Loading...
HomeMy WebLinkAboutBuck CBE - Appendix C_20191230Wood Environment & Infrastructure Solutions, Inc. Duke Energy Coal Combustion Residuals Management Program wood. Buck Station Basin CAMA Closure Plan APPENDIX C — Engineering Evaluations and Analysis Wood Environment & Infrastructure Solutions, Inc. Duke Energy Coal Combustion Residuals Management Program wood. Buck Station Basin CAMA Closure Plan Stormwater Peak Runoff and Volumes for 100-year Storm Event Duke Energy, Buck Station Stormwater Rainfall Depth Peak Runoff Volume Basin ID (in) (cfs) (ac-ft) Primary/Secondary Ash 7.17 545.24 68.129 Basin Additional Primary Ash 7.17 382.38 63.001 Basin Rev. 0 December 5, 2019 FINAL REPORT Buck Steam Station Full Probable Maximum Flood Evaluation April 4, 2019 Mr. John Kwon, P.E. Mr. Charlie Hiner, P.E. Mr. Dale Smith, P.E. Duke Energy 400 South Tryon Street Charlotte, NC 28202 RE: Report for Full Probable Maximum Flood Evaluation Ash Basin Dams, Buck Steam Station, Rowan County, NC Gentlemen: AECOM Technical Services, Inc. (AECOM) is pleased to submit this report for the task of Full Probable Maximum Flood Evaluation according to regulatory requirements for the following structures at Buck Steam Station: 1. Additional Primary Dam (ROWAN-068) 2. Basin 1 to Basin 2 Dam (ROWAN-069) 3. Basin 2 to Basin 3 Dam (ROWAN-070) 4. Divider Dam (ROWAN-071) 5. Main Dam (ROWAN-047) The dams are classified by the North Carolina Department of Environmental Quality (NCDEQ) as large size High Hazard (Class C) structures. This classification is driven by the potential environmental effects of a failure of the Buck Steam Station ash pond dams. The High Hazard classification is based upon the potential environmental impacts, not loss of life or property resulting from a breach. As a high hazard dam, the Spillway Design Flood (SDF) that is required by the previous NCDEQ Dam Regulations is the 3/a Probable Maximum Flood (PMF), based on the size criteria. To meet the recent requirement by NCDEQ, the SDFs for all Buck ash ponds have been elevated to Full PMF. A HEC-HMS model was revised from the previous model for Hazard Potential Classification task to evaluate the hydraulic performance of ash ponds at Buck Steam Station under the event of Full PMF. The evaluation focused on the risk of flood water overtopping of embankments and the required time to drain 80% of peak flood volume in the ponds. A:COM FINAL REPORT Buck Steam Station Full Probable Maximum Flood Evaluation The results of the analysis performed herein by AECOM show that: • Ash ponds in BUCK Steam Station can safely pass the Full PMF flow without overtopping the dams. This is subject to the proposed water level reduction in Basin 2 by additional removal of stoplogs facilitated by excavation of ash around the Basin 2 to 3 Dam outlet riser to support this lowering. • The outflow drainage system can drain 80% of peak PMF flood volume within 3.1 days which is less than the maximum allowable 15 days. Variable Full PIVIPStorm Minimum Crest Elevation (feet, NAVD88) 709.4 710.0 688.4 688.3 688.11 679.6 Initial WSEL (feet, 701.14 701.14 678.0 678.0 678.0 672.03 NAVD88) (proposed) (proposed) (proposed) Peak WSEL (feet, NAVD88) 708.81 708.81 687.48 687.48 687.48 677.78 Minimum Freeboard (feet) 0.59 1.19 0.92 0.82 0.63 1.82 Time Required to Drain 80% of PMF Flood Volume (days) 1.43 1.43 0.70 0.70 0.70 2.07 If you have any questions or need additional information, please do not hesitate to call me at 301-820-3554. %`:�N'CAgO,, pQ' *0ssi0 -.y Sincerely, '�QQ� '�� i = SEAL _ s 040145 Kenneth Ying, PhD,$ •• EP:' C? Principal Water Resou�� AECOM ACOM Page ii FINAL REPORT Buck Steam Station Full Probable Maximum Flood Evaluation FINAL REPORT Full Probable Maximum Flood Evaluation Buck Steam Station - Ash Ponds Rowan County, North Carolina Prepared for: Duke Energy Corporation 400 South Tryon Street Charlotte, North Carolina 28202 Prepared by: AECOM 6000 Fairview Road Suite 200 Charlotte, NC 28210 A=COM .Lo MCA /,0 R ,pQ FEss� �L9' _ :Q f SEAL � U 040145� eiH Y. '-- FINAL REPORT Buck Steam Station Full Probable Maximum Flood Evaluation Table of Contents 1.0. Introduction.......................................................................................................................................4 2.0. Review of Available Data...................................................................................................................6 3.0. Hydrologic Parameter Calculation.....................................................................................................7 4.0. Stage/Storage/Discharge Curve Development.................................................................................7 5.0. Rainfall Data......................................................................................................................................8 6.0. Hydrologic Model Simulation Results...............................................................................................8 7.0. Conclusions........................................................................................................................................9 8.0. References.........................................................................................................................................9 Figures Figure 1: Aerial View of Buck Steam Plant Ash Basins.................................................................... 4 Tables Table 1: Background Information — Buck Steam Station Ash Pond Dams ...................................... 5 Table 2: Comparison of NCDEQ and EPA Hazard Potential Classifications .................................... 6 Table 3: Model Simulation Results — Full PMP Storm for Existing Conditions ............................... 