Loading...
HomeMy WebLinkAbout20091085 Ver 2_More Info Received_20100203Kimley-Horn and Associates, Inc. pr?c¢orr?? F- ER 3 2010 DENR - WATER QUALITY WETLANDS AND STORMWATER BRANCH February 2, 2010 Mr. Joe Gyamfi 2321 Crabtree Blvd Raleigh, NC 27604 F.X.p DR- 1085 Ua ¦ suite 100 1919 South Boulevard Charlotte, North Carolina 28203-4778 Subject: Troutman Towne Center - Troutman, NC Comment Response Letter Our Ref: 018426001 Dear Mr. Gyamfi: We are writing in response to the engineering review comments for the subject project. A list of the comments and our responses follows: 1. Wet Pond 1: a. Short-circuiting of flows: i. OPTION 1: Please look into the possibility of combining the two forebays into a larger one and locate it at the present location of smaller forebay. There appears to be enough relief from 91-MH to the smaller forebay to bring the flow to that location. This way, you will have single forebay weir, have additional space and volume, minimize grading and maintenance issues with two forebays and berms and even ii. OPTION 2: Please extend about three-quarters length of the longer portion of the forebay weir to the temporary pool elevation so as to elongate the flow path from the eastern inlet to the outlet. Please ensure the following requirements are maintained as you extend the berm: 2:1 side slope, minimum 5ft width at the top of the weir, and percentage of forebay volume to overall pond volume should fall within 18-22%. OPTION 2 was used to avoid short-circuiting the flow of wet detention pond 1. OPTION 1 was not used due to the close proximity of geogrid to proposed relocation of storm sewer pipe. b. Please provide documentation to support the reported 10- year storm elevation in the pond. See attached Hydrocad Reports in calculation package. ¦ TEL 704 335 0210 FAX 704 409 1810 Mr. Joe Gyamfi, February 2, 2010, Page 2 ? ? ? Kimley-Horn and Associates, Inc. c. This office recommends that the secondary spillways be designed for the excess discharge (9.55cfs) from the next available storm (i.e.25-year storm) since almost all the routed flow from the 10-year storm outlets through the primary control structure to the Level Spreader. The primary outlet structure and pipe are now designed to route the entire 10-year storm event. Since both ponds are large enough to detain the 25-year storm event as well, the emergency spillways are now designed using the pre-development 25-year flow. Both spillway widths increased. d. One of the major design elements (#15) of a wet pond states that "the BMP shall not be located to produce adverse impacts on the water levels in adjacent wetlands". The BMP Manual then states under Section 10.3.2 (Siting of BMP) that the Permanent Pool Elevation (PPE) shall be located no more than 6 inches above or below the Seasonal High Water Table (SHWT). Two major issues with the wet pond 1 arising from the above statements are: i. The BMP has been located very close to a wetland. ii. The Soil report indicates that the actual groundwater table elevation ranges from 867 to 869 feet from bore holes (D1-D4) installed at the location of the BMP. This implies that the SHWT would, at a minimum, be 2 feet above the permanent pool elevation of 867 feet. Because of the issues stated above, please submit the following: OPTION 1: Detailed engineering measures necessary to prevent impacts to the wetland during the construction stages of the BMP and also during its use as sediment basin and subsequently as a wet pond. This should include a narrative of the sequence of construction or installation activities, necessary structures or devices (both temporary and permanent) and supported plans or diagrams that will be put in place. Section 10.3.8 or the BMP Manual may be helpful. OPTION 2: On the other hand, if you are convinced that the location will not adversely affect the wetland, please submit engineering calculations and hydro geological analysis to demonstrate and/or support your assertion. Please refer to Section 10.3.2 of the BMP Manual for guidance. Another possible solution would be to raise the bottom of the pond and the permanent pool elevation if the required surface ? ? ? Kimley-Horn and Associates, Inc. Mr. Joe Gyamfi, February 2, 2010, Page 3 area can still be achieved, in addition t o providing a liner, irrespective of whichever option you choose. Clay liners are now proposed for each pond. A note was added to the plans (C-26) stating: MINIMUM 12" THICK COMPACTED CLAY LINER ALONG THE INTERIOR OF ALL POND SLOPES FROM PERMANENT POOL TO BOTTOM OF POND. LINER MUST HAVE AN INFILTRATION RATE OF NO MORE THAN 0.01 IN/HR. INFILTRATION RATE SHALL BE TESTED BY THE CONSTRUCTION TESTING LABORATORY AND VERIFIED BY THE GEOTECHNICAL ENGINEER. 2. Level Spreader for Pond 1: a. Please provide photos of the vegetation down slope of the Level Spreader that is being used as the filter strip. See attached. b. Please re-orient your outlet control structure and discharge pipe such that the incoming flow from the pond shall be discharged at an angle to the "blind swale" of the Level Spreader. This was discussed in detail with Ms. Beverly Rosenbloom on January 20, 2010. The level spreader is now 65' and is angled from the point of pond outlet discharge more than 90°. This angle is as big as it can be based on the new length and proximity to the existing wetlands. c. Please submit a completed Operation and Maintenance Agreement for the Level Spreader-Filter Strip System. The signed form is forthcoming from Walmart. 3. Wet Pond 2: a. The drawdown time of the water quality volume is approximately 4.7 days and not 2.6 days as reported on the supplement form. The revised drawdown time is shown on the supplement form. b. Since there was no borings at this location, and no information of the seasonal high water table, please add liner to this pond. ? ? Kimley-Horn and Associates, Inc. Mr. Joe Gyamfl, February 2, 2010, Page 4 A liner was added to this pond as well with a similar note as above (see response to comment 1d). 4. Wet Ponds 1 and 2: a. The temporary pool volume under Section H (Design Information) of the Supplement Form should be the storage volume provided between the primary orifice and the next available opening (orifice, weir) on the control structure. The reported storage volume is now revised. b. Please ensure that the provided storage volume described in (a) above equals or exceeds the required minimum water quality treatment volume. In addition, please make sure they correctly match the values reported in the stage-area-storage table. The stage-area-storage table was not calculating the storage volume correctly. An additional calculation was added and the correct volume is now reported. We trust this meets your needs for continued review of this project, but please feel free to call me at (704) 319-7699 with any questions or concerns. Sincerely yours, KIMLEY-HORN AND ASSOCIATES, INC. Beverly Rosenbloom, El Enclosure cc: Tim Dollander, Troutman Towne Center, LLC Brian Fletcher, Troutman Towne Center, LLC (K\CSE_LDEV\013426 Chivas Retail Partners\000 Troutman Towne Center\Conespondence\L020210.DWQ-CONEvfNT-RESPONSE.BRR.doc) Permit No. (to be provided by DWQ) OF w A rE9 ARA O? PG ?n WDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Troutman Towne Center Contact person Beverly Rosenbloom Phone number 704.319-7699 Date 2/2/2010 Drainage area number Wet Detention Pond 1 (DA-1) 11. DESIGN INFORMATION Site Characteristics Drainage area 646,430 ftz Impervious area, post-development 549,727 ft2 % impervious 85.04% Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume 43,923 ft3 OK 92,620 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 (Y or N) 2.8 in 0.30 (unitless) 0.68 (unitless) 0.12 in/hr OK 0.44 ft3/sec 51.66 ft3/sec 51.22 ft3/sec 870.00 fmsl 867.00 fmsl fmsl 867.50 fmsl 866.50 fmsl Data not needed for calculation option #1, but OK if provided. 860.00 fmsl 859.00 fmsl Data not needed for calculation option #1, but OK if provided. 1.00 ft (Y or N) 870.0 fmsl OK Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 1 of 2 Permit No (to be provided by DWQ) !l. DESIGN INFORMATION Surface Areas Area, temporary pool 35,544 ft2 Area REQUIRED, permanent pool 23,207 ft2 SA/DA ratio 3.59 (unitless) Area PROVIDED, permanent pool, Apenpwl 24,268 ft2 OK Area, bottom of 1 Oft vegetated shelf, Abrn shell 15,059 ft2 Area, sediment cleanout, top elevation (bottom of pond), Abo,jo„d 3,549 ft2 Volumes Volume, temporary pool Volume, permanent pool, Vpen pool Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SA/DA Table Data Design TSS removal Coastal SA/DA Table Used? Mountain/Piedmont SA/DA Table Used? SA/DA ratio Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vp pool Area provided, permanent pool, A,._poo, Average depth calculated Average depth used in SA/DA, d, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Ape r,-P l Area, bottom of 1 Oft vegetated shelf, Abm shed Area, sediment cleanout, top elevation (bottom of pond), Abate "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) Average depth calculated Average depth used in SA/DA, day, (Round to nearest 0.5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if-non-circular) Coefficient of discharge (CD) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (Cw) Length of weir (L) Driving head (H) Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated fitter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is: Form SW401-Wet Detention Basin-Rev.8-9/17/09 92,620 ft3 OK 83,923 ft3 17,072 ft3 20.3% % OK 85% N (Y or N) Y (Y or N) 3.59 (unitless) Y (Y or N) 83,923 ft3 24,268 ft2 3.46 ft OK 3.0 ft Insufficient. Check calculation. N (Y or N) 24,268 ft2 15,059 ft2 3,549 ft2 6.50 ft ft ft Y (Y or N) 2.90 in in2 0.60 (unitless) 0.97 ft (Y or N) (unitless) (unitless) ft ft 0.44 ft3/sec 51.66 ft3/sec 0.21 ft3/sec 4.80 days OK, draws down in 2-5 days. 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 3.6 :1 OK Y (Y or N) OK 1.0 ft OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Emergency Pipe Parts I. & II. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. BRR _C-14 1. Plans (1" - 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. BRR C-25-C-27 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. BRR C-25-C-27 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. BRR C-5-C-8 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. BRR attached 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. BRR C-5-C-8 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. BRR attached 7. The supporting calculations. BRR attached 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). BRR attached 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 Permit mAt")h NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) W A rf9O ?{ y OL °M? wor^? -< I. PROJECT INFORMATION Project name Troutman Towne Center Contact person Beverly Rosenbloom Phone number 704-319-7699 Date 2/2/2010 Drainage area number Wet Detention Pond 1 (DA-1) II. DESIGN INFORMATION Site Characteristics Drainage area 646,430 ft2 Impervious area, post-development 549,727 ft2 % impervious 85.04% Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1 yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Off vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume 43,923 ft3 OK 92,620 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 Y (Y or N) 2.8 in 0.30 (unitless) 0.68 (unitless) 0.12 inthr OK 0.44 ft3/sec 51.66 ft3/sec 51.22 ft3/sec 870.00 fmsl 867.00 fmsl fmsl 867.50 fmsl 866.50 fmsl Data not needed for calculation option #1, but OK if provided. 860.00 fmsl 859.00 fmsl Data not needed for calculation option #1, but OK lf provided. 1.00 ft Y (Y or N) 870.0 fmsl OK Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 1 of 2 Permit No (to be provided by DWQ) II. DESIGN INFORMATION Surface Areas Area, temporary pool 35,544 ft2 Area REQUIRED, permanent pool 23,207 ft2 SA/DA ratio 3.59 (unitless) Area PROVIDED, permanent pool, Apean_p., 24,268 ft2 OK Area, bottom of 1 Oft vegetated shelf, Aw shetl 15,059 ft Area, sediment cleanout, top elevation (bottom of pond), Abo,_,m 3,549 ft2 Volumes Volume, temporary pool 92,620 ft3 OK Volume, permanent pool, Vper,-pwi 83,923 ft3 Volume, forebay (sum of forebays if more than one forebay) 17,072 ft3 Forebay % of permanent pool volume 20.3% % OK SA/DA Table Data Design TSS removal 85% Coastal SA/DA Table Used? N (Y or N) Mountain/Piedmont SAIDA Table Used? Y (Y or N) SA/DA ratio 3.59 (unftless) Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, Vperm-pwl 83,923 ft3 Area provided, permanent pool, Apevn_oo 24,268 ft Average depth calculated 3.46 ft OK Average depth used in SAIDA, day, (Round to nearest 0.5ft) 3.0 It Insufficient. Check calculation. Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, ApQnwi 24,268 ft2 Area, bottom of 1 Oft vegetated shelf, Abcsnee 15,059 ft2 Area, sediment cleanout, top elevation (bottom of pond), Aye, 3,549 ft2 "Depth" (distance b/w bottom of 10ft shelf and top of sediment) 6.50 ft Average depth calculated It Average depth used in SA/DA, day, (Round to nearest 0.5ft) ft Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 2.90 in Area of orifice ('rf-non-circular) in2 Coefficient of discharge (CD) 0.60 (unftless) Driving head (Ho) 0.97 It Drawdown through weir? (Y or N) Weir type (unitless) Coefficient of discharge (CW) (unftless) Length of weir (L) ft Driving head (H) ft Pre-development 1-yr, 24-hr peak flow 0.44 ft3/sec Post-development 1-yr, 24-hr peak flow 51.66 ft3/sec Storage volume discharge rate (through discharge orifice or weir) 0.21 ft3/sec Storage volume drawdown time 4.80 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 3.6 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 ft OK Vegetated filter provided? Y (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: Emergency Pipe Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & It. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. BRR _C-14 1. Plans (1" 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. BRR C-25-C-27 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. BRR C-25-C-27 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. BRR C-5-C-8 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. BRR attached 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. BRR C-5-C-8 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. BRR attached 7. The supporting calculations BRR attached 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). BRR attached 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 Permit A` NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) W A 7- Rp .rr,w I. PROJECT INFORMATION Project name Troutman Towne Center Contact person Beverly Rosenbloom Phone number 704-319.7699 Date Drainage area number Wet Detention Pond 2 (DA-2 and DA-3) II. DESIGN INFORMATION Site Characteristics Drainage area Impervious area, post-development % impervious Design rainfall depth Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1 yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 10ft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume 2/2/2010 1,588,633 ft2 1,041,955 ft2 65.59% 1.0 in 84,766 ft3 OK 90,738 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 Y (Y or N) 2.8 in 0.30 (unitless) 0.68 (unitless) 0.12 in/hr OK 6.04 ft3/sec 87.20 ft3/sec 81.16 ft3/sec 873.40 fmsl 872.00 fmsl fmsl 872.50 fmsl 871.50 fmsl Data not needed for calculation option #1, but OK 9 provided. 867.00 fmsl 866.00 fmsl Data not needed for calculation option #1, but OK 9 provided. 1.00 ft Y (Y or N) 873.4 fmsl OK Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 1 of 2 Permit No (to be provided by DWQ) 11. DESIGN INFORMATION Surface Areas Area, temporary pool 67,856 ft2 Area REQUIRED, permanent pool 57,985 ff SAIDA ratio 3.65 (unitless) Area PROVIDED, permanent pool, Apen" 59,041 ft2 OK Area, bottom of 1 Oft vegetated shelf, Ate, shell 39,718 ft2 Area, sediment cleanout, top elevation (bottom of pond), Abot nd 26,439 ft Volumes Volume, temporary pool Volume, permanent pool, VPermyouol Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SA/DA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SA/DA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Vpen-1=1 Area provided, permanent pool, Apen-pool Average depth calculated Average depth used in SAIDA, d,,, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Apenpw, Area, bottom of 1 Oft vegetated shelf, Aw_s,ea Area, sediment cleanout, top elevation (bottom of pond), Ab,,_po d "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) Average depth calculated Average depth used in SAIDA, d,v, (Round to nearest 0.5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orif ice (if-non-circular) Coefficient of discharge (Co) Driving head (Ho) Drawdown through weir? Weir type Coefficient of discharge (C„,) Length of weir (L) Driving head (H) Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is: Form SW401-Wet Detention Basin-Rev.8-9/17/09 90,738 ft3 OK 215,126 ft3 45,564 ft3 21.2% % OK 90% N (Y or N) Y (Y or N) 3.65 (unltless) Y (Y or N) 215,126 ft3 59,041 ft2 3.64 It OK 3.5 ft OK N (Y or N) 59,041 ft2 39,718 ft 26,439 ft2 4.50 ft 3.64 ft OK 3.5 ft OK Y (Y or N) 5.00 in in2 0.60 (unftless) 0.41 If (Y or N) (unitless) (unitless) It ft 6.04 ft3/sec 87.20 ft3/sec 0.41 ft3/sec 2.50 days OK, draws down in 2-5 days. 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 4.0 :1 OK Y (Y or N) OK 1.0 ft OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK Emergency pipe Parts I. & II. Design Summary, Page 2 of 2 Permit (to be provided by DWQ) III. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. BRR _C-14 1. Plans (1" 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. BRR C-25-C-27 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. BRR C-25-C-27 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. BRR C-5-C-8 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. BRR attached 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. BRR C-5-C-8 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. BRR attached 7. The supporting calculations. BRR attached 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). BRR attached 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 Permit A*`AF NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) W A?TFROG C, ? ? I. PROJECT INFORMATION Project name Troutman Towne Center Contact person Beverly Rosenbloom Phone number 704-319-7699 Date 2/2/2010 Drainage area number Wet Detention Pond 2 (DA-2 and DA-3) II. DESIGN INFORMATION Site Characteristics Drainage area 1,588,633 ft2 Impervious area, post-development 1,041,955 ft2 % impervious 65.59% Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 84,766 ft3 OK Volume provided 90,738 ft3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1 yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 10ft vegetated shelf elevation Bottom of 10ft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume ft3 ft3 ft3 ft3 ft3 Y (Y or N) 2.8 in 0.30 (unitless) 0.68 (unitless) 0.12 in/hr OK 6.04 ft3/sec 87.20 ft3/sec 81.16 ft3/sec 873.40 fmsl 872.00 fmsl fmsl 872.50 fmsl 871.50 fmsl Data not needed for calculation option #1, but OK if provided. 867.00 fmsl 866.00 fmsl Data not needed for calculation option #1, but OK if provided. 1.00 ft Y (Y or N) 873.4 fmsl OK Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & II. Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) IL DESIGN INFORMATION Surface Areas Area, temporary pool 67,856 ft2 Area REQUIRED, permanent pool 57,985 ft2 SA/DA ratio 3.65 (unitless) Area PROVIDED, permanent pool, Apenyoo, 59,041 ft2 OK Area, bottom of 1 Oft vegetated shelf, Aw She 39,718 ft2 Area, sediment cleanout, top elevation (bottom of pond), AbIlmd 26,439 ft2 Volumes Volume, temporary pool 90,738 ft3 OK Volume, permanent pool, Vpevn poo 215,126 ft3 Volume, forebay (sum of forebays if more than one forebay) 45,564 ft3 Forebay % of permanent pool volume 21.2% % OK SA/DA Table Data Design TSS removal 90% Coastal SAIDA Table Used? N (Y or N) Mountain/Piedmont SA/DA Table Used? Y (Y or N) SA/DA ratio 3.65 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Y (Y or N) Volume, permanent pool, Vpermyoo, 215,126 ft3 Area provided, permanent pool, Apenvoo, 59,041 ft2 Average depth calculated 3.64 ft OK Average depth used in SA/DA, deV, (Round to nearest 0.5ft) 3.5 ft OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, Ape.