HomeMy WebLinkAboutSW6200101_Final Permit_2020420ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
April 20, 2020
David A. Heins, Chief Environmental Division
Directorate of Public Works
2175 Reilly Road, Stop A
Fort Bragg, NC 28310
Subject: Stormwater Permit No. SW6200101
Special Operations Forces (SOF) Civil Affairs TEMF — PN69552
Cumberland County
Dear Mr. Heins:
The Division of Energy, Mineral and Land Resources (DEMLR), received a complete Stormwater
Management Permit Application for the subject project on April 15, 2020. Staff review of the plans and
specifications has determined that the project, as proposed, will comply with the Stormwater Regulations
set forth in Title 15A NCAC 02H .1000. We are forwarding Permit No. SW6200101, dated February 20,
2020, for the construction, operation and maintenance of the subject project and the stormwater system.
This permit shall be effective from the date of issuance until April 20, 2028, or until rescinded and shall
be subject to the conditions and limitations as specified therein, and does not supersede any other agency
permit that may be required.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings
(OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes. Per
NCGS 143-215(e) the petition must be filed with the OAH within thirty (30) days of receipt of this
permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required)
and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via
telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made
this permit shall be final and binding.
This project will be kept on file at the Fayetteville Regional Office. If you have any questions, or need
additional information concerning this matter, please contact Corey Anen at (919) 707-3649; or
Corey.Anen@ncdenr.gov.
Sincerely,
for S. Daniel Smith,
Director, Division of Energy, Mineral and Land Resources
cc: SW6200101 File, Fayetteville Regional Office
cc: F. Michael Mayer, PE — Mason & Hanger
D E Q North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612
NORTH CAROLINA
oePanmam ofenmronmemai ouai� F� 919.707.9200
State Stormwater Permit
Permit No. SW6200101
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT QUALITY
STATE STORMWATER MANAGEMENT PERMIT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North
Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBYGRANTED TO
Directorate of Public Works
for
Special Operations Forces (SOF) Civil Affairs TEMF — PN69552
Mountain Viper Drive, Fort Bragg, NC
Cumberland County
FOR THE
construction, operation and maintenance of the Stormwater Control Measures (SCM) in
compliance with the provisions of 15A NCAC 02H .1000 (hereafter referred to as the
"storm vLa ter rules") and the approved stormwater management plans, specifications and other
supporting data as on file with and approved by the State and considered a part of this permit.
This permit shall be effective from the date of issuance until April 20, 2028, and shall be
subject to the following specified conditions and limitations:
I. DESIGN STANDARDS
This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. The SCM is approved for the management of stormwater runoff as described in the
application documents and as shown on the approved plans.
3. All stormwater collection and treatment systems must be located within a dedicated
common areas or recorded easements. The final plats for the project will be recorded
showing all such required easements, in accordance with the approved plans.
4. The runoff from all built -upon area within the permitted drainage area of this project
must be directed into the SCM.
5. The built -upon areas associated with this project shall be located at least 30 feet
landward of all perennial and intermittent surface waters.
II. SCHEDULE OF COMPLIANCE
During construction, erosion shall be kept to a minimum and any eroded areas of the
system will be repaired immediately.
2. SCMs that allow stormwater to infiltrate shall not be located on or in areas with
Page 1 of 4
State Stormwater Permit
Permit No. SW6200101
contaminated soils.
3. The permittee shall at all time provide the operation and maintenance necessary to
assure every SCM functions at optimum efficiency. The approved Operation and
Maintenance Plan must be followed in its entirety and maintenance must occur at the
scheduled intervals including, but not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and re -vegetation of slopes and the filter strip.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans.
f. Debris removal and unclogging of all drainage structures, level spreader, filter
media, planting media, underdrains, catch basins and piping.
g. Access to the cell and outlet structure must be available at all times.
4. Records of maintenance activities must be kept for the SCM. The reports will indicate
the date, activity, name of person performing the work and what actions were taken.
The owner shall keep maintenance records and these shall be available upon request
by the party responsible for enforcing the stormwater program under which the SCMs
were approved.
5. The permittee shall submit an annual summary report of the maintenance and
inspection records for the SCM. The report shall summarize the inspection dates,
results of the inspections, and the maintenance work performed at each inspection.
