Loading...
HomeMy WebLinkAboutSW5200701_Site Calculations_20200708Famous Chicken 'n Biscuits at Spring Hope, NC Owner/Developer: It's Farm Time, LLC Contact: Brad Mercer brad. mercer(cb-becajun.com 252.208.2233 ENGINEERING 801 EAST WASHINGTON STREET P.O. BOX HOS NASHVILLE, N.C. 27856 PHONE: (252) 459-8196 WWW. STOCKSENGINEERING.COM 11' e o SEAL ° J p ° 19843 e O�Zo Stocks Engineering, P.A. 801 East Washington Street PO Box 1108 Nashville, NC 27856 PROJECT: Bojangles' at Spring Hope, NC DATE : July 1, 2020 PAGE :I of 1 Post -Development Tc< Area ID Area (Ac.) C 110 Q10 (cfs) 5 DI#3 0.74 0.75 6.64 3.69 5 CB#6 0.25 0.90 6.64 1.49 5 CB#4 0.06 0.50 6.64 0.20 5 CB#5 1.90 0.73 6.64 9.21 Post -Development Tc Area ID Area (Ac.) C 125 Q25 (cfs) 5 DI#3 0.74 0.75 7.45 4.13 5 C13#6 0.25 0.90 7.45 1.68 5 CB#4 0.06 0.50 7.45 0.22 5 CB#5 1.90 0.73 7.45 10.33 10-Year Storm 25-Year Storm Runoff Computations Hydraflow Storm Sewers Extension for Autodesk0 AutoCADO Civil 3130 Plan nutfall Project File: Road Pipe System.stm Number of lines: 4 1 Date: 7/1/2020 Storm Sewers 02.00 Page 1 Line Line ID Flow Line Line Line Invert Invert Line HGL HGL Minor HGL Dns Junction No. rate Size shape length EL Dn EL Up Slope Down Up loss Junct Line Type (cfs) (in) (ft) (ft) (ft) N (ft) (ft) (ft) (ft) No. 1 CB#5 to FES#6 16.36 24 Cir 62.000 249.80 251.12 2.129 250.75 252.58 0.71 252.58 End Curb- 2 CB#4 to CB#5 6.03 24 Cir 32.000 251.32 252.34 3.187 252.58 253.21 n/a 253.21 j 1 Curb- 3 CB#6 to CB#4 1.68 18 Cir 19.000 253.00 255.02 10.632 253.22 255.51 0.18 255.51 2 Curb- 4 DI#3 to CB#4 4.13 24 Cir 56.000 252.54 256.00 6.179 253.21 256.71 n/a 256.71 2 DropGrate Project File: Road Pipe System.stm -- Number of lines: 4 Run Date: 7/1/2020 NOTES: Known Qs only ; j - Line contains hyd. jump. Storm Sewers 02.00 Page 1 Line Size Q Downstream Len Upstream Check JL Minor coeff loss Invert HGL Depth Area Vel Vel EGL Sf Invert HGL Depth Area Vel Vel EGL Sf Ave Enrgy elev elev head elev elev elev head elev Sf loss (in) (cfs) (ft) (ft) (ft) (sqft) (ft/s) (ft) (ft) N (ft) (ft) (ft) (ft) (sgft) (ft/s) (ft) (ft) N N (ft) (K) (ft) 1 24 16.36 249.80 250.75 0.95 1.47 11.13 0.69 251.44 0.000 62.000 251.12 252.58 1.46"" 2.45 6.67 0.69 253.27 0.000 0.000 n/a 1.02 0.71 2 24 6.03 251.32 252.58 1.26 1.31 2.90 0.33 252.91 0.000 32.000 252.34 253.21 j 0.87*" 1.31 4.61 0.33 253.54 0.000 0.000 n/a 1.32 0.44 3 18 1.68 253.00 253.22 0.22* 0.16 10.61 0.18 253.40 0.000 19.000 255.02 255.51 0.49"" 0.50 3.38 0.18 255.68 0.000 0.000 n/a 1.00 0.18 4 24 4.13 252.54 253.21 0.67 0.92 4.50 0.26 253.47 0.000 56.000 256.00 256.71 0.71 *" 1.00 4.11 0.26 256.98 0.000 0.000 n/a 1.00 n/a