Loading...
HomeMy WebLinkAboutNCC202894_NOI Application_20200710Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 7/8/2020 10:57:56 AM (NCG01 NOI Submission) Approve by Farkas, Jim J 7/9/2020 3:16:15 PM (Review- Construction NOI 27947) . The task was assigned to Farkas, Jim J by round robin distribution 7/8/2020 10:58 AM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: July 10, 2020 5:00 PM. The priority is: High 7/8/2020 10:58 AM Submit by Selkane, Aziza 7/10/2020 8:09:54 AM (Payment Verification for NCC202894) * Holly Ntemann • Selkane, Aziza assigned the task to Selkane, Aziza 7/10/2020 8:08 AM The task was assigned to DEMLR NCG01 Payment Team. The due date is: August 20, 2020 5:00 PM. The priority is: High 7/9/2020 3:17 PM .• SThF� '; 1 NORTH CAROLINA EnrlronmertW quallly A. Project Information Part A. Project Location and Waterbody Information Are you submitting IT No an NOI that was r Yes rejected before? 1a. Project Name * Roxboro Corrective Action Plan (CAP) Pilot Study 1 b. Specific Lot This field rray be used to list specifc lot nunbers. Numbers 2. County* Person 3. Highway or Street 1700 Dunnaway Rd Address* Street narre only is acceptable if no address number assigned yet 4.CityorTownship* Semora 5. State * NC 6. Zip Code * 27343 7. Latitude* Enter the latitude in decinal degrees 36.4820 8. Longitude* Enter the longitude in decir al degrees (M.JST be negative) -79.0630 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 07/20/2020 Estimated Construction Project Start Date 10. Date to End * 06/30/2021 Estinated Construction Project End Date 11. SIC (Primary)* Industrial (1541) Standard Industrial Classification for Developrrent 12. Acres to be 18.50 disturbed* (including off -site borrow and waste areas) 13. Total site area 3,340.00 (acres) * 14. Post- 0.50 construction (Estirrated) impervious area (acres) * NCC Project NCC-PERSO-2020-Roxboro Corrective Action Plan (CAP) Pilot Tracking ID Study Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Hyco Reservoir Waterbody* Ibrre of w aterbody into w hich storrrw ater runoff w ill discharge 15b. Waterbody 22-58-(0.5) Index No.* NCWaterbody Index Number Stormwater rJ No discharges will flow r- Yes to additional wate rs * 16a. Is this project r Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. ^ F2rnittee Inforrration - Legally Fbsponsible Entity and Individual Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Legally Pesponsible Entity Name * Duke Energy Progress LLC It pernittee is an individual (i.e., organization does not apply), enter first and last narre in this field. 2. First Name * Issa IF Corporation, enter Faegistered Agent First %rre 3. Last Name* Zarzar It Corporation, enter F;bgistered Agent Last %ne 3b. Title GM CCP Project Management 4. Permitee E-mail issa.zarzar@duke-energy.com Address* 5. Permittee 919.546-7574 Telephone No.* 6. Permittee Mailing Street Address Address* 410 South Wilmington Street Address Line 2 city State / Rovince / F;bgion Raleigh NC Fbstal / Zip Code Country 27601-1849 us Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* 410 South Wilmington Street Address Line 2 city State / Frovince / Faegion Raleigh NC Fbstal / Zip Code Country 27601-1849 us 8. Type of Non -Government Ownership* C. Site Contact Information Part C. Roject Site Contact Inforrration _................................................................................................................................................................._ 1. Primary Site John Contact - First Name * 2. Primary Site Riina Contact - Last Name * 3. Title Project Manager 4. Site Contact E- john.riina@duke-energy.com mail Address* 5. Site Contact 201 819-0480 Telephone No. 6. Organization CCP Project Management Name 7. Site Contact Street Address Mailing Address* 1700 Dunnaway Road Address Line 2 city Semora Fbstal / Zip Code 27343 8. Consultant Name (Optional) First and Last nave 9. Consultant E-mail This person will be copied on all correspondence. 10. Consultant Telephone No. State / Rovince / Region NC Country us D. E&SC Plan Part D. ^ Erosion & Sediment Control (E&SC) Ran Approval Information ...................................................................................................................................................................................................................................................................................................................................... 1. Date E&SC Plan 07/02/2020 Approved * 2. E&SC Plan Project PERSO-2020-011 Number/ID * Assigned by agency or local program 3. E&SC Plan r State DEQ Office Approved by* r Local Program 4. State DEQ Office * Raleigh (RRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. For linear projects, please also upload a site map showing the overall extent of the project or include the beginning point and end point coordinates in the "Notes" box below. 5. E&SC Plan PERSO-2020-011_20200702_LOA.pdf 381.2KB Approval letter or Mast beRDFformal Grading Permit 6. Site Location Map Helpful for linear project review (Optional) Mast be FCFfornat. Rease do not upload entire set of E&SCplans. 7. Notes (Optional) Frovide any additional information that night help the reviewer better understand how uploaded docurrents support the application. Include additional waterbodies for linear projects if necessary. 8. NOI Certification Roxboro Corrective Action Plan (CAP) Pilot Form Study.pdf 39.68KB Mast be FCFfon-rat This is an Express f No Review Project* F Yes E. Certification North Carolina General Statute 143-215.6E (i) provides that: Any person who knowingly makes anyfalse statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Artcle; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guilty ofa Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: 17 I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * 17 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent f Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature %'� '7 Lnr Type Name * Issa J. Zarzar Title GM CCP Project Management Organization Legally Plesponsible Entity Duke Energy Progress LLC Date * 07/08/2020 F. Tracking and COC Info NOI Tracking No. 27947 NC Reference No. NCG01-2020-2894 Uses 'count_nunber' variable (increrrented by SP) Certificate of NCC202894 Coverage (COC) Uses 'count_nurrber' variable (increrrented by SP) No.* Count Number 2894 Sequential nunber for subnittal that is incremented by Stored Frocedure COC Year 2020 Year of date reviewed (used to assign YY digits after "NOC' in COCno.) Initial Invoice No. NCC202894-2020 Invoice Due Date 8/8/2020 Initial Fee $ 100.00 Invoice Status OPEN