HomeMy WebLinkAboutNCC202901_ESC Approval Submitted_20200715 ROY COOPER # * '>
Crotuncr
J�
MICHAEL S.REGAN
secrc,ra:;- 'e Cawsv�"
BRIAN WRENN NORTH CAROLINA
1c rinq txr.c rnr Environmental Quality
June 11,2020
LETTER OF APPROVAL
Brannon Road, LLC
ATTN: Jesse Satterwhite, Managing Partner
5933 Farmwell Rd.
Raleigh, NC 27610
RE: Project Name: Brannon Road Subdivision
Project ID: FRANK-2020-018
Approved Acres: 6.3
County: Franklin, City: Zebulon, Address: Brannon Road
River Basin: Tar-Pamlico, Stream Classification: Other
Submitted By: JAECO Consulting Engineers
Date Received by LQS. June 8, 2020
Plan Type: Revised
Dear Mr. Satterwhite:
The subject erosion and sedimentation control plan has been approved. The enclosed Certificate of
Approval must be posted at the job site. This plan approval shall expire three(3)years following the date
of approval,if no land-disturbing activity has been undertaken,as is required by Title 15A NCAC 413 .0129.
As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice
of Intent (eNOi) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction
General Permit. After the form is reviewed and found to be complete,you will receive a link with payment
instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via
email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eN01
form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to Annette
Lucas at Annette.Lucas u,ncdennizo or Paul Clark at Pau l.Clark u.ncdenr.gov. If the owner..'operator of
this project changes in the future, the new responsible party is required to apply for his±her own COC.
Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following;documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 pen-nit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Q Nnrth Carolina Deparintent of Cnv;rontnental quail,% II)ivlsion of Cncry}.Ailacral and Land Rr;our:es
ka?eigh Rcginnalilltircr I1118 hta l5crvirc CCnrfr :SHOO harrClt llrirr UlNgh-IJnrrh Corot na 27&f}cc
Letter of Approval
Brannon Road, LLC
June l 1, 2020
Page 2 of
Also,this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to insure
compliance with the approved plan.
Title 15A NCAC 413 .0118(a) requires that a copy of the approved erosion control plan be on file at the job
site. Also, this letter gives the notice required by G.S. l 13A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 1 13A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land-disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form,which you provided.You are requested to rile an amended fornm if there is any change
in the information included on the form. This permit allows for a land-disturbance, as called for on the
application plan, not to exceed time approved acres. Exceeding the acreage will be a violation of this permit
and would require a revised plan and additional application fee. In addition, it would be helpful if you notify
this office of the proposed starting date for this project.Please noti fy us if you plan to have a preconstruction
conference.
Your cooperation is appreciated.
Sincerely,
U
Sally Castle, El
Regional Engineering Associate
Land Quality Section
Enclosures: Certificate of Approval
NPDES NCGOI Fact Sheet
cc: Travis Tyboroslci, PE (travis@jaeco.com) — Electronic Copy
Regional Office File