Project File: Road Pipe System.stm Number of lines: 4 Run Date: 7/1/2020 Notes: " depth assumed; "' Critical depth.; j-Line contains hyd. jump ; c = cir e = ellip b = box Storm Sewers 02.00 Storm Sewer Profile Proj. file: Road Pipe System.stm Elev. (ft) N V M LO 271.00 266.00 271.00 266.00 261.00 261.00 256.00 256.00 251.00 251.00 246.00 63% 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) 246.00 110 120 O ONO O o-ow • O � to °0 O O LJJ N CNO o CNN � .-- M O ��� O NNN � www o MttO � M O O �NM O NNN M Www + ON O �� NN Ww 19. OOLf - 18" 10 Storm Sewers Storm Sewer Profile Proj. file: Road Pipe System.stm Elev. (ft) � O E N N N CO O � O N N N oWww CO E>> to Ix C S N 7 E Q S J It 'IT MMV) O 10NN M N N N o Www co E» �5 E Es V 7 C Q J 0 0 00 0 LbLO C N N o Ww m E�; U) (if E 273.00 273.00 268.00 268.00 263.00 263.00 258.00 258.00 253.00 — — — — — 56.000L - 253.00 _ 24" 3.199/6 248.00 248.00 0 10 20 30 40 50 60 70 80 90 100 HGL EGL Reach (ft) Storm Sewers • 1pp� ENGINEERING W Rip -Rap Outlet Protection Pipe # FES #6 Known: 24" RCP Q25 = 16.36 cfs V25 = 11.13 ft/s Min. Required: (Use NCDEQ Table 8.06b) La = 10' W = 6' 3do = 6' dso = 2.5" (Rip Rap Size) *Use Class B Rip Rap over Mirafi 140N 18" in depth. Project: Location Date: Basin ID: Area Disturbed Runoff Area Runoff Coefficient • l� ENGINEERING Skimmer Sediment Basin Bojangles' at NC 581, Spring Hope, NC Spring Hope, NC 15-Jun-20 1 Intensity (10 Year) Q10= Basin Volume Calculation: Volume of Sediment= Surface Area Calculation: 3.99 Acres 3.99 Acres 0.35 6.64 Inch / Hr 9.27 CFS 3.99 Acres 7,182 CF X 1,800 CF Sediment / Year Surface Area = Q10 X 325 SF/CFS 9.27 CFS X 325 SF/CFS 3,014 SF Sediment Basin Sizing: 105 Length 30 Width Sediment Basin Volume: 7,875 CF Sediment Basin Area: 3,150 SF Weir Design and Velocity Check: Weir Length= 1 15 Feet Height of Water over Weir= 1 0.38 Feet Velocity Check: 1.64 FPS Skimmer Sizing: Days to Drain = 3 Days Skimmer Size = 2 Inches Orifice Size = 2.5 i Depth 1.6 Inches • w"M ENGINEERING Skimmer Sediment Basin Project: Bojangles' at NC 581, Spring Hope, NC Location: Spring Hope, NC Date: 15-Jun-20 Basin ID: 2 Area Disturbed Runoff Area Runoff Coefficient Intensity (10 Year) Q10= Basin Volume Calculation: Volume of Sediment= 4.83 4.83 0.35 6.64 11.22 4.83 Acres 8,694 CF Acres Acres Inch / Hr CFS X 1,800 CF Sediment / Year Surface Area Calculation: Surface Area = Q10 X 325 SF/CFS 11.22 CFS X 325 SF/CFS 3,648 SF Sediment Basin Sizing: 120 Length 30 Width Sediment Basin Volume: 9,000 CF Sediment Basin Area: 3,600 SF Weir Design and Velocity Check: Weir Length= 1 20 Feet Height of Water over Weir= 1 0.35 Feet Velocity Check: 