Loading...
HomeMy WebLinkAboutWQ0041790_Application (FTSE)_20200709TIMCADAMS Date: June 30, 2020 To: NCDEQ 610 East Center Avenue Suite 301 Mooresville, North Carolina 28115 I am sending you the following items: ❑ Drawings ❑ Letter ❑ Specifications ® Submittal ❑ Plans ❑ Prints i HAND DE IVER Re: Six Twenty IIlri1; Moow-SVILL Job #: TPH-19010 ❑ Statement of Qualifications ❑ Other QUANTITY UNIT DESCRIPTION 1 Copy Cover Letter 1 Copy FTA Signed + Original 1 Copy Conditional Letter 1 Copy Signed 620 E Woodlawn Road Townhomes Sugar Creek WWTP NCDDEQ_FTSE 1 Copy Six Twenty - Topo Map 1 Copy Six Twenty - Street Level Map Transmitted as checked below: ® For approval ❑ For your use ❑ As requested Remarks: Copy to: ❑ For review + comment ❑ Other ❑ Other creating experiences through experience 3430 Toringdon Way, Suite 110, Charlotte, NC 28277 / 704. 527.0800 June 16, 2020 NCDEQ Mooresville Regional Office Water Quality Section 610 E. Center Avenue Mooresville, North Carolina 28115 Re: Fast -Track Application (FTA 04-16) For Sewer Six Twenty Charlotte, North Carolina TPH-19010 Please find enclosed with this letter the following attachments: 1. Application Form (FTA 04-16) — one original (hand delivered) 2. Application Fee (hand delivered) 3. Flow Tracking/Acceptance for Sewer Extension Permit Form (FTSE 08-13) 4. Street Level Map 5. USGS Topographic Map The proposed project is 31 unit townhome development in Charlotte, NC. Charlotte will be accepting the sewer flows from this project. The proposed private sewer collection system will have 8" gravity main and will be built in one phase. Sincerely, MCADAMS Stuart Woodard, PE Project Engineer SAW/ks creating experiences through experience 3430 Toringdon Way, Suite 110, Charlotte, NC 28277 / 704. 527. 0800 DWI R Division of 'Dater Resources State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: 7 C t{to be completed by vwlt) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: TriPointe Homes Inc. (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ❑ Municipal ® Other mot., [°� " ']'`D W 3. Signature authority's name: Luke Woodburn per 15A NCAC 02T .0106(b) 1'? Title: Director of Land Develo ment 4. Applicant's mailing address: 3436 Toringdon Way, Suite 210 W ,_S City: Charlotte State: North Carolina Zip: 28277- 5. Applicant's contact information: Phone number: 704 944-4434 Email Address: Luke.Woodbum@TriPointeHomes.com II. PROJECT INFORMATION: t ,J%f , f'iar MOORESVII,i OFFICE l . Project name: Six Twenty 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: WQ00 and issued date: If new construction but part of a master plan, provide the existing permit number: WQ00 3. County where project is located: Mecklenburg 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.173797' Longitude:-80.870858' 5. Parcel ID (if applicable): (or Parcel 1D to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Stuart Woodard, PE License Number: 046788 Firm: McAdams Mailing address: 3430 Toringdon Way, Suite 110 City: Charlotte State: NC Zip: 27277- Phone number: (704 527-0800 Email Address: woodardna,mcadamsco.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: McAlpine Creek Wastewater Treatment Plant Permit Number: NCO024970 Owner Name: Charlotte Water V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ Downstream (Receiving) Sewer Size: inch System Wide Collection System Permit Number(s)Jif applicable: WQCS Owner Name(s): FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial % Industrial (See 15A NCAC 02T .0103(200)) "Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(fl? ❑ Yes ❑ No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.01140 T Daily Design Flow a,b 777]WO. of Units Flow Townhomes 190 gal/unit 31 5,890 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 5,890 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: _ GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: VIII. Size (inches) Length (feet) Material 8" 905.55 PVC ➢ Section H &III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: 0Longitude: - ° 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry -15A NCAC 02T .0305(h)(1)(1i): ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T .0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(fl & W ® Yes ❑ No ➢ 15A NCAC 02T.0305 contains minimum separations that shall be provided for sewers stems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet "Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-1 or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 02T.0305W contains alternatives where separations in 021.0305(fl cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpa-e ➢ If noncompliance with 02T.0305(f) or (2), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ❑ N/A ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑ No ❑ N/A ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ® Yes ❑ No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 & Buffer PermlttinI Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T,0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes ® No ❑ N/A ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains (latest version), and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? If No, complete and submit the variance/Alternative Design Request application (VADC 10-14) and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: I, 'T womwo attest that this application for (Professional Engineer's name from Application Item III.1.) has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: ,,e�'(VA CA�� 06 SEAL 046766 /?. 