-Poo, 59,041 f' Area, bottom of 1 Oft vegetated shelf, Abm_aher 39,718 fiz Area, sediment cleanout, top elevation (bottom of pond), Abot ow 26,439 ft2 "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) 4.50 ft Average depth calculated 3.64 ft OK Average depth used in SAIDA, deV, (Round to nearest 0.5ft) 3.5 ft OK Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice (if circular) 5.00 in Area of orifice (if-non-circular) in2 Coefficient of discharge (CD) 0.60 (unitless) Driving head (Ho) 0.41 ft Drawdown through weir? (Y or N) Weir type (unitless) Coefficient of discharge (C„,) (unitless) Length of weir (L) ft Driving head (H) ft Pre-development 1-yr, 24-hr peak flow 6.04 ft3/sec Post-development 1-yr, 24-hr peak flow 87.20 ft3/sec Storage volume discharge rate (through discharge orifice or weir) 0.41 ft3/sec Storage volume drawdown time 2.50 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 3 :1 OK Length to width ratio 4.0 :1 OK Trash rack for overflow & orifice? Y (Y or N) OK Freeboard provided 1.0 ft OK Vegetated fitter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: Emergency pipe Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parts I. & It. Design Summary, Page 2 of 2 Permit No (to be provided by DWQ) Jill. REQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. BRR _C-14 1. Plans (1" 50' or larger) of the entire site showing: Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), Overflow device, and Boundaries of drainage easement. BRR C-25-C-27 2. Partial plan (1" = 30' or larger) and details for the wet detention basin showing: Outlet structure with trash rack or similar, Maintenance access, Permanent pool dimensions, Forebay and main pond with hardened emergency spillway, Basin cross-section, Vegetation specification for planting shelf, and Filter strip. BRR C-25-C-27 3. Section view of the wet detention basin (1" = 20' or larger) showing: Side slopes, 3:1 or lower, Pretreatment and treatment areas, and Inlet and outlet structures. BRR C-5-C-8 4. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified on the plans prior to use as a wet detention basin. BRR attached 5. A table of elevations, areas, incremental volumes & accumulated volumes for overall pond and for forebay, to verify volume provided. BRR C-5-C-8 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. BRR attached 7. The supporting calculations. BRR attached 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). BRR attached 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Form SW401-Wet Detention Basin-Rev.8-9/17/09 Part III. Required Items Checklist, Page 1 of 1 1 r r^ STi � - "• Y MMM � '. �p ij y 77,! Al y r T r. 7� '` �1 �1.F4�04�+,Y#r•s !F ''�,,} 'f!°4:_�. J� `�4 c}�'� f�ti � � �r—',,�` � a'�"Sc;Y�s'� • � � � rr i' T^' i 1 � X1.1 . �� Y � � w- �:. - _ 019 }p' R� Ar V •�. - r _ st_v WE mss.. �".� a-�+frl�yt �►. gra r ,may, .. � �a ?}cp flq - o as va. ¦ Stormwater Management Calculations Troutman Towne Center Construction Documents FEB "S 2U, Prepared for: DM. VanR cwnurr North Point Resources, LLC wVw"mPVOR1,'*,17Eftw*" 124 Iron Gate Circle Mooresville, NC 28117 © Kimley-Horn and Associates, Inc. 2010 Kimley-Horn and Associates, Inc. This document, together with the concepts and designs presented herein, as an instrument of service, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley-Horn and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc. TROUTMAN TOWNE CENTER CONSTRUCTION DOCUMENTS TROUTMAN, NORTH CAROLINA STORMWATER MANAGEMENT CALCULATIONS Prepared for: North Point Resources, LLC 124 Iron Gate Circle Mooresville, NC 28117 Prepared by: Kimley-Horn and Associates, Inc. 1919 South Boulevard, Suite 100 Charlotte, North Carolina 28203 C A vp?':oF?SS10 f?2 ?• 14 '``J???' 1 t? i 1111y? \\\2• t 2 D February 2010 KHA Ref: 018426001 TABLE OF CONTENTS i OVERVIEW SITE MAPS - SITE VICINITY MAP - USDA SOIL CLASSIFICATION MAP FLOOD INSURANCE RATE MAP USGS QUADRANGLE - WATERSHED MAPS PRE-DEVELOPMENT WATERSHED MAP • POST-DEVELOPMENT WATERSHED MAP WATER QUALITY WET POND CALCULATIONS - VOLUME AND SURFACE AREA CALCULATIONS ANTI-FLOTATION CALCULATIONS - RIP RAP CALCULATIONS WATER QUANTITY CURVE NUMBER CALCULATIONS - TIME OF CONCENTRATION CALCULATIONS HYDROCAD HYDROLOGY REPORTS - WET DETENTION POND I WET DETENTION POND 2 - STORMWATER MANAGEMENT CALCULATIONS i - Troutman Towne Center, Troutman, North Carolina • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • OVERVIEW STORMWA TER MANAGEMENT & EROSION CONTROL CALCULATIONS Troutman Towne Center, Troutman, North Carolina Background OVERVIEW This report contains the approach and results of a stormwater and erosion control analysis conducted for the Troutman Towne Center commercial development. The 60-acre project site is located in the south west quadrant of the interchange of Interstate 77 and US-21 in the Town of Troutman. The existing on-site conditions consist primarily of woods and dense brush. Approximately 4.8 acres adjacent to US-21 consist of gravel and there is currently a paved access path to an existing cell tower. This tower will remain on site. The Wilco Hess gas station and Wendy's restaurant just north of the site drain onto the site therefore these areas are accounted for in the stormwater and erosion control calculations. The site topography varies from elevation 930 ft to elevation 840 ft. Ken Branch stream separates the site flowing from Interstate 85 to US-21. An existing culvert under I-85 drains approximately 62 acres to this existing stream. The stream carries a total of 147 acres from the site and across Interstate 85 into two existing box culverts under US-21. Floodplain/Floodway The proposed site does not lie within a 100-year floodway boundary as determined by FIRM Map# 3710474000J, Panel 4740 (see Figure). Water Quality Water quality treatment by means of permanent Best Management Practices (BMP's) will be provided using two wet detention basins as treatment. The ponds are designed to treat the first inch of runoff per the North Carolina Division of Water Quality (NCDWQ) Stormwater Best Management Practices Manual and will draw down over a period of two to five days. Wet Detention Basin 2 is designed to provide a minimum 90% average annual removal of Total Suspended Solids (TSS). Wet Detention Basin 1 is designed to provide a minimum of 85% average annual removal of TSS and therefore discharges to a filter strip and level spreader. Water Quantity The proposed wet detention basins have been designed to address the water quantity requirements to match pre- and post-development peak runoff rates for the 1-year, 24-hour storm events per the NCDWQ BMP Manual. These ponds will also control the peak runoff rates for the 10-year, 24-hour storm event per the Town of Troutman Unified Development Ordinance (UDO). The 25-year, 24-hour storm event was checked for 6" of freeboard at the top of bank. STORMWA TER MANAGEMENT CALCULATIONS Troutman Towne Center, Troutman, North Carolina Results Pre-Dev Flow Post-Dev Flow Pre-Dev Flow Post-Dev Flow (1-yr, 24-hr storm, (1-yr, 24-hr storm, (10-yr, 24-hr storm, (10-yr. 24-hr storm, CFS CFS CFS CFS Wet Pond 1 0.44 0.43 11.70 5.12 Wet Pond 2 6.04 2.38 32.66 27.37 Erosion Control The project will require disturbance of approximately 60 acres. Proposed temporary erosion control measures include stone construction entrances, silt fence, tree protection fence, diversion ditches, sediment traps and sediment basins. Wet Detention Basin 1 will also be utilized as a riser basin during the construction of the project. Permanent erosion control measures include seeding, riprap aprons, and a lining of the proposed ditches. All measures have been designed in accordance with North Carolina Department of Environment and Natural Resources (NCDENR) Erosion and Sediment Control Planning and Design Manual. Conclusion The proposed wet detention basins were designed using methods prescribed by the aforementioned resources. HydroCAD software was utilized to evaluate the pre-development and post-development flow rates. HydroCAD utilizes TR-55 methods of calculating times of concentration (based on sheet, shallow concentrated, and channelized flows) and SCS curve number method of generating hydrographs (results are provided in Appendix C). Based on the analyses provided herein, the proposed system will be adequate to address the stormwater requirements of NCDWQ and the Town of Troutman. STORMWA TER MANAGEMENT CALCULATIONS Troutman Towne Center, Troutman, North Carolina • • • • • • • • • • • i • • • • • • • • • • • • • • i • • • • • • • • • • • • • • • • • SITE MAPS STORMWA TER MANAGEMENT & EROSION CONTROL CALCULATIONS Troutman Towne Center, Troutman, North Carolina T UTMAN BARKSDALE ROAD 21 AUTUMN LEAF ROAD y?G ST O? O '90 SITE `?Tp CLONTZ HILL ROAD o? S? rn N D tY fn 21 i "?b CO v=i 2 =n TROUTMAN TOWNE VICINITY MAP FIGURE CENTER Kimley-Horn and Associates, inc. OUTMAN, NC NTS 1 THIS DOCUMENT. TOGETHER WTN THE CONCEPTS AND DESIGNS PRESENTED T MMK AS AN INSTRUMENT OF SERVICE, IS Nflp1DED ONLY FOR THE PURPOSE AND CLIENT FOR WOCH IT WAS PREPARED. REUSE OF AND NPROPER RELIANCE ON THIS DOCUMENT LNTHOUT WTITIEN AUDMZATION AND ADAPTATION BY KMEY-HORN AND ASSOCIATES. INC. SHALL RE WTHOUT UANUTY TO KNIEY-HORN AND ASSWATES, INC. - K,\CSE-LDEV\018426 Chivas RetaR Partners\000 Troutman Towne Center\Calcs\Storm\Solls aril VlcWt Ma .dw I TROUTMAN TOWNE CENTER SOILS MAP FIGURE - Kimley-Horn and Associates, Inc. TROUTMAN, NC NTS 2 TIMS DOOAAENT. WOEIHER NTH THE CONCEPTS AND DESIONS PRESENTED HEREIK AS AN INSTRUMENT OF SERWM IS NTENDED ONLY FOR THE PURPOSE AND CLENT FOR MHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT NTHOUT WRITTEN AUTNMZATION AND ADAPTATION BY 0AEY-HORN AND ASSOCIATES. MJC. SHALL BE NTHOUT UARUTY TO K*A.EY-HORN AND ASSOCIATES. WC. • • • • • • • • • • • • PRE-DEVELOPMENT DRAINAGE AREA MAP STORMWA TER MANAGEMENT & EROSION CONTROL CALCULATIONS Troutman Towne Center, Troutman, North Carolina 8 ? f? ^` F 6 2 ? !Y V) cn cl UUcV o 7A Z yW Q Q M y1 ". t7i .. Q M II II J o N Q op ".."... p" J` i=vi N'? U ? Qf?D? ¢ ? 00 , of r-.: L) p cv U F- - I 3 J 3= 0 a 3 I N W w JZ W :LJ U M M C.D - o a rv to II II a - LIS Z" Z n e 400 a x 1 J a Z w ? 