HomeMy WebLinkAboutNCC202960_ESC Approval Submitted_20200714 RGY COOPER a p Governor MICHAEL S.REGAN Secretary Brian Wrenn .4rNng Director NORTH CAROLINA Environmental Qual" July 9, 2020 LETTER OF APPROVAL Piedmont Natural Gas Company, Inc. Attention: Kevin Sell, Manager PO Box 33068 Charlotte,NC 28233 RE: Project Name: PNG Bryson Park Extension Project ID: DAVID-2021-003 Total Acres: 4.7 County: Yadkin River Basin: Yadkin-Pee Dee Project Location: Hege Rd- Lexington Submitted By: WK Dickson Date Received by LQS: duly 9, 2020 Plan Type: Utilities—Express -New This office has received a soil erosion and sediment control plan for the project listed above which was submitted as required by the North Carolina Sedimentation Pollution Control Act (G.S. 113A-57 (4)). The Act requires that all persons disturbing an area of one or more acres of land must obtain approval of a soil erosion control plan prior to the commencement of the land-disturbing activity (G.S. 113A-54(d) (4)). The Act further states that this plan must be filed a minimum of 30 days prior to the activity and the approving authority must approve or disapprove the submitted plan within 30 days of receipt. Failure of the approving authority to approve or disapprove the submitted plan within the 30-day period will be deemed approval of the plan. Commencement or continuation of a land-disturbing activity under the jurisdiction of this Act prior to the approval of an erosion and sediment control plan is a violation of the Act. The approval of an erosion and sediment control plan is conditioned on the applicant's compliance with Federal and State water quality laws, regulations and rules. Please note additional information may be requested during the review of your ESC plan, and ESC plans are reviewed in the order received. North Carolina Department orEnvironmentaI Quality I Division of-Energy,Mineral and Land Resources 7� Winston-Salem Regional Office 1450 Banes Mil l Road,Suite 300,Winston-Salem,North Carolina 27105 jg�D,E336-776-9800 Be advised the NC Construction General Permit (also known as "NCGO 1") was renewed on April 1, 2019. The updated permit does not significantly change the measures that are required to be implemented on construction sites. However, there are some organizational and technical updates to the permit. Most notably, there is a new process in which construction sites will obtain official coverage under an NCGO1 permit through an electronic process, after the soil erosion and sediment control plan approval is issued. For assistance and guidance with the revised 2019 NCGO1 (Construction Stormwater General Permit NCG010000) as adopted on April 1, 2019, please use the following link: htips://deq.nc.gov/about/divisions/energy-mineral-land-resources/energy-mineral-land- perrn its/stormwater-p_e_rmits_Iconstruction-sw If you have questions, please do not hesitate to contact our office at (336) 776-9800. Your cooperation in this matter is appreciated and we look forward to working with you on this proj ect. Sincerely, Scott Sink Assistant Regional Engineer Land Quality Section Cc: WK Dickson 1213 West Morehead Street Charlotte, NC 28208 ��yy i� Q„r G3 •r� � � o � v a F o