Loading...
HomeMy WebLinkAbout20190914 Ver 1_Mod to Approved Impacts_20200715From: Steffens, Beth To: Scarbrauah.Anthonv Cc: Covil. Patrick Subject: RE: [External] RE: 401 WQC Approval Letter for Bridgeton 115KV Substation (DWR Project No. 19-0914) Date: Thursday, July 16, 2020 7:37:50 AM Attachments: image002.ong RE SAW-2019-01397 Culvert Ouestion.mso • less vou verify. Send all suspicious email as an attachment to renort.spamianc.eov Anthony, Yes. She said email documentation of change was adequate (please see attached). Thanks, Beth Beth Steffens, PE Site/Civil Department Manager Dewberry 919-923-2306 From: Scarbraugh, Anthony <anthony.scarbraugh@ncdenr.gov> Sent: Thursday, July 16, 2020 5:01 AM To: Steffens, Beth <esteffens@Dewberry.com> Cc: Covil, Patrick <pcovil@Dewberry.com> Subject: RE: [External] RE: 401 WQC Approval Letter for Bridgeton 115KV Substation (DWR Project No. 19-0914) [CAUTION] External Email. Do NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all suspicious emails. Beth, Have you discussed the proposed change with Ms. Thompson of US Army Corps of Engineers? Regards, Anthony Anthony Scarbrough fMEQ`5 North Carolina Department. of En�-lrnnmental Quality 252.948.3924 (Office) "~ Anthony-Scarbraugh@Wlenr gov &Yk3i CQ)'9Spolider7CB 10 aid &OM Ui6 ad FOSS ,s &A4BGt 10 Ve Ab1h Caroirry f' "C ReC00919W 3 i may be 0i h7 Rr pff!Nn From: Steffens, Beth[mailto:esteffens(@Dewberry.com] Sent: Wednesday, July 15, 2020 4:45 PM To: Scarbraugh, Anthony <anthony.scarbraugh a(7ncdenr.gov> Cc: Covil, Patrick <pcovilC@Dewberry.com> Subject: [External] RE: 401 WQC Approval Letter for Bridgeton 115KV Substation (DWR Project No. 19-0914) Anthony, Duke Energy is proposing to keep an existing 34' culvert in place rather than remove it (see attached figures). This would eliminate the 34' of temporary stream impact listed in the permit. Does the NCDEQ need any documentation other than this email for this revision? Type of Impact Amount Approved Amount Approved Plan location/ (units) (units) Reference Permanent Temporary Attached Wetland WA-1 0.16 (acres) 0 (acres) Figures: 5 and 11 ❑f 18 WA-2 0 (acres) 0.09 (acres) Stream S-1 (Installation of 2 125 (linear feet) 0 (linear feet) Figures: 5 and 11 of Culverts) 1� 5-2 (culvert removal) 0 (linear feet) 34 (linear feet) Thank you, Beth Beth Steffens, PE Site/Civil Department Manager Dewberry 919-923-2306 From: Scarbraugh, Anthony<anthony.scarbraugh(@ncdenr.gov> Sent: Friday, August 30, 2019 3:57 PM To: Steffens, Beth <esteffensC@Dewberry.com> Cc: Jones, Jerry R <Randall.Jones(@ncdenr.gov>; Thompson, Emily