Loading...
HomeMy WebLinkAboutNCG551111_Rescission_20200709ROY COOPER MICHAEL S. REGAN S. DANIEL SMITH NORTH CAROLINA EnW"meera/Quafity July 9, 2020 Bishop Johnny Godair First Pentecostal Church 2008 W Carver St Durham, NC 27705 Subject:Rescission of Certificate of Coverage NCG551111 First Pentecostal Church Durham County Dear Mr. Godair: Division staff has confirmed that the subject Certificate of Coverage (CoC) is no longer required. Therefore, in accordance with your request, NPDES CoC NCG551111 is rescinded, effective immediately. If in the future your church wishes to discharge wastewater to the State's surface waters from the subject site, you must first apply for and receive a new NPDES permit. If you have any questions concerning this matter, please contact Charles H. Weaver at (919) 707-3616 or via e-mail [charles.weaver@ncdenr.gov]. cc: NPDES files Sincer lyt for &DanieZ1Sm/j-/th,, rt'or' Division of Water Resources North Carolina Department of Environmental Quality I Division of Water Resources 1617 Mail Service Center I Raleigh, North Carolina 27699-1617 919-707-3712 Weaver, Charles From: Bernard, Jane Sent: Thursday, July 9, 2020 10:52 AM To: Weaver, Charles Subject: RE: [External] First Pentecostal Church of Durham For file We are fine with it. Send me a copy of the letter for the file please. From: Weaver, Charles Sent: Thursday, July 9, 2020 9:47 AM To: Bernard, Jane <jane.bernard@ncdenr.gov> Subject: RE: [External] First Pentecostal Church of Durham For file If the RRO is OK with rescission, I'll rescind the CoC. Let me know. CHW From: Bernard, Jane <iane.bernard@ncdenr.gov> Sent: Wednesday, July 8, 2020 12:24 PM To: Weaver, Charles <charles.weaver@ncdenr.gov> Cc: Dunn, Barbara M <barbara.dunn@ncdenr.gov> Subject: FW: [External] First Pentecostal Church of Durham For file From: Gary MacConnell, P.E. [mailto:gars.macconnell@macconnellandassoc.com] Sent: Wednesday, July 8, 2020 11:01 AM To: Bernard, Jane <]ane.bernard@ncdenr.gov> Cc: Cory Brantley <linstaller@gmail.com>; Shane Brantley <dbsonsl@gmail.com>; gingle@fpcdurham.org; Sessoms, Brian <Brian.Sessoms@durhamnc.gov> Subject: [External] First Pentecostal Church of Durham External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.eov Certification and Record Drawings attached. Gary S. MacConnell, PE President O: (919) 467-1239 C: (919) 523-2248 Please note new physical and email addresses: i MacCONNELL Associates, P.C. 501 Czveade PoLnle lane, Suit-e103 Cary, 1{', 275 H P.D. BOX 129 Nlarrlxvllle, NC 27-UO 'lil� [919}-t63-i2'.N} F9x� {919} 314�S1U From: Gary MacConnell, P.E. Sent: Wednesday, July 8, 2020 10:59 AM To: Bernard, Jane <lane.bernard@ncdenr.gov> Cc: Cory Brantley <linstaller@gmail.com>; Shane