9 Appendices Appendix A: Areal Topographic Survey of Buck Steam Station Ash Basins (2015) Appendix B: Elevation -Discharge Curves Appendix C: Hydrologic Simulation Results COM Page ii FINAL REPORT Buck Steam Station Full Probable Maximum Flood Evaluation Acronyms and Abbreviations CCR Coal Combustion Residuals DEC Duke Energy Corporation EPA Environmental Protection Agency GIS Geographic Information System HEC Hydrologic Engineering Center HMS Hydrologic Modeling System HPC Hazard Potential Classification IDF Inflow Design Flood LiDAR Light Detection and Ranging NAVD North American Vertical Datum NCDEQ North Carolina Department of Environmental Quality NGVD National Geodetic Vertical Datum PMF Probable Maximum Flood PMP Probable Maximum Precipitation SDF Spillway Design Flood COM Page iii FINAL REPORT Buck Steam Station Full Probable Maximum Flood Evaluation 1.0. Introduction AECOM was contracted with Duke Energy Corporation (DEC) for the task of Probable Maximum Flood (PMF) Evaluation of the ash ponds at Buck Steam Station. The scope of work for this study includes the collection and review of relevant information and additional Hydrologic & Hydraulic (H&H) analyses to evaluate whether the combined capacity of spillways can adequately manage flow during the peak discharge from a PMF for Buck Steam Station ash ponds based on the high hazard potential (per NC Rules) CCR surface impoundment classification. AECOM will also provide recommendation regarding the management of PMF for the Buck Basin Dams. Duke Energy's Buck Steam Station Plant is a retired coal-fired generating station located near Salisbury, N.C. that began operation in 1926 and was retired in 2013. The facility is located on the Yadkin River upstream of High Rock Lake and uses a wet -ash pond system consisting of three basins separated by a system of five dams to store ash. These dams are regulated by North Carolina Department of Environmental Quality (NCDEQ) and include: the Main Dam (ROWAN-047), Divider Dam (ROWAN-071), and Basin 2 to Basin 3 Dam (ROWAN-070), Basin 1 to Basin 2 Dam (ROWAN-069), and Additional Primary Dam (ROWAN-068). Figure 1 shows the configuration of ponds and associated dams. Figure 1: Aerial View of Buck Steam Plant Ash Basins A=COM FINAL REPORT Buck Steam Station Full Probable Maximum Flood Evaluation In accordance with the U.S. Environmental Protection Agency's (EPA's) Final CCR Rule (effective date: October 19, 2015) (Ref. 11), the inflow design flood is based on the hazard potential classification of the impoundment as required by § 257.73 and § 257.74 of Final CCR rule. The inflow design floods for specific hazard potential classifications are as follows: (1) The probable maximum flood (PMF) for high hazard potential CCR surface impoundments; (2) the 1000-year flood for significant hazard potential CCR surface impoundments; (3) the 100-year flood for low hazard potential CCR surface impoundments; and (4) the 25-year flood for incised CCR surface impoundments. Based on the EPA CCR Rule, the Additional Primary Dam classified as High Hazard and the rest of the dams were classified as Significant Hazard. The dams are classified by the NCDEQ as large size High Hazard (Class C) structures. This classification is driven by the potential environmental effects of a failure of the Buck Steam Station ash pond dams. The High Hazard classification is based upon the potential environmental impacts, not loss of life or property resulting from a breach. As a high hazard dam, the Spillway Design Flood (SDF) that is required by the previous NCDEQ Dam Regulations is the % PMF when coupled with the size for the dam. To meet the recent requirement by NCDEQ, the SDFs for all Buck ash ponds have been elevated to Full PMF. The goal of this technical memorandum is to document the capacity of the spillway and outflow weirs during a PMF event for the Buck station dams according to the guidance and criteria established by NCDEQ. While DEC already demonstrated that the dams meet the EPA CCR Rule requirements as part of the 2016 CCR certifications, these are covered herein again as well as a secondary goal. Previous studies, including the Main Dam Spillway Replacement Investigation (Ref. 7) modeled and classified the dams by the NCDEQ hazard classification system. Table 1 presents pertinent dam characteristics collected from the previous studies. Table 1: Background Information — Buck Steam Station Ash Pond Dams General Dam Information Name Additional Basin 1 to Basin 2 to Divider Main (Section Main (Section Primary Basin 2 Basin 3 for Basin 2) for Basin 3) State ID ROWAN-068 ROWAN-069 ROWAN-070 ROWAN-071 ROWAN-047 ROWAN-047 NCDEQ Hazard High High High High High High Classification Height (feet) 71 22 14 9 59 59 Minimum Crest Elevation (feet, 709.4 710.0 688.4 688.3 688.11 679.6 NAVD88) Notes: Based on most up to date topography including new bathymetric survey (Ref. 3). The previous studies determined that all five Buck Steam Station ash pond dams are classified by NCDEQ as large size High Hazard (Class C) structures. Inundation studies show that there is no probable loss of life for all these dams, except Additional Primary, and the classification could be based on economic damage due to potential environmental impacts. A=COM FINAL REPORT Buck Steam Station Full Probable Maximum Flood Evaluation NCDEQ and EPA regulations use different classification systems to determine hazard risks associated with a potential dam failure. The HPCs defined by NCDEQ are dependent on the effects of the failure on environmental conditions downstream. EPA's HPC is defined based on whether the failure could result in loss of life downstream. A comparison of NCDEQ HPCs and EPA HPCs is shown in Table 2. Table 2: Comparison of NCDEQ and EPA Ilazard Potential Classifications Classification Defillition Required SDF Very Large Full PMP High Hazard Probable loss of Full PMP human life Probable loss of 1 or Large 3/4 PMP more human lives due to No probable loss of High breached roadway or (Class C) bridge on or below the Medium �/2 PMP human life, but dam or economic damage probable economic greater than $200,000. Significant loss, environmental 1,000 Year damage, or Small 1;, PMP disruption of lifeline facilities. Probable economic Very 3/4 PMP No probable loss of damage between $30,000 Large human life, low Intermediate and $200,000 or highway Low probability orr 100 Year Large '/2 PMP (Class B) damage or service economic Medium 1/3 PMP interruption affecting 25 environmental loss to 250 vehicles a day. (losses limited to owner's property) Small 100 Year Very y2 PMP Probable economic Large damage less than $30,000 Dams which pose no Large 1/, PMP Low or interruption of road Less than Low high, significant, or 25 Year (Class A) service affecting less than low hazard potential. Medium 100 Year 1 25 vehicles a day. i I Small 50 Year ` Note: All CCR Dams are classified from January 2019 by NCDEQ as high hazard with a required SDF of full PMP. In previous studies, the design criteria applied the % PMF for each pond per the requirement for large size Class C impoundments. The recent requirement from NC DEQ elevated the design criteria to Full PMF. AECOM conducted a review of the available information and additional H&H analyses to support the assessment of the capacity for the Buck CCR impoundments. 