Loading...
HomeMy WebLinkAboutClosure Report Request for Asheville Dan River and L V Sutton_20200717ROY COOPER Governor MICHAEL S. REGAN Secretary Paul Draovitch Senior Vice President Environmental, Health, & Safety Duke Energy 526 South Church Street Mail Code EC3XP Charlotte, North Carolina 28202 NORTH CAROLINA Environmental Quality July 17, 2020 Subject: Closure Report Request for Asheville Steam Electric Plant, Dan River Combined Cycle Station, and L. V. Sutton Energy Complex Dear Mr. Draovitch: The North Carolina Department of Environmental Quality (DEQ) is requesting Duke Energy to provide Closure Reports for the subject facilities similar to that received for the Riverbend Steam Station (Duke Energy March 11, 2020 letter, Documentation of Compliance with the Coal Ash Management Act of 2014, Session Law 2014-122, Section 3. (b), 3. (c)(1) and 3. (c)(2) Coal Ash Impoundment Excavation and Closure, Riverbend Steam Station — Ash Basin 1 and Ash Basin 2). The Closure Reports should include the following: • A summary of closure activities to date and those planned in the context of project milestones, • As -built drawings and schematics along with the results of any engineering evaluations and analyses for the closed impoundments, • Final Plans for management of wastewater and storm water, • A list of all State or Federal permits obtained or anticipated for impoundment closure, • A description of the Post -Closure Monitoring and Care Plan, • A proposed Final Monitoring Plan, and • Updated cost estimates for closure and post -closure operations. Please provide these Closure Reports to DEQ within 6 months of the date of this letter or 6 months from the date of the final excavation activity at the facility's impoundment(s). DE oe`aa'HNA a.w` North Carolina Department of Environmental Quality 217 West Jones Street I I601 Mail Service Center I Raleigh, North Carolina 27699-1601 919,707.8600 It should be noted that, on December 6, 2019, DEQ requested that Duke Energy provide a Closure Report for the Riverbend Steam Station. Duke Energy replied with the March 11, 2020 letter, Documentation of Compliance with the Coal Ash Management Act of 2014, Session Law 2014- 122, Section 3. (b), 3. (c)(1) and 3. (c)(2) Coal Ash Impoundment Excavation and Closure, Riverbend Steam Station — Ash Basin I and Ash Basin 2. DEQ comments on this letter will be provided in a separate correspondence. If you have any questions, please contact Steve Lanter at (919) 707-3667. Sincerely, Sincerely, Digitally signed by Edward F. Mussler III, ct P.E. Date: 2020.07.14 11:06:04-04'00' Viic�k Bolich, L.G., Chief Edward F. Mussler III, P.E., Chief Ground Water Resources Section Solid Waste Section Division of Water Resources Division of Waste Management cc: ARO/MRO/WIRO/WSRO WQROS Regional Office Supervisors (Electronic) GWRS Central File Copy Sheila Holman — DEQ (electronic copy) George Eller — DEMLR (electronic copy) NORTH CAROUNA kZ> oy.rrr��s�grq� North Carolina Department of Environmental Quality 217 West Jones Street 1 1601 Mail Service Center I Raleigh, North Carolina 27699-1601 919.707.8600