Brantley <dbsonsl@gmail.com>; gingle@fpcdurham.org; Sessoms, Brian <Brian.Sessoms@durhamnc.gov> Subject: FW: First Pentecostal Church of Durham Jane, The service connection construction of the First Pentecostal Church of Durham to the City Sewer is complete. I have attached one photo of the recirculating sand filter before decommissioning and three after. Under separate cover I will send you the Engineer's certification and Record Drawings. Please rescind the Church's discharge permit which is no longer used. Thank you for you help as always and let me know if you need anything else. Have a great day. Gary S. MacConnell, PE President O: (919) 467-1239 C: (919) 523-2248 Please note new physical and email addresses: McCNLL Associates, P.C. 341 Cssead,e Polole Lane, Suite 103 Cary, NC, 27513 PD. Bof 129 Nlorri%vllk, NC 27-%0 fok (919)467-12J9 Fax! (919) aIMOM j - I First Pentecostal Truth Church // Where F� Truth TMeMeeett 2008 W. Carver St. • Durham, NC 27705 919.477.6555 Nathaniel Urshan, Pastor Johnny Godair, Bishop Certification Letter July 8, 2020 Mr. Charles Weaver NCDEQ — Water Resources 512 N. Salisbury St. 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Re: First Pentecostal Church of Durham Rescind Coverage under General Permit MacConnell & Associates, P.C. Project No.: A63202.00 Dear Mr. Weaver: The project to connect the Church's wastewater collection system to the City of Durham's collection system is complete. We are now discharging to the City. The previous recirculating sand filter discharge system has been demolished. I am enclosing record drawings and engineer's, certification. I am requesting that you rescind our coverage under the general permit. Please contact our engineer Gary MacConnell, P.E. (919) at 467-1239 if you have any questions. Thank you for your assistance. Sincerely, g647 A74" ohnny Godair Bishop cc: Gary S. MacConnell, PE, Engineer Shane Brantley, Contractor P.O. Box 129 Morrisvi[le, NC 27560 (919)467-1239 July 8, 2020 MacCONNELL & Associates, P.C. "Engineering Today For Tomorrow's Future" Certification Letter Mr. Brian Sessoms, Principal Engineer City of Durham, Public Works — Engineering Development Review 101 City Hall Plaza Durham, North Carolina 27701 Re: First Pentecostal Church of Durham Final Inspection — Certification MacConnell & Associates, P.C. Project No.: A63202.00 Dear Mr. Sessoms: 501 Cascade Pointe Lane Suite 103 Cary, NC 27513 www.macconnellandassoc.com I certify that the above referenced project was installed with due care and to acceptable construction standards. The system was installed as shown on the record drawings dated July 8, 2020. Please see attached record drawings. I trust that this letter meets your