2.0. Review of Available Data Duke Energy provided AECOM with available data for the Buck Steam Station systems. The data provided by Duke Energy is summarized in Appendix C of the Phase 2 Report (Ref. 10). The same data was used to complete this memorandum in addition to the supplementary hydrologic data and information from the reports below: A=C'OM FINAL REPORT Buck Steam Station Full Probable Maximum Flood Evaluation • AECOM, 2017: AECOM prepared report to NC DEQ for the new spillway design for Basin 3. This spillway became operational in 2019 (Ref. 8). • AECOM, 2016: AECOM prepared the report for the development of Hazard Potential Classifications (HPCs) according to the definitions provided in the Coal Combustion Residuals (CCR) Rule for the ash ponds at Buck Steam Station. (Ref. 15) • AECOM, 2015: AECOM conducted a Spillway Replacement Analysis for Basin 3 (Secondary Pond) in the Buck Steam Station dam system. This project studied investigated replacing the existing riser. Updated hydrologic and hydraulic modelling was performed using HEC-HMS assuming breach conditions to design the system for the % PMP storm event (Ref. 7). • AECOM, 2014: AECOM conducted an H&H analysis of the existing conditions at the Buck Steam Station to determine if the existing spillway systems for the dams could safely pass the % PMP SDF without overtopping the embankment. The methodology and conclusions were submitted in the Phase 2 Report, "Hydrologic and Hydraulic Analysis, Buck Steam Station — Ash Points," dated November 2014 (Ref. 10). • ESP, 2012: ESP performed a dam breach analysis of the Buck Steam Station dams to determine potential damage from failure events. The results indicated that significant damage to properties other than that owned by DEC is not expected. Supporting information can be found in the report "Dam Breach Analysis, Buck Steam Station", dated August 10, 2012 (Ref. 2). • CHA, 2009: CHA performed an assessment of dam safety at the Buck Steam Station dams to document the visual observations and stability analysis of the dams in this area. Survey measurements of dam characteristics were documented. Additional information can be found in the report, "Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3) Final Report, Duke Energy Buck Steam Station", dated September 14, 2009 (Ref. 14). The supporting computer models included the HEC-HMS model for the watershed and the EPA-SWMM Model for the outfall pipeline. 3.0. Hydrologic Parameter Calculation This hydrologic and hydraulic memorandum used hydrologic parameters calculated during preparation of the HPC (Ref. 15). During this memorandum update, no parameters were changed from the HPC Report (Ref. 15). 4.0. Stage/Storage/Discharge Curve Development The stage/storage/discharge curves from HPC study were applied with proper modification to incorporate the adjustment of stop -log outlet elevation. A=COM FINAL REPORT Buck Steam Station Full Probable Maximum Flood Evaluation Stage/Storage Curve The stage/storage curve for the ponds were adapted from the HPC report data (Ref. 15) and are listed in Appendix B. Stage/Discharge Curve The stage -discharge rating curve adapted the data from HPC report for the Primary Pond. For Basin 2 to Basin 3 Dam, initial water level and stop -log elevation were updated and the revised elevation -discharge curve is shown in Appendix B. Other curves for each basin are also listed in Appendix B. 5.0. Rainfall Data The probable maximum flood (PMF) is the flood that results from the probable maximum precipitation (PMP). The PMP is defined as statistically the greatest amount of rainfall that can occur for a given geographic area. The newly required design storm the Buck Steam Station Dams is the full PMF and the ponds must pass at least 80% of peak PMF flood volume water stored within 15 days of the design storm. The rainfall amount and distribution for the Full PMP was calculated in the Phase 2 study using Hydro meteorological Reports 51 (Ref. 4) and 52 (Ref. 5). The total rainfall depth for the full PMP was calculated to be 29.49 inches for 6 hours. No updates to the Full PMP precipitation data were made for this evaluation. 6.0. Hydrologic Model Simulation Results Following calculation of the hydrologic parameters, Full PMP event, and stage/storage/discharge curves, the hydrologic model was created. The United States Army Corps of Engineers (USACE) Hydrologic Engineering Center (HEC) Hydrologic Modeling System (HMS) version 4.3 was used to model the study area. The control specifications of the model were set to run for 15 days following the start of the storm events. This helped enabled that the majority of the full outflow hydrograph was captured. Starting water surface elevation for the dams were entered into the HEC-HMS model based on normal pool elevation of the reservoirs. Tables 3 presents the results of the hydrologic analysis for the existing conditions of the dams. The HEC- HMS simulations summary is shown in Appendix C. Note that the initial water surface elevations used herein were selected based on the stop log elevations as provided by Duke for the spillway riser structures for the dams. The calculated minimum freeboard will be different if stop log elevations are changed. A=COM FINAL REPORT Buck Steam Station Full Probable Maximum Flood Evaluation Cable 3: Model Simulation Results - Full PNIP Storm for Existing Conditions Full PMP Storm Variable Additional Basin 1 to Basin 2 to Divider Main Main PrimaryBasin Basin 2 3 (Section for (Section for Basin 2) Basin 3) Minimum Crest Elevation 709.4 710.0 688.4 688.3 688.11 679.6 (feet, NAVD88) Initial WSEL (feet, 678.0 678.0 678.0 701.14 701.14 672.03 NAVD88) (proposed) (proposed) (proposed) Peak