B CIV USARMY CESAW (US (Emily.B.Thompson(@usace.army.mil) <Emily.B.Thompson(@usace.army.mil> Subject: 401 WQC Approval Letter for Bridgeton 115KV Substation (DWR Project No. 19-0914) [CAUTION] External Email. Do NOT click links or open attachments unless expected. Please use the "Phish Alert" button to report all suspicious emails. Ms. Steffens, Please find attached the 401 Water Quality Certification approval letter for the proposed project. If you have any questions, please feel free to contact me. Regards, Anthony Scarbraugh Anthony Scarbraugh Environrr 43Wf2l Specialise II, Watu Resources ::D-EQ5 North Carolina Department of Envimnmcntal Quality 252-948.3924 (Office) ~ Anthony- Scarbraugh[a3-deny-gov G-"W cwwpa 6Ym io"tam uis actress s a tIlet Ao vie l bih Ca Dfm flrolc Rx xas Law a xt may be dsdbsed to laid pamos- Visit Dewberry's website at www.dewberry.com If you've received this email even though it's intended for someone else, then please delete the email, don't share its contents with others, and don't read its attachments. Thank you. Visit Dewberry's website at www.dewberEy.com If you've received this email even though it's intended for someone else, then please delete the email, don't share its contents with others, and don't read its attachments. Thank you. ............. --� I ��yl • ��11I •-------••••••-i-i----•-•-•1r I� • .-.ate--.��•o�►i-i-i �-� Ti STREAM INTERMITTENT DALINEAR • III n` 4♦-. � 1 ���� ►e sue-, I INTERMITTENT Hill u La Q ^ — — 7 / WETLANDS FLAGS J T-1 7HRU T--6 _� I_,, --�r ZU.- 1185403 DUKE ENERGY PROGRESS, INC. p/n/o ROL/NA POWER & LIGHT COMPANY PARCEL /D. 2-043-050 D. B. 1066, PG. 350 PARCEL 1 & 2 LEGEND ,0570 • • • HORIZONTAL GRAPHIC SCALE 60 0 30 60 120 ( IN FEET ) 1 inch = 60 ft. IR. AND WIFE CROWN -050 22, ITIF 14Q—r WA-2A J 62 LINEAR FEET OF INTERMITTENT STREAM IMPACTS. L ---------- / W-8/TC-1 WETLANDS FLAGS WA-2A 7HRU WA-14A PERMANENT WETLAND IMPACTS (0.16 ACRES) OVA .�26 2's, Dewberry' Dewberry Engineers Inc. 2610 WYCLIFF ROAD SUITE 410 RALEIGH, NC 27607 PHONE: 919.881.9939 FAX: 919.881.9923 NCBELS # F-0929 18" WIDE TRENCH IMPACTS �\ TEMPORARY WETLAND IMPACTS (0.14 ACRES) mac' W8-1 U Wb 13 1_ \ 7LAND,� FLAGS 7HR HG-4A \ TB-3 I ' . - GROUNDING DITCH, TYP. Ar C TREE CLEARING AREA - NO GRUBBING \ EX. TRANSMISSION LINE L U.- 1185401 DUKE ENERGY PROGRESS, INC. p/n/o CAROLINA POWER & LIGHT COMPANY PARCEL ID. 2-043-075 D.B. 1068, PG. 740 NGB HOL PARCEL /D.- TREE CLEARING AREA O.B. 1RAAC - NO GRUBBING . '-""'A / � LU.