00 QX?V: w U -W CO aQd'c" 400 ' Q M II II O Z U ? N U r SOO 1 I ? r •aas$se••• ••••••••••••• •••• •••• ••••••••• o z i Z \i { 10 a ? N • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • POST-DEVELOPMENT DRAINAGE AREA MAP STORMWA TER MANAGEMENT & EROSION CONTROL CALCULATIONS Troutman Towne Center, Troutman, North Carolina o V Q Z L 4.J 0 ' Q W Z Z ():? L - O QQDo? z C, C] Mo C) H •••••••••••••••••••••••••••••••••••••••• (?l 4 a ? a a a? N 7 NO 1 U _yG N YN tS wilb WET POND CALCULATIONS STORMWATER MANAGEMENT & EROSION CONTROL CALCULATIONS Troutman Towne Center, Troutman, North Carolina • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • pP-Z " Kimley-Horn and Associates, Inc. Project Information WET DETENTION BASIN 1 Project Name: Troutman Towne Center KHA Project #: 018426000 Designed by: BRR Date: 7/7/2009 Revised by: BRR Date: 8/30/2009 Revised by: Date: Site Information Sub Area Location: Drainage Area 1 Drainage Area (DA) = 14.84 Acres Impervious Area (IA) = 12.62 Acres Percent Impervious (1) = 85.0 % Required Surface Area Permanent Pool Depth: 3.00 ft SA/DA = 3.59 (85% TSS Removal via Pond) Min Req'd Surface Area = 23207 sf (at Permanent Pool) Required Storage Volume: Design Storm = 1 inch (Project Does Not Drain to SA waters) Determine Rv Value = 0.05 +.009 (1) = 0.82 in/in Storage Volume Required = 43,923 cf (above Permanent Pool) Elevations Bank Elevation = 873.00 ft Top of Pond Elevation = 873.00 ft Temporary Pool Elevation = 870.00 ft Forebay Weir = 867.00 ft Shelf Beginning Elevation = 867.50 ft Permanent Pool Elevation = 867.00 ft Shelf Ending Elevation = 866.50 ft Bottom Elevation = 859.00 ft Wet Basin Areas/Volumes Area @ Top of Temporary Pool = 35,544 sf Area @ Top of Permanent Pool = 24,268 sf Volume of Temporary Storage = 89,718 cf Side Slopes of Pond = 3 :1 Side Slopes of Shelf = 10 :1 Side Slopes of Pond (below shelf) = 3 :1 Is Permanent Pool Surface Area Sufficient (yes/no)? Volume of Storage Provided 89,718 cf Total Volume Sufficient (yes/no)? Yes Orifice Size = 2.90 inches Drawdown Time = 4.80 days Area (s.f.) 35,544 24,268 (Elevation = 870.00) (Elevation = 867.00) Yes ( 24268 > 23207 ) sf i i WET DETENTION BASIN 1 Project Information Project Name: Troutman Towne Center KHA Project #: 018426000 Designed by: BRR Date: 8/30/2009 Revised by: Date: Revised by: Date: Site Information Sub Area Location Drainage Area (DA) = Impervious Area (IA) = Percent Impervious (1) = Orifice Sizing Drainage Area 1 14.8 Acres 12.6 Acres 85.0 % (Drainage Area) Q2 Days = 0.5192 cfs Q5 Days - 0.2077 cfs Orifice Size = 2.90 in Q Orifice = 0.216 cfs Drawdown Time = 4.80 days less than 5 days (yes/no) ? Yes greater than 2 days (yes/no) ? Yes Orifice Equation: Q=CAgd(2gh) (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) Q2< Q < Q5 c = 0.6 Ay= Area of Pipe = n/4D2 g = gravity = 32.2 ft/s2 h = orifice head = 1 /3 (TPE-PPE-1 /2D) TPE = Temporary Pool Elevation PPE = Permanent Pool Elevation D = Diameter Kirnley-Horn C and Associates, Inc. WET DETENTION BASIN 2 Project Information Project Name: Troutman Towne Center KHA Project #: 018426000 Designed by: BRR Date: 7/7/2009 Revised by: BRR Date: 9/1/2009 Revised by: Date: Site Information Sub Area Location: Drainage Area 3 Drainage Area (DA) = 36.47 Acres Impervious Area (IA) = 23.92 Acres Percent Impervious (1) = 65.6 % Required Surface Area Permanent Pool Depth: 3.25 ft SA/DA = 3.65 (90% TSS Removal via Pond) Min Req'd Surface Area = 57985 sf (at Permanent Pool) Required Storage Volume: Design Storm = 1 inch (Project Does Not Drain to SA waters) Determine Rv Value = 0.05 +.009 (1) = 0.64 in/in Storage Volume Required = 84766 cf (above Permanent Pool) Elevations Area (s.f.) Bank Elevation = 876.50 ft Top of Pond Elevation = 876.50 ft Temporary Pool Elevation = 873.40 ft 67,856 Forebay Weir = 872.00 ft Shelf Beginning Elevation = 872.50 ft Permanent Pool Elevation = 872.00 ft 59,041 Shelf Ending Elevation = 871.50 ft Bottom Elevation = 864.00 ft Wet Basin Areas/Volumes Area @ Top of Temporary Pool = Area @ Top of Permanent Pool = Volume of Temporary Storage = Side Slopes of Pond = Side Slopes of Shelf = Side Slopes of Pond (below shelf) = Is Permanent Pool Surface Area Suffic Volume of Storage Provided 67856 sf (Elevation = 873.40) 59041 sf (Elevation = 872.00 ) 88828 cf 31 101 31 ient (yes/no)? Yes ( 59041 > 57985 ) sf 88828 cf Total Volume Sufficient (yes/no)? Yes Orifice Size = 5.00 inches Drawdown Time = 2.5 days WET DETENTION BASIN 2 Project Information Project Name: Troutman Towne Center KHA Project #: 018426000 Designed by: BRR Date: Revised by: BRR Date: Revised by: Date: Site Information Sub Area Location Drainage Area (DA) = Impervious Area (IA) = Percent Impervious (1) = Orifice Sizing 8/30/2009 9/1/2009 Drainage Area 3 36.5 Acres 23.9 Acres 65.6 % (Drainage Area) Q2 Days = 0.5141 cfs Q5 Days = 0.2056 cfs Orifice Size = 5.00 in Q Orifice = 0.414 cfs Drawdown Time = 2.5 days less than 5 days (yes/no) ? Yes greater than 2 days (yes/no) ? Yes Orifice Equation: Q=cAgV(2gh) (Flowrate required for a 2 day drawdown) (Flowrate required for a 5 day drawdown) (Diameter) Q2< Q < Q5 c = 0.6 A9= Area of Pipe = rt/4D2 g = gravity = 32.2 ft1s2 h = orifice head = 1/3 (TPE-PPE-1/2D) TPE = Temporary Pool Elevation PPE = Permanent Pool Elevation D = Diameter • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • VOLUME AND SURFACE AREA CALCULATIONS STORMWA TER MANAGEMENT & EROSION CONTROL CALCULATIONS Troutman Towne Center, Troutman, North Carolina N C O _R u a) u a T R N Q R H i T Q u QI C u m ? dr E H W 'O y C C R Ia N uu ? O O O] C O Y 0 c Q 9 x°$ m¢ E m bb- u N aa, U 0 O F' R E 0 H C O rn 0) 00 O O O ( ) M ? CD co O O o coo O 10! CO D] R v ! T E E s 0 R O Z •o y ? 'O u o c a) m ._ ar ? ? Y Q D: K O a` d V R u r+ v ei 00 v H H R ¢ m c a) 3 0 00 - R o •C ? LL N Q) ? 0 3 O O u') c-I tD L!1 N N "I O O u 3 O O p 1 p 1 ° ¢ O N [T 00 N C n n cu E ? ^ O u O O p tD tD to M O .•-i v M to to O N N M aT N N CO > O F- fVO 0 0 0 n m N tD N a R N O o t!1 0 ID 0 o0 0 0 'i ci N ?"I W a 0 0 0 0 0 0 0 0 J 0 ? N } Ol w N 7 n M m 01 0) n 0) v O Ol m ¢ ¢ .-i N N m cF d' Vl m W w w tD N m tD 'D 0 'D 0 0 z tC w o0 00 00 00 00 W 0 W h O (7 a o G C v R N E o Q1 d 9 v 0 N e-I N r4 en O 01 ei W n m I? a1 y E n 0) o E O N 3 > a > to T ? T R R R v E v O 0) O LL O_ LL a) n rn to v n o Ln ri 'I O m o a Doi m m co u 7 0 0 N 0 o O O M 00 O 7 tf1 t71 0 00 n a' ¢ p ?' O r t0 0 tD tD n O1 r4 a7 n ? Vl rn N > N N N m m M m N ,..I ei -4 N N N Q) E 0) Lm 01 O m n ?-i V• N rl O ci -T C n ?-1 .-I H N O1 7 V O O N oo m N O N to O • .. > ` v tri of rI m ao M e1 y Ci .-1 m v m n M 0 c N a R o F-• fuo O to co co 'i a n N n m m 0 0 0 to V m `-' to 1-1 to N N m ID N Ln d' d* O1 n W m m co R m 0 co 0 ri '! to N in -! m N n N N m C M M V V tD n tD n H o0 oo W vi CT ci O 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 ?-I ¢ W ^ 1 0) d' m m n D M vi m m a) ui m at a n to o co m v v o to N m .-I n J N '-1 O O O rn O to m m V n C0 t/1 i m V• N M Ln t0 oo O N N -1 7 --1 t!1 N oo -1 W N Ql N N m 1 M m e V 7 e . e D Z Q h O O e-1 N m Ln 0 n oo Q1 O r-, N m o o 0 tD n 0 0 n n n n to oo oo 00 oo W 0 0 0o oo W oo oo oo oo oo oo L -0 O 4 -6 O Y O o N a y a c _ Q o t N >• `R R m E c o 0 O d E o D. o D o r a H m a F tD m 11 u NItDD M O fli 0 N 0 a W N cn E 7 a) a) o a > N N 7 c c v o v cu O > c c a) R R m E E C R O 0. co o_ a to w • • w • • • w • w • x ? 1¦ u C O R 7 u W T R 'a 1 a 3 N 0, R yl ? T a C m y u pp R i W v i m O N N N w Y E O 7 m N rn N O m > C ) m i a76 A o 0o0 - w C ? U o o ° 3 o - R a0 c 0 R O R V 3 N n Q !- Ir R a 0 V In m ? y ul ma`cr c 3 o ? y, C O C O y O m W g O m E E t a>> ? L R 3 y .O O z .o „ ? v m i z z p O d Y ` a E E 4 lL ti 01 ti m ID ID 10 10 u 7 O O y > m M ; V R E v O m J u O O ? O 0 Vl a0 D > ~ p F- m m Vl n N Io N O N m O m N In O 0 N vl •-I O N a n 0 m n m N m W w 0 0 0 0 0 0 0 ? a J O w ~O N ao m n rn In O ~ Q Q= ? ? 0 o o m m .-I Io N m m m .-+ a GO W O pip n W Ot O .? 4 N i lD W 10 00 10 00 n W n OD '4 W n W c O O 0 p 0_ c w ? o c R E d a N N m a tD O N Vl ~ C N II d E cx v o E o VI 7 > w o > R v E a O a O a ? m E E m oo N n m a N n O ol m _? M, 2 ? N Ol lp H OD lD n W 00 O N O O C W I, N Cl m N 'i al oc .-i ' t!1 m m > n oo N Co w o, W oo I!1 n o0 m N I jl U N Vf T ?y .-I N N P01 -* a C Vl Q N T O n n Vl ut N n 0 Ol ul m Ot o o Vl co m n LID Io tO Io n a 10 I In m t0 oo w m O m .-1 vl m oo N n .. o `-' n O m lp Ol N O N Io N H V W A > N m m m .-I N m m N C n n m o H m m O .+ o0 o oo n n m m N v o " R m V In n O Io N n Io 1, m n o n O w o 1, n ti N rn M m o 0 O m a n N .n n 1', In m O Io 0 w Io 00 I/1 n 00 of Ql n ?+ 0 0 0 0 0 0 0 Q W R O ID m m 00 n N o0 N VI N 00 OD .-I O O rl N t0 V w V1 o V O o, to of O N J 0 L w Q ? m IUD Ol N Vl tb Ot V' a ? ? Ql m tp W N N N m m m m V lp l0 tD l0 n n n 2 a m Ic n oo a, o rl `^ N `^ m ? a .n Io '^ 2 a Io Io Io Ic n n ?+ n ^I n m n n n n ? Q N o0 0o r>o 00 00 0o m m ao m oo r>o 00 c G o o r a y a c p ? - n c c H m R m _ .`u E y c o c 0 ° E o o o y y m a r r~i V N ? "I m .? o n ti ? rn N v E u u ? v w 0 0. > Iail I° ? 0 oci ac > a m m E E E R w a '^ o CL LL m N ANTI-FLOTATION CALCULATIONS STORMWA TER MANAGEMENT & EROSION CONTROL CALCULATIONS Troutman Towne Center, Troutman, North Carolina N C 3 V m N V m > m 3 N 'a m v7 v u Q u m a V m m 7 E W a a c r 10 Ip .z u :3 mO > c O O c Q da Y m pp, o O 0 0 N N O ?2 22 co co ro m 4i 15 16 16 m c m U m o0 C 3 to O N C O (0 O E 7 CO (D c O -6 m :M E m v n o Z o m a a ? m m N u a m L. W ' •p Q y N d m a Y p 1' C O CL` N m t0 V ei Q N 00 ? N C f6 ? m CO Q cf O O O C LL m ? G1 ? 0 C 0 ? t m m (0 N m (0 N a > ?. 7 o m _ T O O - m N E o ? C ` • O Y U A r Y U :7- co CD O O O O O O 7 c7 O O O) m co u7 O O O O C m 7 7 Lo co n Y II II II II II 11 Qj II 11 II II O S G ? ??tn S S m L L L7 N O ° ° a O) 01 O C Q O (0 m C J= C m N N N 0 Q Q O ,C w j U? ? 0 C O ? ? E d ? _Q of Q 65 m m o U) 3: 3? o ° o o m N I O 0 E a fA U ? >N > > N c m c 2 n L N a 11 3 -m° U m rn L ? O C N T aa) 3 CL m N N E a? > >O E E m :c C E E _c _ E v O C 0 Z, z? O O 110 O O OOO 1O N C14 CV N n 0 Co T u a n u n u ? N 3 V (O ? . .. a ?n T L C a m ' 5 ? (q N m 3 3 C O C T d ° J > N C T O !n LL 2 m s m LL > 3 N m O E z U) W p, T 3 o p co _N to l9 sg u 0 u m N L.7 m > m 72 H CL Q u m y N m ? E W C c c N Ip E " ? o m > O A o C a` Um c 3 0 m E 7 1= O O o° 0 N N C9 N 2) N m m m m m m m o o mlm O o z 0/ ? Q c w d Q a m O > > a? 2 p ¢ C a Y a N I? Q a a ID a m a o 3 .C ? LL O m m p p 3 O I ID L ? 