Loading...
HomeMy WebLinkAbout20200667_U-5887_Permit Drawings_7-13-2020_20200713Hji (Version 2.08; Released April 2018) North Carolina Department of Transportation Highway Stormwater Program STORMWATER MANAGEMENT PLAN iL FOR NCDOT PROJECTS WBS Element: 44634.1.1 TIP No.: U-5887 County(ies): Henderson Page 1 of 3 General Project Information WBS Element: 44634.1.1 TIP Number: U-5887 Project Type: Roadwa Widenin Date: 5/29/2020 NCDOT Contact: Barry Mosteller Contractor / Desi ner: Vaughn and Melton Address: Address: 1800E Associates Lane Charlotte, NC 28217 Phone: Phone: 704-357-0488 Email: Email: 'cford vau hnmelton.com City/Town: Flat Rock Count ies : Henderson River Basin(s): French Broad CAMA County? No Wetlands within Project Limits? Yes Project Description Project Length (lin. miles or feet): 1.06 Surrounding Land Use: ISuburban Proposed Project Existing Site Project Built -Upon Area ac. ac. ac. Typical Cross Section Description: Annual Avg Daily Traffic (veh/hr/day): Design/Future: 7200 Year: 2040 Existing: 6700 Year: 2010 General Project Narrative: (Description of Minimization of Water Quality Impacts) U-5887 involves the widening of Highland Lake Road from a 2-lane shoulder section to 2-lane and 3-lane curb and gutter sections from NC-225 (Greenville Highway) to a point approximately Spartanburg Highway (US-176). The existing typical section is a 2-lane shoulder section consisting of 11-foot travel lanes. Existing roadway will be replaced with 2-lane and 3-lane curb and gutter sections consisting of 12-foot travel lanes. Jurisdictional features including wetlands and streams and a crossing of King Creek and Dye Branch are present within project limits. The proposed roadway improvements will require the addition of a proposed closed system and new roadway ditches. Rip Rap pads were used at pipes outlets throughout the project to reduce water velocities into wetlands and jurisdictional streams. The Sediment and Erosion Control Plan for U-5887 has been designed using Environmentally Sensitive Area (ESA) criteria for jurisdictional streams flowing into the French Broad River. ESA designation requires special procedures to be followed for construction activities within 50' of each designated stream. Post Construction Stormwater Program will be implemented throughout U-5887 to the maximum extent practical. Waterbody Information Surface Water Body 1 : King Creek NCDWR Stream Index No.: 6-55-8-1-2-(2) NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: SA Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? No Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) ;lassification for Water Body I