requirements for approving this system. Thank you for your continued assistance, and if you have any questions, please do not hesitate to call me at (919) 467-1239. Gary S. MacCon Project Manager 17069 MACGO 111'11111110% cc: Jane Bernard, NCDEQ — Raleigh Regional Office Gail Ingle, First Pentecostal Church of Durham Shane Brantley, Contractor Z:\T-Drive (Projects)\Library\2018\A63202.00 - First Pentecostal Church of Durham - Sewer Connection\Drawings\A63202.00 - Cover.dwg Jul 08, 2020 10:33am FIRST PENTECOSTAL CHURCH OF DURHAM SEWER CONNECTION DURHAM COUNTY, NC - PROJECT No. A63202.00 Hart ° Et Lain County ARAGGTOW 1'1' fadi.brn _ )0D Jr T "."TY' I-fE'OHT{ a 147 V1t Madam Ave WAREHOUSE IS7.4iGT VR Ch pet HiIr 5 w y } HCrLL�SriDET AvCI'VI_• rEFESA E Lawsnn PARK5JJE mLL 'c E PAR 1T rr-�- •. OICAGE • E. NOR TH 00h"H.4.4' EGE r St PRIM' S T R,EEr aver 6 6r 4M1 2125 E Gear St, Durham, m, NC 27704 Chi° • • 9 r i3121 Roc kV Knoll fry{ Oak Grove VICINITY MAP • 17069 S. m P,GG 94Z0 PROJECT MANAGEMENT COPYRIGHT © 2019 P.I.N.: 0842-02-57-0377 2125 E. GEER ST. DURHAM, NC 27704 SCHEDULE OF DRAWINGS: C-101 C-102 C-103 D-101 D-102 D-103 LICENSE No. C-1039 ai COVER SHEET EXISTING CONDITIONS PROPOSED SEWER CONNECTION HYDRAULIC PROFILE OF PROPOSED FORCE MAIN DETAILS 1 DETAILS 2 DETAILS 3 MacCONNELL & Associates, P. C. 2125E Geer St, Durham, NC 27704 • Doixdr Tree 11` wivimprt Keg 55 Burgers Shakes & Pass rf .EGieso St Fr rp1j 501 CASCADE POINTE LANE, SUITE 103 CARY, NORTH CAROLINA 27513 P. O. BOX 129 MORRISVILLE, NORTH CAROLINA 27513 TEL: (919) 467-1239 FAX: (919) 319-6510 LOCATION MAP THESE RECORD DRAWINGS HAVE BEEN PREPARED BASED UPON INFORMATION FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, THE DESIGN PROFESSIONAL CANNOT ASSURE ITS ACCURACY, AND THUS IS NOT RESPONSIBLE FOR THE ACCURACY OF THIS RECORD DRAWING OR FOR ANY ERRORS OR OMMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO IT AS A RESULT. THOSE RELYING ON THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE. RECORD DRAWING J U LY 8, 2020 OCTOBER 7, 2019 NO. 1 2 DATE 10/16/19 12/06/19 REVISIONS DESCRIPTION PER CITY OF DURHAM C-103 SHEET PER CITY OF DURHAM C-101,2,3 A63202.00 — FIRST PENTECOSTAL CHURCH OF DURHAM — SEWER CONNECTION A63202.00 FIRST PENTECOSTAL CHURCH OF DURHAM SEWER CONNECTION Z:\T-Drive (Projects)\Library\2018\A63202.00 - First Pentecostal Church of Durham - Sewer Connection\Drawings\A63202.00 - Base.dwg Jul 08, 2020 10:33am i / / 1 / / / / / SS / / EX. 8" S.S• SS 65 FI SST PENTECOSTAL CH U RCH OF DURHAM DB 5902 PG 802 P3 106 PG 31 LOT 2 PIN 0842-02-57-0377 100' STREAM BUFFER 50' STREAM BUFFER 0 0. UNNAMED TRIBUTARY TO ELERBEE CREEK 50' STREAM BUFFER 100' STREAM BUFFER 15.56 EXISTING CONDITIONS