'd m ? m > m 2 7 CD Q m x m E m OI n `o E E m 'c .c o ? U w A t Y U O G O O N O O CV N 7 7 7 O tOD V V ? ? II II 11 II 11 II m II II II II c C y V L S .t! C C L m L Y >?L.. L Z :2 'L z Q N (00 07 C> m= 0 ID m m y y Q O J Q p p O 2 c m m a O ° L C p m C D U U E m Q m c r t_ N G 5` ? m U rn L ? ? O C W ? C T E 3 v C N CD E o E f° E E ? 0 m v v 1 O UO cn O N r O V C N T 11 II II II II II 3 ?? a t c v ' r m O ? u) N 3 c m o U 'O J > N .2 W N cr N > c m > 3 y m` O -a m E -CU) W m `o p 3 c ? 'N m • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • RIP RAP CALCULATIONS STORMWA TER MANAGEMENT & EROSION CONTROL CALCULATIONS Troutman Towne Center, Troutman, North Carolina Troutman Towne Center Kimle -Horn and Associates, Inc. Charlotte, North Carolina Date: 10/6/2009 KHA Project #: 018426001 Prepared by: KRT Checked by: RIP RAP APRON CALCULATIONS Per NCDENR Design Manual Structure: Pipe Diameter (in): Slope (%): Manning (n): Radius (in): Pipe Area (sf): Flowing Full: 10-year flow from ICPR: Discharge (Q10) = Pipe Diameter (in) = d50 = Design Conditions = Width at Pipe Outlet'Do' (ft) _ Length of Apron 'La' (ft) = Width at End of Apron 'W' (ft) _ Min. Stone Depth (in) _ Stone Class = 24 1.30 0.0130 0.011 12 3.14 Wetted Perimeter Flow Area Hydraulic Flow Velocity Depth Theta (ft) (sf) Radius Flow (GPD) (CFS) (fps) 24.0 6.283 6.283 3.142 0.500 19,754,345 30.57 9.73 14.21 3.512 3.512 1.937 0.552 13,003,378 20.12 10.39 20.12 24 0.5 Figure 8.06a Assume Minimum Tailwater 6 13 Figure 8.06a 19 13.5 Class B CURVE NUMBER CALCULATIONS STORMWA TER MANAGEMENT & EROSION CONTROL CALCULATIONS Troutman Towne Center, Troutman, North Carolina - t Kiml -H rn / ey o and Iociates. Inc. -Project Information - Project Name: Troutman Towne Center KHA Project #: 018426000 - Designed by: BRR Revised by: BRR - Revised by: BRR Revised by: BRR Pre vs. Post Runoff Analysis Composite Curve Number (CN) Date: 6/30/2009 Date: 9/112009 Date: 10/9/2009 Date: 12/2/2009 omposlte Drainage Area Drainage Cover/Soil Hydrologic Soil Product of Curve Number Name Location Name (Type) Cover Description' Group Curve # (CN)" Area (ac) CN x area (CN) RE-DEVELOPMENT J Appling, Cecil, Woods DA-1 OUTFALL 1 Lloyd, Madison Good Condition B 55 9.00 495 55 al-Mart (Lot Appling, Cecil, Brush #11) Lloyd, Madison >75% Ground Cover B 48 6.22 299 48 Appling, Cecil, Brush Lloyd, Madison <50% Ground Cover B 67 1.84 123 67 17.06 917 53.7 Appling, Cecil, Woods DA-2 OUTFALL 1 Lloyd, Madison Good Condition B 55 1.78 98 55 Hotel Appling, Cecil, Brush o) ( Lloyd, Madison >75% Ground Cover B 48 0.64 31 48 L Appling, Cecil, Lloyd, Madison Existing Impervious Pavement B 98 0.61 60 98 3.03 188 62.2 Appling, Cecil, Woods DA-3 OUTFALL 1 Lloyd, Madison Good Condition B 55 0.32 17 55 Outparcels and Appling, Cecil, Brush Wilco Lloyd, Madison >75% Ground Cover B 48 17.02 817 48 Appling, Cecil, Lloyd, Madison Existing Open Space B 61 0.88 53 61 Appling, Cecil, Lloyd, Madison Existing Impervious Pavement B 98 9.62 943 98 27.84 1831 65.8 J ; Jotal Pre-Development Drainage Area to Detention Pond 2 (DA-2 and DA-3):J 30.87 2019 65.4 K:\CSE_LDEV\018426 Chivas Retail Partners\000 Troutman Towne Center\Calcs\Storm\2009-12-02_Stormwater Calculations.xls 1 of 2 • p-.! Kimley-Horn r \ h! and Associates, Inc. -Project Information Project Name: Troutman Towne Center KHA Project #: 018426000 - Designed by: BRR Revised by: BRR - Revised by: BRR Revised by: BRR Pre vs. Post Runoff Analysis Composite Curve Number (CN) Date: 6/30/2009 Date: 9/11/2009 Date: 10/9/2009 Date: 12/2/2009 • composite Drainage Area Drainage Cover/Soil Hydrologic Soil Product of Curve Number Name Location Name (Type) Cover Description' Group Curve # (CN)" Area (ac) CN x area (CN) POST DEVELOPMENT Appling, Cecil, DA-1 POND 1 Lloyd, Madison Impervious B 98 12.62 1237 98 Wal-Mart (Lot Appling, Cecil, #11) Lloyd, Madison Open Space B 61 2.22 135 61 { 14.84 1372.18 92.46 Appling, Cecil, Brush UND DA-1 OUTFALL 1 Lloyd, Madison >75% Ground Cover B 48 0.96 46 48 Appling, Cecil, Lloyd, Madison Open Space B 61 1.06 65 61 2.02 110.74 54.82 Appling, Cecil, Brush DA-2 POND 2 Lloyd, Madison >75% Ground Cover B 48 018 9 48 Hotel Appling, Cecil, (Lot #10) Lloyd, Madison Impervious B 98 2.61 256 98 Appling, Cecil, Lloyd, Madison Open Space B 61 0.29 18 61 { 3.08 282.05 91.61 Appling, Cecil, DA-3 POND 2 Lloyd, Madison Impervious B 98 21.31 2088 98 Wilco and Appling, Cecil, Woods Outparcels Lloyd, Madison Good Condition B 55 0.08 4 55 Appling, Cecil, Brush Lloyd, Madison >75% Ground Cover B 48 5.15 247 48 Appling, Cecil, Lloyd, Madison Open Space B 61 6.86 418 61 33.40 2758.20 82.59 Total Post-Devel opment Drainage Area to Detention Pond 2 (DA-2 and DA-3): 36.47 3040 83.4 Appling, Cecil, Brush UND DA-3 OUTFALL 2 Lloyd, Madison >75% Ground Cover B 48 0.57 27 48 Appling, Cecil, Lloyd, Madison Open Space B 61 0.49 30 61 { 1.06 57.25 54.01 -` Cover Descriptions per North Carolina Division of Water Quality Stormwater Best Manavement Practices Manual, Table 3-5 -" From North Carolina Division of Water Quality Stormwater Best Manavement Practices Manual, Table 3-5 Outparcels = Lot's #3,4,5,7,8,9 and Drive B, C and Lexus Drive • - K:\CSETLDEV\018426 Chivas Retail Partners\000 Troutman Towne Center\Calcs\Storm\2009-12-02_Stormwater Calculations. As 2of2 TIME OF CONCENTRATION CALCULATIONS STORMWA TER MANAGEMENT & EROSION CONTROL CALCULATIONS Troutman Towne Center, Troutman, North Carolina • • m'd -Y A T O l0 O Q ? L O 4) C V d' O .J U N w O p a ? > E d ~ IL O O O O N N co m O a a ni O O O C O O U c 0 'a m m O H m U E ° D a Z a) N N _ O C .. Mn > > U O , L:", a) 0 = C 0 d O Y O C U 4) O CL` a) E F- ~ d > co) ?j N > o Q ; 7 ? R a? a 'o N m a) r d d co o) C 0 3 U O D LL r O U Q `o O > v > m > CL aac N N d T TE O F L N C N a) CD c r C 4) L C O 00 U W CL O COO J L I _ N ? LL c a U 0 0 U 0 O T F- 6 C O Q m J Cn a N O N E Z O G7 (D O P) co O N 01 N 0) (O co co Cl) r O (") N N C) O m m to m N II 11 II C . C C Ln Ln E n E O M E of co F of F v co c 0 C 0 M c 0 c c c r N U r O U C O r C%! U C O U U ?- U O O O E E E (o rn ui (o rn (o U U? N ? U? N ? N O O O O O O O O O O N O O O O O O O O (") O O O O C O O O m O O O O 1(7 N r (D N 117 O O v O O O m w O co 0 0 'p 'p o c c U O o O O c c L ? O 0 0 8 a0 ( ) 3 W 30 s z z c d 3 W a 0 N o a l0 0 d ?i l 0 0 y N m L O tm; c6 y C (D L 0 O C N N L ` O C l0 C C d m C U U U U U J LL J LL N J LL ? O O O r o c m Q _ M Q _ O o Q 0 .0 U U O m o J 0 J R O, O ? F - z W 2 a O J W W O W a O HYDROCAD HYDROLOGY REPORTS 1-YEAR, 10-YEAR, 25-YEAR EVENTS WET DETENTION POND 1 STORMWATER MANAGEMENT & EROSION CONTROL CALCULATIONS Troutman Towne Center, Troutman, North Carolina • • • • • • • • • • • i • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 1S Pre-development 3S Undetained Post-development zs Post-development 77 4P Wet Deten ion Pond 1 Z 5P Outfall 1 Subca F ach on Link 2010-01-21_Wal-Mart Pond Type 11 24-hr 1 year, 24-hour Rainfall=2.85" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCADO 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Paae 2 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre-development Runoff Area=17.060 ac 0.00% Impervious Runoff Depth>0.10" Tc=27.3 min CN=54 Runoff=0.44 cfs 0.148 of Subcatchment 2S: Post-development Runoff Area=14.840 ac 0.00% Impervious Runoff Depth>1.89" Tc=5.0 min CN=92 Runoff=51.66 cfs 2.337 of Subcatchment 3S: Undetained Post-development Runoff Area=2.020 ac 0.00% Impervious Runoff Depth>0.12" Tc=5.0 min CN=55 Runoff=0.14 cfs 0.021 of Pond 4P: Wet Detention Pond 1 Peak Elev=869.95' Storage=90,416 cf Inflow=51.66 cfs 2.337 of Primary=0.37 cfs 0.261 of Secondary=0.00 cfs 0.000 of Outflow=0.37 cfs 0.261 of Pond 5P: Outfall 1 Inflow=0.43 cfs 0.282 of Primary=0.43 cfs 0.282 of Total Runoff Area = 33.920 ac Runoff Volume = 2.506 of Average Runoff Depth = 0.89" 100.00% Pervious= 33.920 ac 0.00% Impervious = 0.000 ac • • • • • 2010-01-21 Wal-Mart Pond Type 1124-hr 1 year, 24-hour Rainfall=2.85" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 • HydroCAD® 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 3 • Summary for Subcatchment 1S: Pre-development • • Runoff = 0.44 cfs @ 12.61 hrs, Volume= 0.148 af, Depth> 0.10" • Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs ., Type II 24-hr 1 year, 24-hour Rainfall=2.85" • Area (ac) CN Description • 17.060 54 17.060 100.00% Pervious Area • Tc Length Slope Velocity Capacity Description • (min) (feet) (ft/ft) (ft/sec) (cfs) 27.3 Direct Entry, see spreadsheet • • Subcatchment IS: Pre-development • Hydrograph • 0.44 cfs ¦ Runoff 0.45 Type III24-hr 1 year... • 0.4 24-hour • 0.35 Rainfall=2.85" • 0.3 Runoff Area 17.060 ac 0.25 Runoff Volume=0148 of • U. Runoff De .. LL pth>0.10 • 0.2 Tc=27.3 min • 0.15 CN=54 0.05 • 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 • 0 • Time (hours) • • • • • • • • • 2010-01-21_Wal-Mart Pond Type 11 24-hr 1 year, 24-hour Rainfall=2.85" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCADO 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 2S: Post-development Runoff = 51.66 cfs @ 11.95 hrs, Volume= 2.337 af, Depth> 1.89" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1 year, 24-hour Rainfall=2.85" Area (ac) CN Description 14.840 92 14.840 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Post-development Hydrograph ¦ Runoff 51.66 cfs 50 Type II 24-hr 1 year 45 24-hour 40 Rainfall=2.85" 35 Runoff Area=14.840 ac 30 Runoff Volume=2.337 of LL 25 Runoff Depth>1.89" 20 Tc=5.0 min 15 CN=92 1 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2010-01-21 Wal-Mart Pond Type 11 24-hr 1 year, 24-hour Rainfall=2.85" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCAD® 9.00 s/n 05123 @2009 Hydr2CAD Software Solutions LLC Page 5 Summary for Subcatchment 3S: Undetained Post-development Runoff = 0.14 cfs @ 12.03 hrs, Volume= 0.021 af, Depth> 0.12" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1 year, 24-hour Rainfall=2.85" Area (ac) CN Description ' 2.020 55 2.020 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: Undetained Post-development Hydrograph 0.15 0.14 0.13: Type II 24-hr 1 year 0.12- 24-hour °" Rainfall=2.85" 01 Runoff Area=2.020 ac 0.09-. 