HomeMy WebLinkAbout20160186 Ver 3_Email with USCG_20200710Williams, Paul C
From: Pitts, Hal R CIV <Hal.R.Pitts@uscg.mil>
Sent: Tuesday, June 16, 2020 1:14 PM
To: Williams, Paul C
Subject: [External] FW: B-2500 Bonner Bridge Project - Additional Temporary Breasting Line
From: Akers, Brittany S LT <Brittany.S.Akers@uscg.mil>
Sent: Thursday, June 11, 2020 9:22 AM
To: Pitts, Hal R CIV <Hal.R.Pitts@uscg.mil>
Cc: Creelman, Matthew K CIV <Matthew.K.Creelman2@uscg.miI>
Subject: RE: B-2500 Bonner Bridge Project - Additional Temporary Breasting Line
Good morning Mr. Pitts,
We have no objections as long as the piles are well lit (boat traffic starts around 4am).
If this does get approved, we would appreciate a heads up. The station can advertise it on their facebook page as well.
v/r,
LT Akers
From: Pitts, Hal R CIV <Hal.R.Pitts@uscg.mil>
Sent: Wednesday, June 3, 2020 4:40 PM
To: D05-SMB-SecNC-Marine <D05-SMB-SecNC-MarineEvents@uscg.mil>; Creelman, Matthew K CIV
<Matthew.K.Creelman 2@uscg.mil>
Cc: Akers, Brittany S LT <Brittany.S.Akers@uscg.mil>; Tyson, Matthew I MST1 <Matthew.I.Tyson@uscg.mil>;
pcwilliams2@ncdot.gov
Subject: FW: B-2500 Bonner Bridge Project - Additional Temporary Breasting Line
Importance: High
D5 (dpw) — PATON/Sector WWM,
1. For Sector WWM - Please review the attached request, coordinate with maritime stakeholders (as deemed
appropriate) and reply with Sector's recommendation concerning the proposal to D5 (dpw), copy me. This action will
require a USACE permit or permit amendment and a PATON permit. NCDOT intends to prepare permit applications
next week.
2. For D5 (dpw) — PATON — The existing barge mooring breasting line system will remain in place at this time.
3 Please contact Mr. Williams (NCDOT) with any questions.
Respectfully,
Mr. Hal R. Pitts
Chief, Bridge Branch
Fifth Coast Guard District
431 Crawford Street
1
Portsmouth, VA 23704
(757) 398-6222
Hal.R.Pitts@uscg.mil
From: Williams, Paul C <pcwilliams2@ncdot.gov>
Sent: Thursday, May 28, 2020 11:32 AM
To: Pitts, Hal R CIV <Hal.R.Pitts@uscg.mil>; Hughes, Emily B CIV USARMY CESAW (US)
<Emily.B.Hughes@usace.army.mil>
Cc: Tisdale, Jessica (Jessica.Tisdale@hdrinc.com) <Jessica.Tisdale@hdrinc.com>
Subject: [Non-DoD Source] B-2500 Bonner Bridge Project - Additional Temporary Breasting Line
Due to shoaling issues around the remnant bridge/fishing pier and existing temporary breasting lines on the south side
of Oregon Inlet, the Contractor (PCL) has requested to place a new breasting line in deeper water at the site. This would
be for the Crofton 4600 crane/barge that must remain on the east side of the new bridge. The Crofton has been tied up
to the remnant bridge/fishing pier, but that access will not be available if shoaling in the area continues as anticipated.
Before we submit requests for permit modifications, I wanted to get your comments on this new temp. breasting line
alignment. The line is close to the centerline of the current navigation channel. The Crofton is 72' wide, so placing it on
the north side of the breasting line would place it 226' from the centerline of the channel at most.
Emily,
Would this proximity to the marked channel be an issue with Section 408?
Thanks for looking at this, and feel free to call me if you would like to discuss.
Paul C. Williams, Jr.
Division Environmental Officer
Division One
NC Department of Transportation
(252) 482-1861 office
(252) 333-9812 mobile
(252) 482-8722 fax
pcwilliams2(a�ncdot.gov
113 Airport Dr.
Suite 100
Edenton, NC 27932
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.