6. The SCM shall be constructed in accordance with the approved plans and
specifications, the conditions of this permit, and with other supporting data.
7. If groundwater conditions that affect the functionality of the SCM are detected during
construction, the permittee shall immediately contact the Division.
8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and
prior to operation of this permitted facility, a certification must be received from an
appropriate designer for the SCM certifying that it has been installed in accordance
with this permit, the approved plans and specifications, and other supporting
documentation. Any deviations from the approved plans and specifications must be
noted on the Certification. A modification maybe required for those deviations.
9. SCMs impacted by sedimentation and erosion control during the construction phase
shall be cleaned out and converted to its approved design state.
10. The permittee shall submit to the Director and shall have received approval for revised
plans, specifications, and calculations prior to construction, for any modification to the
approved plans, including, but not limited to, those listed below:
a. Any revision to any item shown on the approved plans, including the stormwater
management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project area.
The project area is defined as all property owned by the permittee, for which
Sedimentation and Erosion Control Plan approval was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
Page 2 of 4
State Stormwater Permit
Permit No. SW6200101
11. A copy of the approved plans and specifications shall be maintained on file by the
Permittee for a minimum of eight years from the date of the completion of construction.
12. The Director may notify the permittee when the permitted site does not meet one or
more of the minimum requirements of the permit. Within the time frame specified in the
notice, the permittee shall submit a written time schedule to the Directorfor modifying
the site to meet minimum requirements. The permittee shall provide copies of revised
plans and certification in writing to the Director that the changes have been made.
13. The O&M Agreement shall be referenced on the final plat and shall be recorded with the
County Register of Deeds upon final plat approval. If no subdivision plat is recorded for
the site, then the O&M Agreement shall be recorded with the county Register of Deeds
so as to appear in the chain of title of all subsequent purchasers.
III. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director. In the
event of a change of ownership, or a name change, the permittee must submit a
completed Name/Ownership Change form signed by both parties, to the State,
accompanied by the supporting documentation. The approval of this request will be
considered on its merits and may or may not be approved.
2. The permittee is responsible for compliance with all permit conditions until such time as
the Division approves a request to transfer the permit.
3. Failure to abide by the conditions and limitations contained in this permit may subject
the Permittee to enforcement action by the State, in accordance with North Carolina
General Statute 143-215.6A to 143-215.6C.
4. The issuance of this permit does not preclude the Permittee from complying with any
and all statutes, rules, regulations, or ordinances, which may be imposed by other
government agencies (local, state, and federal) having jurisdiction.
5. In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including
those as may be required by this Division, such as the construction of additional or
replacement stormwater management systems.
6. The permittee grants DEQ Staff permission to enter the property during normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
7. The permit issued shall continue in force and effect until revoked or terminated. The
permit may be modified, revoked and reissued or terminated for cause. The filing of a
request for a permit modification, revocation and re -issuance or termination does not
stay any permit condition.
8. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
9. Approved plans and specifications for this project are incorporated by reference and
are enforceable parts of the permit.
Page 3 of 4
State Stormwater Permit
Permit No. SW6200101
10. The issuance of this permit does not prohibit the Director from reopening and modifying
the permit, revoking and reissuing the permit, or terminating the permit as allowed by
the laws, rules and regulations contained in Session Law 2006-246, Title 15A NCAC
2H.1000, and NCGS 143-215.1 et.al.
11. The permittee shall notify the Division in writing of any name, ownership or mailing
address changes at least 30 days prior to making such changes.
12. The permittee shall submit a renewal request with all required forms and documentation
at least 180 days prior to the expiration date of this permit.
Permit issued this the 20t" day of April, 2020.
For Brian Wrenn
Acting Director, Division of Energy, Mineral, and Land Resources
Page 4 of 4
State Stormwater Permit
Permit No. SW6200101
Directorate of Public Works
Special Operations Forces (SOF) Civil Affairs TEMF — PN69552
Cumberland County
Designer's Certification
I, , as a duly registered
State of North Carolina, having been authorized to observe (periodically/ weekly/
full time) the construction of the project,
(Project Name)
in the
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL
Submit to: NCDEQ-DEMLR Fayetteville Regional Office
225 Green St., Ste. 714
Fayetteville, NC 28301-5095
Page 1 of 1