0.08 Runoff Volume=0.021 of 0.07 U - Runoff Depth>0.12" 0.06 Tc=5.0 min 0.05- 0.04 . CN=55' 0.03 0.02 0.01 . 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2010-01-21 Wal-Mart Pond Type 11 24-hr 1 year, 24-hour Rainfall=2.85" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCAD® 9.00 s/n 05123 © 2009 HydroCAD Software Solutions LLC Page 6 Summary for Pond 4P: Wet Detention Pond 1 Inflow Area = 14.840 ac, 0.00% Impervious, Inflow Depth > 1.89" for 1 year, 24-hour event Inflow = 51.66 cfs @ 11.95 hrs, Volume= 2.337 of Outflow = 0.37 cfs @ 20.00 hrs, Volume= 0.261 af, Atten= 99%, Lag= 482.8 min Primary = 0.37 cfs @ 20.00 hrs, Volume= 0.261 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 869.95'@ 20.00 hrs Surf.Area= 35,406 sf Storage= 90,416 cf Plug-Flow detention time= 347.8 min calculated for 0.260 of (11% of inflow) Center-of-Mass det. time= 174.4 min ( 936.4 - 762.0 ) Volume Invert Avail.Storage Storage Description #1 867.00' 212,289 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 867.00 24,268 0 0 868.00 29,605 26,937 26,937 869.00 32,538 31,072 58,008 870.00 35,544 34,041 92,049 871.00 38,750 37,147 129,196 872.00 41,532 40,141 169,337 873.00 44,371 42,952 212,289 Device Routing Invert Outlet Devices #1 Primary 866.00' 24.0" Round Culvert L= 50.4' RCP, groove end projecting, Ke= 0.200 Outlet Invert= 864.00' S= 0.03977' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 867.00' 2.9" Vert. Water Quality Orifice C= 0.600 #3 Device 1 870.00' 12.0" W x 6.0" H Vert. Water Quantity Control Weir C=0.600 #4 Device 1 871.60' 14.0' long x 0.5' breadth Open Grate on Control Structure Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #5 Secondary 872.00' 25.0' long x 30.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=0.37 cfs @ 20.00 hrs HW=869.95' (Free Discharge) L1=Culvert (Passes 0.37 cfs of 32.50 cfs potential flow) 2=Water Quality Orifice (Orifice Controls 0.37 cfs @ 8.10 fps) 3=Water Quantity Control Weir ( Controls 0.00 cfs) =Open Grate on Control Structure ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=867.00' (Free Discharge) L5=Emergency Spillway ( Controls 0.00 cfs) 2010-01-21_Wal-Mart Pond Type 11 24-hr 1 year, 24-hour Rainfall=2.85" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCAD® 9.00 s/n 05123 © 2009 HydroCAD Software Solutions LLC Page 7 Pond 4P: Wet Detention Pond 1 Hydrograph ¦ Inflow 51.66 cfs ha outflow Inflow Area=14.840 ac ¦ Primary (.] Secondary 55 Peak Elev=869.95' 50 Storage=90,416 cf 45- 40- 35-. - - 30 3 o FL 25- - 20- 15 1 10 0.37 cfs 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2010-01-21 -Wal-Mart Pond Type 11 24-hr 1 year, 24-hour Rainfall=2.85" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCAD® 9.00 s/n 05123 © 2009 HydroCAD Software Solutions LLC Page 8 Stage-Discharge for Pond 4P: Wet Detention Pond 1 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 867.00 0.00 0.00 0.00 867.10 0.02 0.02 0.00 867.20 0.06 0.06 0.00 867.30 0.09 0.09 0.00 867.40 0.12 0.12 0.00 867.50 0.14 0.14 0.00 867.60 0.15 0.15 0.00 867.70 0.17 0.17 0.00 867.80 0.18 0.18 0.00 867.90 0.19 0.19 0.00 868.00 0.21 0.21 0.00 868.10 0.22 0.22 0.00 868.20 0.23 0.23 0.00 868.30 0.24 0.24 0.00 868.40 0.25 0.25 0.00 868.50 0.26 0.26 0.00 868.60 0.27 0.27 0.00 868.70 0.28 0.28 0.00 868.80 0.29 0.29 0.00 868.90 0.29 0.29 0.00 869.00 0.30 0.30 0.00 869.10 0.31 0.31 0.00 869.20 0.32 0.32 0.00 869.30 0.33 0.33 0.00 869.40 0.33 0.33 0.00 869.50 0.34 0.34 0.00 869.60 0.35 0.35 0.00 869.70 0.35 0.35 0.00 869.80 0.36 0.36 0.00 869.90 0.37 0.37 0.00 870.00 0.37 0.37 0.00 870.10 0.48 0.48 0.00 870.20 0.67 0.67 0.00 870.30 0.92 0.92 0.00 870.40 1.21 1.21 0.00 870.50 1.54 1.54 0.00 870.60 1.80 1.80 0.00 870.70 2.01 2.01 0.00 870.80 2.19 2.19 0.00 870.90 2.36 2.36 0.00 871.00 2.51 2.51 0.00 871.10 2.65 2.65 0.00 871.20 2.79 2.79 0.00 871.30 2.91 2.91 0.00 871.40 3.03 3.03 0.00 871.50 3.15 3.15 0.00 871.60 3.26 3.26 0.00 871.70 4.61 4.61 0.00 871.80 6.98 6.98 0.00 871.90 10.15 10.15 0.00 872.00 14.01 14.01 0.00 872.10 20.73 18.61 2.12 872.20 29.89 23.90 5.99 872.30 41.15 30.10 11.05 Elevation Discharge Primary Secondary (feet) (cfs) (cfs) (cfs) 872.40 54.17 37.09 17.08 872.50 67.55 43.69 23.86 872.60 76.12 44.75 31.37 872.70 84.24 45.14 39.09 872.80 92.76 45.54 47.23 872.90 102.17 45.93 56.25 873.00 112.07 46.32 65.75 2010-01-21_Wal-Mart Pond Type 11 24-hr 1 year, 24-hour Rainfall=2.85" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCAD® 9.00 s/n 05123 © 2009 HydroCAD Software Solutions LLC Page 9 Summary for Pond 5P: Outfall 1 Inflow Area = 16.860 ac, 0.00% Impervious, Inflow Depth > 0.20" for 1 year, 24-hour event Inflow = 0.43 cfs @ 12.04 hrs, Volume= 0.282 of Primary = 0.43 cfs @ 12.04 hrs, Volume= 0.282 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Pond 5P: Outfall 1 Hydrograph -ill ¦ Inflow ¦ Primary w U 3 O LL 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) i 2010-01-21 Wal-Mart Pond Type 11 24-hr 10 year, 24-hour Rainfall=5.10" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCADO 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 1 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre-development Runoff Area=17.060 ac 0.00% Impervious Runoff Depth>0.84" Tc=27.3 min CN=54 Runoff=11.70 cfs 1.192 of Subcatchment 2S: Post-development Runoff Area=14.840 ac 0.00% Impervious Runoff Depth>3.94" Tc=5.0 min CN=92 Runoff=102.26 cfs 4.878 of Subcatchment 3S: Undetained Post-developmentRunoff Area=2.020 ac 0.00% Impervious Runoff Depth>0.91" Tc=5.0 min CN=55 Runoff=3.42 cfs 0.153 of Pond 4P: Wet Detention Pond 1 Peak Elev=871.57' Storage=151,580 cf Inflow=102.26 cfs 4.878 of Primary=3.22 cfs 2.003 of Secondary=0.00 cfs 0.000 of Outflow=3.22 cfs 2.003 of Pond 5P: Outfall 1 Inflow=5.12 cfs 2.155 of Primary=5.12 cfs 2.155 of Total Runoff Area = 33.920 ac Runoff Volume = 6.222 of Average Runoff Depth = 2.20" 100.00% Pervious= 33.920 ac 0.00% Impervious = 0.000 ac 2010-01-21_Wal-Mart Pond Type l/ 24-hr 10 year, 24-hour Rainfall=5.10" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCAD® 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1S: Pre-development Runoff = 11.70 cfs @ 12.26 hrs, Volume= 1.192 af, Depth> 0.84" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10 year, 24-hour Rainfall=5.10" Area (ac) CN Description 17.060 54 17.060 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.3 Direct Entry, see spreadsheet Summary for Subcatchment 2S: Post-development Runoff = 102.26 cfs @ 11.95 hrs, Volume= 4.878 af, Depth> 3.94" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10 year, 24-hour Rainfall=5.10" Area (ac) CN Description 14.840 92 14.840 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Subcatchment 3S: Undetained Post-development Runoff = 3.42 cfs @ 11.98 hrs, Volume= 0.153 af, Depth> 0.91" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10 year, 24-hour Rainfall=5.10" Area (ac) CN Description 2.020 55 2.020 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 2010-01-21 Wal-Mart Pond Type 11 24-hr 10 year, 24-hour Rainfall=5.10" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCAD® 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 3 Summary for Pond 4P: Wet Detention Pond 1 Inflow Area = 14.840 ac, 0.00% Impervious, Inflow Depth > 3.94" for 10 year, 24-hour event Inflow = 102.26 cfs @ 11.95 hrs, Volume= 4.878 of Outflow = 3.22 cfs @ 13.74 hrs, Volume= 2.003 af, Atten= 97%, Lag= 107.6 min Primary = 3.22 cfs @ 13.74 hrs, Volume= 2.003 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 871.57'@ 13.74 hrs Surf.Area= 40,325 sf Storage= 151,580 cf Plug-Flow detention time= 290.6 min calculated for 1.998 of (41% of inflow) Center-of-Mass det. time= 194.0 min ( 938.5 - 744.5 ) Volume Invert Avail.Storage Storage Description - ' #1 867.00 212,289 cf Custom Stage Data (Prismatic) Listed below (Recalc) - Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 867.00 24,268 0 0 - 868.00 29,605 26,937 26,937 869.00 32,538 31,072 58,008 870.00 35,544 34,041 92,049 . 871.00 38,750 37,147 129,196 872.00 41,532 40,141 169,337 873.00 44,371 42,952 212,289 Device Routing Invert Outlet Devices #1 Primary 866.00' 24.0" Round Culvert L= 50.4' RCP, groove end projecting, Ke= 0.200 Outlet Invert= 864.00' S= 0.03977' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 867.00' 2.9" Vert. Water Quality Orifice C= 0.600 #3 Device 1 870.00' 12.0" W x 6.0" H Vert. Water Quantity Control Weir C=0.600 #4 Device 1 871.60' 14.0' long x ON breadth Open Grate on Control Structure Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #5 Secondary 872.00' 25.0' long x 30.0' breadth Emergency Spillway - Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 _ Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=3.22 cfs @ 13.74 hrs HW=871.57' (Free Discharge) L1=Culvert (Passes 3.22 cfs of 40.40 cfs potential flow) 2=Water Quality Orifice (Orifice Controls 0.47 cfs @ 10.15 fps) 3=Water Quantity Control Weir (Orifice Controls 2.76 cfs @ 5.52 fps) -Open Grate on Control Structure ( Controls 0.00 cfs) §econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=867.00' (Free Discharge) 5=Emergency Spillway (Controls 0.00 cfs) 2010-01-21_Wal-Mart Pond Type 11 24-hr 10 year, 24-hour Rainfall=5.10" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCAD@ 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 4 Summary for Pond 5P: Outfall 1 Inflow Area = 16.860 ac, 0.00% Impervious, Inflow Depth > 1.53" for 10 year, 24-hour event Inflow = 5.12 cfs @ 12.01 hrs, Volume= 2.155 of Primary = 5.12 cfs @ 12.01 hrs, Volume= 2.155 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs 2010-01-21_Wal-Mart Pond Type 1124-hr 25 year, 24-hour Rainfall=6.09" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCAD@ 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 5 Time span=0.00-20.00 hrs, dt=0.05 hrs, 401 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre-development Runoff Area= 17.060 ac 0.00% Impervious Runoff Depth>1.31" Tc=27.3 min CN=54 Runoff=20.10 cfs 1.864 of Subcatchment 2S: Post-development Runoff Area=14.840 ac 0.00% Impervious Runoff Depth>4.87" Tc=5.0 min CN=92 