HomeMy WebLinkAbout20160186 Ver 3_S3 Breasting Line from B2500_Permit Modification 06.18.2020_SHEETS_20200710MLLW ELEV. -0.5
0
I
O O19
BREASTING LINE "S-3"
00 06/02/20 TAM TAM FOR REVIEW
REV DATE DESIGN DRAWN REMARKS
N. CAROLINA DEPARTMENT OF TRANSPORTATION
DARE COUNTY, NC
BONNER BRIDGE REPLACEMENT PROJECT
BREASTING LINE "S-3"
ELEVATION VIEW
PCL CIVIL CONSTRUCTORS
BONNER BRIDGE REPLACEMENT
1566 NC-345, WANCHESE, NC 27981
Phone: (252) 423-3093
FOR REVIEW SCALE Drawing Approved
AS NOTED Number BREAST. LINE S-3
MUDLINE ELEV. p -13.0
X
�
D_
a
a
I
0
I
b
CC)
36"x80' STEEL
PIPE PILE FOR
BREASTING LINE
40'-0"
I
TYP