Loading...
HomeMy WebLinkAbout20080868 Ver 2_CAMA GP for Broomsfield Monitoring Stations_20180208V ! _. CAMA / E1DRED9rr & FILL NO. 72907 GENERAL, PERMIT Previous D a. New Previous permit # N \ 1 a New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued t-4 I lls_� As authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC b 1 Ff • 1 "Z 0 t� Applicant Name I t> jvt . / A Project Location: Coun®.Rules attached. ty ^a._� �r icy, Address (o _L C?AL TDA. �4 -Ple A.Q Street Address/ State Road/ Lot #(s) 2jqr-jp G I U U L City A.-1 -r�ytL,4 StateN (—ZIP Oki t"I lyz�-, Phone # (-A ) 7-Z .-t4 V -7 E-Mail Subdivision Authorized Agent ,7 t= f r ; v,-L n i5 ) Affected ❑CW DEW WTA ❑ES S AEC(s): OOEA ❑ HHF p ❑ URA N/A ❑ PWS: ORW: yes' -no PNA yet'% oo 1 Cityf±-e-1 52 �>62 A Phone # (_) River Basin Adj. Wtr. Body Closest Mal. Wtr. Body F-�Nt L. , r e T2t �- O■OO■O■■■■■■■■!■■■■■■■!■■■■■O■■■■■■■■■■■ !■■■■■■■■OE■■■■■■■■!■O■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■' ■■■■■■■■■■■■■ENE ■■■■■■■■■■■■■■■■■■■■■■■■■■■ NONE 0 mom No N ■■■■■■O■r■■NFi�i�QNi3�O■Old ■BEEN ■O■■ ME OEMs ■■■■■■■■O■■■■■■■■!■■■■■■■■■■■N■■■■■■■■■■ O■N■ONO■■■■■■■■■■■■■■ENE■■■■E■■■NEEMEE ■■■■■ NO■O■■O■■O■■■■■■OOO■N■O■■■■O■■■■ONE■■OE■ ■O■el ■O■■■■■NOON■■■ON■O■■■O■�nTili7lnnE■■■■ ■ENN■!■O■■ME ■■N■■■■EEO■■NO■NO■Oil■iiliilil■■OOO ■EN■■■■■E■■■■N■■■■■■■■■■■■■�:T,T17R1l;T,:�1■■■■ ■■■■N■O■!ONE■!O■■N■■■O■OOO■L'�'�11i� L�lulJO■■■ !■■■ONOOOSEE OO■NO■■DOE■O■O■■O■■■■■■■O■■■ ■O■O■■O■■■E■■■■■■■NOS■■■O■O■■■OE■■�O�O■O ■EN■■O■■NONE■■■O■■■�O�O■■O■■■■O■■■■■■■ naturel i e e readcomplianoestatement onback ofpermit*'k Check# J� 1 V PermiMMicer's Printed Name Signatu 0 i4 b �at3cy ��t� 4+ fr n-,t.. Issuing Date Expiration Date ROY COOPER Governor NC. MICHAEL S. REGAN Coastal Management secreAvy EN"WN14EWALQuA my BRAXTON DAVIS Director BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico & Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation. t. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and monitoring efforts. • Pre -project site conditions: 2 e9 By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify that all information Drovlrlpri is rnm_I'+e and accurate. Permit Offic s ign/at�ure OULtd l Issue Date CAMA GENERAL PERMIT #: 7 o190`I j'lj State of North Carolina I Envlromomtal Quality I Coastal Maragement Washington Office 1943 Washington Square Mall Washington, NC 278891252-946-6481 Wilmington Office 1 127 Cardinal Drive Eat Wilmington, NC 28405-38451 910-796-7215 Morehead City Office 1400 Commerce Avenue Morehead City, NC 28557 1 252-808-2808 RECEIVED I1,C1 24 2018 DCM-WARD r• SR 1002 Bay City Road M z J Iw � W Z n /y O N ,xw } og N a a Z C 3 N .z7 m f7 � W o � ci mx o W z H HO W V1 ti O F- I o �o N a ~ z d N o 3 tg� N a IL w U Y�I/� N a a X N N ZZ �N W a w a a a >U j 6 K LL U W ��J N Z N N KF>w> f N Z�iJ O no N vio V U O N � O 'a x a a e � N N b N .Zz Z NO L.L W LL a a >U a � O � N Z O N f �2 J J �QI Zvi r: t CAAAA / q DREDGE & FILL No. 72908 A � C D GENERAL PERMIT Previous permit# ,/—\ [New ❑Modification El Complete Reissue ❑Partial Reissue Date previous permit