HomeMy WebLinkAboutSW3200701_03-Supplement EZ_20200707SUPPLEMENT EZ COVER PAGE
FQR A5 GAdECi
PROJECT INFORMATION
1 1 Project Name
2 Pr ect Area ac
3 Coastal Wetland Area rac)-
4 Surface Water Area {ac}
5 is this o ad High or Low pans' 7
6 Does this project use an off -site SCM?
Prescot Village Phase 1
10,54 --
-......_ - Na.
No
COMPLIANCE WrrH 02H .1003{4j
7 :Width of vegetated setbacks provided I feet)
8 .Will the vegetated setback remain vegetated?
68
Yes
e
9 Is BUA other that as listed in .100314] fc•d] out of the setback?
10 is streambank stabilization proposed on this project?
Yes
_ _ _
No
NUMBER
AND TYPE OF SCMa:
11
[Infiltration-Sntem
0
12
13
Bioretention Cell
Wet Pond
0
1
14
15
Stormwater Wetland
0
Permeable Pavement 0
Sand Filter 0
16
17
18
_
Rainwater Harvesting;RWH)_ 0
1 Green Roof 0
Level 5 reader -Filter Sid LS-FS 0
19
20
21
Disconnected Impervious Surface {DISC _ _ — —0 —
Treatment Swale 0
D Pond L0
22
_ 23
24
StormFiller
Silva Cell - - --—...-------
0
----- 0 ----- —
0
25
IBMIter
26
Filterra
0
FORMS LDADED
.3 --L State, Z _
Email,.
ranan r arranGn4 rt . rr�a eci manager
DewbenyErtiineers Inc_
9300 Harris Comers Parkway, Suite 220
Charlotte. NC 28269
- 704-631-5206
blafranchi * dewberry. cam
Certllicatlon Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or
supervision: that the Information provided in the form Is, to the best of my knowledge and belief, true. accurate, and complete; and
that the engineering plans, specifications. operation and maintenance agreements and other supporting Information are consistent
with the information provided here.
11111+111s,
`��� CAROB
=pQ; �FiSSI0' /l'y
Q-
Q
SEAL
40016
141 1 tia %%%N
Signature of Designer
03-06- 20Z0
Date —
DRAINAGE AREAS
1LIsalVpart
s a high densityro'ect? _ Yes____
2o number of drainage areas/SCMs 1 _
of this project subject to previous rote
3ons? No
4
5
6
- _ 1
F1
8
FORM5LOADED
from project (sq
as
•246
3s
ds
on subdivided loi
1) (sq ft)
!008 rules
'017 rules
w BUA outside of subdivided lots (subject
permitting) (sf)
2008 rules
2017 rules
f1site - total area (sq
1995 rules
SL 2006-246
rules
BUA (sq ft) - — --
rules _
,06-246 —
2008 rules
—'
2017 rules
11
Design storm (inches)
1995 rules
SL 2006-246
2008 rules
2017 rules
12
Breakdown of new BUA:
- Sidewalk It
- hoof sq ft)
- Roadwa ..(s4
- Future sq fti
- Other, please specify in the comment box
--
---_— —_---
_
— - --
- — — ---
below Isq ft1
New infiltrating permeable pavement on
13
subdivided lots sgft).
New infiltrating permeable pavement outside of
14
subdivided lots (sq Ill..
Exisitng BUA that will remain (not subject to
15
ermitt!ngJ (sq ft�
16
Exislin BUA that is alreadw permitted [rrq ft1= I
17
Existinu BUA that will be removed (sq ft� !
18
Percent BUA
19
_ _
Des' n volume of 5CM cu tt)
20
Calculation method for des' n volume
1ADDITIONAL
INFOMATION
Please use this space to provide any additional
21
information about the drainage area(s):
WET POND
1 Drainage area number
1
2 Design volume of SCM (cu ff)
t 29460 cf
13ENEW MDC F110M AZH .11 0
3 Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4 Is the SCM located away from contaminated soils?
Yes
5 What are the side slopes of the SCM (H:V)?
3=1
Does the SCM have retaining walls, gabion walls or other
6 engineered side slopes?
No
Are theintets, outlets, and receiving stream protected from erosion
7 (10-year storm)?
Yes
Is there an overflow or bypass for inflow volume in excess of the
8 design volume?
Yes
_
9, What is the method for dewatering the SCM for maintenance?
Drawdown Orifice
plicable, will the SCM be cleaned out after construction?
Yes
sthema6tenance access comply with General MDC (8)?
Yes
sthe drainageeasemerncomplywith General MDC (9)?
+2D
YesSCM
is on asingle family lot, does (will?) the plat comply with
eral MDC (10)?
Yes
14 Is there an O&M Agreement that complies with General MDC (11)?_i
Yes
15 Is there an O&M Plan that complies with General IuIpG (i2j7
_
j Yes
16 Daes the SCM fallow the device specific MDC?
_
Yes
_j
17 Was the SCM designed by an NC licensed professional?
_ _
Yes
18 Method used
SA/DA
19 Has a stage/storage table been provided in fhe calculations?
Yes
Elevation of the excavated main pool depth (bottom of sediment
20
removal) (fmsl)
501.50
21
Elevation of the main pool bottom -(top of sediment removal) (fmsl)
502.00
507.00
22;Elevation of the bottom of the vegetated shelf(fmsl)
23 Elevation of the permanent pool (fmsi)
507,5U
508.00
_
24 Elevation of the top of the vegetated shelf (fmsl)
25 Elevation of the temporary pool (Imsl)
_
509.14
26
Surface area of the main permanent pool (square feet)
11117 sf
27
Volume of the main permanent pool (cubic feet)
43992 cf
28
Average depth of the main pool (feet)
.396 It
Equation 2
29
Average depth equation used _
if using equation 3, main pool perimeter (feet)
30
B_274 cf
31
If using equation 3, width of submerged veg, shelf (feet)
32
Volume of the forebay (cubic feet)
33
Is this 15-20% of the volume in the main pool?
Yes
5 in
34
Clean -out depth for forebay (inches)
35
Design volume of SCM (cu ft)
_
r 29460 cf
36
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter (inches)
! 3 in
38
If weir, weir height (inches)
39
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
1.09
Ara the inlat(s) and outlet located in a manner that avoids shorl-
41 circuiting?
Yes
42 Are berms or baffles provided to improve the flow path?
Yes
43 Depth of forebay at entrance (inches)
6 In
44 Depth of forebay at ex t (inches)
in
45 Does water flow out of the forebay in a non -erosive manner?
Yes
46,Width of the vegetated shelf (feet)
10 ff
47!SI60e of vegetated shelf (H:V)
10:1
;Does the orifice drawdown from below the top surface of the
48 permanent pool?
No
Does the pond minimize impacts to the receiving channel from the 1-
49 yr, 24-hr storm?
Yes _
Are fountains proposed? (If Y. please provide documentation that
50 MDC(9) Is met.) l
No
I
51 [Is a trash rack or other device provided to protect the outlet system?'
Yes
I
52;Are the dam and embankment planted in non -clumping turf grass? :
Yes
-
53' Species of turf that will be used on the dam and embankment
- —
Fescue Mix
-- —
Was a planting plan been provk%c or t e vegetate sfr`elf7
- - -
Yes
ADDITIONAL INFORMATION
Please use this space to provide any additional information about
55 the wet pond(s):
Wet Pond 4 10:29 AM 1/24/2020