HomeMy WebLinkAboutwq0024577_Inspection_20200714ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANIEL SMITH
Dfrector
Karen H Brashear
City of Goldsboro
PO Drawer A
Goldsboro, NC 27533-9701
NORTH CAROLINA
Environmental Quality
March 17, 2020
SUBJECT: Compliance Inspection Report
Goldsboro WRF Reclaimed Water Project
Non -discharge Permit No. WQ0017791
Wayne County
Dear Mrs. Brashear:
The North Carolina Division of Water Resources conducted an inspection of the Goldsboro WRF
Reclaimed Water Project on 3/13/2020. This inspection was conducted to verify that the facility is
operating in compliance with the conditions and limitations specified in Non -discharge Permit No.
WQ0017791. The findings and comments noted during this inspection are provided in the enclosed
copy of the inspection report entitled "Compliance Inspection Report".
There were no significant issues or findings noted during the inspection and therefore, a response to this
inspection report is not required.
If you should have any questions, please do not hesitate to contact Paul Mays with the Water Quality
Regional Operations Section in the Washington Regional Office at 252-948-3940 or via email at
paul.mays@ncdenr.gov.
Sincerely,
ATTACHMENTS
Cc: Laserfiche
'p,"d qr. mi),
Paul Mays, Environmental Specialist 1
Water Quality Regional Operations Section
Washington Regional Office
Division of Water Resources, NCDEQ
North Caro na Department of Envlronmenta, Quay tY I D�vs,on of Water Re sources
Wash'. rgtnn Reg 'ona Dffce 1943 Washington S;cara ht a,'[ Wish cgton, Nora: Carona 27S69
252-946-€491
Compliance Inspection Report
Permit: WQ0017791 Effective: 06/O1/15 Expiration: 05/31/20 Owner: City of Goldsboro
SOC: Effective: Expiration: Facility: Goldsboro WRF Reclaimed Water Project
County: Wayne PO DrawerA
Region: Washington
Goldsboro NC 275339701
Contact Person: Karen H Brashear Title: Phone: 919-735-3329 Ext.101
Directions to Facility:
System Classifications: SI,
Primary ORC: Robert Paul Sherman
Secondary ORC(s):
On -Site Representative(s):
Certification: 26362 Phone:919-735-3329
Related Permits:
NC0023949 City of Goldsboro - Goldsboro WRF
Inspection Date: 03/13/2020 Entry Time 12:OOPM
Primary Inspector: Paul M Mays
Secondary Inspector(s):
Exit Time: 01:OOPM
Phone: 252-948-3940
Reason for Inspection: Routine Inspection Type: Compliance Evaluation
Permit Inspection Type: Reclaimed Water
Facility Status: E Compliant ❑ Not Compliant
Question Areas:
Treatment Flow Measurement -Effluent Treatment Flow Measurement -Influent Miscellaneous Questions
Treatment Flow Measurement -Water Record Keeping Treatment Flow Measurement
Use Records
End Use -Reuse
(See attachment summary)
Page 1 of 5
Permit: WQ0017791 Owner -Facility: City of Goldsboro
Inspection Date: 03/13/2020 Inspection Type: Compliance Evaluation Reason for Visit: Routine
Inspection Summary:
The Goldsboro WIRE was inspected 03/13/2020 at 12:OOpm by Paul Mays. The facility was found to be compliant with
permit W00017791, well maintained and well operated. The ORC Robert Sherman was present during the inspection and
was very helpful. Below is a summary of the findings during the inspection.
The golf course received 5289338 gallons in 2019-2020 and the effluent flow meter for the effluent pipe leading to the golf
course was calibrated on 11/12/2019
The effluent flow meter leading to the spray field on the farm was calibrated on 11/12/2019
All required records were present and readily available for the inspection with no hassle. Irrigation records were reviewed with
ORC and records indicate compliance with permitted flow to the golf course and the farm. The October 2019 NDMR was
spot checked for completeness and it was found to be complete. October 31, 2019 was checked on NDMR versus the lab
data and no issues were found. The data checked out.
The farm and golf course both look good and well maintained. All required units were present and in good condition. There
were some issues with the pumps for irrigation on the golf course. However, this issue is being addressed and does not
violate the permit conditions.
The required sign indicating reuse water is being utilized on site was present and in plain sight at golf course club desk. This
is good. Because as a friendly reminder, the absence of this sign would mean noncompliance with the permit and possibly
enforcement. Therefore, it must always be present and in plain sight at all times.
Page 2 of 5
permit: W00017791 Owner -Facility: City of Goldsboro
Inspection Date: 03/13/2020 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Type
Yes
No NA NE
Activated Sludge Spray, LR
❑
Single Family Drip
❑
Infiltration System
❑
Lagoon Spray, LR
❑
Single Family Spray, LR
❑
Recycle/Reuse
❑
Activated Sludge Spray, HR
❑
Activated Sludge Drip, LR
❑
Reuse (Quality)
Treatment Flow Measurement -Influent
Yes
No NA NE
Is flowmeter calibrated annually?
❑
❑ ❑
Is flowmeter operating properly?
❑
❑ ❑
Does flowmeter monitor continuously?
❑
❑ 0 ❑
Does flowmeter record flow?
❑
❑ 0 ❑
Does flowmeter appear to monitor accurately?