Iis;li��zt� SIU1117W �1tCY (Version 2.08; Released April 2018) Highway Stormwater Program STORMWATER MANAGEMENT PLAN FOR NCDOT PROJECTS �E ` WBS Element: 44634.1.1 TIP No.: U-5887 County(ies): Henderson Page 2 of 3 Additional Waterbody Information Surface Water Body (2): Dye Branch NCDWR Stream Index No.: 6-55-8-1-2-4 NCDWR Surface Water Classification for Water Body Primary Classification: Class C Supplemental Classification: None Other Stream Classification: None Impairments: None Aquatic T&E Species? No Comments: NRTR Stream ID: SB Buffer Rules in Effect: N/A Project Includes Bridge Spanning Water Body? INo I Deck Drains Discharge Over Buffer? N/A Dissipator Pads Provided in Buffer? N/A Deck Drains Discharge Over Water Body? I N/A (If yes, provide justification in the General Project Narrative) (If yes, describe in the General Project Narrative; if no, justify in the General Project Narrative) (If yes, provide justification in the General Project Narrative) Hi� hwa North Carolina Department of Transportation gStormwater Highway Stormwater Program STORMWATER MANAGEMENT PLAN (Version 2.08; Released April 2018) FOR NCDOT PROJECTS WBS Element: 44634.1.1 TIP No.: U-5887 Count ies : Henderson Page 3 of 3 Swales Sheet No. Station & Coordinates (Road and Non Road Projects) Surface Water Body Base Width ft Front Slope H:1 Back Slope H:1 Drainage Area ac Recommended Treatm't Length ft Actual Length ft Longitudinal Slope % Q2 cfs V2 (fps) Q10 cfs) V10 (f s Rock Checks Used BMP Associated w/ Buffer Rules? 5 -L- 27+60 LT (1)King Creek 2.0 2.0 2.0 1.0 102 282 0.76% 18.4 1.9 24.8 3.2 No No 35.2866,-82.4394 6 -L- 33+28 LT (1)King Creek 2.0 2.0 2.0 7.5 754 135 0.44% 5.5 0.9 7.5 1.0 No No 35.2876,-82.4365 7 -Path 2- 11+00 RT (1)King Creek 0.0 2.0 4.0 1.0 99 356 5.01% 1.5 3.3 2.0 3.6 No No 35.2871,-82.4340 7 -L- 50+95 LT (1)King Creek 0.0 2.0 4.0 3.8 379 136 2.50% 5.6 3.5 7.6 3.9 No No 35.2885,-82.4312 Additional Comments • • Ewlliiii �u See Sheet IA For Index of Sheets See Sheet I B For Standard Symbology Sheet 'as 1780 ° o Spartan 1 4 NDERSO ILLE Heights 176 1935 END T PROJECT U-5 7 1 z9 1937 �p N Y 783 3 % 1937 m 3(i t^ ' \ i 1819 1936 1820 Chickadee ,gyp �GV83 ,tm Cir. 05 � Nmae� —1935 Cy�9 1825 Oakdale Cemetery 1821 BEGIN PRO T 887 SI VICINITY MAP (1V T.S) STATE OF NORTH CAROI ILA PERMIT DRAWING DIVISION OF HIGHWAYS SHEET 1 OF 10 HENDERSON COUNTY LOCATION: SR 1783 (NORTH HIGHLAND LAKE ROAD) FROM NC225 TO WEST OF US 176 TYPE OF WORK: GRADING, DRAINAGE, PAVING, SIGNALS, SIGNING, AND RETAINING WALLS WETLAND AND SURFACE WATER IMPACTS PERMIT $ —Y6— HIGHLAND GOLF DR- - - o —Y5— HIGHLAND GOLF DR. —Y4— PARK ENTRANCE � o s —L— NORTH HIGHLAND LAKE ROAD a < 14 (SR 1783) JPATH— MULTI —USE PATH w zZ SITE 3 SIT 4 J 5 , SITE 2 R " "@ SITE 1 PoND —Y7— JAMES ST. SR 1820 —YI— NC225 I" C B GREENVILLE HIGHWAY - —IRK— BLUE RIDGE SOL E BEGIN TIP PROJECT U-5887 '\)' FLATROCK �, ( �S —Y3— HIGHLAND PARK . OF - —L— STA. IO + 00.00 SR 1823 GRAPHIC SCALES 50 25 0 50 100 PLANS 50 25 0 50 100 PROFILE (HORIZONTAL) 10 5 0 10 20 PROFILE (VERTICAL) DESIGN DATA ADT 2010 = 6700 ADT 2040 = 7200 T - 5 % V 35 MPH * TTST =2 DUAL 3 FUNC CLASS = RURAL COLLECTOR i —Y2— HIGHLAND LAKE DR. SR 1825 Portions of this project are within the Village of Flat Rock and the City of Hendersonville. Design exceptions on this project for horizontal and vertical curves. Clearing on this project shall be performed to the limits established by method II. PROJECT LENGTH Prepared In the Office of.. VA UGHN & MELTON, INC. 1318-F PATTON AVENUE ASHEVILLE, NC 28806 PHONE (828)253-2796 LENGTH ROADWAY TIP PROJECT U-5887 = 1.064 MILES 2018 STANDARD SPECIFICATIONS TOTAL LENGTH OF TIP PROJECT U-5887 — 1.064 MILES RIGHT OF WAY DATE: REECE M. SCHULER, P.E., P.L.S PROJECT ENGINEER CONTACT: JONATHAN WOODARD, PE DIVISION 14 SENIOR PROJECT ENGINEER LETTING DATE: JPHILPOT PROJECCTTDESIGN ENGINEER 9TATR BTATB PRO]RC1' RBPRRRNCR N0. -_-T NO. TOTAL BIOSRTB N.C. U-5887 1 e TR PROI.NO .6PR01. D&9CR�'CION 44634.1.1 NA PE ❑ m ❑B i26 ❑a. Yaugrm&Mellon s'B sa 1� (� Cons Englnesrs ❑ /J• Asr,evme, ❑ AS • 11or•Tn Cvoilna -a¢sxsisnB ❑ M ❑ ❑ sus s„ 9.ss ,o, ,s, oaea ❑ —Y8— US 176 ` SPARTANBURG HIGHWAY \END TIP PROJECT U-5887 —L— STA. 66+16.58 'THERN RAILROAD 2D. DESIGN EXCEPTION FOR HORIZONTAL AND VERTICAL CURVES REQUIRED PRELIMINARY PLANS DO NOT USE MR CONSTRUCTION INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED HYDRAULICS ENGINEER ROADWAY DESIGN ENGINEER P.E. SEE NOTE 1 IMPACTS IN WATER 4 TEMP. IMPACTS IN (8R xA6'E ONSPAN ARCH) SURFACE WATER IMPACTS IN TEMP. IMPACTS IN TRUSTEES OF PINECREST SURFACE WATER SURFACE WATER PRESBYTERIAN CHURCH (BANK STABILIZATION) -L- PT StoJ8+6292 CL B zint w\ ,� .,F IMPACTS IN c ' STABILIZ • ,—.(BANK 1 ° JOSEPH �AYBANK i yc I CoNc �F I® IMPACTS IN PERMANENT WATERS I® TEMPORARY IMPACTS IN SURFACE WATERS PERMIT DRAWING SHEET 2 OF 10 (4Q IMPACTS IN SURFACE WATER (18" PIPE OUTLET AND DITCH) PERMIT —L— PC Sto23+2790 SITE #1 PERMIT SITE #2 E LAGE OF LAT ROCK CL B RIP RAP EST 3 TONS �BkLBMS-33 IAI� O� ZZ 6 �, LT, MEN/NGER CREEK EST 10 SYGF - y GpE NAIL /* T11� BASE OF 48" BL. POPI A CL I 0 SYGNS F REMOVE PIPE ----------- IMPACTS IN F _SURFACE WATER (28x 6' CONSPAN ARCH) -L- ARC END CULVERT 0 —L— STA22+58.70 ADDISON BROWN E1 , KERRY P. LINDSEY NOTE 1: NATIVE MATERIAL