N82°37'02' E 77.64' APPROXIMATE LOCATION OF EX. SANITARY SEWER LINE EX. SEWER MANHOLE RIM: 340.23 EX. INV IN: 329.90 EX. INV IN: 329.85 EX. INV OUT: 329.83 SAND FILTER (TO BE REMOVED) 33 1 � -7- -o 0 rn CLEAN OUT 0o. EXISTING ATHLETIC FIELD SEPTIC TANK 6" PVC INV IN=335.36' (TO BE REMOVED) RECIRCULATION TANK INV OUT=333.50' (TO BE REMOVED) CHLORINATION/ DECHLORINATION N (TO BE REMOVED) 24" CONCRETE PIPE INV OUT: 332.64 v / 3p SSA \ UNNAMED TRIBUTARY TO ELERBEE CREEK Yro 6'1 DROP INLET RIM: 351.72 INV BOTTOM: EXISTING BUILDING SSS SEA p� FR M ENT 341.29 EXISTING BUILDING SS x ( EXISTING \ PARKING LOT \ 2' (5)� ' 47.78"W 11.6 50' STREAM BUFFER 100' STREAM BUFFER SEWER MANHOLE RIM: 340.38 INV IN: 331 18 INV OUT: 331.12 EXISTING PARKING LOT CD THESE RECORD DRAWINGS HAVE BEEN PREPARED BASED UPON INFORMATION FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, THE DESIGN PROFESSIONAL CANNOT ASSURE ITS ACCURACY, AND THUS IS NOT RESPONSIBLE FOR THE ACCURACY OF THIS RECORD DRAWING OR FOR ANY ERRORS OR OMMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO IT AS A RESULT. THOSE RELYING ON THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE. RECORD DRAWING JULY 8, 2020 / GRAPHIC SCALE: 60 30' 90 NOTES 1. EXISTING BASE MAP INFORMATION TAKEN FROM SURVEY BY S.D. PUCKETT 8c ASSOCIATES (11/15/2018) DURHAM COUNTY G.I.S., AERIAL PHOTOGRAPHY AND FIELD MEASUREMENTS. 1. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL TRADES AND SUBCONTRACTORS. CONTRACTOR IS ALSO RESPONSIBLE FOR FIELD VERIFYING DIMENSIONS, ELEVATIONS, AND LOCATIONS OF ALL EXISTING CONDITIONS AND UTILITIES. 2. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE SOIL EROSION AND SEDIMENTATION CONTROL REQUIREMENTS. 3. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE OSHA, NCDOT AND SAFETY REQUIREMENTS. 4. CONTRACTOR IS RESPONSIBLE FOR REPAIRING ALL CONSTRUCTION DAMAGE EXPEDITIOUSLY AND AT NO ADDITIONAL COST TO THE OWNER. 5. DESIGN IS FOR A CHURCH WITH A DESIGN FLOW OF <1000 GPD. 6. PROPERLY REMOVE AND DISPOSE OF TANKS, SAND FILTER, MEDIA AND PIPING OR WITH ENGINEER'S APPROVAL, TANKS MY BE PUMPED CLEANED, BROADCAST WITH LIME AND CRUSHED IN PLACE. LEGEND SD SS SS FM ADJACENT BOUNDARY PROPERTY LINE DITCH/CREEK FENCE RIGHT OF WAY EX. CONTOURS - INDEX EX. CONTOURS - INTERMEDIATE PROP. CONTOUR - INDEX PROP. CONTOUR - INTERMEDIATE EXISTING OVERHEAD POWER EXISTING STORM DRAIN EXISTING SANITARY SEWER PROPOSED SANITARY SEWER PROPOSED FOCEMAIN PROPOSED MANHOLE REVISIONS NO. DATE DESCRIPTION 2 12/06/19 PER CITY OF DURHAM 3 04/29/20 PER ENGINEER PROJECT MANAGER: GSM PROJECT ENGINEER: GSM DRAWN BY: JDH CHECKED BY: GSM DATE: OCTOBER 7, 2019 0069 LICENSE No. C-1039 MacCONNELL & Associates, P. C. 501 CASCADE POINTE