issued �jL�j,` As authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in. an area of environmental concern pursuant to I SA NCAC J O @$ules attached. Applicant Name J' S7 14 . G A`y i—o>\t Address (02 < D A Y_ 1�-,A ` L t20 City A t+ 2Ok-.i State 0 c ZIP Zi`do 4. Phone # 43 tt 7E-Mail Authorized Agent ­5 t- YT 'T Affected OCW OEW OES ,JotM AEC(s): DOEA OHHF lHA CUBA ❑N/A ❑ PWS: ORW: yes ) PNA yes(/no Project Location: County A.A,I-v-pA rl- Sttreet Address/ State Road/ Lot #(s) O f r- S TZ 1 u o 1 U0 n1 113N1 nct.h T-Z� Sly U--n.1 f .LJ City At 4 '�.-L;,a A� ZIP --2`--7,q e3 So Phone # ( ) River Basin-TA(Z - ?f,\ML, i t) Adj. Wtr. Body lU n) r' A ti ,YJ " M 1 -0, (nat /mom /unkn) Closest Maj. Wtr. Body;� L-'' C--� 'TZy Vrt Type of Project/ Activity --7 Ew L', Groin length number Bulkhead/ Ftiprap length avg distance offshore max distance iv■iiiii■■iiiiiiiisiiiiiiiiiiiiiiiiiiiii ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ !!■■■■■■■i�■■i^stri(ii�!!�+7■�i.iai�■fie©■■�if�ii■■■■■■ Basin, channel cubic yards_ Boat rarnp ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■E:■■C�■4:1R'©F�QiSF-a■■C�ISe�!■■'SI.�lR"�Iil.�i■Il■ ■■■■■■■■`7■■■�/■■■■■■!■■!■■■■■■■■■■■■■■G!■ Beach Bulldozing ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ .�Cr:�,2rry t' ���•t�l Agent or Ap licant Print me ,'� \ �O,1'rr Cw- K^ Signature *� se read compliance statement on back of permit 1 Application Feels) Check # PEm1 c s Printed Name Signat re Issuing Date - Expiration Date Nc. Coastal Management ENVIRONMENTAL OUALIW BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY ROY COOPER Covemor MICHAEL S. REGAN Secretary BRAXTON DAVIS Director A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico & Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 020.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation. i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and monitoring efforts. • Pre -project site conditions: By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify that all information provided is complete and accurate. or T <Z4es5 CAMA GENERAL PERMIT#: IP rCr s 5lgnatu ScTo h e v 2z�l Issue Date State of North Carolina I Environmental Quality I Coastal Management Washington Office 1943 Washington Square Mall Washington NC 278891252-946-6481 Wilmington Office 1 127 Cardinal Drive ExL Wilmington NC 28405-38451 910-796-7215 Morehead City Office 1400 Commerce Avenue Morehead City, NC 28557 1 252-808-2808 RECEIVED OCT 24 2018 DCM-WARD z SR 1002 Bay City Road \ � W z ■ _ % \ a : ■ ` X0 §« j / w - - .x- §$ W § 2 ( z z a ` \ \ : a z X I § .. IN 0 } t a § I � ! 2 — ---- -- : �w § [� 2 §(( ( 5 § (' ;§ Ix � e . z 0 ± ± , ) /2 #!� §§ )I§ As authorized by the State and the Coastal Resources REQGE & FILL No. 72909 A ® C D PERMIT Previous permit# T)lg ztion ❑Complete Reissue ❑Partial Reissue Date previous permit issued North Carolina, Department of Environmental Quality tmmission in an area of environmental concern pursuant to 15A NCAC 0-? f311ules attached. Applicant Name VG `5 (PP.