Runoff=124.25 cfs 6.018 of Subcatchment 3S: Undetained Post-developmentRunoff Area=2.020 ac 0.00% Impervious Runoff Depth>1.40" Tc=5.0 min CN=55 Runoff=5.48 cfs 0.236 of Pond 4P: Wet Detention Pond 1 Peak Elev=871.96' Storage=167,795 cf Inflow=124.25 cfs 6.018 of Primary=12.52 cfs 2.992 of Secondary=0.00 cfs 0.000 of Outflow=12.52 cfs 2.992 of Pond 5P: Outfall 1 Inflow= 13.29 cfs 3.228 of Primary=13.29 cfs 3.228 of Total Runoff Area = 33.920 ac Runoff Volume = 8.118 of Average Runoff Depth = 2.87' 100.00% Pervious = 33.920 ac 0.00% Impervious = 0.000 ac 2010-01-21_Wal-Mart Pond Type 11 24-hr 25 year, 24-hour Rainfall=6.09" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCAD® 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Pace 6 Summary for Subcatchment 1 S: Pre-development Runoff = 20.10 cfs @ 12.25 hrs, Volume= 1.864 af, Depth> 1.31" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 year, 24-hour Rainfall=6.09" Area (ac) CN Description 17.060 54 17.060 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 27.3 Direct Entry, see spreadsheet Summary for Subcatchment 2S: Post-development Runoff = 124.25 cfs @ 11.95 hrs, Volume= 6.018 af, Depth> 4.87' Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 year, 24-hour Rainfall=6.09" Area (ac) CN Description 14.840 92 14.840 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Subcatchment 3S: Undetained Post-development Runoff = 5.48 cfs @ 11.97 hrs, Volume= 0.236 af, Depth> 1.40" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25 year, 24-hour Rainfall=6.09" Area (ac) CN Description 2.020 55 2.020 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 2010-01-21 Wal-Mart Pond Type 11 24-hr 25 year, 24-hour Rainfall=6.09" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 . HydroCADO 9.00 s/n 05123 © 2009 HydroCAD Software Solutions LLC Page 7 Sul Inflow Area = 14.840 ac, Inflow = 124.25 cfs @ Outflow = 12.52 cfs @ Primary = 12.52 cfs @ Secondary = 0.00 cfs @ mmary for Pond 4P: Wet Detention Pond 1 0.00% Impervious, Inflow Depth > 4.87" for 25 year, 24-hour event 11.95 hrs, Volume= 6.018 of 12.34 hrs, Volume= 2.992 af, Atten= 90%, Lag= 23.3 min 12.34 hrs, Volume= 2.992 of 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 871.96'@ 12.34 hrs Surf.Area= 41,429 sf Storage= 167,795 cf Plug-Flow detention time= 236.7 min calculated for 2.985 of (50% of inflow) Center-of-Mass det. time= 150.0 min ( 889.6 - 739.6 ) Volume Invert Avail.Storage Storage Description - ' #1 867.00 212,28 9 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 867.00 24,268 0 0 868.00 29,605 26,937 26,937 869.00 32,538 31,072 58,008 870.00 35,544 34,041 92,049 - 871.00 38,750 37,147 129,196 872.00 41,532 40,141 169,337 873.00 44,371 42,952 212,289 Device Routing Invert Outlet Devices #1 Primary 866.00' 24.0" Round Culvert L= 50.4' RCP, groove end projecting, Ke= 0.200 Outlet Invert= 864.00' S= 0.03977' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 867.00' 2.9" Vert. Water Quality Orifice C= 0.600 #3 Device 1 870.00' ' 12.0" W x 6.0" H Vert. Water Quantity Control Weir C=0.600 ' ' #4 Device 1 871.60 14.0 long x 0.5 breadth Open Grate on Control Structure Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #5 Secondary 872.00' 25.0' long x 30.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 _ Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=12.49 cfs @ 12.34 hrs HW=871.96' (Free Discharge) t-1=Culvert (Passes 12.49 cfs of 42.12 cfs potential flow) 2=Water Quality Orifice (Orifice Controls 0.49 cfs @ 10.59 fps) 3=Water Quantity Control Weir (Orifice Controls 3.15 cfs @ 6.30 fps) =Open Grate on Control Structure (Weir Controls 8.85 cfs @ 1.74 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=867.00' (Free Discharge) t-5=Emergency Spillway ( Controls 0.00 cfs) 2010-01-21 Wal-Mart Pond Type 11 24-hr 25 year, 24-hour Rainfall=6.09" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCAD® 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 8 Summary for Pond 5P: Outfall 1 s Inflow Area = 16.860 ac, 0.00% Impervious, Inflow Depth > 2.30" for 25 year, 24-hour event - Inflow = 13.29 cfs @ 12.32 hrs, Volume= 3.228 of Primary = 13.29 cfs @ 12.32 hrs, Volume= 3.228 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-20.00 hrs, dt= 0.05 hrs HYDROCAD HYDROLOGY REPORTS 1-YEAR, 10-YEAR, 25-YEAR EVENTS WET DETENTION POND 2 31 URMWA TER MANAGEMENT & EROSION CONTROL CALCULATIONS Troutman Towne Center, Troutman, North Carolina 1S Pre-development 2S Post-deqrlopment 4P 3S) Wet Deter -on Pond 2 Undetained 5P Post-development Outfall 1 • • • • • • • • Subca Reach on Link 2010-02-01-Phase 1 Pond Type 1124-hr 1 year, 24-hour Rainfall=2.85" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCAD® 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 2 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre-development Runoff Area=30.740 ac 0.00% Impervious Runoff Depth>0.37" Tc=44.3 min CN=65 Runoff=6.04 cfs 0.949 of Subcatchment 2S: Post-development Runoff Area=36.470 ac 0.00% Impervious Runoff Depth>1.22" Tc=5.0 min CN=83 Runoff=87.20 cfs 3.701 of Subcatchment 3S: Undetained Post-development Runoff Area= 1.060 ac 0.00% Impervious Runoff Depth>0.11" Tc=5.0 min CN=54 Runoff=0.04 cfs 0.009 of Pond 4P: Wet Detention Pond 2 Peak Elev=873.73' Storage=112,558 cf Inflow=87.20 cfs 3.701 of Primary=2.37 cfs 1.298 of Secondary=0.00 cfs 0.000 of Outflow=2.37 cfs 1.298 of Pond 5P: Outfall 1 Inflow=2.38 cfs 1.307 of Primary=2.38 cfs 1.307 of Total Runoff Area = 68.270 ac Runoff Volume = 4.660 of Average Runoff Depth = 0.82" 100.00% Pervious = 68.270 ac 0.00% Impervious = 0.000 ac r • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 2010-02-01_Phase 1 Pond Type 1124-hr 1 year, 24-hour Rainfall=2.85" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCAD® 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment 1S: Pre-development Runoff = 6.04 cfs @ 12.54 hrs, Volume= 0.949 af, Depth> 0.37' Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1 year, 24-hour Rainfall=2.85' Area (ac) CN Description 30.740 65 30.740 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 44.3 Direct Entry, see spreadsheet Subcatchment 1S: Pre-development Hydrograph ¦ Runoff 6.04 cfs 6 TYpe 11 24,-hr I year 24-hour 5 Rainfall=2.85'' Runoff Area=30.740 ac 4 Runoff Volume=0.949 a a 3 Runoff Depth>0.37" TO=44.3 min 2 CN=65 1. 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2010-02-01-Phase 1 Pond Type 1124-hr 1 year, 24-hour Rainfall=2.85" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCAD® 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 2S: Post-development [49] Hint: Tc<2dt may require smaller dt Runoff = 87.20 cfs @ 11.96 hrs, Volume= 3.701 af, Depth> 1.22" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1 year, 24-hour Rainfall=2.85" Area (ac) CN Description 36.470 83 36.470 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 2S: Post-development Hydrograph 90 87.20 cfs 85 Type II 24-hr 1 year 80 75 24-hour 70 Rainfall2.85" 65 60 Runoff Area=36.470 ac w 55 ' Runoff Volume=3.701of v 50 ° 45 Runoff Depth>1.22" U. 40 35 Tc=5.0 min 30- 25" CN=83 - 20 15 ¦ Runoff 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • 2010-02-01_Phase 1 Pond Type 1124-hr 1 year, 24-hour Rainfall=2.85" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCAD® 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment 3S: Undetained Post-development [49] Hint: Tc<2dt may require smaller dt Runoff = 0.04 cfs @ 12.05 hrs, Volume= 0.009 af, Depth> 0.11" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 1 year, 24-hour Rainfall=2.85" Area (ac) CN Description 1.060 54 1.060 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: Undetained Post-development Hydrograph 0.046 ¦ Runoff 0.044 0.04 fs C 0.042 - - Type 1124: hr I year 0.04 0.038 24-hour 0.036 0.034 -Rainfall=2.85" 0.032 003 Runoff Area'=1 060 ac .. 0.028 . 0.026 _ Runoff Volume-0. - X09 of 0.024 0 0.022 U. Runoff Depth>0.11'. 0.02 0.018 T=5rV min 0.016 0.014 N=54 0.012 - 0.01- 0.008- 0.006- 0.004- 0.002 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2010-02-01-Phase 1 Pond Type 1124-hr 1 year, 24-hour Rainfall=2.85" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCAM 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 6 Summary for Pond 4P: Wet Detention Pond 2 Inflow Area = 36.470 ac, 0.00% Impervious, Inflow Depth > 1.22" for 1 year, 24-hour event Inflow = 87.20 cfs @ 11.96 hrs, Volume= 3.701 of Outflow = 2.37 cfs @ 15.04 hrs, Volume= 1.298 af, Atten= 97%, Lag= 185.0 min Primary = 2.37 cfs @ 15.04 hrs, Volume= 1.298 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 873.73'@ 15.04 hrs Surf.Area= 68,965 sf Storage= 112,558 cf Plug-Flow detention time= 260.9 min calculated for 1.298 of (35% of inflow) Center-of-Mass det. time= 173.4 min ( 964.3 - 790.9 ) Volume Invert Avail.Storage Storage Description #1 872.00' 316,119 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 872.00 59,041 0 0 873.00 66,546 62,794 62,794 874.00 69,840 68,193 130,987 875.00 73,190 71,515 202,502 876.00 76,590 74,890 277,392 876.50 78,320 38,728 316,119 Device Routing Invert Outlet Devices #1 Primary 868.00' 24.0" Round Outlet Pipe L= 77.0' RCP, groove end projecting, Ke= 0.200 Outlet Invert= 867.00' S=0.0130'/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 872.00' 5.0" Vert. Water Quality Orifice C= 0.600 #3 Device 1 873.40' 30.0" W x 12.0" H Vert. Water Quantity Control Weir C=0.600 #4 Device 1 874.85' 14.0' long x 0.5' breadth Open Grate on Control Structure Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #5 Secondary 875.50' 55.0' long x 55.