CONSISTS OF MATERIAL THAT IS EXCAVATED FROM THE STREAM BED OR FLOODPLAIN AT THE PROJECT SITE DURING CULVERT CONSTRUCTION. RIP RAP MAY BE USED TO SUPPLEMENT THE NATIVE MATERIAL. IF RIP RAP IS USED, NATIVE MATERIAL SHOULD BE PLACED ON TOP TO FILL VOIDS AND PROVIDE A FLAT SURFACE FOR ANIMAL PASSAGE. NATIVE MATERIAL IS SUBJECT TO APPROVAL BY THE ENGINEER AND MAY BE SUBJECT TO PERMIT CONDITIONS. ME PROJECT REFERENCE NO. SHEET NO. U-5887 5A INN SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPL]E FE PLANS DO NOT USE MR / W ACQUISITION PRELIMINARY DO NOT USE FO FLANS t CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED THE VILLAGE OF FLAT ROCK CL B RIP RAP EST 10 TONS EST 28 SYGF 0 NARROW SLOT v V Sta. = 24 + 72-28 + 74 Q=4.350 cfs V=2.173 fps d=1.001 ft s = 0.00765 ftRt n = 0.035 Liner= Vegetative SEE SHEET 9 FOR -L- PROFILE SEE SHEET 14 FOR -PATH- PROFILE TER LIZA' NiL- ® IMPACTS IN PERMANENT WATERS ® TEMPORARY IMPACTS IN SURFACE WATERS NOTE 1: NATIVE MATERIAL CONSISTS OF MATERIAL THAT IS EXCAVATED FROM THE STREAM BED OR FLOODPLAIN AT THE PROJECT SITE DURING CULVERT CONSTRUCTION. RIP RAP MAY BE USED TO SUPPLEMENT THE NATIVE MATERIAL. z IF RIP RAP IS USED, NATIVE MATERIAL o SHOULD BE PLACED ON TOP TO FILL VOIDS AND PROVIDE A FLAT SURFACE w� FOR ANIMAL PASSAGE. NATIVE MATERIAL IS SUBJECT TO APPROVAL BY >� THE ENGINEER AND MAY BE SUBJECT TO PERMIT CONDITIONS. V 1 ,= OT � � /1" � � 4� IMPACTS I SURFACE WATER �8' x 6' CONSP H) A4 (J h�� � s7 EM . C )N S CE � CR PERMIT �,a= -L- PC ta23+2 _ ffi SITE #1 4 a S K ffi B P E N /F IN PROJECT REFERENCE NO. SHEET NO. U-5887 5B PERMIT DRAWING RN✓ SHEET NO. ROADWAY DESIGN HYDRAULICS SHEET3 OF 10 ENGINEER ENGINEER g Y DOCUMENT NOT CONSIDERED FINAL \ / UNLESS ALL SIGNATURES COMPLETED CL B I� P EST 10 ONS EST 28 YGF INC®N)<I�L]E ]E PLANS DO NOT USE MR/ W ACQUISITION PRELIMINARY DO NOT USE FO FLANS CONSTRUCTION i v Sta. =24+72-28+74 Q=4.350 cfs V=2.173 fps d=1.001 ft s = 0.00765 ftRt n = 0.035 Liner= Vegetative ME SEE SHEET 9 FOR —L— PROFILE SEE SHEET 14 FOR —PATH— PROFILE SHEET NO. PROJECT REFERENCE NO. SHEET NO. U-5887 6A PERMIT DRAWING RN✓ SHEET NO. SHEET5 OF 10 ROADWAY DESIGN HYDRAULICS ENGINEER ENGINEER IINC®N> P L1E ]E PLANS 00 NOT USE FOR f W ACOUISITION Sta. = 33 + 28-34 + 03 Q=22.932 cfs V = 2.6788 fps d=1.628 DETAIL 3 STANDARD BASE DITCH O N S=0.0044 ftft n = 0.035 Liner=Vegetative DOCUMENT NOT CONSIDERED FINAL N°Nr°I N°luml UNLESS ALL SIGNATURES COMPLETED .in D=2 Ft. co B=3 t^ EST. DDE=73 CV � Q POND FROM -L- STA. 33+28 LT. TO -L- STA. 34+03 LT. V Z 061 2'BASE DITCH SEE DETAIL 3 BM ^4 ELEV. 2111.19' -BL- STA. 27+43.77 29.4 'LT. N `� NAIL SET IN BASE OF 15' POPLAR 1 D CL B R ONS iN�SRW�'' EST 14 SYGF = 60 I rn IMPACTS IN '�.