LANE, SUITE 103 CARY, NORTH CAROLINA 27513 MORRISVILLE, NORTH CAROLINA 27560 TEL: (919) 467-1239 FAX: (919) 319-6510 FIRST PENTECOSTAL CHURCH OF DURHAM SEWER CONNECTION DURHAM COUNTY, NC EXISTING CONDITIONS PROJECT NUMBER DRAWING NUMBER A63202.00 C-101 COPYRIGHT © 2019 A63201.00 — FIRST PENTECOSTAL CHURCH OF DURHAM — SEWER CONNECTION A63201.00 - FIRST PENTECOSTAL CHURCH OF DURHAM - SEWER CONNECTION Proposed sewer connection Z:\T-Drive (Projects)\Library\2018\A63202.00 - First Pentecostal Church of Durham - Sewer Connection\Drawings\A63202.00 - Base.dwg Jul 08, 2020 10:33am 50' STREAM BUFFER 100' STREAM BUFFER 7 .— EX. SS S.S• 15.56 SS SS 02 \ 77 64, N82 3 APPROXIMATE LOCATION OF EX. SANITARY SFWFR UNNAMED TRIBUTARY TO ELERBEE CREEK REMOVE EXISTING F.E.S AND ADD CONCRETE CAP OVER NEW PIPE TO PREVENT EROSION. REINSTALL F.E.S. EWER MANHOLE R'h ' 340.23 EX. INV IN: 329.90 EX. INV IN: 329.85 EX. INV OUT: 329.83 PROPOSED FORCEMAIN AND GRAVITY SEWER PLAN 1 "=20' ELEVATION 345.0 i 4 CONNECT NEW 6 .PVC TO EXISTING 6" PVC N FROM BUILDING NEW PUMP\ STATION NEW 2" SCH. 40 PVC FORCE MAIN 22.5° BEND N 4'x10' BORE PIT FOR N DIRECTIONAL DRILL N 0 0 PROVIDE MECHANICAL COUPLING AND RESTRAINED BENDS FOR PVC/HDPE CONNECTION (45° BEND) N' \' • 4'x10' BORE PIT FOR DIRECTIONAL DRILL 350.0 / >.i( G�sEMEN- SE s�p ,02 � _ 8 SS . 24" CONCRETE PIPE I INV OUT: 332.64 CONNECT TO EXISTING MH BY BORING AND BOOTING NEW INV. IN: 330.50 r 2+00 Z N N i N / / i' / I EXISTING PARKING LOT L 18" CONCRETE PIPE N (ORIGIN UNKNOWN) INV OUT: 335.68 N \ N DIRECTIONAL DRILL 4" HDPE HDD --- UNDER CREEK. SLEEVE 2" HDPE SDR N 11 FORCE MAIN THROUGH THE 4" . PROVIDE MIN. 3' SEPARATION BELOW CREEK BED. 45° BEND TRANSITION FROM 2" HDPE TO 6" PVC FOR +10' PRIOR TO MANHOLE. PROVIDE 2"X6" REDUCER iNND MECHANICAL COUPLING FOR CONNECTION. \ NN AT PROPERTY LINE INV. IN: 331.50' INV. OUT: 330.50 UNNAMED TRIBUTARY TO ELERBEE CREEK 8" D.I.P. SANITARY SEWER GRAVITY LINE EXISTING BUILDING 50' STREAM BUFFER 345.0 340.0 STATION RIM: 340.23' 340.0 NEW INV IN: 330.50' INV. IN: 329.90' INV. IN: 329.85' INV. OUT: 329.83' EXISTING GROUND NEW MANHOLE AT F.E.S. OF 24" RCP STORM DRAIN PROPERTY LINE COMPACTED INV. IN: 331.50 INV. OUT: 331.00 BACKFILL PVC PRIOR TO I \ ENTERING MANHOLE I gir . all Ad riwitirisiiiii..wa,.,, ,„.___ _ A © 0.50% ce PROVIDE A CONCRETE CAP OVER • > NEW PIPE TO PREVENT EROSION c.) FROM EXISTING STORM DRAIN PROPOSED 2" SCH. 320.0 320.0 PROVIDE MECHANICAL COUPLING \ AND TRANSITION FROM PVC TO HDPE FOR DIRECTIONAL DRILL \ UNDER CREEK. 