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=2.36 cfs @ 15.04 hrs HW=873.73' (Free Discharge) t-1=Outlet Pipe (Passes 2.36 cfs of 39.93 cfs potential flow) 2=Water Quality Orifice (Orifice Controls 0.81 cfs @ 5.95 fps) 3=Water Quantity Control Weir (Orifice Controls 1.55 cfs @ 1.86 fps) -Open Grate on Control Structure (Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=872.00' (Free Discharge) 't-5--Emergency Spillway ( Controls 0.00 cfs) • I• 2010-02-01 Phase l Pond Type 11 24-hr 1 year, 24-hour Rainfall=2.85" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCAD® 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 7 Pond 4P: Wet Detention Pond 2 Hydrograph ¦ Inflow ? Outflow ¦ Primary ? Secondary 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2010-02-01 -Phase 1 Pond Type 11 24-hr 1 year, 24-hour Rainfall=2.85" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCAD® 9.00 s/n 05123 © 2009 HydroCAD Software Solutions LLC Page 8 Summary for Pond 5P: Outfall 1 [40] Hint: Not Described (Outflow= Inflow) Inflow Area = 37.530 ac, 0.00% Impervious, Inflow Depth > 0.42" for 1 year, 24-hour event Inflow = 2.38 cfs @ 15.03 hrs, Volume= 1.307 of Primary = 2.38 cfs @ 15.03 hrs, Volume= 1.307 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Pond 5P: Outfall 1 Hydrograph ¦ Inflow ¦ Primary 2 F w v 3 0 U. 1 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) 2010-02-01_Phase 1 Pond Type 11 24-hr 10 year, 24-hour Rainfall=5.10" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCAD@)9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Paae 1 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre-development Runoff Area=30.740 ac 0.00% Impervious Runoff Depth>1.53" Tc=44.3 min CN=65 Runoff=32.66 cfs 3.912 of Subcatchment 2S: Post-development Runoff Area=36.470 ac 0.00% Impervious Runoff Depth>3.04" Tc=5.0 min CN=83 Runoff=209.26 cfs 9.240 of Subcatchment 3S: Undetained Post-development Runoff Area=1.060 ac 0.00% Impervious Runoff Depth>0.85" Tc=5.0 min CN=54 Runoff=1.66 cfs 0.075 of Pond 4P: Wet Detention Pond 2 Peak Elev=875.28' Storage=223,486 cf Inflow=209.26 cfs 9.240 of Primary=27.07 cfs 6.439 of Secondary=0.00 cfs 0.000 of Outflow=27.07 cfs 6.439 of Pond 5P: Outfall 1 Inflow=27.37 cfs 6.514 of Primary=27.37 cfs 6.514 of Total Runoff Area = 68.270 ac Runoff Volume =13.227 of Average Runoff Depth = 2.32" 100.00% Pervious= 68.270 ac 0.00% Impervious = 0.000 ac 2010-02-01-Phase 1 Pond Type 1124-hr 10 year, 24-hour Rainfall=5.10" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCADO 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 1 S: Pre-development Runoff = 32.66 cfs @ 12.45 hrs, Volume= 3.912 af, Depth> 1.53" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10 year, 24-hour Rainfall=5.10" Area (ac) CN Description 30.740 65 30.740 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 44.3 Direct Entry, see spreadsheet Summary for Subcatchment 2S: Post-development Runoff = 209.26 cfs @ 11.95 hrs, Volume= 9.240 af, Depth> 3.04" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10 year, 24-hour Rainfall=5.10" Area (ac) CN Description 36.470 83 36.470 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Subcatchment 3S: Undetained Post-development Runoff = 1.66 cfs @ 11.98 hrs, Volume= 0.075 af, Depth> 0.85" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 10 year, 24-hour Rainfall=5.10" Area (ac) CN Description 1.060 54 1.060 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, 2010-02-01 Phase 1 Pond Type 11 24-hr 10 year, 24-hour RainfaU=5.10" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 - HydroCAD® 9.00 s/n 05123 © 2009 HydroCAD Software Solutions LLC Page 3 Summary for Pond 4P: Wet Detention Pond 2 • Inflow Area = 36.470 ac, 0.00% Impervious, Inflow Depth > 3.04" for 10 year, 24-hour event Inflow = 209.26 cfs @ 11.95 hrs, Volume= 9.240 of Outflow = 27.07 cfs @ 12.22 hrs, Volume= 6.439 af, Atten= 87%, Lag= 16.0 min - Primary = 27.07 cfs @ 12.22 hrs, Volume= 6.439 of Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 of - Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs ' Peak Elev= 875.28 @ 12.22 hrs Surf.Area= 74,158 sf Storage= 223,486 cf - Plug-Flow detention time= 172.2 min calculated for 6.418 of (69% of inflow) Center-of-M ass det. time= 106.3 min ( 877.2 - 770.9 ) - Volume Invert Avail.Storage Storage Description ' #1 872.00 316,119 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) i 872.00 59,041 0 0 - 873.00 66,546 62,794 62,794 874.00 69,840 68,193 130,987 875.00 73,190 71,515 202,502 - 876.00 76,590 74,890 277,392 876.50 78,320 38,728 316,119 Device Routing Invert Outlet Devices #1 Primary 868.00' 24.0" Round Outlet Pipe L= 77.0' RCP, groove end projecting, Ke= 0.200 Outlet Invert= 867.00' S=0.0130'/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 872.00' 5.0" Vert. Water Quality Orifice C= 0.600 #3 Device 1 873.40' 30.0" W x 12.0" H Vert. Water Quantity Control Weir C= 0.600 #4 Device 1 874.85' 14.0' long x 0.5' breadth Open Grate on Control Structure Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 #5 Secondary 875.50' 55.0' long x 55.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=27.02 cfs @ 12.22 hrs HW=875.28' (Free Discharge) t1=Out1et Pipe (Passes 27.02 cfs of 46.01 cfs potential flow) 2=Water Quality Orifice (Orifice Controls 1.15 cfs @ 8.44 fps) 13=Water Quantity Control Weir (Orifice Controls 14.08 cfs @ 5.63 fps) -Open Grate on Control Structure (Weir Controls 11.79 cfs @ 1.94 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=872.00' (Free Discharge) t-5=Emergency Spillway (Controls 0.00 cfs) 2010-02-01-Phase 1 Pond Type 1124-hr 10 year, 24-hour Rainfall=5.10" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCADO 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 4 Summary for Pond 5P: Ouffall 1 Inflow Area = 37.530 ac, 0.00% Impervious, Inflow Depth > 2.08" for 10 year, 24-hour event Inflow = 27.37 cfs @ 12.22 hrs, Volume= 6.514 of Primary = 27.37 cfs @ 12.22 hrs, Volume= 6.514 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs 2010-02-01-Phase 1 Pond Type 1124-hr 25-year, 24-hour Rainfall=6.09" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCADO 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Pape 5 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1S: Pre-development Runoff Area=30.740 ac 0.00% Impervious Runoff Depth>2.17" Tc=44.3 min CN=65 Runoff=47.44 cfs 5.546 of Subcatchment 2S: Post-development Runoff Area=36.470 ac 0.00% Impervious Runoff Depth>3.90" Tc=5.0 min CN=83 Runoff=264.34 cfs 11.853 of Subcatchment 3S: Undetained Post-development Runoff Area=1.060 ac 0.00% Impervious Runoff Depth>1.33" Tc=5.0 min CN=54 Runoff=2.70 cfs 0.117 of Pond 4P: Wet Detention Pond 2 Peak Elev=875.87' Storage=267,395 cf Inflow=264.34 cfs 11.853 of Primary=48.10 cfs 8.422 of Secondary=33.25 cfs 0.516 of Outflow=81.35 cfs 8.938 of Pond 5P: Outfall 1 Inflow=82.21 cfs 9.055 of Primary=82.21 cfs 9.055 of Total Runoff Area = 68.270 ac Runoff Volume =17.517 of Average Runoff Depth = 3.08" 100.00% Pervious = 68.270 ac 0.00% Impervious = 0.000 ac 2010-02-01 -Phase 1 Pond Type 1124-hr 25-year, 24-hour Rainfall=6.09" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCADO 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 1S: Pre-development Runoff = 47.44 cfs @ 12.44 hrs, Volume= 5.546 af, Depth> 2.17' Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-year, 24-hour Rainfall=6.09" Area (ac) CN Description 30.740 65 30.740 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 44.3 Direct Entry, see spreadsheet Summary for Subcatchment 2S: Post-development Runoff = 264.34 cfs @ 11.95 hrs, Volume= 11.853 af, Depth> 3.90" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-year, 24-hour Rainfall=6.09" Area (ac) CN Description 36.470 83 36.470 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Subcatchment 3S: Undetained Post-development Runoff = 2.70 cfs @ 11.97 hrs, Volume= 0.117 af, Depth> 1.33" Runoff by SCS TR-20 method, UH=SCS, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Type II 24-hr 25-year, 24-hour Rainfall=6.09" Area (ac) CN Description 1.060 54 1.060 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, • • • i i 2010-02-01 Phase 1 Pond Type ll 24-hr 25-year, 24-hour Rainfall=6.09" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 i HydroCADO 9.00 s/n 05123 @2009 HydroCAD Software Solutions LLC Pace 7 Summary for Pond 4P: Wet Detention Pond 2 Inflow Area = 36.470 ac, 0.00% Impervious, Inflow Depth > 3.90" for 25-year, 24-hour event Inflow = 264.34 cfs @ 11.95 hrs, Volume= 11.853 of Outflow = 81.35 cfs @ 12.09 hrs, Volume= 8.938 af, Atten= 69%, Lag= 8.1 min Primary = 48.10 cfs @ 12.09 hrs, Volume= 8.422 of Secondary = 33.25 cfs @ 12.09 hrs, Volume= 0.516 of Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 875.87'@ 12.09 hrs Surf.Area= 76,145 sf Storage= 267,395 cf Plug-Flow detention time= 147.6 min calculated for 8.908 of (75% of inflow) Center-of-Mass det. time= 87.9 min ( 853.0 - 765.1 ) Volume Invert Avail.Storage Storage Description - #1 872.00' 316,119 cf Custom Stage Data (Prismatic) Listed below (Recalc) • i Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) i 872.00 59,041 0 0 i 873.00 66,546 62,794 62,794 874.00 69,840 68,193 130,987 i 875.00 73,190 71,515 202,502 i 876.00 76,590 74,890 277,392 876.50 78,320 38,728 316,119 • Device Routing Invert Outlet Devices i #1 Primary 868.00' 24.0" Round Outlet Pipe L= 77.0' RCP, groove end projecting, Ke= 0.200 . Outlet Invert= 867.00' S= 0.0130'/' Cc= 0.900 n= 0.011 Concrete pipe, straight & clean #2 Device 1 872.00' 5.0" Vert. Water Quality Orifice C= 0.600 . #3 Device 1 873.40' ' 30.0" W x 12.0" H Vert. Water Quantity Control Weir C=0.600 ' ' #4 Device 1 874.85 14.0 long x 0.5 breadth Open Grate on Control Structure Head (feet) 0.20 0.40 0.60 0.80 1.00 ' Coef. (English) 2.80 2.92 3.08 3.30 3.32 ' ' #5 Secondary 875.50 55.0 long x 55.0 breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=48.07 cfs @ 12.09 hrs HW=875.86' (Free Discharge) t1=Outlet Pipe (Barrel Controls 48.07 cfs @ 15.30 fps) 2=Water Quality Orifice (Passes < 1.25 cfs potential flow) 13=Water Quantity Control Weir (Passes < 16.81 cfs potential flow) -Open Grate on Control Structure (Passes < 47.29 cfs potential flow) Secondary OutFlow Max=32.25 cfs @ 12.09 hrs HW=875.86' (Free Discharge) t5=Emergency Spillway (Weir Controls 32.25 cfs @ 1.62 fps) 2010-02-01-Phase 1 Pond Type 11 24-hr 25-year, 24-hour Rainfall=6.09" Prepared by Kimley-Horn and Associates, Inc. Printed 2/2/2010 HydroCADO 9.00 s/n 05123 © 2009 HydroCAD Software Solutions LLC Page 8 Summary for Pond 5P: Ouffall 1 Inflow Area = 37.530 ac, 0.00% Impervious, Inflow Depth > 2.90" for 25-year, 24-hour event Inflow = 82.21 cfs @ 12.09 hrs, Volume= 9.055 of Primary = 82.21 cfs @ 12.09 hrs, Volume= 9.055 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs