HomeMy WebLinkAbout20200588 Ver 1_DEQ trout buffer variance request_202007084PL HEADWATERS ENGINEERING July 7, 2020 Mr. Stan Aiken Land Quality Section North Carolina Department of Environmental Quality 2090 US70 Highway Swannanoa, NC 28778-8211 Subject: Erosion and Sedimentation Control Narrative Trout Buffer Variance Request Stream Restoration and Dam Construction John Meshad Property on Norton Ridge Road Macon County, North Carolina Dear Mr. Aiken: This narrative describes site conditions, transmits plans for proposed stream restoration and dam construction, and requests a trout buffer variance for the subject project. The work is being done in response to Notices of Violation (NOVs) from Macon County and the NC Division of Water Resources issued in November 2019. Restoration will take place on unnamed tributaries (UTs) to Big Norton Prong (Class WS-II; Tr; HQW). The site is located in the Little Tennessee River basin. Site Conditions The project site is located on the western floodplain of Big Norton Prong where three UTs enter the main stem creek on the east side of Norton Ridge Road. The westernmost UT was previously impounded and the NOV relates to Mr. Meshad having started expanding the impoundment prior to obtaining the necessary permits. Site grades within the immediate work area are relatively flat but the pond site is surrounded by rolling terrain; elevations range from about 3925 feet at the southern property boundary to about 3900 feet in the pond footprint. Work was halted upon receipt of the NOV and soil stockpiles, silt fences and a flashboard riser pond outlet structure remain in place. The northern and western boundaries of the disturbed area are wooded. The proposed project, detailed in the attached plans, involves the following: • Construction of 426 LF of new, off-line stream channel on two UTs to Big Norton Prong; • Construction of a 6-foot tall dam and creation of a 0.8-acre pond where a smaller pond had existed prior to the NOV; and • Planting native trees and shrubs in riparian buffer areas. Proposed Erosion and Sedimentation Control Measures The design attempts to minimize erosion and sedimentation through the following practices: Erosion and Sedimentation Control Narrative Stream Restoration and Dam Construction at Meshad Property Page 2 of 2 • A coffer dam flow diversion, pump -around and/or diversion swale will be used to divert stream flow around work areas and through an existing flashboard riser outlet structure; • The contractor will be required to mobilize all equipment and materials necessary for the project before beginning any stream work; • Silt fences will be installed on the stream sides of all temporary stockpiles; and • The contractor will be required to stage his work such that disturbed areas along the stream banks will be stabilized with seeding, mulch and erosion control matting prior to the end of each work day. Stream restoration and dam construction will take place concurrently and will begin soon after permits are obtained. The project is expected to last for three months, with planting to take place during the dormant season following grading. Details on the construction sequence and erosion and sedimentation control practices are included in the attached plan sets. Closure Attachments to this narrative include: a completed trout buffer waiver supplemental information form, stream restoration plans by Headwaters Engineering, PC, and dam design plans by Garner Engineering. If you have any questions or need additional information, please call me at 828.606.0306. Sincerely, Headwaters Engineering, PC Andrew Bick, PE Principal Attachments NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources Trout Buffer Waiver Supplemental Information The following information should be completed and submitted with respect to the site requiring the buffer waiver. Project Name: Stream Restoration and Dam Construction Owner's Name: John W. Meshad Address: 1417 Kimlira Lane, Sarasota, FL 34231 Consultant's Name: Headwaters Engineering, PC Address: 45 Lotus Place, Asheville, NC 28804 Stream Name: Tributaries to Norton Prong Water Class: WS-II; Tr; HQW County: Macon Project Purpose: Resolve NOV for unauthorized stream impacts; construct new dam Total Acres of Land -Disturbing Activity: 1.7 (ac) Total Acres Disturbed within buffer zone: 0.5 (ac) Total Length of Stream on Tract 1073 (ft) Buffer Impacts: Buffer Width Reduction: Vegetation Trimming: Channel Piping: (ft) (ft) (ft) Channel Relocation: 376 (existing); 426 (proposed) (ft) Total Length of Buffer Impact: 376 (existing); 426 (proposed) (ft) CONSTRUCTION PLANS FOR STREAM RESTORATION UTs TO BIG NORTON PRONG MACON COUNTY, NORTH CAROLI NA r t. � SITE ,� �y}�' '21 t ors c - L ll. Yl SHEETINDEX PREPARED FOR: 1: TITLE 2: NOTES AND SYMBOLS Mr. John Meshad 3: CONSTRUCTION SEQUENCE VICINITY MAP Sarasota, FL 4-5: PLAN AND PROFILE NOT TO SCALE 6: EROSION CONTROL PLAN 7-8: TYPICAL SECTIONS 9-10: DETAILS n n Q w Q cl� o z o O �W u� U cn w O E O p� 0 v W a U HE Q W @ o I Z �w No z U) �B U In � tq U) W Ltl LU _ � U Z Z z 000 Q D_ Z Z 0 0 Z ~ ~ z w00 E Z U U Z w 0-0O �0< c/)� DATE: JULY 2020 SCALE: AS SHOWN TITLE n n Q NOTES- 1. NO STREAM WORK SHALL BEGIN UNTIL ALL MATERIALS NEEDED FOR STREAM RESTORATION ACTIVITIES ARE BROUGHT TO THE SITE. 2. ALL EQUIPMENT SHALL BE CLEANED PRIOR TO MOBILIZATION AND SHALL BE MAINTAINED TO BE FREE OF LEAKS. 3. FUELING SHALL BE PERFORMED IN A CONTAINED AREAAT LEAST 200 FEET FROM FLOWING WATER. 4. WORK SHALL BE STAGED SUCH THAT NO MORE CREEK BANK IS DISTURBED THAN CAN BE STABILIZED WITH SEED, MULCH AND MATTING BY THE END OF THAT WORK DAY. 3. TREES, UTILITIES AND OTHER SITE FEATURES SHALL BE PROTECTED IN PLACE UNLESS MARKED FOR REMOVAL. 4. TREES AND LOGS REMOVED DURING GRADING SHALL BE SALVAGED FOR ON -SITE USE AS IN THE PROJECT UNLESS DIRECTED OTHERWISE. LOGS AND CLEARING DEBRIS NOT USEFUL TO THE PROJECT SHALL BE DISPOSED OFF -SITE. 5. LIVE STAKES AND BUFFER TREES AND SHRUBS SHALL BE INSTALLED DURING THE DORMANT SEASON, TYPICALLY DECEMBER THROUGH MARCH. 6. CONSTRUCTION OF THE DAM SHALL OCCUR CONCURRENTLY WITH STREAM RESTORATION ACTIVITIES. SEE DAM PLANS BY GARNER ENGINEERING (7/3/20) FOR SPECIFICS ON DAM DESIGN. uiz HFr QLa �w z Q z W Lu 2 (D Z Z OEU Qn z �z� OOz woo E Z C) (D Z w m O �0 c/)� 0 ELo o 0 v �U � o z � J U) J m W a) m � U z DATE: JULY 2020 SCALE: AS SHOWN NOTES AND SYMBOLS SHEET 2 OF 10 n n Q CONSTRUCTION SEQUENCE: LLJ o z GENERAL NOTES O o (n 1. ALL EQUIPMENT AND MATERIALS NECESSARY TO COMPLETE THE PROJECT SHALL BE MOBILIZED TO THE SITE BEFORE WORK BEGINS ON THE STREAMS. j 2. SILT FENCE SHALL BE INSTALLED ON BIG NORTON PRONG SIDE OF ALL TEMPORARY STOCKPILES. LLJ 3. A STAGED FLOW DIVERSION SHALL BE USED TO DIVERT STREAM FLOW AROUND WORK AREAS. THE DIVERSION WILL EMPLOY A COMBINATION OF A COFFERDAM, PIPE AND A PUMP -AROUND, DEPENDING V) ON SITE CONDITIONS AND STREAM FLOW RATES ENCOUNTERED DURING CONSTRUCTION. o 4. STREAM BANKS MUST BE STABILIZED WITH SEED, MULCH AND MATTING WITHIN 24 HOURS OF REACHING FINAL GRADES. Q m c 5. ALL GRADED AREAS STEEPER THAN 3:1 MUST BE STABILIZED WITH SEED AND MULCH WITHIN 7 DAYS OF REACHING FINAL GRADES. ALL OTHER AREAS MUST BE STABILIZED WITHIN 14 DAYS OF REACHING FINAL GRADES 6. ALL EQUIPMENT SHALL BE CLEANED PRIOR TO MOBILIZATION AND SHALL BE MAINTAINED TO BE FREE OF LEAKS. 