>4>Pa#,14C Co,I S -I c Project Location: County RcA L,ryoszr, ld� , Address IS J -� IIIwy 4�& . City A i-IrZ012. A State I-1 `t ZIPOCR Phone # E-Mail Authorized Agent N I ,F�- Affected 51l DEW EWrA DES %®PTS Al oEA ❑ HHF ❑ IH ❑ UBA ❑ N/A ❑ PWS: ORW: yes (n� PNA yes /(K6D Street Address/ State Road/ Lot #(s) b�F S2 cocy t_ on.) WO-/JAMt-O-172-rri. Subdivision HrURA Phone # ( ) River BasinTA g. I24l,,LL)Zy Adj. Wtr. BodyL4 0, '1 ONPA big -M ,+3 u * 4'u.-) (nat /mi) /unkn) Closest Maj. Wtr. Body A" I Co �t ut±rL i ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■C��■� :Tr'��!!�!■NHS■N■■!lOaMA■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■LcT.f [�■FJ.*.I��IIDP':�■■►�7!�L�'1'■rir'���JC�'r!1_�1�■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■OMEN M■NEM ■■■■■■■■■■■■■■■■■■■■■■■■■■■NONE ■■■■■ E■■■■■■■■■E■■■■■■■■Yliiirilli�i/■■■■■ ■EN■■ ■■n■■■■■■■■■■■■■■■wN■■NN■■■■■■ M■■■■■■■■■■■■■■■■■■■■ME■E■E■■■N■■E■■■■■■ ►i'• titer s Printed Name C"kV n.., Signal�Please read complialke statement on back of permit" Sign ture =/ c � 0L 2a o °i I�u so3 s cP g Cx rr�� 7��4f 6 �cUA-0> �cY9 Application Fee(s) Check# Issuing Date Expiration Date Coastal Management ENVIRONMENTAL QUALITY BUFFER AUTHORIZATION CERTIFICATE FOR PIERAND DOCKING FACILITIES ACCESS WAY ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON DAVIS Director A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico & Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation. i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and monitoring efforts. • Pre -project site By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify that all information orovided is comolete and accurate. en 1t Off ce rs Signature -_6 2 o in Issue Date CAMA GENERAL PERMIT#: 7a%9 State of North Carolina I Environmental Quality I Coastal Management Washington Office 1943 Washington Square Mail Washington, NC 278891252-946-6481 Wilmington Office 1 127 Cardinal Drive Ex[. Wilmington, NC 28405-313451 910-796-7215 Morehead City Office 1400 Commerce Avenue Morehead City. NC 28557 1252-808-2808 RECEIVED OCT 24 2018 DCM-WARO Q�oad 4 a aa� v in y_ 7 O S 0 peoH Aj!D Ae8 ZOOT dS § ■ M z [ � ■ � ^ / |§ _ ` § §2 [■_-- - ® \ j k ( z LL, L\ B\\ § [ L-k qH X &; m ;f \ Ix e . z 0 I LL r 10 /: §) §E§ r CAMAl.❑DR DG& FILL No . 72910 A � C D GENERA PERMIT Previous permit# >J?& ew ❑Modifca ion ❑Complete Reissue - ❑Partial Reissue Date previous permit issued 74 1� As authorized by the State of _North Carolina, Department of Environmental Quality f_I 1 and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC 0-7 ' Z nC-:> ® Rules attached. Applicant Name C. S .' ) ogPti q l i 2 !!. Project Location: County -eA�7 foa w Address 1 5'-5o w Street Address/ State Road/ Lot #(s) of rr city AtA LJtZA Stater) G ZIP 2-?-geD o .',1 Gu.e�,c Phone # (2S2) 3z' - ` ='/iE-Mail Subdivision Authorized Agent -1 I/Y City AL15zor2-A- ZIP o .b Affected El Cw �4W WTA [aES EWTS Phone # ( ) River Basin AEC(s): D OEA ❑ HHF ❑ IH ❑ USA ❑ WA Adj. Wtr. Body (nat /man /unkn) ❑ PWS: ORW: yes / no PNA yes / no Closest Mal. Wtr. Body 116 ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ iE:bl■■■!