Loading...
HomeMy WebLinkAboutNCC202901_ESC Approval Submitted_20200715 ROY COOPER # * '> Crotuncr J� MICHAEL S.REGAN secrc,ra:;- 'e Cawsv�" BRIAN WRENN NORTH CAROLINA 1c rinq txr.c rnr Environmental Quality June 11,2020 LETTER OF APPROVAL Brannon Road, LLC ATTN: Jesse Satterwhite, Managing Partner 5933 Farmwell Rd. Raleigh, NC 27610 RE: Project Name: Brannon Road Subdivision Project ID: FRANK-2020-018 Approved Acres: 6.3 County: Franklin, City: Zebulon, Address: Brannon Road River Basin: Tar-Pamlico, Stream Classification: Other Submitted By: JAECO Consulting Engineers Date Received by LQS. June 8, 2020 Plan Type: Revised Dear Mr. Satterwhite: The subject erosion and sedimentation control plan has been approved. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three(3)years following the date of approval,if no land-disturbing activity has been undertaken,as is required by Title 15A NCAC 413 .0129. As of April 1,2019,all new construction activities are required to complete and submit an electronic Notice of Intent (eNOi) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the $100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eN01 form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to Annette Lucas at Annette.Lucas u,ncdennizo or Paul Clark at Pau l.Clark u.ncdenr.gov. If the owner..'operator of this project changes in the future, the new responsible party is required to apply for his±her own COC. Title 15A NCAC 4B .0118(a) and the NCGOI permit require that the following;documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 pen-nit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Q Nnrth Carolina Deparintent of Cnv;rontnental quail,% II)ivlsion of Cncry}.Ailacral and Land Rr;our:es ka?eigh Rcginnalilltircr I1118 hta l5crvirc CCnrfr :SHOO harrClt llrirr UlNgh-IJnrrh Corot na 27&f}cc Letter of Approval Brannon Road, LLC June l 1, 2020 Page 2 of Also,this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to insure compliance with the approved plan. Title 15A NCAC 413 .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. l 13A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 1 13A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form,which you provided.You are requested to rile an amended fornm if there is any change in the information included on the form. This permit allows for a land-disturbance, as called for on the application plan, not to exceed time approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting date for this project.Please noti fy us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, U Sally Castle, El Regional Engineering Associate Land Quality Section Enclosures: Certificate of Approval NPDES NCGOI Fact Sheet cc: Travis Tyboroslci, PE (travis@jaeco.com) — Electronic Copy Regional Office File