7. FUELING SHALL BE PERFORMED IN A CONTAINED AREAAT LEAST 200 FEET FROM FLOWING WATER.+r 8. LIVE STAKES AND BIOENGINEERING PRACTICES SHALL BE INSTALLED DURING THE DORMANT SEASON, TYPICALLY DECEMBER THROUGH MARCH. MOBILIZATION AND SITE PREPARATION � 9. MOBILIZE EQUIPMENT AND MATERIALS TO THE SITE AND LOCATE LIMITS OF DISTURBANCE. ="' " cc 10. INSTALL CONSTRUCTION ENTRANCE/EXITAS SHOWN ON THE PLANS. USE EXISTING GRAVEL ROAD OFF NORTON RIDGE ROAD TO ACCESS WORK AREA. y Yo 11. MONITOR HAUL ROAD FOR SOIL LOSS ON A DAILY BASIS AND MAINTAIN ROAD AND GRADE OR STABILIZE WITH STONE AS NEEDED TO PREVENT SOIL LOSS. D w,.• q.� 12. USE EXISTING CULVERT TO CROSS THE STREAMS. STREAM RESTORATION AND DAM ROUGH GRADING 13. REMOVE ALL FLASHBOARDS FROM EXISTING OUTLET STRUCTURE AND DRAIN EXISTING POND AS MUCH AS POSSIBLE. o 14. CONSTRUCT COFFER DAM AND DIVERSION PIPE TO INTERCEPT STREAM FLOW AND ROUTE IT TO THE EXISTING OUTLET STRUCTURE. 0E o Lo 15. INSTALL PUMP -AROUND OR TEMPORARY DIVERSION SWALE TO CAPTURE FLOW FROM S3 AND S4 AND ROUTE IT TO THE COFFER DAM AND DIVERSION PIPE. ° U 16. USE PUMP(S) TO DEWATER WORK AREAAS NEEDED AND DISCHARGE TO STABLE WOODED OR GRASS AREA BEYOND THE WORK AREA. !_ E °' 17. SCARIFY SUBGRADE IN STREAM WORK AREATO A DEPTH OF AT LEAST 6 INCHES IN ORDER TO PROMOTE BOND WITH FILL SOILS. Q w T z 18. PLACE AND COMPACT FLOODPLAIN FILL SOILS IN LIFTS NOT EXCEEDING 10 INCHES IN THICKNESS THROUGH THE RESTORED STREAM AND FLOODPLAIN CORRIDOR. BRING COMPACTED FILL TO tu . z4 J PROPOSED FLOODPLAIN GRADES. SEE GARNER PLANS FOR DAM GRADING SPECIFICATIONS. to U) 19. EXCAVATE S3 AND S4 CHANNELS PER THE PLAN AND PROFILE DRAWINGS, LEAVING SHORT SECTIONS OF BANK MATERIALS AS NEEDED TO MAINTAIN DIVERSION. Q J m uj 20. SEED, MULCH AND PLACE MATTING OVER COMPLETED BANKS ON S3 AND S4 CHANNELS. INSTALL CONSTRUCTED RIFFLES. _ Lu co U 0 21. USE PUMP -AROUND TO DIVERT FLOW AROUND THE UPSTREAM ENDS OF S3 AND S4; EXCAVATE UPSTREAM ENDS OF S3 AND S4 AND TURN FLOW INTO THE NEW CHANNELS. DISMANTLE STREAM z PUMP -AROUND OR DIVERSION SWALE 22. AFTER THE DAM/POND CONSTRUCTION (GARNER PLANS) IS COMPLETE, REMOVE DIVERSION PIPE AND ROUTE S1 FLOW INTO THE POND. 23. SMOOTH FLOODPLAIN BEYOND THE DAM TO DESIRED FINSHED GRADES ADJACENT TO RESTORED STREAMS. U DEMOBILIZATION Z ZO O 24. RIP, SEED AND MULCH HAUL ROAD AND STAGING AREAS. U a Z 25. REMOVE TRASH AND DEBRIS AND RESTORE DISTURBED AREAS TO THEIR PRE -CONSTRUCTION CONDITIONS. Q Z 26. REMOVE CONSTRUCTION ENTRANCE/EXITAND SILT FENCE(S) O Z I__~ z Lu PLANTING/BIOENGINEERING O 27. BARE ROOT PLANTS AND LIVE STAKES SHALL BE INSTALLED DURING THE DORMANT SEASON, GENERALLY DECEMBER THROUGH MARCH. 12 ZO U (D Z w m O �O< C/)� DATE: JULY 2020 SCALE: AS SHOWN CONSTRUCTION SEQUENCE SHEET 3 OF 10 _ J- 0' 20 0( + • l a o Z ESTABLISHED o U) • RIPARIAN BUFFER _ W U � V) 1 I • r„ 11 ii J "e71 y v� e� S •` y� < . FORMER STREAM: '� ".0Q" 'j * ALIGNMENTS . '•., ' ^; O y .• CD t1! E Ln r lU Z 0) U 1 1 ag 0 Q u, Z ` \ ESTABLISHED w U _ RIPARIAN BUFFER ❑ J +F / �m z PROP. DAM; SEE M / O GARNER ENG. PLANS ', 0O0 TEMP. COFFER DAM AND CONST. HAUL ROUTE P. + 7 H a Z DIVERSION PIPE; SEE t ►' . z H GARNER ENG. PLANS _ �► 1 ��z O Lu O of Z U M O C� ~ p 00 O 00 O 0) 00 O U' Z Q O 3901 t t 0 O O� O t p p p t p Oo ti NO + o O ',I- CD O �� 3901 o M M 0) M 0) — 0) co — co — 0) — M + m co CQ c NM M in -- 3899 — — No 00 p � p `'°' NO `'p 3899 OM _ �01) �0) + 0) -qO M M c,) 00 co3897 DATE: JULY 2020 ?