• 1185402 DUKE ENERGY PROGR p/n/o CAROL/NA POWER & L/G / PARCEL /D. 2-04 D. B. 1068, PG. / WETLAND MATTING TO BE USED FOR TRANSMISSION LINE CONSTRUCTION ACCESS DATE TITLE SHEET NO. 01.27.2020 WETLAND IMPACTS EXHIBIT PROD. NO. PROJECT BRIDGETON 115KV SUBSTATION 50102846 3431 HWY 17 WA-14A I, BRADLEY D. PHILLIPS CER77FY THAT THIS PLAT WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION: (DEED DESCRIP77ON RECORDED IN BOOK 1066, PAGE 350, DEED BOOK 1068, PAGE 740 AND DEED BOOK 1068, PAGE 555,• THAT THE BOUNDARY NOT SURVEYED ARE CLEARLY INDICATED AS DRAWN FROM INFORMA77ON (AS SHOWN ON MAP),• THAT THE RA770 OF PRECISION OR POSI77ONAL ACCURACY AS CALCULATED IS k49,000; AND THAT THIS MAP MEETS THE REOUIREMENTS OF THE STANDARDS OF PRAC77CE FOR LAND SURVEYING IN NORTH CAROLINA (21 NCAC 56.160 THIS DAY OF ___.j -- 2018. A-A_ PROFESSION LAND SURVEYO LICENSE N ER L--5088 I, BRADLEY D. PHILLIPS, CERTIFY THAT THIS PROJECT WAS COMPLETED UNDER MY DIRECT AND RESPONSIBLE CHARGE FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION; THAT THIS GROUND SURVEY WAS PERFORMED AT THE 957. PERCENT: CONFIDENCE LEVEL TO MEET FEDERAL GEOGRAPHIC DATA COMMITTEE STANDARDS,' THAT THIS SURVEY WAS PERFORMED TO MEET THE REOUIREMENTS FOR A TOPOGRAPHIC/PLANIMETRIC SURVEY TO THE ACCURACY OF CLASS A. AND VERTICAL ACCURACY WHEN APPLICABLE TO THE CLASS C STANDARD AND THAT THE ORIGINAL DA TA WAS OBTAINED ON JULY 7, 2018, THAT THE SURVEY WAS COMPLETED ON ✓UNE 10, 2018; THAT CONTOURS SHOWN AS [BROKEN LINES] MAY NOT MEET THE STATED STANDARD; AND ALL COORDINATES ARE BASED ON NORTH CAROLINA STATE PLANE WAD 83' 2011 AND ALL ELEVA77ONS ARE BASED ON NA VD 88. ASUWRVW)4; LA LICENSE NUMBER L-5088 I, BRADLEY D. PHILLIPS, CERTIFY THAT THIS MAP WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL GPS SURVEY MADE UNDER MY SUPERVISION AND THE FOLLOWING INFORMATION WAS USED TO PERFORM THE SURVEY.• (1) CLASS OF SURVEY- A (2) POSITIONAL ACCURACY 0.07' (3) TYPE OF GPS FIELD PROCEDURE • RTK (4) DA TES OF SURVEY JUL Y 7-JUL Y 10, 2018 (5) DATUM/EPOCH- NAD 83 (2011) (6) PUBLISHED/FIXED-CONTROL USE NCVRS (7) GEOID MODEL: 12A (8) COMBINED GRID FACTOR(S): 0.999877889 (9) UNITS.- U.S. FEET !>YIR -; \may •\ l 110\\ 01 i INV 24' METAL PIPE=12.69 COMP PT -� r ECM • � ..�• .moo, INV 24" METAL PIPE=1222 EVEL YN HARTLEY MARTIN PARCEL ID: 2-043-010 D.B. 1415, PG. 110 / LEGEND LINES SURVEYED LINES NOT SURVEYED TIE LINES - - OLD INTERIOR LINE - - - - - - OVHD DISTRIBUTION LINE - ABBREVIATIONS (OVERHEAD) IP = EXISTING IRON PIPE/PIN RIGHT-OF-WAY - - IR = EXISTING IRON ROD/PIN EPK = EXISTING PK-NAIL p IRON PIPE (F) [9 CON. MON.