3. Applicant's Certification per 15A NCAC 02T .0106(b): I, attest that this application for (Signature Authority's name & title from Application Item 1.3. has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.618, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 as well as civil penalties up to $25,000 per violation. Signature: Date: 8- t-CEIVL VOR J U ri `1rVaRos MOO RESVII_t F REX—,,'Oi'.';A(_ 0 FW, FORM: FTA 04-16 Page 5 of 5 State of North Carolina WR, Department of Environmental Quality Division of Water Resources of art Resource � +; ax 4 Flow Tracking for Sewer Extension Applications 1=islor VI, (FTSE 10-18) Entity Requesting Allocation: TriPOinte Homes, Inc. Project Name for which flow is being requested: 620 E Woodlawn Road Townhomes More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: McAlpine Creek, Irwin Creek, Sugar Creek b. WWTP Facility Permit #: NC0024970, NC0024945, NCO024937 All flows are in MGD c. WWTP facility's permitted flow 99.00 d. Estimated obligated flow not yet tributary to the WWTP 10.769 e. WWTP facility's actual avg. flow 72.158 f. Total flow for this specific request 0.00589 g. Total actual and obligated flows to the facility 82.928 h. Percent of permitted flow used 83.8% II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow** Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pf), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Woodlawn Road Downstream Permit Number: Unknown Page 1 of 6 FTSE 10-18 III. Certification Statement: 1 Ke ri Cantrell certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and lI plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. 6/4/2020 Signing Official Signature Date Chief Engineer Title of Signing Official Page 2 of 6 FTSE 10-18 W4JER June 4, 2020 Mr. Luke Woodbum TriPointe Homes, Inc. 3436 Toringdon Way Suite 210 Charlotte, NC 28277 SUBJECT: SEWER FLOW CONDITIONAL ACCEPTANCE 620 E WOODLAWN ROAD TOWNHOMES 620 E WOODLAWN ROAD - CLTWATER TRACKING# 20202521 After review by Charlotte Water's Capacity Assurance Program GAP ,your project was identified to be located in a local collection sanitary sewer system determined to have limited sanitary sewer system capacity. After analysis of the sanitary sewer system associated with the proposed development, 20202521, 620 E WOODLAWN ROAD TOWNHOMES, it was determined that there will be sufficient capacity within the existing public gravity sewer to accommodate the proposed average day flow of 6,890 gallons per day, at the connections points indicated on the submitted utility plan, and connections will be allowed after completion of the following public infrastructure project: Wastewater Replacement Project: Little Hope Creek Sanitary Sewer Improvements — Phase 3. Project No. CMP-40-14.002 This infrastructure improvement project was identified to support current and future customers; therefore, Charlotte Water is conditionally approving these proposed flows contingent on the completion and activation of the required offsite Sanitary Sewer improvements. The anticipated completion date for the required Little Hope Creek Sanitary Sewer Improvements — Phase 3 Project, is the 3rd Quarter (Fall) of 2021. As public sewer limitations affecting specific development projects are eliminated as portions of the public sewer project are completed and placed in service prior to the full sewer project completion, these specific projects will be issued a full CAP approval and allowed to connect to the public sewer. We request a detailed schedule of your development project, preferably Gantt chart, with specific milestones and schedule dependencies. This will allow us to contact you at critical milestones identified for either project. The CAP analysis performed determines available capacity within the existing public gravity sewer system The developer is responsible for any additional private or public sewer infrastructure required to convey flow from the proposed development to the existing public gravity sewer. If you have any questions, you may contact new services at (704) 336-1041. Sincerely, Eric L. Howard Senior Engineer Charlotte Water 5100 Brookshire Blvd, Charlotte, NC 28216 charlottewater.org 1 Operated by the City of Charlotte 0 1,000 2,000 4,000 Feet 1 inch = 2,000 feet •'1 • CHARLOTTE, NORTH CAROLINA North Carolina Secretary of State Search Results Page 1 of 2 • File an Annual Report/Amend an Annual Report • Upload a PDF Filing • Order a Document Online - Add Entity to My Email Notification List • View Filings • Print a Pre -Populated Annual Report form • Print an Amended a Annual Report form •• • Legal Name Tri Pointe Homes, Inc. Sosld: 1763625 Status: Current -Active Q Date Formed: 10/22/2018 Citizenship: Foreign State of Incorporation: DE Fiscal Month: December Annual Report Due Date: April 15th CurrentAnnual Report Status: Registered Agent: Corporation Service Company **Note load times may be long* Mailing 19540 Jamboree Road Suite 300 Irvine, CA 92612 Reg Mailing 2626 Glenwood Ave Ste 550 Raleigh, NC 27608 50 M • Chief Executive Officer Douglas F Bauer 19540 Jamboree Road Suite 300 Principal Office Reg Office 19540 Jamboree Road Suite 300 2626 Glenwood Ave Ste 550 Irvine, CA 92612 Vice President Leigh Hansen 19540 Jamboree Rd Suite 300 Raleigh, NC 27608 Chief Financial Officer Glenn J Keeler 19540 Jamboree Rd Suite 300 Irvine CA 92612 Irvine CA 92612 Irvine CA 92612 https://www.sosnc.gov/online_services/search/13usiness Registration -Results 7/9/2020 North Carolina Secretary of State Search Results Page 2 of 2 Secretary David C Lee 19540 Jamboree Rd Suite 300 Irvine CA 92612 Assistant Secretary Matt Thomas 19540 Jamboree Road Suite 300 Irvine CA 92612 https://www.sosne.gov/online_services/searchll3usiness _Registration Results 7/9/2020