° - - 3897 SCALE: AS SHOWN 10+00 10+50 11 +00 11 +50 LEGEND S3 PLAN & EXISTING POND BOTTOM (APPROX.) PROFILE SCALES: H:1 �� = 20�, V: 1 �� = 4� PROPOSEDTHALWEG SHEET 4 OF 10 G Q 0, 20, 6 w Q cn o Z - _ o_ (n W rfb cn Ld Q m U 14r— iL e l u} 1 f r ■ . % ��ten pJ y0 i • w _ + •1 0 W-V,ri V * N Lo CD w z �U f ESTABLISHED RIPARIAN BUFFER' Q w U z OVERLAPS WITH DAM t€ z EMBANKMENTS / ww mw } _ U 1 Z FORMER STREAM• CONST. HAUL ROUTE ALIGNMENTS i O Oz T ) i ■ - - it a Z woo Z U cl (Dz Q m O CD CD ci �O< DATE: JULY 2020 SCALE: AS SHOWN S4 PLAN & PROFILE SHEET 5 OF 10 3902 p o � � � COO COO O p OM M �� �� OMOp co O O 3900 tOM MOpO � co mCA p p Op0 t crj Ln f� O � p + � �O TM t p t p MCA CA 3898 ri — CO CA O � M N M t p t (h Cp O p cn --� — p p —— -- --- M� � O N O — — N co M co � p �� +� t� N p 0 \ 3896 z —vi M M pp N p NCO CA 0+00 0+50 1 +00 1 +50 M 2+00 p "' �° 2+50 LEGEND SCALES: H:1 �� = 20', V. ill = 41 EXISTING POND BOTTOM (APPROX.) - — — PROPOSED THALWEG — j AERIAL IMAGERY FROM NC ONEMAP IS DATED 2015. CONTOURS GENERATED FROM PROP. TROUT o BARE EARTH LiDAR DATED 2016/2017. BUFFERS — P L cn f rf—f— _-__-- 0 0 RESTORED STREAM S3; � \ zo cn 1 PUMP -AROUND OR 163 LF +/_ — o AL ALi � J DIVERSION SWALE_LL w 3 \ 40 1 O, TEMP. COFFER DAM, SEE - ° RESTORED STREAM S4; GARNER ENG. PLANS o •.. 4� a � '' 263 LF `� � `/ I ` � ` � / r /� � _11L \ :+� ter• Q� r PROPOSED DAM; SEE �4 GARNER ENG. PLANS a q,CD �_ _ USE EXISTING CULVERT rn E Lo \ TO CROSS STREAMS w ° 'T ♦ ♦� `� Q w Z � ♦ q♦ o o, z c� , SF \ ` \ ��O,Q w w w MIN. 15" HDPE TEMPORARY ► sF sF l °o� �p a = coNO/�T DIVERSION PIPE ROUTED TO ♦ ��sF 4 z ON/�/0 EXISTING AGRI-DRAIN �` q` sF .I ♦` \° �O,L GF/�p OUTLET STRUCTURE; SEE ` ♦ g \ o q0 GARNER ENG. PLANS f / z STAGING o� \ 0 o U AREA _ Q a z PROP. LIMITS OF / EXISTING TROUT BUFFER co °o / ON BIG NORTON PRONG\\\\\q 12 z U AC DISTURBANCE; 1.7 +/- r� q o v oo � oo p � z \ / O \ P CONST. ENTRANCE/EXIT ° LAT.:35.093817; LONG.-83.189178 \ Lu Q m O 0 DATE: JULY 2020 SCALE: AS SHOWN EROSION CONTROL PLAN SHEET 6 OF 10 d d Q 5' MIN. BENCH 3 MIN. (TYP) 10' MIN. 4.4' 0 6' ON RIGHT BANK APPROX. EXISTING SEED, MATTING, LIVE STAKES POND BOTTOM =21 �2OU TYP. BOTH BANKS FILL SOILS, COMPACTED IN LIFTS J NOT MORE THAN 12" THICK TYPICAL SECTION 7 _j STREAM S3 -RIFFLE FILL BEYOND BENCHES CAN BE LEFT LOWER THAN FLOODPLAIN TO CREATE VERNAL POOLS IF NECESSARY (TYP) 10' MIN. 6.0' 1.0' S MIN. BENCH ON RIGHT BANK 3.5 2.5 3 MIN. (TYP) ------ �1 1� 1 APPROX. EXISTING FILL BEYOND BENCHES CAN BE LEFT POND BOTTOM SEED, MATTING, LIVE STAKES LOWER THAN FLOODPLAIN TO CREATE _7 FILL SOILS, COMPACTED IN LIFTS TYP. BOTH BANKS VERNAL POOLS IF NECESSARY (TYP) NOT MORE THAN 12" THICK SECTION DRAWN FOR LEFT -BENDING POOL; USE 2 TYPICAL SECTION MIRROR IMAGE FOR RIGHT -BENDING POOL 7 STREAM S3 - POOL NOTES LEGEND 1. TYPICAL SECTIONS DRAWN LOOKING DOWNSTREAM. 2. DISTURBED BANKS SHALL BE ROUGHENED PERPENDICULAR EXISTING _ _ _ _ _ _ TO SLOPE, COVERED WITH 3" LAYER OF TOPSOIL, SEEDED, PROPOSED MULCHED AND MATTED WITH 780 G/MZ COIR FIBER MATTING. 