Loading...
HomeMy WebLinkAboutNCS000572_Email RE Status_20200707Georgoulias, Bethany From: Lucas, Annette Sent: Tuesday, July 7, 2020 4:57 PM To: Dishmon, Joyce Martin Cc: Newcomb, Dana H; Georgoulias, Bethany Subject: RE: [External] FW: DRCC Site Map from Permit Renewal Joyce, I apologize for the lack of response. I am blocking some time tomorrow afternoon to devote to the Dan River minor modification request and will get back to you by the end of the day tomorrow. Sincerely, Annette Annette Lucas, PE Stormwater Program Supervisor Division of Energy, Mineral and Land Resources North Carolina Department of Environmental Quality Phone: (919) 707-3639 Email: annette.lucasa-ncdenr.gov Web site: deg.nc.gov/SW Physical Address: 512 North Salisbury Street, Office 640L, Raleigh, NC 27604 Mailing Address: 1612 Mail Service Center, Raleigh, NC 27699-1612 7 itL-���DE Q 4(� Jf1,I.I ! .r.':; NA � aoa.rn+.trM o� ram„ �»n�. .aW0i1V Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of staff and the public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. We appreciate your patience as we continue to serve the public during this challenging time. From: Dishmon, Joyce Martin [mailto:Joyce.Dishmon@duke-energy.com] Sent: Tuesday, July 7, 2020 12:01 PM To: Lucas, Annette <annette.lucas@ncdenr.gov> Cc: Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: FW: [External] FW: DRCC Site Map from Permit Renewal • External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to an Hello Annette, Per our previous conversation, I wanted to check the status of the review of the Dan River permit renewal application for issuance of a minor modification to facilitate completion of closure of the ash basins. The landfill cap project is scheduled for completion in September of this year and the permit expires 9/30/20. It is my concern that once the permit expires there will not be an option for minor modification and there needs to be time allowance to prepare and submit the minor modification request. Thank you for your consideration in completing this project. Joyce Dishmon Permitting and Compliance, Carolinas Office: 336-623-0238 Cell: 336-394-5524 Email: ioyice.dishmon@duke-energy.com From: Dishmon, Joyce Martin <Joyce.Dish mon@duke-energy.com> Sent: Thursday, June 25, 2020 1:19 PM To: Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov> Subject: Re: [External] FW: DRCC Site Map from Permit Renewal No, I am waiting to see if I need to submit a modification to at least get the ash basin closure covered. Regards, Joyce Get Outlook for iOS [aka.msl From: Georgoulias, Bethany<bethany.georgoulias@ncdenr.gov> Sent: Thursday, June 25, 2020 1:02:41 PM To: Dishmon, Joyce Martin <Joyce.Dish mon@duke-energy.com> Cc: Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: [EXTERNAL] RE: [External] FW: DRCC Site Map from Permit Renewal *** Exercise caution. This is an EXTERNAL email. DO NOT open attachments or click links from unknown senders or unexpected email. *** Joyce, Did you ever get a response from Annette on this? Bethany Georgoulias Environmental Engineer Stormwater Program, Division of Energy, Mineral, and Land Resources N.C. Department of Environmental Quality 919 707 3641 office bethany.georgoulias@ncdenr.gov 512 N. Salisbury Street, Raleigh, NC 27604 (location) 1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing) Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater DES-" Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Dishmon, Joyce Martin [mailto:Joyice.Dishmon@duke-energy.com] Sent: Friday, June 19, 2020 12:18 PM To: Lucas, Annette <annette.lucas@ncdenr.gov> Cc: Newcomb, Dana H <Dana.Newcomb@duke-energy.com>; Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov>; Garcia, Lauren V <lauren.garcia@ncdenr.gov> Subject: [External] FW: DRCC Site Map from Permit Renewal External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to ort.s am nc. ov Hello Annette, I wanted to check the status of the review of Dan River's renewal application to determine if we can request a minor modification for required changes we discussed on our call on 6/4/2020 to ensure Dan River can return flow to the river once the landfill cap is complete. As discussed, the project team will need the modification to remove berms and open culverts for final closure. The estimated project completion is third quarter of 2020. 1 am available to discuss the path forward at your convenience. Thank you for your consideration. Regards, Joyce Dishmon Permitting and Compliance, Carolinas Office: 336-623-0238 Cell: 336-394-5524 Email: ioyice.dishmon@duke-energy.com From: Dishmon, Joyce Martin Sent: Friday, June 5, 2020 10:30 AM To: Lucas, Annette <annette.lucas@ncdenr.gov>; Garcia, Lauren V <lauren.garcia@ncdenr.gov>; Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov> Cc: Newcomb, Dana H <Dana.Newcomb@duke-energy.com> Subject: FW: DRCC Site Map from Permit Renewal Annette, Per our conversation, I have attached the updated outfall map and permit renewal application with supplemental information for your review. The landfill cap is projected to be completed by end of summer and the project team will need the new outfalls to return the flow from this area to the river. The asks are outlined below. 1. The new outfalls will allow the upland areas to flow to the river. Once the landfill cap is complete which should be by August there will not be contact water from the upland areas to outfalls G-2, G-3, G-4. 2. New outfall G-1 will have the ISW from the Combined Cycle that flows from SWO02 and the drainage area that breaks in drainage area outfall 009. Both drainage area outfall 009 and 002 are currently collected at the culvert and pumped to outfall 009. The potential industrial activity from break of outfall 009 is the drainage from the Combined Cycle oil storage and water tower. The oil storage area is curbed with a shed roof. SWO02 is in the current permit. Once the flow is returned to the river DRCC would like to sample SWO02 and the drainage area break from 009 at the discharge of the culvert. 3. SWO10 will flow to G-3. This drainage area is non -contact stormwater. The outfall was used to pump wetland flows away from the stormwater basin for water management. This outfall can be removed from the permit. 4. Outfall SWO09 is located within the former remediated coal yard. This outfall can be removed from the permit. Please let me know if you have questions or need additional information. Dana and I will be available to discuss the review at your convenience. Regards, Joyce Dishmon Permitting and Compliance, Carolinas Office: 336-623-0238 Cell: 336-394-5524 Email: ioyce.dishmon@duke-energy.com