WSEL (feet, NAVD88) 708.81 708.81 687.48 687.48 687.48 677.78 Minimum Freeboard (feet) 0.59 1.19 0.92 0.82 0.63 1.82 Time Required to Drain 80% of PMF Flood Volume (days) 1.43 1.43 0.70 0.70 0.70 2.07 7.0. Conclusions The HEC-HMS model used in this analysis was developed using information obtained during the review of available data. The developed model is deemed a reasonable estimation of the conditions for the project area. The analysis was performed using conservative assumptions where appropriate for hydrologic parameter calculation and hydraulic capacity of the outlet structures. The results of the analysis are shown in Table 3, which presents the performance of dams under the design storms for the designated HPCs for the dams at the Buck Steam Station based on the NCDEQ and the EPA Final CCR Rule Classifications. Through review of relevant information and additional H&H analyses, it was concluded that: o The pond system can safely pass the Full PMF flow without overtopping the dams. This is subject to the proposed water level reduction in Basin 2 by additional removal of stoplogs facilitated by excavation of ash around the Basin 2 to 3 Dam outlet riser to support this lowering. o The outflow drainage system can drain 80% of PMF flood volume within 3.1 days which is less than the maximum allowable 15 days. Note that the outflow drainage system for the Main Dam includes an outfall pipeline which only activates for flood larger than 100-year return period. Under the PMF condition, it is active until flood elevation recedes below the 100-year flood level. 8.0. References 1. North Carolina Administrative Code - Title 15A Department of Environment and Natural Resources of Subchapter 2K - Dam Safety. http://www.damsafetyaction.org/NC/about- eaps/what.php 2. ESP Associates, P.A., Buck Steam Station Hydrologic Analysis - Calculation # BC -UNIT 5-6-0008, April 20, 2012. AXOM FINAL REPORT Buck Steam Station Full Probable Maximum Flood Evaluation 3. Areal Topographic Survey of Buck Steam Station Ash Basins for Duke Energy Corporation. Developed by WSP, February 2, 2015. Book No. BUCKBOOK01. 4. Probable Maximum Precipitation Estimates, United States East of the 105th Meridian. Hydrometeorological Report No. 51. NOAA. June 1978. 5. http://www.nws.noaa.gov/oh/hdsc/studies/pmp.html#PMP-documents 6. Application of Probable Maximum Precipitation Estimates - United States East of the 105th Meridian. Hydrometeorological Report No. 52. NOAA. August 1982. 7. http://www.nws.noaa.gov/oh/hdsc/studies/pmp.html#PMP_documents 8. NOAA, National Weather Service (2013) Precipitation -Frequency Atlas of the United Stated Point Precipitation Frequency Estimates by NOAA Atlas 14, Volume 2, Version 3; (NOAA website: http://hdsc.nws.noaa.gov/hdsc/pfds/pfds_map_cont.html?bkmrk=sc). 9. Design Report: Spillway Replacement, Basin 3 (Secondary Pond), Buck Steam Station (NCDEQ State Dam ID: ROWAN-047). Salisbury, North Carolina. AECOM. July 31, 2015. 10. Design Report: New Spillway Replacement, Basin 3 (Secondary Pond), Buck Steam Station (NCDEQ State Dam ID: ROWAN-047). Salisbury, North Carolina. AECOM. October, 2017. 11. U.S. Army Corps of Engineers (2013), Hydrologic Engineering Center, HEC-HMS, Hydrologic Modeling System, Version 4.0, December 31, 2013. 12. AECOM, Buck Steam Station - Final Phase 2 Reconstitution of Ash Pond Design Report - Revision 4 - October 2017. 13. 40 C.F.R. § 257.261, Vol. 80 No. 74. April 17, 2015. 14. Froelich, D. C. (2008). "Embankment Dam Breach Parameters and Their Uncertainties." Journal of Hydraulic Engineering, Vol. 134, No. 12, May, pgs. 1708-1720. 15. ESP Associates, N.C., Buck Steam Station Dam Breach Analysis- Calculation # BC -UNIT 5-6-0009, August 10, 2012. 16. CHA, Assessment of Dam Safety Coal Combustion Surface Impoundments (Task 3) Final Report, Duke Energy Buck Steam Station, September 14, 2009. 17. AECOM, Report for Determination of Hazard Potential Classifications - Buck Steam Station, March 16, 2016. A=COM FINAL REPORT Buck Steam Station Full Probable Maximum Flood Evaluation Appendix A Areal Topographic Survey of Buck Steam Station Ash Basins (2015) l0" zua.7wii AERA T?POGR!PW- SURVEY .............. SP....... _. A:COM FINAL REPORT Buck Steam Station Full Probable Maximum Flood Evaluation Appendix B Elevation -Discharge -Storage Curve Tables Elevation -Discharge Rating Table for Basin 2 to Basin 3 Dam Stop Log Elevation = 678 feet (Primary Pond [Basin 21 in HEC-HMS Model) Elevation 662 Discharge 0.0 664 0.0 666 0.0 668 0.0 670 0.0 672 0.0 674 0.0 676 0.0 678 0.0 678.27 5 679.27 45.0 680.27 103.5 681.27 171.2 682.27 234.1 683.27 257.8 684.27 279.5 684.77 289.8 685.27 299.7 685.77 309.2 686.77 327.5 687.77 344.9 688.77 529.0 689.27 759.8 690.27 1376.9 691.27 2155.1 A=COM FINAL REPORT Buck Steam Station Full Probable Maximum Flood Evaluation Elevation -Discharge Rating Table for Main Dam at Basin 3 (Secondary Pond [Basin 3] in HEC-HMS Model) Elevation r 658 Discharge 0 660 0 662 0 664 0 666 0 668 0 670 0 672 0 673 0 673.27 26 673.77 43 674.77 84 675.27 85 675.77 85 676.77 85 677.27 223 677.77 475 678.77 1188 679.27 1627 679.6 1942 681.27 6398 AZCOM FINAL REPORT Buck Steam Station Full Probable Maximum Flood Evaluation Elevation -Discharge Rating Table for Additional Primary Basin (Additional Primary Pond [Basin 1] in HEC-HMS Model) Elevation Discharge .: 0.0 696 0.0 698 0.0 700 0.0 702 0.0 702.63 5.6 703.27 18.9 704 26.9 704.27 41.3 704.77 73.9 705.77 111.9 706.77 154.8 707.77 202.0 708.77 227.2 709.27 257.4 709.4 845.6 710 A:COM FINAL REPORT Buck Steam Station Full Probable Maximum Flood Evaluation Elevation -Storage Rating Table for Primary Pond (Basin 2) (Primary Pond [Basin 21 in HEC-HMS Modell Elevation (Feet, NAVD88) 662 Volume (acre-foot) 0 664 0.00001 666 2.307 668 8.0763 670 17.072 672 29.202 674 44.515 676 63.217 678 85.407 678.27 88.698 679.27 101.39 680.27 114.88 681.27 129.31 682.27 145.69 683.27 166.93 684.27 193.55 684.77 211.88 685.27 233.33 685.77 257.25 686.77 310.84 687.77 367.82 688.77 428.55 689.27 459.96 690.27 524.71 691.27 592.21 A=COM FINAL REPORT Buck Steam Station Full Probable Maximum Flood Evaluation Elevation -Storage Rating Table for Secondary Pond (Basin 3) (Secondary curve [Basin 3] in HEC-HMS Model) Elevation 658 lVolurne ..t 0 660 2.1 662 8.9 664 19 666 31.8 668 47.2 670 66.3 672 89.3 672.2 91.9 673 102.4 673.2 105 673.27 105.9 673.77 113 674.77 128.5 675.27 136.8 675.77 145.3 676.77 163 677.27 172.2 677.77 181.6 678.77 201 679.27 210.9 679.6 217.4 681.27 252.8 A=COM FINAL REPORT Buck Steam Station Full Probable Maximum Flood Evaluation Elevation -Storage Rating Table for Additional Primary Basin (Basin 1) (Additional Primary Pond [Basin 1] in HEC-HMS Model) Elevation D:foot) 696 Volume (acre- 0 698 0.01 700 0.81 702 7.68 702.63 19.81 703.27 32.13 704 46.19 704.27 54.07 704.77 72.65 705.77 126.08 706.77 194.89 707.77 268.98 708.77 346.45 709.27 386.09 709.4 396.48 710 444.91 AZCOM FINAL REPORT Buck Steam Station Full Probable Maximum Flood Evaluation Appendix C Hydrologic Simulation Results Full PMF Simulations 1. Additional Primary Dam & Basin 1 to 2 Dam ® Summary Results for Reservoir "Pond -Add -Prim" F-- F O C Project: BUCK PMP HMS Simulation Run: PMP-BCDF Reservoir: Pond Add Prim Start of Run: 01Jan2012, 00:00 Basin Model: PROPOSED BCDF End of Run: 163an2012, 00:00 Meteorologic Model: 6Hr PMP Compute Time:l4Mar2D19, 18:14:18 Control Specifications:15-Day Volume Units: o IN ACff Computed Results Peak Inflow: 3275.3 (CFS) Datetrime of Peak Inflow: 01]an2012, 03:23 Peak Disdarge: 204.10S) Date/Time of Peak Discharge:013an2D12, 06:15 Inflow Volume: 32.52 (IN) Peak Storage: 349.8 (AC+- ) Discharge Volume:31.05 ON Peak Elevation: 708.81(FT) 2. Basin 2 to 3 Dam, Divider Dam, and Main Dam (Section for Basin 2) L Summary Results for Reservoir "Pond Primary" C p C Project: BUCK PMP HMS Simulation Run: PMP-BCDF Reservoir: Pond Primary Startof Run: 011an2D12, 00:00 Basin Model: PROPOSED BCDF End of Run: 16]an2D 12, 00:00 Meteorologic Model: 6Hr PMP Compute Tiime:l4Mar2D19, 18:14:18 Control Specifications:l5-Day Volume Units: o Cif AC -FT Computed Results Peak Inflow: 2989.1(CFS) Date/rime of Peak Inflow: 011an2012, 03:18 Peak Discharge: 339.8 (CFS) Date/rime of Peak Discharge:011an2012, 06:12 Inflow Volume: 28.96 (IN) Peak Storage: 351.1(AC+ ) Discharge Volume:28.86 (IN) Peak Elevation: 687.48 (FT) A -COM FINAL REPORT Buck Steam Station Full Probable Maximum Flood Evaluation 3. Main Dam (Section for Basin 31 L71 Summary Results for Reservoir "Pond -Second" W C p C Project: BUCK PMP HMS Simulation Run: PMP-BCDF Reservoir: Pond Second Startof Run: 013an2012, 00:00 Basin Model: PROPOSED BCDF End of Run: 16]an2012, 00:00 Meteorologic Model: 6Hr PMP Compute Time: l4Mar2019, 18:14:18 Control Specification: 15-0ay Volume Units: o IN AC -FT Computed Results Peak Inflow: 1149.3 (CFS) Date/Time of Peak Inflow: Ol]an2012, 03:19 Peak Discharge: 483.5 (CPS) Date/Time of Peak Discharge:011an2012, 04:30 Inflow Volume: 28.48 (IN) Peak Storage: 181.8 (AC+-} Discharge Volume:28.06 (IN) Peak Elevation: 677.78 (FT) A=COM wood. October 14, 2019 Mr. Dale Smith Project Manager Duke Energy 526 South Church Street Charlotte, North Carolina 28202 Subject: Hydrology and Hydraulics Analysis Summary Report Buck Main Dam (ROWAN-047) and Additional Primary Dam (ROWAN-068) Decommissioning Duke Energy — Buck Steam Station Rowan County, North Carolina Wood Project No. 7812180092 Dear Mr. Smith, As part of the decommissioning plan for the Main Dam (ROWAN-047) and the Additional Primary Dam (ROWAN-068), Wood Environment & Infrastructure Solutions, Inc. (Wood) has prepared this Hydraulic and Hydrologic analysis (H&H) summary report. This H&H summary represents the Main Dam (ROWAN-047) and the Additional Primary Dam (ROWAN-068) in their proposed decommissioned condition. Background Information The Main Dam (ROWAN-047) is classified by North Carolina Department of Environmental Quality (NCDEQ) as a high hazard structure. The high -hazard classification is driven by the potential environmental effects if a failure of the dam was to occur. The Main Dam was constructed in 1957 and serves as the primary retention structure for the Primary Ash Basin and the Secondary Ash Basin. The main characteristics of the dam are: • Dam Length: 2,384 feet • Structural Height: 70 feet • Crest Width: 14 feet • Upstream Slope: 3.5H:1V • Downstream Slope: 3.5H:1 V The Additional Primary Dam (ROWAN-068) is classified by NCDEQ as a high hazard dam. This classification is driven by the potential environmental effects if a failure of the dam was to occur. The Additional Primary Dam was constructed in 1982 and serves as the primary Wood Environment & Infrastructure Solutions, Inc. 4021 Stirrup Creek Drive, Suite 100 Durham, North Carolina 27703 Tel (919) 381-9900 Fax (919) 381-9901 www.woodolc.com Licensure: NC Engineering F-1253 NC Geology C-247 Duke Energy October 14, 2019 Page 2 Buck Steam Station Hydrology and Hydraulics Analysis Summary Report Wood Project No. 7812-18-0092 retention structure for the Additional Primary Ash Basin. The main characteristics of the dam are: • Dam Length: 2,000 feet • Structural Height: 72 feet • Crest Width: 20 feet • Upstream Slope: 2.5H:1V • Downstream Slope: 2.5H:1 V H&H Evaluation Criteria The computer program HydroCAD was used to perform the Hydrologic and Hydraulic calculations to determine the flow depth and velocity through the breach section for the proposed decommissioned condition. The Main Dam (ROWAN-047), in the decommissioned conditions, will have a trapezoidal opening (breach) in the western dam section. The breach opening is designed to have approximately a 150 foot bottom width, 10:1 side slopes, and is cut to an elevation of approximately 643 feet at the inside face of the dam. The Additional Primary Dam (ROWAN-068), in the decommissioned conditions, will have a trapezoidal opening (breach) in the eastern dam section. The breach opening is designed to have approximately a 50 foot bottom width, 10:1 side slopes, and is cut to an elevation of approximately 666 feet at the inside face of the dam. The design storm for the decommissioned condition is the 100-year, 24-hour storm event, which equates to 7.17 inches of rainfall for a twenty-four (24) hour period. H&H Summary A summary of the H&H modeling is provided in Table 1 below. Table 1 - H&H Results Results for Decommissioned Condition Main Dam (ROWAN-047) Additional Primary Dam (ROWAN-068) Peak Discharge Rate (ft3/s) 545 382 Breach Opening Bottom Width (ft) 