3. ADJUST GRADING LIMITS AS NEEDED TO PROTECT EXISTING MATURE TREES NOT MARKED FOR REMOVAL. r�r o . y0 (A cr0 wz F� aLu 060 1 Z az w m 2 (D Z Z O�U Q a Z ry Z OO F-? Lu O w Z CU (.9 Z wm0 O U) H Z) O E L 0,7 �U � o �z � J U) J W �m U z I SCALE: AS SHOWN I STREAM S3 TYPICAL SECTIONS SHEET 7 OF 10 n n Q w Q cr) o z 0 o (n m W u u 7.0' BENCH 10' (TYP) FILL BEYOND BENCHES CAN BE LEFT o 0.8' LOWER THAN FLOODPLAIN TO CREATE Q m 0 3 MIN. (TYP) 2.5 (TYP) VERNAL POOLS IF NECESSARY (TYP) --1 _LLL--U1�1__1 L�—JluL__LI111__ u.Ll- _LLL _LJ111__1LiLI�Jlu1- APPROX. EXISTING 3.0' SEED, MATTING, LIVE STAKES.j'}r POND BOTTOM TYP. BOTH BANKS': FILL SOILS, COMPACTED IN LIFTS TYPICAL SECT ON ` NOT MORE THAN 12" THICK 0 °1 w 8 STREAM S4 - RIFFLE O E Lo 0 V c) BENCH 10:1 (TYP) 9.0' Q Lu z cn 1.5 3 MIN. (TYP)' _ I I I I III 3.5 2.5 1 (a 3: U) APPROX. EXISTING " `---�__ �iul ' 1 1_ III = _ — — - _ � m SEED, MATTING, LIVE STAKES FILL BEYOND BENCHES CAN BE LEFT U POND BOTTOM LOWER THAN FLOODPLAIN TO CREATE z FILL SOILS, COMPACTED IN LIFTS TYP. BOTH BANKS VERNAL POOLS IF NECESSARY (TYP) NOT MORE THAN 12" THICK (D SECTION DRAWN FOR LEFT -BENDING POOL; USE 2 TYPICAL SECTION O � 0 MIRROR IMAGE FOR RIGHT -BENDING POOL g STREAM S4 -POOL 1-7 a z or Z OOZ I__ ~ z wfy oo 0-- Z U NOTES: � O Z 0' 5' 10, 15' W 0o O LEGEND 1. TYPICAL SECTIONS DRAWN LOOKING DOWNSTREAM. 2. DISTURBED BANKS SHALL BE ROUGHENED PERPENDICULAR 5 EXISTING TO SLOPE, COVERED WITH 3" LAYER OF TOPSOIL, SEEDED, PROPOSED MULCHED AND MATTED WITH 780 G/M2 COIR FIBER MATTING. 3. ADJUST GRADING LIMITS AS NEEDED TO PROTECT EXISTING MATURE TREES NOT MARKED FOR REMOVAL. DATE: JULY 2020 SCALE: AS SHOWN STREAM S4 TYPICAL SECTIONS SHEET 8 OF 10 TOP OF BANK n n Q V MIN MATTING SHALL BE 780 G/M2 COI R REMOVE ALL DEBRIS, SCARIFY SURFACE, PLACE TOPSOILAND SEED/MULCH BEFORE PLACING MATTING STEEL T-POST FILTER FABRIC WITH WIRE BACKING COMPACTED BACKFILL l I I SIDE EK RUNOFF ., 24" MIN. MATTING PLACED FLUSH WITH BANK SURFACE, LAP OVER DOWN STREAM / DOWN SLOPE SEAMS 12" WOOD STAKE PLACED IN 3' O.C. DIAMOND PATTERN MATTING ANCHORED 1' BELOW STREAM BED 1 EROSION CONTROL MATTING 9 NTS d WIRE BACKING PROFILE 4" 111. 1 T NOTES: 1. SILT FENCE SHALL BE PLACED ON STREAM SIDE OF ALL STOCKPILES. SECTION 2. SILT FENCE SHALL BE REMOVED UPON COMPLETION OF EARTHWORK. 2 SILT FENCE i NTS 4' - 2 (TYP) 1.0 6 MIL PLASTIC SHEETING ANCHORED TO GROUND NOTE: MAINTAIN AT LEAST 1% FALLALONG PROFILE. COBBLE PAD OR WOODEN PALLET OUTLET SHALL BE WELL VEGETATED OR STABILIZED WITH CLASS A STONE AS NEEDED TO PREVENT EROSION COFFER DAM; SAND BAGS W/ PLASTIC SHEETING DIVERSION PUMP SIZED FOR BASE FLOW + 30% FLOW MAX DEPTH -1' HDPE SHEETING HELD IN PLACE ON TOP WITH SAND BAGS X PROFILE NON -WOVEN SILT BAG II WORK AREA* 10' MIN. FROM STREAM SII T RAC-3 DEWATERING PUMP AS NEEDED TOE OF BANK (TYP) TOP OF BANK (TYP) VARIES SILT BAG ON STONE PAD, SEE DETAILABOVE PROTECT EXIST. BANK VEGETATION FOR ADD'L FILTER DISCHARGE TO STABLE STREAM BED AREA *NOTE: WORK AREA SHALL BE STABILIZED BY THE END OF EACH WORK DAY TOP OF BANK BANK TO BANK STREAM BOTTOM MAX DEPTH COFFER DAM SECTION Ix0 Wz a� z az LU !u U zz O0U QCLZ or Z H 0 O Z � ~ z w00 E Z U 12 U Z wm0 O < W� 0 E Lo 0 v �U � o z � J U) J coo W a) m � U z I DATE: JULY 2020 I I SCALE: AS SHOWN I 3 TEMPORARY DIVERSION SWALE 4 PUMP -AROUND SCHEMATIC DETAILS 9 NTS 9 NTS SHEET 9 OF 10 RIPARIAN SEED MIX Seeding Rate = 20 lb/acre Mulching: wheat or oat straw mulch applied at 2 tons/acre Common Name Scientific Name Percentage Deer Tongue Panicum clandestinum 20 Big Bluestem Andropogon gerardii 20 Virginia Wildrye Elymus virginicus 20 Indiangrass Sorghastrum nutans 20 Soft rush Juncus effusus 20 IN. 2 NODES ABOVE GRADE LIVE STAKE TIN DIAMOND PATTERN HARD SOIL OR STONE MAY BE PRESENT SEE NOTE 1 BASEFLOW W.S. 3 NODES MIN. SECTION 2 LIVE STAKING 10 NTS TEMPORARY SEED MIX Rate (lb/acre) Rate (lb/acre) Applied Application Dates Common Name Scientific Name Applied w/ Riparian Mix Separately August 15 to May 1 Rye Grain Secale cereale 120 60 May 1 to August 15 Browntop Millet Urochloa ramosa 40 20 18" MIN. 1 SEED MIXES AND 10 BUFFER PLANTING TOP CUT AT 15' AFTER INSTALLATION BUDS POINTED UPWARD 1 /2" TO 2" BASE CUT AT 45 DEG. LIVE STAKE DETAIL LIVE STAKE NOTES: 1. FORM PILOT HOLE THROUGH HARD SOIL OR STONE TO PREVENT DAMAGE TO STAKE. 