(F) NIP = NEW IRON PIPE (1/2" SET) ECM = EXISTING CONCRETE MONUMENT COMPUTED POINT NPK = NEW PK-NAIL (SET) GUY ANCHOR R/W = RIGHT OF WAY RCP = REINFORCED CONCRETE PIPE LIGHT POLE CGF = COMBINED GRID FACTOR EP = EDGE OF PAVEMENT `� RETAIL POWER POLE EG = EDGE OF GRAVEL -� NTS �--- NOT TO SCALE CONC. = CONCRETE GM = GAS METER FL = FLUSH WITH GROUND WOODS LINE AG = ABOVE GROUND BG = BELOW GROUND - X- CI-F x- CHAIN LINK FENCE = UG UNDERGROUND PA = PROPERTY LINE RCP - REINFORCED CONCRETE PIPE CA = CENTERLINE CMP RRS = RAIL ROAD SPIKE = CORRUGATED METAL PIPE CID = COMPUTED POINT (NOT SET) plp - DUCTILE IRON PIPE MAG MAGNET NL = NAIL ELEC = ELECTRIC n US/Gyp NCGS NGS ASKIN (OBSERVED) .30, PAVEMETVT /0/ NAD 83 (2011) NSRS 150' PUB R/iL N = 532> 106.50 _ G/C E = 2,581,14361 p.B.' S pG \ ELEV = 23.60 NCGS NGS NO DISK (OBSERVED) NAD 83 (2011) NSRS _..... \ 9�,� w l� N = 531, 985.54 r �N- �- E = 2> 581, 080 03 TOP Pot£ - - :.,G's, ELEV = 22.42 6704 D ? C! CUT BREAKS STAND A /N I .. ...-.. .. a�'f .� FlX1NDA N ,. V 12" CUP- 1 � PA R/W r 1. T TOP POLE _ :) i' uc cae Vc c T uc .e- -- g uc c� / TC-4 j \/ N g� 20 USLI� '' i 53.20 c1 SKI P / /1 '' ✓✓, ✓'GAVE al .'\' i''` A 6O " \ } TRANSFORMER " . • TOP POLE �._ ` 3 4 " /P CRIMP w \ / COMP PT " 54.39., W/ TIMBER \ / SIR 2 \ FOUNDATION 1 I \ GAJE\STOPS. U I 0.51t ac. > I PARCEL #2 \ .�. UG uc c 22148t sq.ft. `\ 28„E r l i r` GT �, (" CABINET c c 03 r \ 1 U o c> BATTERY BOX W/ � \ t y SFjG> �' r �� INV 3O" RCP=15.34 U TIMBER FOUNDA770N CONC. FO ON 51913 c c�euC� — UNDA77 'ii` O 6.91 f ac. h i� oM Paox C 30100n0E t. " r . M - 1.20E ac. 1NV w " r'. WETLANDS FLAGS II 15 WE71ANDS FLAGS �.. i 52108t sq.ft. WA-12 . _ _ M_....__... i \ - _ _ — 1 THRU WB 13 T T THRU j 1- =''� � �"...�. '- a.�- �Lzl� 7C 1 THRU TC 4 f •�i `t WETLANDS FLAGS " ... - TC I >. ._ •. " i ' •.,., r r' � � WETLANDS FLAGS w 8 1 ... / . i 1. WA WA-2A 77-IRU WA-14A Ga� } WE77ANDS - LU.` : 1.185403 . y WA-1 THRU WA-12 DUKE ENERGY PROGRESS.' INC. _. OLD BLOOr- P�n�a- FOUNDA770N \. /'' j >w CAROLINA POWER & LIGHT COMPANY .l� , i O ^O ,34' L T C. M , . . N40"19 - PARCEL . ID. 2-043-050 ✓ r D.S. .1066, PG. J50 \1 . 232' 83 PARCEL '1 & 2 (TOTAL) .— L5 144.81� C N3172:'S0"W L2 COMP PT 112" IP 2" AG SY LA YED OVER ECM 943.72' ECM COMP PT LU.• 1185401 DUKE ENERGY PROGRESS, INC. P1n1a CAROLINA POWER & LIGHT COMPA PARCEL ID: 2-043-075 WILLIAM WESCOTT BROWN, JR. AND WIFE D.B. 1068, PG. 740 KRISTI L. ENGLISH BROWN PARCEL ID: 2-043-050 D.B. 3161, PG. 222, ALL PLA T CABINET G, SLIDE 194-C Line Table Line ,# Direction Length L 1 S7727'06 "W 20.01 L2 N407934 "W 18.25 L3 N68 01 06 E J2.80 L 4 S2120'16 E 50.20 L5 N407934"W 52.20 L6 S2120'161F 2222 35, GENERAL NOTES 1) IRON PIPES AT ALL CORNERS UNLESS OTHERWISE NOTED. 