50 150 Breach Opening Side Slope 10:1 10:1 Flow Depth in Breach (ft) 0.96 0.95 Slope of Breach Channel (ft/ft) 0.0213 0.0704 Peak Velocity (ft/s) 5.15 6.67 Duke Energy October 14, 2019 Page 3 Conclusion Buck Steam Station Hydrology and Hydraulics Analysis Summary Report Wood Project No. 7812-18-0092 Based on the results of this H&H analysis, Wood concludes that the breaches in the Main Dam (ROWAN-047) and the Additional Primary Dam (ROWAN-068) will safely pass the 100-year storm event without overtopping the remaining dike remnants. Furthermore, the discharge velocity through the dike opening should not cause erosive conditions across the breach section or adjacent dike slopes (the breach opening/channel for the Additional Primary Dam (ROWAN-068) will be lined with riprap due to the steeper slope and higher velocity). Closing Wood appreciates the opportunity to offer our services on this project. If you have any questions concerning this response, please contact us. Sincerely, Wood Environment & Infrastructure Solutions, Inc... Y • Q V.V r SEAL Richard L. Hiner, PE, CPESC = 29185 Joshua M. Bell, PE Senior Associate Engineer 4:; Senior Engineer ���� ✓/ l/ d d l l l l l l l l l l�\\\\ Attachments H&H Calculations — Decommissioned Conditions 1S Final C nditions - Addition I Primary Ba in DA Dam Breach Channel M Dukeville Road Culvert Subcat Reach on Link 2S Final Co ditions - Primary/ econdary Basi DA 7R Dam Breach Channel Buck Ash Basin Breaches - 100-year Final Conditions -Full PMP Prepared by AMEC Printed 10/11/2019 HvdroCAD® 10.00-24 s/n 05847 © 2018 HvdroCAD Software Solutions LLC Paae 2 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 172.776 86 Newly graded area, HSG B (1 S, 2S) 189.614 65 Woods/grass comb., Fair, HSG B (1S, 2S) 362.390 75 TOTAL AREA Buck Ash Basin Breaches - 100-year Final Conditions -Full PMP Prepared by AMEC Printed 10/11/2019 HydroCAD® 10.00-24 s/n 05847 © 2018 HydroCAD Software Solutions LLC Page 3 Soil Listing (all nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 362.390 HSG B 1 S, 2S 0.000 HSG C 0.000 HSG D 0.000 Other 362.390 TOTAL AREA Buck Ash Basin Breaches - 100-year Final Conditions -Full PMP Prepared by AMEC Printed 10/11/2019 HydroCADO 10.00-24 s/n 05847 © 2018 HydroCAD Software Solutions LLC Page 4 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 172.776 0.000 0.000 0.000 172.776 Newly graded area 1 S, 2S 0.000 189.614 0.000 0.000 0.000 189.614 Woods/grass comb., Fair 1 S, 2S 0.000 362.390 0.000 0.000 0.000 362.390 TOTAL AREA Buck Ash Basin Breaches - 100-year Final Conditions -Full PMP Type 1124-hr 100-yr Rainfall=7.17" Prepared by AMEC Printed 10/11/2019 HvdroCAD® 10.00-24 s/n 05847 © 2018 HvdroCAD Software Solutions LLC Paae 5 Time span=0.00-200.00 hrs, dt=0.05 hrs, 4001 points Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv. Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment 1 S: Final Conditions - Runoff Area=167.300 ac 0.00% Impervious Runoff Depth=4.52" Flow Length=2,025' Tc=64.7 min CN=77/0 Runoff=382.38 cfs 63.001 of Subcatchment2S: Final Conditions - Runoff Area=195.090 ac 0.00% Impervious Runoff Depth=4.19" Flow Length=1,100' Tc=44.0 min CN=74/0 Runoff=545.24 cfs 68.129 of Reach 6R: Dam Breach Channel Avg. Flow Depth=0.95' Max Vet=6.67 fps Inflow=382.38 cfs 63.001 of n=0.055 L=355.0' S=0.0704'/' Capacity=4,106,525.71 cfs Outflow=382.14 cfs 63.001 of Reach 7R: Dam Breach Channel Avg. Flow Depth =0.96' Max Vet=5.15 fps Inflow=545.24 cfs 68.129 of n=0.040 L=470.0' S=0.0213 '/' Capacity=1,856,073.24 cfs Outflow=544.30 cfs 68.129 of Reach 8R: Dukeville Road Culvert Avg. Flow Depth =0.98' Max Vet=7.78 fps Inflow=382.14 cfs 63.001 of 600.0" x 48.0" Box Pipe n=0.013 L=100.0' S=0.0050 '/' Capacity=2,437.78 cfs Outflow=382.28 cfs 63.001 of Total Runoff Area = 362.390 ac Runoff Volume = 131.130 of Average Runoff Depth = 4.34" 100.00% Pervious = 362.390 ac 0.00% Impervious = 0.000 ac Buck Ash Basin Breaches - 100-year Final Conditions -Full PMP Type // 24-hr 100-yr Rainfall=7.17" Prepared by AMEC Printed 10/11/2019 HvdroCADO 10.00-24 s/n 05847 © 2018 HvdroCAD Software Solutions LLC Paae 6 Summary for Subcatchment 1S: Final Conditions - Additional Primary Basin DA Runoff = 382.38 cfs @ 12.68 hrs, Volume= 63.001 af, Depth= 4.52" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-200.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=7.17" Area (ac) CN Description 74.400 65 Woods/grass comb., Fair, HSG B 92.900 86 Newly graded area, HSG B 167.300 77 Weighted Average 167.300 77 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.7 100 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.34" 37.0 1,925 0.0300 0.87 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 64.7 2,025 Total Subcatchment 1S: Final Conditions - Additional Primary Basin DA Hydrograph 382.38 cfs @ 12.68 hrs R6noff=312.38 cfs @ 12.i8 hrs 350 1 Type 124-hr Ra 100-yr infall 7.17" 300 Runoff Area=167.�00 ac Runoff Volume=63-.001-af 250 Runoff Deptht4.52" 3 200 Flow Length=2,025' _o Tc=64,7 min u_ 150 - CN=77/0 100 50 / 0 20 40 60 80 100 120 140 160 180 200 Time (hours) 0 Runoff Buck Ash Basin Breaches - 100-year Final Conditions -Full PMP Type // 24-hr 100-yr Rainfall=7.17" Prepared by AMEC Printed 10/11/2019 HvdroCADO 10.00-24 s/n 05847 © 2018 HvdroCAD Software Solutions LLC Paae 7 Summary for Subcatchment 2S: Final Conditions - Primary/Secondary Basin DA Runoff = 545.24 cfs @ 12.42 hrs, Volume= 68.129 af, Depth= 4.19" Runoff by SCS TR-20 method, UH=SCS, Split Pervious/Imperv., Time Span= 0.00-200.00 hrs, dt= 0.05 hrs Type II 24-hr 100-yr Rainfall=7.17" Area (ac) CN Description 56.943 86 Newly graded area, HSG B 87.553 65 Woods/grass comb., Fair, HSG B 22.933 86 Newly graded area, HSG B 27.661 65 Woods/grass comb., Fair, HSG B 195.090 74 Weighted Average 195.090 74 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.7 100 0.0100 0.06 Sheet Flow, Woods: Light underbrush n= 0.400 P2= 3.34" 16.3 1,000 0.0420 1.02 Shallow Concentrated Flow, Woodland Kv= 5.0 fDs 44.0 1,100 Total Subcatchment 2S: Final Conditions - Primary/Secondary Basin DA 545.24 cfs 500 450 400 350 3 300 ,° 250 200 150 100 50 0 I Hydrograph 12.42 hrs 0 Runoff Runoff=5�5.24 cfs @ 12.42 hrs �Type 124-hr �10�yr RainfalT�717" F —1 F Ruof-Are�a=19y190c Runoff Volume=68.129 of L