2. LIVE STAKE MIX TO INCLUDE AT LEAST TWO OF THE FOLLOWING SPECIES: SILKY DOGWOOD, SILKY WILLOW, ELDERBERRY, NINEBARK, BUTTONBUSH. 3. LIVE STAKES SHALL BE INSTALLED DURING THE DORMANT SEASON, GENERALLY DECEMBER THROUGH MARCH. 0 0 a m� O OI Z ZI SEE PLAN U SCARIFY SUBGRADE PRIOR TO STONE PLACEMENT A r BARE ROOT TREE AND SHRUB PLANTING MINIMUM DENSITY OF 400 STEMS/ACRE COMMON NAME SCIENTIFIC NAME SPACING (FEET) Tulip Poplar Liriodendron tulipifera 12-18 Sycamore Platanus occidentalis 12-18 Tag Alder Alnus serrulata 8-12 Ninebark Physocarpus opulifolius 8-12 Witch -hazel Hamamelis virginiana 8-12 Pawpaw Asimina triloba 12-18 Bitternut Hickory Carya cardiformis 12-18 0 I ELEVATION POINT, SEE PROFILE MIX OF CLASS B STONE AND ON -SITE GRAVEL AND COBBLE 1' (TYP) PLAN d EMBED HARDWOOD BRANCHES AND LOGS AS DIRECTED MIX OF CLASS B STONE AND ON -SITE GRAVELAND COBBLE 18" MIN. AFTER COMPACTION SECTION A -A' EMBED LOG/BRANCH MIN. T INTO BANK 3 CONSTRUCTED RIFFLE 10 NTS d d Q 0 +n E � Ix 43 0,7 W z a, U ¢w Z 3W 6 N U Q J LU W N W _ � U Z 0 Z Z OWU Q a Z Z H O OW? LU O W Z U Z wm0 �O< (n H Z) DATE: JULY�DATE: JULY 20200 SCALE: AS SHOWN DETAILS SHEET 10 OF 10 NORTON RIDGE POND DAM PROJECT INFORMATION PROJECT OWNER: JOHN MESHAD 941-321-5180 jmeshad@jwmmanagement.com STATE I D#: N/A AVAILABLE CODE: DAM SAFETY ACT OF 1967 DAM SIZE CLASSIFICATION: SMALL (5 FEET HIGH) DAM HAZARD CLASSIFICATION: EXEMPT PROJECT LOCATION: PROJECT ENGINEER: GARNER ENGINEERING INC. 9 DAVIS LANE FAIRVIEW, NC 28730 828.337.5716 JOHN@GARNER-ENG.COM CONTACT: JOHN GARNER NORTON RIDGE ROAD MACON COUNTY HIGHLANDS, NC 07/03/2020 NORTON RIDGE ROAD HIGHLANDS, NC L.• ..Rich Miay.,q iCrab PROJECT LOCATION zd 4 k. r c Palk �p�ry _ ' - Bridge 14.c Mtn -. - - - - Chestnut - Ridge f �f .Nnn I� _ IlOiaD 17 LOCATION MAP USGS HIGHLANDS QUADRANGLE, 2019 . - _ „1 I iris a_���ie r-`� • reaN A N i Al-LAIA NcVN0NA]. FOREST f .4i ar,.�•r. k - �-- �- ��' �) I Sdf EMBANKMENT DAM DESIGN INFORMATION OPERATIONS RECOMMENDATIONS CREST ELEVATION: 3902.1 FEET CREST WIDTH: 8 FEET UPSTREAM SLOPE: 2H:1V DOWNSTREAM SLOPE: 3H:1V GENERAL FILL SOIL TYPE: SM, SC, ML MAX. PARTICLE SIZE: 8 INCHES DRY DENSITY: 85 - 110 PCF COMPACTION: 95% DRY DENSITY - STANDARD PROCTOR MOISTURE CONTENT: 0 +/- 3% OF OPTIMUM EMBANKMENT CORE SOIL TYPE: SM, SC, ML, CL MAX. PARTICLE SIZE: 3 INCHES DRY DENSITY: 85 - 110 PCF COMPACTION: 95% DRY DENSITY - STANDARD PROCTOR MOISTURE CONTENT: 0 +/- 3% OF OPTIMUM SPILLWAY SYSTEMS PRINCIPAL SPILLWAY: 2X24-INCH AGRI-DRAIN STANDPIPE 15-INCH (MIN) INTAKE AND DISCHARGE PIPE EMERGENCY SPILLWAY: 10-FOOT OVERFLOW SECTION ELEV. = 3901.7 (MAX) WATERSHED PARAMETERS AREA: 14 ACRES CURVE NUMBER: 48 TIME OF CONCENTRATION: 0.33 HOUR BASIN LAG: 0.20 HOUR 5-YEAR CALCULATED INFLOW 8.4 CFS 25-YEAR CALCULATED INFLOW 16.9 CFS LOCAL RAINFALL DATA* (*NOAA - PRECIPITATION FREQUENCY DATA SERVER) PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 72-hr 4 (3.42A.08) 4: 9-4.88 4. 25789 5.67-6.81 6.64 8?04 7. 