❑
❑ 0 ❑
Comment
Treatment Flow Measurement -Water Use Records Yes No NA NE
Is water use metered? 0 ❑ ❑ ❑
Are the daily average values properly calculated? 0 ❑ ❑ ❑
Comment:
Treatment Flow Measurement -Effluent Yes No NA NE
Is flowmeter calibrated annually? 0 ❑ ❑ ❑
Is flowmeter operating properly? 0 ❑ ❑ ❑
Does flowmeter monitor continuously? 0 ❑ ❑ ❑
Does flowmeter record flow? M ❑ ❑ ❑
Does flowmeter appear to monitor accurately? 0 ❑ ❑ ❑
Comment: The golf course received 5289338 gallons in 2019-2020 and the effluent flow meter for the
effluent pipe leading to the golf course was calibrated on 11/12/2019
The effluent flow meter leading to the spray field on the farm was calibrated on 11/12/2019
Record Keepina
Is a copy of current permit available?
Are monitoring reports present: NDMR?
NDAR?
Yes No NA NE
■❑❑❑
■❑❑❑
■❑❑❑
Page 3 of 5
Permit: W00017791 Owner -Facility: City of Goldsboro
Inspection Date: 03/13/2020 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Are flow rates less than of permitted flow?
0
❑ ❑ ❑
Are flow rates less than of permitted flow?
0
❑ ❑ ❑
Are application rates adhered to?
0
❑ ❑ ❑
Is GW monitoring being conducted, if required (GW-59s submitted)?
❑
❑ 0 ❑
Are all samples analyzed for all required parameters?
E
❑ ❑ ❑
Are there any 2L GW quality violations?
❑
❑ N ❑
Is GW-59A certification form completed for facility?
❑
❑ N ❑
Is effluent sampled for same parameters as GW?
❑
❑ 0 ❑
Do effluent concentrations exceed GW standards?
❑
❑ 0 ❑
Are annual soil reports available?
❑
❑ 0 ❑
# Are PAN records required?
❑
❑ N ❑
# Did last soil report indicate a need for lime?
❑
❑ 0 ❑
If so, has it been applied?
❑
❑ 0 ❑
Are operational logs present?
❑ ❑ ❑
Are lab sheets available for review?
❑ ❑ ❑
Do lab sheets support data reported on NDMR?
0
❑ ❑ ❑
Do lab sheets support data reported on GW-59s?
❑
❑ 0 ❑
Are Operational and Maintenance records present? 0 ❑ ❑ ❑
Were Operational and Maintenance records complete? 0 ❑ ❑ ❑
Has permittee been free of public complaints in last 12 months? S ❑ ❑ ❑
Is a copy of the SOC readily available? ❑ ❑ N ❑
No treatment units bypassed since last inspection? 0 ❑ ❑ ❑
Comment: All required records were present and readily available for the inspection with no hassle. Irrigatio
records were reviewed with ORC and records indicate compliance with permitted flow to the golf
course and the farm. The October 2019 NDMR was soot checked for completeness and it was
found to be complete. October 31, 2019 was checked on NDMR versus the lab data and no
issues were found. The data checked out.
End Use -Reuse Yes No NA NE
Is the acreage in the permit being utilized? 0 ❑ ❑ ❑
Does the acreage specified in the permit correspond to the measured acreage at the site? 0 ❑ ❑ ❑
Are all essential units provided in duplicate?
0
❑ ❑ ❑
Is an automatically activated standby power source available?
❑
❑0 ❑
Is the equalization capacity adequate?
❑ ❑ ❑
Is aerated flow equalization present?
❑
❑ N ❑
Has the turbidity meter been calibrated in the last 12 months?
N
❑ ❑ ❑
Does the turbidity meter have recording capabilities?
0
❑ ❑ ❑
Is all flow diverted at the appropriate times?
0
❑ ❑ ❑
Page 4 of 5
Permit: WO0017791 Owner -Facility: City of Goldsboro
Inspection Date: 03/13/2020 Inspection Type : Compliance Evaluation
Reason for Visit: Routine
Is all upset wastewater diverted from reuse storage unit?
0
❑ ❑ ❑
Is all upset wastewater treated, retreated, or disposed of acceptably?
0
❑ ❑ ❑
Is upset wastewater treated prior to discharge to irrigation storage?
0
❑ ❑ ❑
Is public access restricted from irrigation area during active site use?
0
❑ ❑ ❑
If golf course, is a sign posted in plain sight on the club house?
0
❑ ❑ ❑
Is the cover crop acceptable?
❑
❑ 0 ❑
Are buffers adequate?
❑
❑ 0 ❑
Is the site free of ponding/runoff?
❑
❑ 0 ❑
Is the acreage in the permit being utilized?
0
❑ ❑ ❑
Is the application equipment acceptable?
0
❑ ❑ ❑
Is the application area free of limiting slopes?
M
❑ ❑ ❑
How close is the closest water supply well?
❑
❑ 0 ❑
Are any supply wells within the CB?
❑
❑ 0 ❑
Are any supply wells within 250' of the CB?
❑
❑ M ❑
Is municipal water available in the area? M ❑ ❑ ❑
Are GW monitoring wells required? ❑ ❑ M ❑
Are GW monitoring wells located properly w/ respect to RB and CB? ❑ ❑ M ❑
Are GW monitoring wells properly constructed, including screened interval? ❑ ❑ M ❑
Comment: The farm and golf course both look good and well maintained. All required units were present
and in good condition. There were some issues with the pumps for irrigation on the golf course.
However, this issue is being addressed and does not violate the permit conditions.
The required sign indicating reuse water is being utilized on site was present and in plain sight at
golf course club desk. This is good. Because as a friendly reminder, the absence of this sign
would mean noncompliance with the permit and possibly enforcement. Therefore it must be
present and in plain sight at all times.
Page 5 of 5