Runof�Depth�4.19" Flow Length=1,100' �Tc=44'0 min CN=74/0 20 40 60 80 100 120 140 160 180 200 Time (hours) Buck Ash Basin Breaches - 100-year Final Conditions -Full PMP Type 1124-hr 100-yr Rainfall=7.17" Prepared by AMEC Printed 10/11/2019 HvdroCAD® 10.00-24 s/n 05847 © 2018 HvdroCAD Software Solutions LLC Paae 8 Summary for Reach 6R: Dam Breach Channel Inflow Area = 167.300 ac, 0.00% Impervious, Inflow Depth = 4.52" for 100-yr event Inflow = 382.38 cfs @ 12.68 hrs, Volume= 63.001 of Outflow = 382.14 cfs @ 12.69 hrs, Volume= 63.001 af, Atten= 0%, Lag= 0.4 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-200.00 hrs, dt= 0.05 hrs Max. Velocity= 6.67 fps, Min. Travel Time= 0.9 min Avg. Velocity = 5.27 fps, Avg. Travel Time= 1.1 min Peak Storage= 20,347 cf @ 12.69 hrs Average Depth at Peak Storage= 0.95' Bank -Full Depth= 70.00' Flow Area= 52,500.0 sf, Capacity= 4,106,525.71 cfs 50.00' x 70.00' deep channel, n= 0.055 Side Slope Z-value= 10.0 7' Top Width= 1,450.00' Length= 355.0' Slope= 0.0704 7' Inlet Invert= 665.00', Outlet Invert= 640.00' Reach 6R: Dam Breach Channel Hydrograph ❑ Inflow ❑ Outflow i% Avg. Flow Depth=0.95' 11 /�Max Vel=6.67 ' 11 ��Capacity=4,106,525.71 cfs 1 1 iiii�iiiiiiiiiiiiii�iiiiiiiiiiiiiii�iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii� Buck Ash Basin Breaches - 100-year Final Conditions -Full PMP Type/1 24-hr 100-yr Rainfall=7.17" Prepared by AMEC Printed 10/11/2019 HvdroCADO 10.00-24 s/n 05847 © 2018 HvdroCAD Software Solutions LLC Paae 9 7 [01 5 a� 4 a 3 d 0 2 1 7 0 6i 2 1 Reach 6R: Dam Breach Channel Stage -Discharge 0 1,000,000 2,000,000 3,000,000 4,000,000 Discharge (cfs) Reach 6R: Dam Breach Channel Stage -Storage 0 5,000,000 10,000,000 15,000,000 Storage (cubic -feet) ❑ Primary ❑ Storage Buck Ash Basin Breaches - 100-year Final Conditions -Full PMP Type 1124-hr 100-yr Rainfall=7.17" Prepared by AMEC Printed 10/11/2019 HvdroCAD® 10.00-24 s/n 05847 © 2018 HvdroCAD Software Solutions LLC Paae 10 Stage -Area -Storage for Reach 6R: Dam Breach Channel Elevation End -Area Storage (feet) (sq-ft) (cubic -feet) 665.00 0.0 0 665.75 43.5 15,425 666.50 98.1 34,826 667.25 163.9 58,202 668.00 241.0 85,555 668.75 329.3 116,884 669.50 428.7 152,189 670.25 539.4 191,469 671.00 661.2 234,726 671.75 794.3 281,959 672.50 938.5 333,168 673.25 1,094.0 388,352 674.00 1,260.6 447,513 674.75 1,438.4 510,650 675.50 1,627.5 577,763 676.25 1,828.5 649,100 677.00 2,040.6 724,413 677.75 2,263.9 803,702 678.50 2,498.5 886,968 679.25 2,744.3 974,209 680.00 3,001.2 1,065,426 680.75 3,269.3 1,160,619 681.50 3,548.7 1,259,788 682.25 3,839.3 1,362,934 683.00 4,141.0 1,470,055 683.75 4,453.9 1,581,152 684.50 4,778.1 1,696,226 685.25 5,113.4 1,815,275 686.00 5,460.0 1,938,300 686.75 5,818.4 2,065,550 687.50 6,188.1 2,196,776 688.25 6,568.9 2,331,977 689.00 6,961.0 2,471,155 689.75 7,364.3 2,614,309 690.50 7,778.7 2,761,439 691.25 8,204.4 2,912,544 692.00 8,641.2 3,067,626 692.75 9,089.3 3,226,684 693.50 9,548.5 3,389,718 694.25 10,019.0 3,556,727 695.00 10,500.6 3,727,713 695.75 10,993.5 3,902,675 696.50 11,497.5 4,081,612 697.25 12,013.4 4,264,775 698.00 12,540.6 4,451,913 698.75 13,079.0 4,643,027 699.50 13,628.5 4,838,118 700.25 14,189.3 5,037,184 701.00 14,761.2 5,240,226 701.75 15,344.4 5,447,244 702.50 15,938.7 5,658,239 703.25 16,544.3 5,873,209 Elevation End -Area Storage (feet) (sq-ft) (cubic -feet) 704.00 17,161.0 6,092,155 704.75 17,789.0 6,315,077 705.50 18,428.1 6,541,976 706.25 19,078.5 6,772,850 707.00 19,740.0 7,007,700 707.75 20,413.4 7,246,775 708.50 21,098.1 7,489,826 709.25 21,794.0 7,736,852 710.00 22,501.0 7,987,855 710.75 23,219.3 8,242,834 711.50 23,948.7 8,501,789 712.25 24,689.3 8,764,719 713.00 25,441.2 9,031,626 713.75 26,204.3 9,302,509 714.50 26,978.5 9,577,368 715.25 27,764.0 9,856,202 716.00 28,560.6 10,139,013 716.75 29,368.5 10,425,800 717.50 30,187.5 10,716,563 718.25 31,018.5 11,011,550 719.00 31,860.6 11,310,513 719.75 32,714.0 11,613,452 720.50 33,578.5 11,920,368 721.25 34,454.3 12,231,259 722.00 35,341.2 12,546,126 722.75 36,239.4 12,864,969 723.50 37,148.7 13,187, 789 724.25 38,069.3 13,514,584 725.00 39,001.0 13,845,355 725.75 39,943.9 14,180,102 726.50 40,898.1 14,518,826 727.25 41,863.5 14,861,525 728.00 42,840.0 15,208,200 728.75 43,828.4 15,559,100 729.50 44,828.1 15,913,976 730.25 45,839.0 16,272,827 731.00 46,861.0 16,635,655 731.75 47,894.3 17,002,459 732.50 48,938.7 17,373,239 733.25 49,994.3 17,747,994 734.00 51,061.2 18,126,726 734.75 52,139.3 18,509,434 Buck Ash Basin Breaches - 100-year Final Conditions -Full PMP Type 1124-hr 100-yr Rainfall=7.17" Prepared by AMEC Printed 10/11/2019 HvdroCAD® 10.00-24 s/n 05847 © 2018 HvdroCAD Software Solutions LLC Paae 11 Summary for Reach 7R: Dam Breach Channel Inflow Area = 195.090 ac, 0.00% Impervious, Inflow Depth = 4.19" for 100-yr event Inflow = 545.24 cfs @ 12.42 hrs, Volume= 68.129 of Outflow = 544.30 cfs @ 12.44 hrs, Volume= 68.129 af, Atten= 0%, Lag= 1.0 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-200.00 hrs, dt= 0.05 hrs Max. Velocity= 5.15 fps, Min. Travel Time= 1.5 min Avg. Velocity = 3.57 fps, Avg. Travel Time= 2.2 min Peak Storage= 49,667 cf @ 12.44 hrs Average Depth at Peak Storage= 0.96' Bank -Full Depth= 55.00' Flow Area= 35,750.0 sf, Capacity= 1,856,073.24 cfs 100.00' x 55.00' deep channel, n= 0.040 Side Slope Z-value= 10.0 7' Top Width= 1,200.00' Length= 470.0' Slope= 0.0213 7' Inlet Invert= 640.00', Outlet Invert= 630.00' Reach 7R: Dam Breach Channel Hydrograph ❑ Inflow ❑ Outflow 11 !/ . .. 