9914 8.31-310.3 : 98-11.5 1 4- 3A 11 5- 5.1 �_hr 4.82 (4A9-521) 5.79 (5.39-6.24) 7.12 (6.62-7.68) 8.18 (7.59-8.83) 9.67 (8.90.10.4) 10.9 1 (9.98-11.7) 12.1 (11.1-13.1) 13.5 (12.2-14.6) 15.4 (13.7-16.8) 17.0 (15.0-18.6) 5.91 7.05 8.59 9.82 11.5 12.9 14.3 15.9 18.0 19.7 2-day (5.51-6.36) (6.58-7.61) (8.009.26) (9.12-10.6) 11 (10.7-12.4) 11 (11.9-13.9) (13.1-15.5) (14.4-17.2) (16.2-19.7) (17.6-21.7) •'•F�:+'Q�M. ARNER ENGINEERING �iiDiy•'. t� ��`� 9 DAVIS LANE )Iti���FAIRVIEW, NC 28730 www.garner-eng.com 07/03/2020 828.337.5716 SCALE: DRAWN BY AS SHOWN JFG PROJECT NO: GE-215 DATE: 07/03/2020 PROF. ENG. FIRM NO. C-4451 ROUTINE OPERATIONS • VISUALLY INSPECT EMBANKMENT (MONTHLY) • VISUALLY INSPECT SPILLWAY OUTFALL (MONTHLY) • VISUAL INSPECTION OF UPSTREAM WATERLINE (MONTHLY) • REVIEW WEATHER FORECAST (ONGOING) • EXERCISE FLASHBOARDS (ANNUALLY) • POND DRAINING - DRAIN POND SLOWLY. RAPID DRAWDOWN CAN LEAD TO SLOPE FAILURES •• REMOVE ONE FLASHBOARD EVERY 24 HOURS. STORM RESPONSE MONITOR RAINFALL FORECASTS TO DETERMINE APPROPRIATE REPONSE • FORECAST > 5" RAIN REMOVE ONE FLASHBOARD* • POND AT EMERG. SPILLWAY REMOVE 2ND & 3RD FLASHBOARDS** *BEFORE THE STORM STARTS, ONLY REMOVE ONE FLASHBOARD AT A TIME. ALLOW POND TO LOWER FOR 24 HOURS BEFORE REMOVING THE NEXT FLASHBOARD. **DURING STORM FLOWS, UP TO THREE FLASHBOARDS MAY BE REMOVED AT ONCE TO QUICKLY CONTROL POND LEVELS. MAINTENANCE RECOMMENDATIONS • MAINTAIN LOW -GROWING VEGETATION ACROSS THE EMBANKMENT TO ALLOW FOR EASE OF ACCESS AND VISUAL INSPECTION. • MOW THE EMBANKMENT AT LEAST TWICE PER YEAR. REMOVE WOODY VEGETATION BEFORE IT BECOMES WELL -ESTABLISHED. KEEP WOODY VEGETATION CLEARED FROM EMBANKMENT EDGES. • REMOVE DEBRIS AND VEGETATION FROM SPILLWAY INTAKES AND OUTFALLS. • MONITOR AND MANAGE ANIMAL IMPACTS AS REQUIRED. DESIGN PARAMETERS NORTH RIDGE POND DAM NORTON RIDGE ROAD HIGHLANDS, NC M00 CONSTRUCTION SEQUENCE: 1. ESTABLISH SEDIMENT AND EROSION CONTROL MEASURES. 2. ESTABLISH CONTROL OF SURFACE WATER BY DIVERTING ALL FLOWS THROUGH EXISTING AGRI-DRAIN STRUCTURE. (SEE CONTROL OF WATER NOTES, BELOW.) 3. CONCURRENT WITH STREAM RESTORATION, CONSTRUCT PERIMETER EMBANKMENT: 3.1. FOUNDATION EXCAVATION AND PREPARATION 3.2. PLACEMENT OF CORE MATERIAL 3.3. PLACEMENT OF SHELL MATERIAL 4. DIVERT FLOWS THROUGH CONSTRUCTED STREAM CHANNEL NORTH OF POND. 5. CONSTRUCT FLOWABLE FILL CRADLE AROUND AGRI-DRAIN PIPING. 6. BACKFILL AGRI-DRAIN TO COMPLETE THE EMBANKMENT. 7. DIVERT SURFACE WATER FLOWS FROM STREAM S4 TO AGRI-DRAIN. (STREAMS S3 AND S4 ARE DIVERTED TO RESTORED STREAM CHANNEL.) 8. ESTABLISH PERMANENT GROUND COVER OVER DISTURBED AREAS. 9. REMOVE EROSION AND SEDIMENT CONTROLS. 10. UPON PERMITTING APPROVAL, INSTALL FLASHBOARDS IN AGRI-DRAIN TO ESTABLISH THE NEW POND. CONTROL OF WATER NOTES: 1. EXTEND EXISTING AGRI-DRAIN PIPING UPSTREAM TOWARD HEAD OF THE POND AND CONSTRUCT A COFFER DAM OVER THE PIPE TO COLLECT FLOWS FROM STREAMS S1, S3, AND S4 (SEE STREAM RESTORATION PLANS BY HEADWATERS ENGINEERING DATED 6/2/2020). 2. REMOVE ALL FLASHBOARDS FROM AGRI-DRAIN. 3. INSTALL PUMPS AND PIPING TO REMOVE EXCESS WATER WITHIN THE WORK AREAS. 3.1. FOUNDATION EXCAVATIONS AND POND BOTTOM EXCAVATIONS WILL REQUIRE PUMPING 4. MONITOR SURFACE WATER CONTROLS DAILY. 5. MONITOR PIPING DISCHARGE LOCATIONS FOR EROSION AND SCOUR. 6. AFTER STREAM RESTORATION, DIVERT FLOWS FROM STREAMS S3 AND S4 INTO NEW STREAM CHANNEL. MAINTAIN DIVERSION OF S1 INTO AGRI-DRAIN PIPING. 