317.0 CREEK STATION 2 PROPOSED FORCEMAIN AND GRAVITY SEWER PROFILE C-103 100' STREAM BUFFER 10 20 40 60 THESE RECORD DRAWINGS HAVE BEEN PREPARED BASED UPON INFORMATION FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, THE DESIGN PROFESSIONAL CANNOT ASSURE ITS ACCURACY, AND THUS IS NOT RESPONSIBLE FOR THE ACCURACY OF THIS RECORD DRAWING OR FOR ANY ERRORS OR OMMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO IT AS A RESULT. THOSE RELYING ON THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE. RECORD DRAWING JULY 8, 2020 NOTES 1. SEE SHEET C-1 01 FOR GENERAL NOTES. 2. D.I.P. STAINLESS STEEL TO BE FACTORY LINED WITH PROTECTO 401 OR APPROVED EQUAL. 3. THE RECEIVING MANHOLE AND THE NEXT 2 DOWNSTREAM MANHOLES SHALL HAVE A SULFIDE —RESISTANT, EPDXY COATING PER SECTION 4.7 OF THE CITY OF DURHAM DEPARTMENT OF WATER MANAGEMENT STANDARDS. LEGEND SD SS SS FM OHL ADJACENT BOUNDARY PROPERTY LINE DITCH/CREEK FENCE RIGHT OF WAY EX. CONTOURS - INDEX EX. CONTOURS - INTERMEDIATE PROP. CONTOUR - INDEX PROP. CONTOUR - INTERMEDIATE EXISTING OVERHEAD POWER EXISTING STORM DRAIN EXISTING SANITARY SEWER PROPOSED SANITARY SEWER PROPOSED FOCEMAIN PROPOSED MANHOLE NO. 2 3 DATE 10/16/19 12/06/19 04/29/20 REVISIONS DESCRIPTION PER CITY OF DURHAM PER CITY OF DURHAM PER ENGINEER PROJECT MANAGER: GSM PROJECT ENGINEER: GSM DRAWN BY: JDH CHECKED BY: GSM DATE: sElm- 17069 MacCONNELL & Associates, P. C. 501 CASCADE POINTE LANE, SUITE 103 CARY, NORTH CAROLINA 27513 LICENSE MORRISVILLE, NORTH CAROLINA 27560 No. C-1039 TEL: (919) 467-1239 FAX: (919) 319-6510 FIRST PENTECOSTAL CHURCH OF DURHAM SEWER CONNECTION DURHAM COUNTY, NC HYDRAULIC PROFILE OF PROPOSED FORCEMAIN PROJECT NUMBER A63202.00 DRAWING NUMBER C-103 COPYRIGHT © 2019 A63201.00 — FIRST PENTECOSTAL CHURCH OF DURHAM — SEWER CONNECTION A63201.00 — FIRST PENTECOSTAL CHURCH OF DURHAM — SEWER CONNECTION Z:\T-Drive (Projects)\Library\2018\A63202.00 - First Pentecostal Church of Durham - Sewer Connection\Drawings\A63202.00 - Detail.dwg Jul 08, 2020 10:33am Details Provided by APPIAN Consulting Engineers - www.appionengineers.com EASEMENT ( NON TRAFFIC AREAS }---( TRAFFIC AREAS SEE 31 23 17 TABLE FOR MINIMUM COMPACTION LIMITS v*v' 4'4,4, 4, W W i 4, W ,V 4. W W W W Y N 4,.Y W 4, 4' 4' W W 4, W W ▪ W W V W W W - Tfl"ITT=TII=�fTI- - -f ST=it(- 111.11111,111 ;IIIIIIII COMMON EARTH BACKFILL IN 12" LIFTSII- OUTSIDE OF STREET '-1I • R/W (TABLE 4 OF 11= 0 31 23 17) "1 12" OF (SELECT) INITIAL EARTH - a BACKFILL - (6" LIFTS MAX) w LU fn n TOP OF PIPE 2"-3" STONE BACKFILL 2"-3" ABOVE TOP OF PIPE (TRAFFIC & NON -TRAFFIC AREAS) HAUNCHING TO SPRINGLINE 3"-6" TYPICAL OR 6" IF ROCK IS ENCOUNTERED (NOTES 2 & 3) UNDISTURBED SOIL NOTES: 1. Foundation stone shall be required when soil conditions are unsuitable. 2. An additional 1 inch depth of bedding material will be required for each additional 2 feet of trench depth in excess of 16 feet up to a maximum of 12 inches. 