12.44 hrs Avg. Flow i �•Max Vel=5.15 fps 1 // 11 �� Capacity=1,856,073.24 cfs 1, Ili 11 Buck Ash Basin Breaches - 100-year Final Conditions -Full PMP Type/1 24-hr 100-yr Rainfall=7.17" Prepared by AMEC Printed 10/11/2019 HvdroCADO 10.00-24 s/n 05847 © 2018 HvdroCAD Software Solutions LLC Paae 12 5 5 4 4 3 3 � a 2 d 2 0 1 1 5 5 4 4 3 93 � 2 a 0 2 1 1 Reach 7R: Dam Breach Channel Stage -Discharge 0 500,000 1,000,000 1,500,000 Discharge (cfs) Reach 7R: Dam Breach Channel Stage -Storage 0 5,000,000 10,000,000 15,000,000 Storage (cubic -feet) ❑ Primary ❑ Storage Buck Ash Basin Breaches - 100-year Final Conditions -Full PMP Type 1124-hr 100-yr Rainfall=7.17" Prepared by AMEC Printed 10/11/2019 HvdroCAD® 10.00-24 s/n 05847 © 2018 HvdroCAD Software Solutions LLC Paae 13 Stage -Area -Storage for Reach 7R: Dam Breach Channel Elevation End -Area Storage (feet) (sq-ft) (cubic -feet) 640.00 0.0 0 640.55 58.0 27,272 641.10 122.1 57,387 641.65 192.2 90,346 642.20 268.4 126,148 642.75 350.6 164,794 643.30 438.9 206,283 643.85 533.2 250,616 644.40 633.6 297,792 644.95 740.0 347,812 645.50 852.5 400,675 646.05 971.0 456,382 646.60 1,095.6 514,932 647.15 1,226.2 576,326 647.70 1,362.9 640,563 648.25 1,505.6 707,644 648.80 1,654.4 777,568 649.35 1,809.2 850,336 649.90 1,970.1 925,947 650.45 2,137.0 1,004,402 651.00 2,310.0 1,085,700 651.55 2,489.0 1,169,842 652.10 2,674.1 1,256,827 652.65 2,865.2 1,346,656 653.20 3,062.4 1,439,328 653.75 3,265.6 1,534,844 654.30 3,474.9 1,633,203 654.85 3,690.2 1,734,406 655.40 3,911.6 1,838,452 655.95 4,139.0 1,945,342 656.50 4,372.5 2,055,075 657.05 4,612.0 2,167,652 657.60 4,857.6 2,283,072 658.15 5,109.2 2,401,336 658.70 5,366.9 2,522,443 659.25 5,630.6 2,646,394 659.80 5,900.4 2,773,188 660.35 6,176.2 2,902,826 660.90 6,458.1 3,035,307 661.45 6,746.0 3,170,632 662.00 7,040.0 3,308,800 662.55 7,340.0 3,449,812 663.10 7,646.1 3,593,667 663.65 7,958.2 3,740,366 664.20 8,276.4 3,889,908 664.75 8,600.6 4,042,294 665.30 8,930.9 4,197,523 665.85 9,267.2 4,355,596 666.40 9,609.6 4,516,512 666.95 9,958.0 4,680,272 667.50 10,312.5 4,846,875 668.05 10,673.0 5,016,322 Elevation End -Area Storage (feet) (sq-ft) (cubic -feet) 668.60 11,039.6 5,188,612 669.15 11,412.2 5,363,746 669.70 11,790.9 5,541,723 670.25 12,175.6 5,722,544 670.80 12,566.4 5,906,208 671.35 12,963.2 6,092,716 671.90 13, 366.1 6,282,067 672.45 13,775.0 6,474,262 673.00 14,190.0 6,669,300 673.55 14,611.0 6,867,182 674.10 15, 038.1 7,067,907 674.65 15,471.2 7,271,476 675.20 15,910.4 7,477,888 675.75 16,355.6 7,687,144 676.30 16,806.9 7,899,243 676.85 17,264.2 8,114,186 677.40 17,727.6 8,331,972 677.95 18,197.0 8,552,602 678.50 18,672.5 8,776,075 679.05 19,154.0 9,002,392 679.60 19,641.6 9,231,552 680.15 20,135.2 9,463,556 680.70 20,634.9 9,698,403 681.25 21,140.6 9,936,094 681.80 21,652.4 10,176,628 682.35 22,170.2 10,420,006 682.90 22,694.1 10,666,227 683.45 23,224.0 10,915,292 684.00 23,760.0 11,167,200 684.55 24,302.0 11,421,952 685.10 24,850.1 11,679,547 685.65 25,404.2 11,939,986 686.20 25,964.4 12,203,268 686.75 26,530.6 12,469,394 687.30 27,102.9 12,738,363 687.85 27,681.2 13,010,176 688.40 28,265.6 13,284,832 688.95 28,856.0 13,562,332 689.50 29,452.5 13,842,675 690.05 30,055.0 14,125,862 690.60 30,663.6 14,411,892 691.15 31,278.2 14,700,766 691.70 31,898.9 14,992,483 692.25 32,525.6 15,287,044 692.80 33,158.4 15,584,448 693.35 33,797.2 15,884,696 693.90 34,442.1 16,187,787 694.45 35,093.0 16,493,722 695.00 35,750.0 16,802,500 Buck Ash Basin Breaches - 100-year Final Conditions -Full PMP Type/1 24-hr 100-yr Rainfall=7.17" Prepared by AMEC Printed 10/11/2019 HvdroCAD® 10.00-24 s/n 05847 © 2018 HvdroCAD Software Solutions LLC Paae 14 Summary for Reach 8R: Dukeville Road Culvert Inflow Area = 167.300 ac, 0.00% Impervious, Inflow Depth = 4.52" for 100-yr event Inflow = 382.14 cfs @ 12.69 hrs, Volume= 63.001 of Outflow = 382.28 cfs @ 12.69 hrs, Volume= 63.001 af, Atten= 0%, Lag= 0.2 min Routing by Dyn-Stor-Ind method, Time Span= 0.00-200.00 hrs, dt= 0.05 hrs Max. Velocity= 7.78 fps, Min. Travel Time= 0.2 min Avg. Velocity = 2.42 fps, Avg. Travel Time= 0.7 min Peak Storage= 4,910 cf @ 12.69 hrs Average Depth at Peak Storage= 0.98' Bank -Full Depth= 4.00' Flow Area= 200.0 sf, Capacity= 2,437.78 cfs 600.0" W x 48.0" H Box Pipe n= 0.013 Length= 100.0' Slope= 0.0050 T Inlet Invert= 640.00', Outlet Invert= 639.50' Reach 8R: Dukeville Road Culvert Hydrograph 382.28 cfs @ 12.69 hrs Inflow Arlea=167.300 ac Inflow=382.14 cfs @ 12.69 hrs 350 Outflow=482.28 cfs @ 12.169 hrs Avg. Flow Depth=0.98' 300 Max Vet=7.78 fps 600.0" x-48.0" `Lo 250 Box Pipe _LL n �013 200 / L L UT g=0.0050 U_ 150 apaciM=2,437.78 cfs �� 100 t, 50 1 i- 0 20 40 60 80 100 120 140 160 180 11 Inflow ❑ Outflow Buck Ash Basin Breaches - 100-year Final Conditions -Full PMP Type/1 24-hr 100-yr Rainfall=7.17" Prepared by AMEC Printed 10/11/2019 HvdroCADO 10.00-24 s/n 05847 © 2018 HvdroCAD Software Solutions LLC Paae 15 0 3 2 a a) 0 1 we 2 3 1 Reach 8R: Dukeville Road Culvert Stage -Discharge 1,000 2,000 3,000 Discharge (cfs) Reach 8R: Dukeville Road Culvert Stage -Storage 5,000 10,000 15,000 20,000 Storage (cubic -feet) ❑ Primary ❑ Storage Buck Ash Basin Breaches - 100-year Final Conditions -Full PMP Type 1124-hr 100-yr Rainfall=7.17" Prepared by AMEC Printed 10/11/2019 HvdroCAD® 10.00-24 s/n 05847 © 2018 HvdroCAD Software Solutions LLC Paae 16 Stage -Area -Storage for Reach 8R: Dukeville Road Culvert Elevation End -Area Storage (feet) (sq-ft) (cubic -feet) 640.00 0.0 0 640.05 2.5 250 640.10 5.0 500 640.15 7.5 750 640.20 10.0 1,000 640.25 12.5 1,250 640.30 15.0 1,500 640.35 17.5 1,750 640.40 20.0 2,000 640.45 22.5 2,250 640.50 25.0 2,500 640.55 27.5 2,750 640.60 30.0 3,000 640.65 32.5 3,250 640.70 35.0 3,500 640.75 37.5 3,750 640.80 40.0 4,000 640.85 42.5 4,250 640.90 45.0 4,500 640.95 47.5 4,750 641.00 50.0 5,000 641.05 52.5 5,250 641.10 55.0 5,500 641.15 57.5 5,750 641.20 60.0 6,000 641.25 62.5 6,250 641.30 65.0 6,500 641.35 67.5 6,750 641.40 70.0 7,000 641.45 72.5 7,250 641.50 75.0 7,500 641.55 77.5 7,750 641.60 80.0 8,000 641.65 82.5 8,250 641.70 85.0 8,500 641.75 87.5 8,750 641.80 90.0 9,000 641.85 92.5 9,250 641.90 95.0 9,500 641.95 97.5 9,750 642.00 100.0 10,000 642.05 102.5 10,250 642.10 105.0 10,500 642.15 107.5 10,750 642.20 110.0 11,000 642.25 112.5 11,250 642.30 115.0 11,500 642.35 117.5 11,750 642.40 120.0 12,000 642.45 122.5 12,250 642.50 125.0 12,500 642.55 127.5 12,750 Elevation End -Area Storage (feet) (sq-ft) (cubic -feet) 642.60 130.0 13,000 642.65 132.5 13,250 642.70 135.0 13,500 642.75 137.5 13,750 642.80 140.0 14,000 642.85 142.5 14,250 642.90 145.0 14,500 642.95 147.5 14,750 643.00 150.0 15,000 643.05 152.5 15,250 643.10 155.0 15,500 643.15 157.5 15,750 643.20 160.0 16,000 643.25 162.5 16,250 643.30 165.0 16,500 643.35 167.5 16,750 643.40 170.0 17,000 643.45 172.5 17,250 643.50 175.0 17,500 643.55 177.5 17,750 643.60 180.0 18,000 643.65 182.5 18,250 643.70 185.0 18,500 643.75 187.5 18,750 643.80 190.0 19,000 643.85 192.5 19,250 643.90 195.0 19,500 643.95 197.5 19,750 644.00 200.0 20,000