Loading...
HomeMy WebLinkAbout20160186 Ver 3_S3 Breasting Line from B2500_Permit Modification 06.18.2020_SHEETS_20200710MLLW ELEV. -0.5 0 I O O19 BREASTING LINE "S-3" 00 06/02/20 TAM TAM FOR REVIEW REV DATE DESIGN DRAWN REMARKS N. CAROLINA DEPARTMENT OF TRANSPORTATION DARE COUNTY, NC BONNER BRIDGE REPLACEMENT PROJECT BREASTING LINE "S-3" ELEVATION VIEW PCL CIVIL CONSTRUCTORS BONNER BRIDGE REPLACEMENT 1566 NC-345, WANCHESE, NC 27981 Phone: (252) 423-3093 FOR REVIEW SCALE Drawing Approved AS NOTED Number BREAST. LINE S-3 MUDLINE ELEV. p -13.0 X � D_ a a I 0 I b CC) 36"x80' STEEL PIPE PILE FOR BREASTING LINE 40'-0" I TYP