Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 N 52 NC0069370 20/07/08 C S31112171819 20
21 66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
N67707172 73 74 75 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Pine Park Retirement Inn
2601 U S Hwy 64 E
Hendersonville NC 28792
Entry Time/Date Permit Effective Date
Exit Time/Date Permit Expiration Date
10:30AM 20/07/08 15/12/01
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Mark Brandon Jones/ORC/828-273-0760/
Other Facility Data
11:30AM 20/07/08 20/11/30
Name, Address of Responsible Official/Title/Phone and Fax Number
Greg Penfold,2601 U S Hwy 64 E Hendersonville NC 28792//828-490-2496/Contacted
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Flow Measurement Operations & Maintenance Sludge Handling Disposal
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date
Daniel J Boss DWR/ARO WQ/828-296-4658/
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#1
DocuSign Envelope ID: FE06291E-763D-409B-B331-BBF69F79A7F5
7/13/2020
7/13/2020
NPDES yr/mo/day
20/07/08
Inspection Type
C3111218
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
On 7/8/2020 I (Daniel Boss) conducted a compliance evaluation inspection of the Brookdale (Pine
Park) WWTP. I met with Mark Jones (ORC) and Daniel Jones for the inspection.
The main problem at this WWTP is the high level of solids in the aeration basins. Settleable solids
measured at 98% in 30 minutes, which is extremely high. The aeration basin solids level needs to be
brought down immediately to prevent any solids washout through the clarifier. Normally this could be
accomplished by wasting solids to the digester, but the digester is full and needs to be pumped out.
Mark Jones said that the aerobic digester needs to be pumped out once per month to allow him to
continue wasting solids from the aeration basins.
The clarifier only had about half a foot of clear supernatant. The top of the sludge blanket was sitting
only about one foot below the water surface. It's quite possible that solids could start to wash out of the
clarifier if solids wasting does not begin soon.
The alarms are not working for either the influent or effluent pump stations. The high water float may
not be working for the effluent pump station. The influent pump station appears to be missing one of
the high water floats. The autodialer and high level float were both working for the influent pump
station.
Both the clarifier and chlorine contact chamber had duckweed covering the surface. Mark said that he
had cleared them of duckweed just the day before, but it grows back very quickly.
NC0069370 17 (Cont.)
Page#2
DocuSign Envelope ID: FE06291E-763D-409B-B331-BBF69F79A7F5
Permit:NC0069370
Inspection Date:07/08/2020
Owner - Facility:
Inspection Type:
Pine Park Retirement Inn
Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Settleable solids are analyzed.Comment:
Pump Station - Influent Yes No NA NE
Is the pump wet well free of bypass lines or structures?
Is the wet well free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Is SCADA telemetry available and operational?
Is audible and visual alarm available and operational?
The audio and visual alarm at the influent pump station were not working, but the autodialer
was working. One of the high water floats seemed to be missing.
Comment:
Bar Screens Yes No NA NE
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
Comment:
Aeration Basins Yes No NA NE
Mode of operation Ext. Air
Type of aeration system Diffused
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin’s surface?
Page#3
DocuSign Envelope ID: FE06291E-763D-409B-B331-BBF69F79A7F5
Permit:NC0069370
Inspection Date:07/08/2020
Owner - Facility:
Inspection Type:
Pine Park Retirement Inn
Compliance Evaluation
Aeration Basins Yes No NA NE
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/l)
The level of solids was extremely high in the aeration basins. Settleable solids measured
98% in 30 minutes.
Comment:
Secondary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the return rate acceptable (low turbulence)?
Is the overflow clear of excessive solids/pin floc?
Is the sludge blanket level acceptable? (Approximately ¼ of the sidewall depth)
There was only about 0.5 feet of clear supernatant in the clarifier. The sludge blanket was
sitting only about 1 foot below the water surface. The clarifiers were covered with
duckweed. Mark Jones said he had removed all of the duckweed just one day prior.
Comment:
Aerobic Digester Yes No NA NE
Is the capacity adequate?
Is the mixing adequate?
Is the site free of excessive foaming in the tank?
# Is the odor acceptable?
# Is tankage available for properly waste sludge?
The digester is full and the ORC is not able to waste solids from the aeration basins until the
digester solids are pumped out. According to Mark Jones the digester needs to be pumped
out once per month for him to be able to waste solids properly.
Comment:
Disinfection-Tablet Yes No NA NE
Are tablet chlorinators operational?
Are the tablets the proper size and type?
Number of tubes in use?2
Page#4
DocuSign Envelope ID: FE06291E-763D-409B-B331-BBF69F79A7F5
Permit:NC0069370
Inspection Date:07/08/2020
Owner - Facility:
Inspection Type:
Pine Park Retirement Inn
Compliance Evaluation
Disinfection-Tablet Yes No NA NE
Is the level of chlorine residual acceptable?
Is the contact chamber free of growth, or sludge buildup?
Is there chlorine residual prior to de-chlorination?
Comment:
De-chlorination Yes No NA NE
Type of system ?Tablet
Is the feed ratio proportional to chlorine amount (1 to 1)?
Is storage appropriate for cylinders?
# Is de-chlorination substance stored away from chlorine containers?
Comment:
Are the tablets the proper size and type?
Are tablet de-chlorinators operational?
Number of tubes in use?1
Comment:
Flow Measurement - Effluent Yes No NA NE
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
The flow meter was last calibrated on 10/20/19.Comment:
Pump Station - Effluent Yes No NA NE
Is the pump wet well free of bypass lines or structures?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Is SCADA telemetry available and operational?
Is audible and visual alarm available and operational?
The alarms were not working.Comment:
Page#5
DocuSign Envelope ID: FE06291E-763D-409B-B331-BBF69F79A7F5