1.59 FPS Skimmer Sizing: Days to Drain = 3 Days Skimmer Size = 2 Inches Orifice Size = 2.5 Depth 1.8 Inches Channel Report Hydraflow Express Extension for AutodeskO AutoCADO Civil 3D0 by Autodesk, Inc. Temporary Diversion #1 - Grassed Triangular Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 255.00 Slope (%) = 2.00 N-Value = 0.035 Calculations Compute by: Known Q Known Q (cfs) = 4.53 Friday, Jun 12 2020 Highlighted Depth (ft) = 0.85 Q (cfs) = 4.530 Area (sqft) = 1.44 Velocity (ft/s) = 3.13 Wetted Perim (ft) = 3.80 Crit Depth, Yc (ft) = 0.80 Top Width (ft) = 3.40 EGL (ft) = 1.00 Elev (ft) Depth (ft) Section 3.00 258.00 2.50 257.50 2.00 257.00 1.50 256.50 1.00 256.00 0.50 -71 255.50 0.00 255.00 254 50 -0 50 1 2 3 4 5 Reach (ft) 6 7 8 9 10 Channel Report Hydraf low Express Extension for Autodesk0 AutoCADO Civil 3DO by Autodesk, Inc. Temporary Diversion #1 - Bare Soil Triangular Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 255.00 Slope (%) = 2.00 N-Value = 0.020 Calculations Compute by: Known Q Known Q (cfs) = 4.53 Friday, Jun 12 2020 Highlighted Depth (ft) = 0.69 Q (cfs) = 4.530 Area (sqft) = 0.95 Velocity (ft/s) = 4.76 Wetted Perim (ft) = 3.09 Crit Depth, Yc (ft) = 0.80 Top Width (ft) = 2.76 EGL (ft) = 1.04 Elev (ft) Section Depth (ft) 3.00 258.00 2.50 257.50 257.00 2.00 1.50 256.50 1.00 256.00 0.50 255.50 0.00 255.00 254 50 -0 50 1 2 3 4 5 Reach (ft) 6 7 8 9 10 Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Temporary Diversion #2 - Bare Soil Triangular Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 251.00 Slope (%) = 3.50 N-Value = 0.020 Calculations Compute by: Known Q Known Q (cfs) = 11.22 Tuesday, Jun 30 2020 Highlighted Depth (ft) = 0.88 Q (cfs) = 11.22 Area (sqft) = 1.55 Velocity (ft/s) = 7.24 Wetted Perim (ft) = 3.94 Crit Depth, Yc (ft) = 1.15 Top Width (ft) = 3.52 EGL (ft) = 1.70 Elev (ft) Section Depth (ft) 254.00 253.50 3.00 253.00 2.50 252.50 2.00 1.50 252.00 251.50 71 1.00 251.00 0.50 ,)r�n tin 0.00 -0 50 1 2 3 4 5 Reach (ft) 6 7 8 9 10 Channel Report Hydraf low Express Extension for Autodesk0 AutoCADO Civil 31DO by Autodesk, Inc. Temporary Diversion #2 - Grassed Triangular Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 251.00 Slope (%) = 3.50 N-Value = 0.035 Calculations Compute by: Known Q Known Q (cfs) = 11.22 Tuesday, Jun 30 2020 Highlighted Depth (ft) = 1.08 Q (cfs) = 11.22 Area (sqft) = 2.33 Velocity (ft/s) = 4.81 Wetted Perim (ft) = 4.83 Crit Depth, Yc (ft) = 1.15 Top Width (ft) = 4.32 EGL (ft) = 1.44 Elev (ft) Section Depth (ft) 254.00 253.50 3.00 253.00 2.50 252.50 2.00 252.00 1.50 251.50 1.00 251.00 0.50 250.50 0.00 -0 50 1 2 3 4 5 Reach (ft) 6 7 8 9 10