7. AFTER BOTH AGRI-DRAIN SPILLWAYS ARE INSTALL AND SECURED, REMOVE UPSTREAM PIPE EXTENSION AND COFFER DAM. 07/03/2020 SCALE: 1. ARNER DRAWN BY ENGINEERING PROJECTNO: IGE-215 9 DAMS LANE DATE: FAIRVIEW, NC 28730 WWW.gaTncr-eng.com PROF. ENG. FIRM 828.337.5716 NO. C-4451 EARTHWORK CONSTRUCTION NOTES: 1. CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SAFETY AND ESTABLISHING SAFE ACCESS TO THE WORK AREA. 2. REMOVE VEGETATION IN AND AROUND THE WORK AREA. 3. REMOVE DEBRIS IN THE POND AREA OBSTRUCTING THE WORK AREA. 4. LOWER POND LEVEL FOR 1 WEEK PRIOR TO CONSTRUCTION START. SEE CONTROL OF WATER NOTES. 5. FOUNDATION EXCAVATION SHALL BE OBSERVED BY THE DESIGN ENGINEER TO CONFIRM DESIGN ASSUMPTIONS. 6. FOUNDATION OVER -EXCAVATION MAY BE REQUIRED TO ACHIEVE ADEQUATE FOUNDATION CONDITIONS FOR EARTH FILL SUPPORT AND SEEPAGE CONTROL. 7. EARTHWORK FOUNDATIONS SHALL BE FREE OF ORGANIC DEBRIS, SATURATED SOILS, STANDING WATER, ICE, FROZEN SOILS, AND UNCONSOLIDATED SOILS. 8. OPEN EXCAVATIONS SHALL BE SLOPED AND/OR SHORED TO PROVIDE SAFE ACCESS TO THE WORK AREA. 9. COMPACTED FILL TO CLASSIFY AS SM OR SC, ACCORDING TO UNIFIED SOIL CLASSIFICATION SYSTEM. 10. COMPACT ALL BACKFILL TO 95% OF STANDARD PROCTOR MAXIMUM DRY DENSITY. 11. PLACE FILL IN 8-INCH LIFTS AND COMPACT WITH MANUAL TAMP OR ROLLER TO ACHIEVE COMPACTION. 12. DRAINAGE PIPING SHALL BE ADS N-12, DOUBLE -WALLED HDPE PIPING. 13. GEOTEXTILE FABRIC SHALL BE NON -WOVEN, NEEDLE -PUNCH FABRIC BY MIRAFI 160N OR APPROVED EQUAL. 14. NON -WOVEN GEOTEXTILE SHALL BE USED TO SEPARATE LEVELING STONE FROM BASE SOILS AND BACKFILL SOILS. 15. STONE AGGREGATE FOR LEVELING SHALL BE NCDOT #57 STONE. STONE SHALL NOT BE USED IN THE EMBANKMENT CORE. 16. RIP RAP SHALL BE NCDOT CLASS A. ALL OTHER STONE OR BOULDERS SHALL BE APPROVED BY THE ENGINEER PRIOR TO USE. 17. FLOWABLE FILL 17.1. 28-DAY COMPRESSIVE STRENGTH = 100 PSI. (MIN.) 17.2. FINE AGGREGATE = ASTM C-33 SAND (50-60%, BY VOL.) 17.3. COARSE AGGREGATE = NC -DOT #78 STONE 17.4. WATER -CEMENT RATIO = 3.5:1 (MAX., BY WEIGHT) 17.5. CEMENT CONTENT = 50 LBS/CU-YD (MIN.) 18. AGRI-DRAIN LEVEL CONTROL DEVICE 18.1. INSTALL AGRI-DRAIN WITH DISCHARGE PIPING IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS 18.2. SECURE VERTICAL PLUMB AND WEIR LEVEL DURING PLACEMENT OF FLOWABLE FILL. 18.3. ADJUST FLASHBOARDS TO ACHIEVE DESIGN WATER SURFACE ELEVATION. 18.4. BACKFILL AROUND AGRI-DRAIN IN 6-INCH LIFTS AND COMPACT WITH MANUAL TAMPER. AVOID DAMAGING THE STRUCTURE. AS SHOWN JFG 07/03/2020 EMBANKMENT DAM DESIGN INFORMATION CREST ELEVATION: 3902.1 FEET CREST WIDTH: 8 FEET UPSTREAM SLOPE: 2H:lV DOWNSTREAM SLOPE: 3H:lV GENERAL FILL SOIL TYPE: SM, SC, MIL MAX. PARTICLE SIZE: 8 INCHES COMPACTION: 95% DRY DENSITY - STANDARD PROCTOR MOISTURE CONTENT: 0 +/- 3% OF OPTIMUM EMBANKMENT CORE SOIL TYPE: SM, SC, ML, CL MAX. PARTICLE SIZE: 3 INCHES COMPACTION: 95% DRY DENSITY - STANDARD PROCTOR MOISTURE CONTENT: 0 +/- 3% OF OPTIMUM PRINCIPAL SPILLWAY: 24-INCH AGRI-DRAIN STANDPIPE 15-INCH (MIN) INTAKE AND DISCHARGE PIPE EMERGENCY SPILLWAY: 10-FOOT OVERFLOW SECTION ELEV. = 3901.7 (MAX) EROSION CONTROL NOTES: 1. EROSION CONTROL DEVICES SHALL BE INSTALL IN ACCORDANCE WITH THE STREAM RESTORATION PLANS PREPARED BY HEADWATERS ENGINEERING DATED 06/02/2020. 2. PLAN ALL WORK TO LIMIT THE AREA AND TIME EXTENT OF LAND DISTURBANCE. 3. MAINTAIN EROSION CONTROL DEVICES AROUND STOCK PILES AND DEBRIS DISPOSAL AREAS. PROVIDE TEMPORARY COVER OVER DISTURBED SOILS IN ADVANCE OF ANTICIPATED STORMS. 4. PLACEMENT OF CEMENTITIOUS MATERIAL SHALL BE LIMITED TO THE AREAS SHOWN ON THESE PLANS. ALL CONCRETE WASHOUT MUST OCCUR OFFSITE. NOTES NORTH RIDGE POND DAM NORTON RIDGE ROAD HIGHLANDS, INC "T 5