HomeMy WebLinkAbout20070082 Ver 1_More Info Received_20070323~t
1
March 23, 2007
Mr. Kyle Barnes
N.C. Division of Water Quality
943 Washington Square Mall
Washington, N.C. 27889
~1~-
Maureen K. Anderson
P. O. Box 453
Oriental, N. C. 28571
(252 249-1504)
Re: 104 skipper Circle, tots 10, 11 and 12 Yacht Club Point
Meuse River Basin, Whittaker creek
(03-04-10, 27-130, sA, tIQ1Y, NsW)
Dear Mr. Barnes:
~1
~~~ 2 ~ ZGG7
uE,~,~ avgTER
~7iAND,IA,+~ STORM',MATEP. 9~RAyCh
This is in reply to your letter dated March 1, 2007, and received by me on March 9,
2007. The following addresses the conditions under your heading "A~itional
Information Requested":
1. I cannot provide a signed and notarized letter from my adjacent landowners, Mr.
and Mrs. Kenneth Brandon, indicating that they agree to the full ia~lementation of
the Heuse River Riparian Buffer Rules. I am attaching coppies of the following
documents• (a) tatter from simonsen taw Firm dated November 2I, 2006, stating that
"The Brandons have no objection to the permit application filed by Ms. ~-nderson."
(b) tatter from me to the Brandons dated March 11, 2007, requesting that they send
me the signed and notarized letter that you requested. (c~ tatter from the Brandons
dated March 16, 2007, indicating that they now ob'ect to mx proposad project. (d)
tatter from me to the Brandons dated March 19, 207 which ~s self-explanatory. (e)
E-mail from Mr. Brandon dated March 20, 2007, to which I did not respond.
2. If CAMA and DWC2 require the alteration of the Qroject in order for me to obtain
the necessary permits, hopefully the attached drawing with hand-corrections in red
pencil is acceQtable. The modified disturbance square footage is essentially the
same as the original excavation plan.
3. The proposed construction of a "drive" to the project site trill be sirrilar to an
ordinary pervious-surface lane to a residential propertx. I do not intend to
maintain this drive as a permanent access road, preferring instead to let nature
fill it back in with coppage and other native plants. The temporary surface will be
3/4" marl, which I understand is considered a pervious material I have already
sent you a copy of_the original drawing submitted to cAMA, and but have attached
another copy ererr~th.
Lastly, attached is a copy of the February 23, 2007 letter from Mr. Al twdge of your
surface water Protection section, Washington Regional office. In it he states:
"staff has determined that the project, as proposed, consists of activities that
will not pose surface water quality threats from storm~rater runoff since na
significant new impervious area is proposed."
-~ ., ~ r
- cc~Z
~a~1'u:
~A
As requested in your letter, I am sending a copy_of this letter with attachments to
Mr. Ian McMillan. Thank you for your consideration. I look forward to your early
reply.
sincerely yours.
~LGLGIh.~~i~/ LC-~ ~tic/~~-~/
Maureen K. Anderson
cc w/att:
Mr. Ian McMillan
401 oversi~ht/'Express unit
N.c. Division of water Quality
2321 Crabtree Boulevard, Suite 254
Raleigh, N.C. 27604