� 4 O SURFACE WATER i � q, (95" x 67" ARCH PIPE CULVERT) f �\ � THE yILLAGE OF FLAT ROCK \ \ OB 1538 PG 202 F �e — \MECHANIZED TIE TO £X/ST$G PATH _ _ — _ _ CLEARING IN D RCPa11 F F _ _ WETLANDS cs PERMIT 9� + _ 2G1 \ -� SITE #3 n y _ F POND FILL IN -L- PRC Sto.32+15.06 Y 0 ,02 SQ YD FIBER WETLANDS ry F WC COIR M M W \ PERMIT \ SITE #4 -L- PT Sto34+62A7 , \ \ \ q Co. FILL IN e-6 CW 61 6' WETLANDS 1 1001S a ^ F 2 RCP -II CR KERRY P. LINDSEY DB 1499 PG 564 " \\ OB 823 PG 95 -L- PC Sto38 36 / WA P Hw y� .4/ 1 JB RET 95"x 67" Ivq 9 61 ARCH PIPE CULVERT 61 0 - - STA40/1+18.35= HIGHLAND LAKE INC. -Y2 POT StQJv�'h�,ril� F OB 999 PG 99 v ° -Y2- PC StoJI+5692 DEXTER THDMPsoN � ° � � DB 492 PG PC 60 DEl-Y2- POT Sto✓O+18-WW F D IS FO BR�CH �- -Y2- PC StoJO+32.68 - WD OUARTER MOON. LLC ® EXCAVATION IN WETLANDS IMPACT N 2S F BUS DB I156 PG 599 FILL IN WETLANDS SURFACE W ER IMPACTS IN PERMANENT WATERS -Y2- PT StoJ2+99.68 yF TS TEMPORARY IMPACTS IN SURFACE WATERS TRUSTEE�]$ OF 1---1 END CONSTRUCTION THE LOAD FAMRY TRUST 1 1 -Y2- Sto.11+1756 DB 1273 PG 773 SV m 8' PVC M ®J MECHANIZED CLEARING ; GR / A 63E INV=2113.35' DBPG1238 i i� 1 sT IS FD j 1 INV=2118.45' -Y2- POT StoJ3+47.32 z S I V=2123.68' A p wyI R 1 TERRY JACKSON icRl DB 757 PG 369 1 �� 1 OQ� 1 he PROJECT REFERENCE NO. SHEET NO. U-5887 6B SHEET NO. PERMIT DRAWING DES ROADWAY DESIGN HYDRAULICS SHEET6 OF 10 ENGINEER ENGINEER �i DO NOT USE FOR f W ACQUISITION Sta. = 33 + 28-34 + 03 Q=22.932 cfs r �) V=1.62 88 fps d=1.628 r ftft s=0.0044 DETAIL r = 0.035 STANDARD BASEE D CH O � n N Liner=Vegetative DOCUMENT NOT CONSIDERED FINAL ffu_l UNLESS ALL SIGNATURES COMPLETED r°un D DFt. W zz r B=2 Ft" ST. DDE 3 CY z POND 2°¢ FROM - . 33+28 LT. TO -L STA. , 03 L 061 .r s -PATH-,PT— SIOJ6+05 -PATH- PC sto 5+5477 2' BASE ITCH 7 ATH- PC StoJ7+8k40 SEE DETA 3 $� EV. 2111.19' �` CC $taJ9+85.71 m3+66 - 6f STA. 27+43.7 29.4 ' LT. I ."NAIL SET IN BASE OF 15' POPLAR PATH- PC $tot g" - 38 CL B RIP RAP EST 14 5 NS —PATH— PT Stoll z J\ ti IMPACTS IN SURFACE WATER (95" x 67" ARCH PIPE CULVERT) I i v�� T E yILOF -K (j 153 8 PG V 7 DB 53 -PA- P to25 MECHANIZED CLEARING N s _ WETLANDS E P H Wo a °,Q -P TS PT $TQ25+8320 �� PERMIT � _`` - S1� - �- SITE #4 r T ` pn o _ 2, w° D MI! _nt InE FILL IN C) OODS _ J W s � �' �.. SOF18E WETLANDS F rn In " — — T $to COIR 1 \ FILL IN rn \ ♦ \ F 6 062 WETLANDS OQ ° KER Y P. LI IF DB 823 PG 95 kP Fa HIGHLAND L E INC. L DB 999 PG " Y $toil+5692 D rP 8 F BRANCy S 'ms ^' ® EXCAVATION IN WETLANDS x FILL IN WETLANDS �: s � IMPACTS IN PERMANENT WATERS s + $toi2+9968 TS TEMPORARY IMPACTS IN SURFACE