2) METHOD OF COMPUTATION IS BY COORDINATE CALCULATION. 3) THE PROPERTY IS SUBJECT TO ANY EASEMENTS, AGREEMENTS, OR RIGHTS -OF -WAY PRIOR TO THE 'DATE OF THIS MAP WHICH WERE NOT APPARENT AT THE TIME OF MY INSPECTION AND MIGHT OTHERWISE BE 'DISCLOSED o.� sp Q .9gk�N B`P/Ck Rp G�c�� Z 0 SIT TERRITORIAL RD �s VZ e�0 L LOCATION MAP NOT TO SCALE DAvis • MARTIN • PowFi.L ENGINEERS & SURVEYORS 6415 OLD PLANK RD, HIGH POINT, NC 27265 (336) 886.4821 1 WWW.DMP-INC.COM I LICENSE: F-0245 STR #1 2-35 NGB HOLDINGS, LLC PARCEL ID: 2-043-073 D. B. 3372, PG. 234, TRACT TWO HE77.ANDS FLAGS *B-1A THRU WB-4A LU.- 1185402 TLANOS FLAGS DUKE ENERGY PROGRESS, INC. -1 THRU TB-3 n a CAROLINA POWER & LIGHT COMPANY / PARCEL ID: 2-043-074 j D. B. 1068, PG 555 78-1 ECM 6" AG STR ,Y42 70 LDf WA-14A BY AN ATTORNEYS TITLE OPINION WHICH AS OF DATE SHOWN HEREON HAS NOT BEEN SUPPLIED TO DAVIS-MARTIN-POWELL ENGINEERS & SURVEYORS. THERE' MAY BE EASEMENTS OR OTHER MATTERS OF RECORD AFFECTING THIS PROPERTY NOT SHOWN HEREON. 4) FLOOD CERTIFICATION: THIS PARCEL IS NOT LOCATED 1N A SPECIAL FLOOD HAZARD AREA AS SCALED FROM MAPS FURNISHED BY NORTH CAROLINA "FLOOD PLAIN MAPPING PROGRAM- DATED JULY 2. 2004. SUBJECT TO VERIFICATION BY DETAILED FLOOD MAP STUDY. SEE :COMMUNITY PANEL NO. 3720558300J. 5) THIS SURVEY SHOWS EXISTING SITE CONDITIONS AS OF SITE: 108509 FOR SOURCE OF TITLE REFER TO DB. 1066, PG. 350, D.B. 1068, PG. 740 & D.B. 1068, PG. 555 JULY 10, 2018. 6) ALL DISTANCES ARE HORIZONTAL GROUND UNLESS NOTED OTHERWISE. DUKE ENERGY PROGRESS, LLC . 7) COORDINATES SHOWN ARE BASED ON THE NORTH ' CAROLINA GRID SYSTEM (NC3200) NAD 83 (2011) AND 165 A S K I I V S BRICK ROAD, E R N U L WERE OBTAINED USING THE NCVRS SYSTEM AND ELEVATIONS ARE BASED ON NAVD88 (GEOID,.12A) B R I D G ETO N 1 1 5 kV SUBSTATION 8) UNDERGROUND UTILITY LINES AS SHOWN WERE TAKEN FROM SURVEY LOCATION OF BOUNDARY & PARTIAL TOPOGRAPHIC SURVEY FIELD MARKINGS PROVIDED BY NC 811 ONE .CALL SERVICE CENTER. UTILITY LOCATIONS SHOULD BE CONSIDERED APPROXIMATE IN LOCATION. DMP DOES NOT CERTIFY TO THE NO. 2 TOWNSHIP ACCURACY OF CONTRACTOR STRESPONS BHE ILE FOR OF THE MARKINGS, C R AVE, N ` G ` VERIFYING ALL UTILITY LOCATIONS PRIOR TO. DIGGING, f�1 1� NC 811 ONE CALL TICKET BOOK: N/A 60 30 0 60 120 180 CREW: SRR 40o S. REFERENCE # C181590999, .C18.1590954 & C181590974. DATE: 7-12-18 PO DRAWN BY: DRW SCALE: 1 "= 60' SCALE IN FEET R.O.P.= 10,000'+ CHARLOTTE TELEPHONE P LAND UNIT: 1 185401 , 1185402 & 1185403 MAP: 1 04929-003151