■■■■®■■■■■■■■■■■■IIU�Ga'lftlfkl■■■■■■■ $iI1,". ease read compliI statement on back of permit" Fee(s) Check# Pe�itOflicer s Printed Name , Signatur Issuing Date Expiration Date l "I CD r-r CD Coastal Management ENYInONlfE aJ GUNLITY BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON DAVIS Director A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico & Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation. i. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and monitoring efforts. • Pre -project site conditions: L4 r4 -c-,> c E1-oP t--4�1 s By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify that all information provided is complete and accurate. Agent or Applicant Printed Name Permit Ot�cePs Signature r . A u 1�tS ��4' �0-- Age t p1i ant SigrWture CAMA GENERAL PERMITtt: ­7caR10,13 !�K cg�t;.-A' Issue Date RECEIVED OCT 24 2018 State of North Carolina I Environmental Quality I Coastal Management Washtngton Office 1943 Washington Square Mall Washington. NC278891252-946-6481 (� A Wilmington Office 1127 Cardinal Drive Ex[. Wimingtom NC 28405-3M1910-796-7215 DCM-WARO Morehead City Office 1400 Commerce Avenue Morehead City. NC 211557 1 252-808-2808 J HIIww V r � W z r � o NN xfw- Y ~ J Li NVI J Z F Zz 30 QI Y r- ° o o o Nn Z C 3 N o m 3 W :3 0 0 o i� - - x t� - NO¢ Z N 3 rQ 0 O ~ W d Z d r V O O U � H a Z N a x LJJ O rn a m Q „9,Z- �d o � 0 Z F J W Z N N. m �a ti > iV % a m d m .. a O L O 2 K a N N J Q' a- U N O O a Q -- a N a VI o H N ,ZZ a w a a a >U LL K O �ww n N Z N N f >> F Za O 4 Z. 7 V Qj N K O m � O 'v a a I N N � N ,Zz 1 rJ XXL L 0�/ IA_ 1L W a a U a O u! f N Z O f }}U t? ¢J zo 7 WW 0i� �i CAMA / DREDGE & FILL No. 72904 A C D GENERAL PERMIT Previous permit# �1\I-)A New ❑Mq�ipcation ❑Complete Reissue ❑Partial Rejssue Date previous permit issued N t A As authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to I SA NCAC 0-1 sa X Rules attached. Applicant Name -PC^S -'i-10 osF, -I A-r i' ro. -Ltal Address 1 S 3 O 4 w Y 3 DCo S City A Lf 2-O-e A State I ZIP'Z 90(o Phone # (amr ) 322- 8 Z Y-9 E-Mail Authorized Agent t / A Affected ❑Cw ❑EW RIPTA DES WIPTS AEC(s): OOEA ❑ HHF ❑ IH ❑ USA ❑ WA ❑ PWS: ORW: yes / �fio) PNA yes & Project Location: County E�eA ti - -�! , ,_)- Street Address/ State Road/ Lot #(s) o r 19 3 41 o,Q T>1�'[>c>MFI-LD An.n Subdivision 0 1 Ae City Asi1ym. -,L_A ZIP �7 Phone # () River Basin TP Il' i^ l rr GJ Adj. Wtr. Body 6R�OM -r t L-L n S tva �r2(nai, lman /unkn) Closest Maj. Wtc Body i 1 "1 -. I U� I utY2 - ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ NDON!■!■■■■■■■■■■!!!!!■■■■■■■■■!!!■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■!■■■!■■■■■!■■!■■■!■■■■■■!■■Ott■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■�■■■■■■■■■■■■■■■NONE ONO■O■■OE■ENEliI�■■!■NEE■YEOr■!■■■■E■■■■■■ • ■EON■■■■EN■OE■■■E■■■■■EEN■■■■■■■■ON■NE■■ ■!EO■■OEEO■O■■■■OE■N■■NN■■■■NEE■■■NONEE■ ■OE ■■EOO■■!EEO■■O■ENEE!■!■EOO■■■O■■EEEO ■■■■■EEE■■■E■■■■■O■O■■■E■■■■■■OE■E■■NNE■ EEO■NEEE■■■■■EN000NE■O■!■EEEI�7:��a:�►,u�•l■!■■ ■EEO■■■E■■■■EEOO■O■■■lOOOEOE■E■!■■■■■■■■ .NDON■■■E■■OEE■■E■■■O■■■■NEO■�EE1�*I1��\■■■ •■■■EEO■OE■!