WATERS F" TRUST PVC MECHANIZED CLEARING INV=2118.45' -Y2- POT StoJ3+47"32 I V=2123.68' wFA a r l � TERRY JACKSOH iGRI w<a DB 757 PG 369 1 , SHEET NO. OUTEALL STRUCTURE EXISTING DA=7.034 ac ANALYSIS 0713 PROPOSED DA=10.08 Tc=10.4 min Tc=10.00 Cc=0.442 Cc=0.470 12=5.15 irvhr 12=5.15 irvhr PROJECT REFERENCE NO. SHEET NO. U-5887 7A PERMIT DRAWING DES SHEET NO. ROADWAY DESIGN HYDRAULICS SHEET8 OF 10 ENGINEER ENGINEER ��,��� INC®h'IIl�LE E IDL.�NS DO NOT VSE POR /W ACOVISITION DETAIL s -r6 POT StoJO+OOAO 3Q SPECIAL CUT DITCH `P Nod �o Smlel �` 1 From THE VILLA E OF FLAT ROC BPS-102 Natural A\�gc Slope DB 138 G,PW 20 ?o D F Min. D -,.o Ft. -T - PT STA/O+OOAO DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED FROM PATH 2 STA.11+00 TO STA.14+50 RT Q2=16.01 cfs Q2=20.38 cfs -Y5- PT Stoll+39.47 TRUCT /0V2=5.fs V2=.01 fps D2=1.04 ft D2 =1.45 ft S+60.00 110=6.96 iryhr 110=6.96 irvhr -L- PC Sto47+64.34 Q10 = 21.64 cfs Q10 = 27.49 cfs CL B RIP RAPEST I TONS \ V10 = 6.89 ft/s V10 = 6.58 fps EST 5 SYYGF -Y5- PT StoJO+9042 D10=1.26 ft D10=1.72 ft ERT=2107.00�' 125=7.99 irvhr 125=7.99 irvhr NIZED -r5- sralo+0000= Q25 = 24.84 cfs Q25 = 31.75 cfs F ------- ---- D25 =1.91 ft/s V25 =1.76 fps - F F - -Y� STkj1+86.46 RErAIr D25=1.40ft D25=1.89 ft _ �� '�• �\ � __ - F S=0.13 ftRt S=0.13 c IF IC -21o7EE Sta. =49+76-50+95 INVERF Q=8.793 cfs IT \ \\} -. F V=4.383 fps SITE L- PT f4+ FEZ d =1.002 ft SPECIAL CUT DITCH R 3 5= 0.0311 ft�ft SEE DETAIL 5 In = 0.035 6.aT Q Liner=Vegetation `V F BL-B 38.83 _ R p T P=21 - PIPE �O F `cam C I Exb vF 21 OUT_=� R JO��, T VI O - 24 RCP X 18"' RCP-11 - R 77.50' HIGHLAND GOLF VILLAS O j H0 EO'WNERS ASSOC. INC. DB 1150 PC 499 RO N. LLC 6s . DB 3 PC 132 -L- PRC StoS +43A0 D1 RET P ARK R. VRI = 3A 1 000S B 1322 PC368 T 72 T Q.0 VERT 144. 8 euEl R -L=i1fo5/+7/7O� R GF JADES GILLILAN0 I 24 71 OB 1059 PC 646 5 O QQ / 7 � �$ R� p EMYYVEHI 0 COL�LNA REM�V �= 10 '4_ °Pv PIP NP=21415�A7 ANU nl itETAI 5 F xs rn - L i F k MECHANIZED (1 ' 7 P----">:mz0{ - 2G _--.\ O O C9 is G ft1T REMOVE PIPE INVERT U4N R548Z5d719RKETS C• rn-� ® FILL IN WETLANDS �" 70 11 / ITyOPF�= 38.32 2j2 B 4„ RCP . CH-L W/35 ST" - / V.i _aQXJ/ 1 PIPE OT O P I x w II,^, 15' "' hV 'L TOP- 6 `/ T St0✓0+88.72 vJ S LOCATION PIPEOVE B 6• I VERT O = � n ' 8 ' R P CQ' p 9 INO � r REMOVE E � 2119.24 30 EMOVE _ - 3 0 x �`N UOT= 141.74 E Q Q STRUCTOC M -1 -L A48+ 56= N s IPN/E� F�=2120. TOP=2720.2 ���999 - 144. S 4;3 ELEV. 2119.39' INVERT=212 .53 -Y6 S J2'l' VE IN 1 � 8 O p 1�9071 I -Y7- ST 11 +'OO.00 V 0 0 TOP=2117. b I I 11 50° / A I INVERT IN 2111.50 I I - - IS MTL B 5 DER 8" RAIN A4 1 . �k' -B T P Y3 . oJO+ STA47+8 E , o V 5 FO 1 �� / -T�t - S 13w43�f„ urGER © +7 . C aV°�y SEeEv� .64' Q eHARLEs Pc 60D -L- STA42+4950= s Eo 0 / r i 000s u� w 4 •cH-LKp© ® m "� III -Y3- POT +00 a ' ♦�� / °�. VICTOR BULLARDO 5� ZD ----- �Q F / so° ,' ; - PT STA/3+84.79 0 DB 1499 PG 600 43p2 0 G _ ® MILDRED H. COOPER 5 1153 s - _ _ JQVY DALE FREEMAN �o DB 1318 PG 562 m s ° _ OB 1250 PO 120 E D CO STRUCTlO / -L- PRC St049+05.30 DONALD HUNTER A -Y3- ST 11+50.00 / _ DB 670 PC 503 d" -Y7 POT StoJ3+23.89 -TRK- PRC STA/5*10DI e' N 29°4T44'E 164.92' 1 -TRK- PRC STA/6+84.72 s ze•45'zr 369.32' (D HIGHLAND LAKE INC. DB 999 PC 99 DETAIL 4 CUT DITCH I- ro Scala) Fro fA c DiKA � Nalu.al � A'� g Slope D F\gc EA � Min. D= 1 Ff. FROM RT STA. 49+76 TO RT STA. 50+95 EA 0 5 GPs- OLITEALL ANALYSIS STRIICTIIRE 0713 EXISTING PROPOSED DA=7.034 ac DA=10.08 Tc=10.4 min Tc=10.00 Cc=0.442 Cc=0.470 12=5.15 irvhr irvhr cfs Q2=25 Q2 =16.01 cfs Q2 = 20.38 cfs c V2 — 5.10 fps V2 = 6.01 fps D2 =1.04 ft D2 =1.45 ft I10=6.96 irvhr 110=6.96 irvhr Q10 = 21.64 cfs Q10 = 27.49 cfs CL B RIP RAP V10 = 6.89 fbs V10 — 6.58 fps EST I TONS EST 5 SYYGF D10=1.26 ft D10=1.72 ft ERT=2107.00 125=7.99 irvhr 125=7.99 irvhr M NIZE Q25 = 24.84 cfs Q25 = 31.75 cfs L� — V25 = 7.91 fVs V25 — 6.76 fps D25 =1.40ft D25 =1.89 ft ETLA�4 S=0.13 fbft S=0.13 ftRt F Sta. = 49 + 76-50 + 95 I R- PERMIT Q=8.793 cfs SITE #4 ' V-4.383 fps d ft =1.002 s=0.0311 ftft / In = 0.035 Liner=Vegetation (V 00 F _ -T F a OQ CLEAR NG MECHANIZED(1y, B•' R _III ® FILL IN WETLANDS (� s i v � G PERMIT DRAWING ROADWAY DESIGN HYDRAULICS SHEET• OF 10 ENGINEER ENGINEER INCOMPLE—E THE OB DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED RC AT III u • • • • ice`% Vll • . i i. / '� �'je•� +r - was / I 7 MR III IIIIO }� • i sic_ � — .. - �► I ae i. � r• s / — Sir FEW IF 05 long ,f � � � _;?'ram, Tom;_ _ � • � ��� , e n � "�l1�jl PF° r_Pane.� _�i�i��u. •, _ti _ •`�-.-„sw.1//� ��//I�/��I////IIp14111A� v'ov N HIGHLAND LAKE tIC. /jjj''/I DB 999 PG 99 & � / Ne: fcl Slo reiz � 7: A F\•�s � ,qa 4 ,� N • » . + 6T6ST . 5 5 �� �.a �� �� •��, »Ea 7 Af9 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From/To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 28' x 6' Conspan Arch 70 95 2 24+60 to 25+25, LT 18" RCP Pipe Outlet & Ditch 30 50 3 40+66 to 41+65, RT 95" x 67" Arch Pipe Culvert 160 3 40+56 to 41+10, LT 95" x 67" Arch Pipe Culvert 50 4 41+34 to 42+65 LT Road Widening 0.03 0.02 TOTALS*: 0.03 0.02 150 305 0 *Rounded totals are sum of actual impacts NOTES: All impacts are linear distance of fills as measured from furthest upstream extent in stream channel to furthest downstream extent in stream channel for each subject fill/impact type 2018 Feb