3) Please provide a map that labels each feature with a specific nomenclature, and please provide a table (preferably PJD form) to quantify each feature on-site The Corps Action ID for the project is: SAW-2019-02038. Please reference this number on all future correspondence. I have also taken a look at our database, and the Neuse River waterdog (proposed for listing) is located within the project area. If they are wanting to do ANY work within the open water areas I would suggest they start coordinating with USFWS, otherwise, I will have to do that on my end. I would anticipate the USFWS will want surveys completed. Given I will not be able to make a no effect determination for the project, a PCN will be required for any work conducted in waters of the United States. Please let me know if you have any additional questions. Best Regards, Sam Samantha Dailey Regulatory Project Manager 2 U.S. Army Corps of Engineers Regulatory Division 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 (919) 554-4884, Ext. 22 Samantha.j.dailey@usace.army.mil