■■!■■■■E■ENEE■■■■rEEO■O■■■■■■ MEN v 1< BSc Aget or Applicant Printed Name (� �• Signature "* Please read complia ce statement on back of permit" rr?- -- Application Fee(s) Check# PermitOfricer's Printed Name Signa re ��� Issuing Date Expiration Date Coastal Management ENVI.ONXENiAI. pl1AlITY BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY ROY COOPER Governor MICHAEL S. REGAN Secretory BRAXTON DAVIS DhrCtor A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico & Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation. 1.. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and monitoring efforts. • Pre -project site conditions: By your signature below you agree to be held responsible for meeting all of the c ns listed above and verify that all information provided is complete and accurate. ent or App cant Printed Name ermi leer's Si ature CAnn r i ;) S ha c � �A.�T^c • �%W' d'" 20 1 5�/ Ag nt o plicant Signlbture Issue Date CAMA GENERAL PERMIT#: lQq(3q ( RECEIVE® State of North Carolina I Environmental Quality I coastal Maugement O C T 2 4 Z 018 Washington Office 1943 Washington Square Mall Washington, NC278891252-946-6481 Wilmington Office 1 127 Cardinal Drive Ext. Wilmington, NC 28405-3M 1 910-796-7215 Morehead City Office 1400 Commerce Avenue Morehead C4, NC 2a557 1 252-808-2808 D C N — It r A R O J N w Z r � o J iVG zz C- x o L o Na Z Y C 3 N r ,zz m sz W o s N O Z r G oa xI o Z L n N O O a \ J N x a O a a U D- a- v o a a N a n e vl _ NN ,Zz IN W a w a a a rc o 0 �ww N N Z N N W G Z;6 f )U Fz K 2 ZN N Qj7 N �j a N K 0 c n a x �p N � N X N ,ZZ O 1� LL W a a UU a O x? F N Z O F 2WW zo V10 2; j a ldalla Rodd lel CD L7 rt CD f fir I CAMA / ❑ D�EDGE &FILL No.72gd$ A .<J) C D GENERAL PERMIT Previous permit# NIA New ❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued N IA As authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC X Rules attached. Applicant Name PC S Pt -I osPO A'i"E o T 0C - Project Location: County__ L•}° gq � cc, C o , Address I G 3e2 I_1 w i 30 (o S Street Address/ State Road/ Lot #(s) p G City ,A"IZE'e- State r)C" ZIP -2 o lbw r+£L 5W4r P �a Phone #(z52)Z.4 E-Mail Authorized Agent N A t'- Affected El CVO ❑ EW V PTA ❑ ES [POTS AEC(s): OEA ❑ HHF ❑ IH Cl UBA ❑ WA ❑ PWS: ORW: yes :no- PNA yes / CityAazA ZIP z�gocA Phone # ( ) River Basingt_ - P7 rIt , I Adj. Wtr. Bod:�wA+ P CJLK, nat Ltnan /unkn) Closest Maj. Wtr. Body 'PAM u e O T--r utat ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■MMMMMMMMNMMMSMMMMMM ■■■■■MEMO ■■■■■■■■■E■■■■■■■■■■■■■■■MOMM ■MM■■■■■■E■Soso ■■■■■■■■■■■■■■■■■■s■■■■■■■■■■■■■■■■■SEE■ ■■■■■■■■■■■■■E■■■E■■■■■■■■E■■E■■SEE■■■■■ ■u■■■■■■■SEE■■■■■ii■■ESE■■■■■■■■■■■■■■■ ■E■■■■■■E�3E■'ic"—O�ETlit"�■Elrer�37OEETIzE.RI�■■EME■ ■s■■■■■■■■■■■■■■■E■■E■■■■■■■■■■■■■ESE■■E ■s■■■■s■■■■s■■■■■■■■■■■■■■■■SEE■■■■■■■■■ ■E■■■O■■■■■■■■■■■■■■■■■■■■■■■■■E■■■E■■■E ■■■ ■■■■■■■■■■OE■■■■■■■■■ ■■■■E■■■■■■■■M MEN NNE ■s■■■■■■■■■■a■■■■s■■E■■■■■■■EEwwE■w■■■■ Photos: Yes ■■■■s■s■s■■■■s■■■■■■■■■■■■■■■■■�■■■■■■■■ Waiver Attached: yes Co ■■■■E■■■■■■■■E■■■■E■O■■■■O■■■■■SEE■■W■ A building permit may beure-quired by: E&�,fr-c, • Notes/ Special Conditions 6 C'O( Note Local Planning jurisdiction) lrSee note on back regarding River Basin rules. Li A- Agen Applicant Prl d Name n q ��>`�r 1 Signature Please readcompl�cestatementonbackofpermit 4,1 , Av_ "> Zno Application Fee(s) Check # PermhOfricer's Printed Name Signature Issuing Date Expiration Date Coat.a.l Mnalement BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY ROY COOPER Govenmr MICHAEL S. REGAN Secretary BRAXTON DAVIS Director A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico & Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 02B.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation. 1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and monitoring efforts. • Pre -project site conditions:T�a�� By your signature below you agree to be held responsible for meeting all of the conditions listed above and verify that all information provided is complete and accurate. /� ,^ er O c�r%_%gpiature Issue Date CAMA GENERAL PERMIT#: la�0S"I5 RECEIVED ,?rT 24 2018 State of North Carolina I Enwonmental Quality I Coastal Maragemem Washington Office 1943 Washington Square Mall Washington, NC 278891252-946-6481 WAR® Wilmington Office 1127 cardinal Drive EKL Wilmington, NC 28405-3M1410-796-MS t)CM- Morehead City Office 1400 Commerce Avenue Morehead City, NC 28557 1 252-808-2808 § ■ M z % § % \ g< ■ - ^ n ' IT !§ z C w ,#"zz « LU 3: = - & 3 §« ` © LU / nx em g _ z IL§ \ ow / w / \ 2 k t �/ L C*4` )§� [ G3J __ ! ! ; � N El § 5 b; ]\ } § 5 . z 0 ± U- w . zo ]) § 2 ` �aalia Ro as CD CD �1RCAMA IK DREDGE & FILL NO. 72906 A \.B D GENERAL PERMIT Previous permit# Al KlNew❑Modification ❑Complete Reissue ❑Partial Reissue Date previous permit issued_ As authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to 15A NCAC 0 is I Z, 00 p Rules attached. Applicant Name4�>66. �P_kq-r Co. Z to G Project Location: County �gP , I--o4z, Cv . Address 17 30 1.1w`/ [n S , City I i-itz,prrA State9 C._ZIP 2 %t60(p Phone #(zz&�37--z-'9za9 E-Mail Authorized Agent Affected ❑ Cw DEW TPTA ❑ ES @yTS AEC(s): OEA ❑ HHF ❑ IH ❑ UBA ❑ WA ❑ PWS: ORW: yes /,fD PNA yes (_n Street Address/ State Road/ Lot #(s) ©-F f s. R.. 19 3 71 o4 "t3¢c>c>"`vIt.LO 5L,_4-10 Gjzrxp� City u tzoR 4 ZIP �So Phone # ( ) River Basin"TjI c.d , o Adj. Wtr. BodP924�ri rrLLjJ C- fiat /man /unkn) Closest Maj. Wtr. Body ' PAO�c� �rueY ■■■■■■■■■■!■■■■■■■■■■■!■■!!■■■■■■■■SEEN, ■N■■■■■■■■■■■■■■■■■■■!■■!!■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■!!■■■■■■■■■■■■■ ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■ ■■■■■■■■■EIraq. W V7■■t2Ie■■■r.a0IN■■■■■■■■■■■■■■■ i�,■■�iii�iiiiiiiiiiiiiiiiiiu�vu�i��W�iii ent or Ap lirant Print me _,.Perri RILer's Printed Name r nature' . • le eread complian estatementonbackofpermit** Signat re Zc>Icj plication Fee(s) Check# Issuing Date Expiration Date J Q ,^ V d K � O a O N I~/1 XW L � Q W Q > rc y 6; .. ' m cz W o N U4 0 6 Z my o W orl } IX 0 4U ti W N O U1 N m W Q1 .9.Z- po a = H N w J 0 p O a Z m X a W W w NWU O o O N W o a Q d a ozi N U O a 0 Q � X a b b N N Z< _ L W R n W a a U a O N N W MWW N N E Zi o Z. N a N2 ¢ O 0 U n X N V N .Zz L r) Z 0/�/ {Ii, W LL a 'a U K � Z N O Z J K WW > ¢2N N2 Z;j J Q � a w Z � o xFw a O NN m r J W NVI zz 3 3 c ° o o � Y a 3 u>cy W O mY O W e� No O F = ¢ '�o a Z a m O p J (� W N O N < a = H z Cj J m a N� -0a OL OU O a- <N waajaN NWaaUNxN f - ZZ K O 2 V1 --yy7 30 44112 N U K O � m O a v x a (p N � m � N .ZG I rJ Z O W a LL IL 0 w rc 0 � 2 O N J ZN J WW F> a NS Zt'j SR 1002 Bay City Road e NC_ Coasial Management ENVIttONNE a2,a UILLITY BUFFER AUTHORIZATION CERTIFICATE FOR PIER AND DOCKING FACILITIES ACCESS WAY ROY COOPER Governor MICHAEL S. REGAN Secretary BRAXTON DAVIS Director A riparian buffer authorization is required for pier and docking facilities access ways through the Tar -Pamlico & Neuse River Riparian buffer per Division of Water Resources (DWR) regulations 15A NCAC 020.0233 & .0259. The Division of Coastal Management (DCM), through a Memorandum of Understanding with the Division of Water Resources (DWR) has reviewed your project proposal and has determined that the project as proposed complies with the aforementioned regulations. Those activities covered by your Coastal Area Management Act (CAMA) permit have received Buffer Authorization provided the project is constructed in a manner that continues to meet all of the conditions listed below. Failure to comply with this Buffer Authorization may subject the property owner and the party (contractor) performing the construction and/or land clearing to a civil penalty by DWR of up to $25,000 per day per violation. 1. Crossing is Perpendicular: Pier and docking facility access way must cross the 50 ft. riparian buffer perpendicularly (which is defined as between 75 and 105 degrees) unless otherwise approved by DCM. The alignment shall minimize the removal of woody vegetation to the greatest extent practicable. 2. Pervious Materials: All reasonable measures shall be taken to ensure the access way is made of pervious materials like open -slatted wood or composite, mulch, or grass to meet the intent of the rules to the maximum extent practicable. 3. Access Width: The width of the pier or docking facility access way shall be limited to six (6) feet. 4. Project Drawing: The drawing on the CAMA General Permit is considered the project drawing of your property indicating the relative location of the pier or docking facility and any requested access way. This drawing will be used to aid in compliance and monitoring efforts. • Pre -project site By your signature below you agree to be held responsible for meeting all of the that all information provided is complete and accurate. JCrara1� C. radEss or v"� of CCS L1 't nt Siena re CAMA GENERAL PERMIT#: /a-LTO(g !� listed above and verify RECEIVED '.i , 24 zoid State of North Carolina I Environmental Quality I Coastal Management 0CM-WAR0 Washington Office 1943 Washington Square Mall Washington NC27899I252-946-6481 Wilmington Office 1127 Cardinal Drive Ex Wilmington NC 28405-38451910-796-7215 Morehead City Office 1400 Commerce Avenue Morehead City, NC 28557 1 M-808-2808