3. See specifications 31 23 17 section 3.12 bedding requirements as bedding depth relates to pipe material. 4. See Detail C01.01 where trench rock is encountered for required clearances. Increase depth at bottom relates to bury. (Note 2 above) y y W W W W W 4, W W 4, 4, J y W 4, +.r -111-111 -III-III-III=1_. I=1 I I=111=I 11-111-I I d I mit7 i 11 11 I-111Enitm I- it"- Illlillll11111111111111111- 1"- R/W (TABLE 4 OF 31 23 17) OR EXCAVATABLE FLOWABLE FILL (SEE 31 23 17, SECTION 2,1) 12" OF (SELECT) INITIAL EARTH BACKFILL (6" LIFTS MAX) TOP OF PIPE N I- SEE 31 23 17 W TABLE FOR MINIMUM N COMPACTION LIMITS N NN ° �° ° N \ < _ - L 4 N w COMMON EARTH BACKFILL c� IN 6" LIFTS IN STREET 1 1-o N c0 M N •-CLEAN COARSE AGGREGATE No. 57 FOR BEDDING, HAUNCHING, & BACKFILL (TRAFFIC AND NON -TRAFFIC AREAS) • DEPTH VARIES SEE NOTE 1 FOUNDATION STONE IF REQUIRED (SEE ALSO DETAIL C01.02) DURHAM 1 8 6 9 CITY OF MEDICINE * *** Dept. of Water Management 1600 Mist Lake Dr. Durham, N.C. 27704 City of Durham, NC USE WITH THE STANDARD SPECIFICATIONS ONLY www.durhamnc.gov Voice (919) 560-4381 SANITARY SEWER LINE TRENCH NotToScale 27311I.01 (TRAFFIC AND NON -TRAFFIC AREAS) REVISION DATE: Feb., 2017 SHEET #: 1 of 1 Details Provided by APPIAN Consulting Engineers - www.appianengineers.com 0 N FIELD and WOODS APPLICATION MANHOLES LOCATED IN THE FLOODPLAIN SHALL HAVE WATERTIGHT IRON CASTINGS. OTHERWISE MANHOLE HDPE INSERTS MAY BE USED PER CITY APPROVAL (SEE PRE -APPROVED PRODUCT LIST) SEE DETAIL C06.01 FOR MANHOLE RING AND COVER GRADE ADJUSTMENT. tsAki FLEX -SEAL SEALANT ON INTERIOR ADJUSTMENT RING AREA USE AN APPROVED has BUTYL RUBBER (MASTIC) SEALANT APPLIED TO TOP OF CONE SECTION '.771-111II-III USE ECCENTRIC CONE PRECAST MANHOLE (MEET REQUIREMENTS OF ASTM. C478, AASHTO M-199) SLOPE OF CHANNEL THRU MANHOLE = 0.10' FALL UNLESS SHOWN OTHERWISE ON PLANS. SEE DETAIL 732.01 FOR INVERT & BOOT DETAIL USE 5' DIA. MANHOLE W/6" MINIMUM EXTENDED BASE WHEN MANHOLE DEPTH EXCEEDS 18'. CONCRETE INVERT AND PIPE ENTRY PER DETAIL 732.01 MANHOLE COVER & RING CASTING. SEE DETAIL C05.02 AND APPROVED MATERIAL LIST FOR MANUFACTURER AND PART #'S CONCRETE COLLAR AROUND MANHOLE CASTING TO SECURE TO MANHOLE TOP (SIZE VARIES) 3' 0" MIN. FROM TOP OF COVER TO GRADE (NOTES 10 & 11) OF DETAIL 732.20 1-III= AI PCr� >h 1°5°01 ior.rovi • a SEE SPECS SECTION 31 23 17, PARAGRAPH 3.12.B FOR FOUNDATION IMPROVEMENT WHEN NEEDED ill , I III elittkeri +17 SEAL INSIDE Sc OUTSIDE OF ALL JOINTS WITH HYDRAULIC CEMENT ALL JOINTS TO BE T&G A AND WILL HAVE MASTIC SEALER. REINFORCING PER PRECAST MANUFACTURER TO MEET ASTM C-478 EXTERNAL JOINT WRAP ON ALL BURIED JOINTS PER DETAIL 732.11 PRECAST OPENING OR CORE & BOOT REQUIRED FOR ALL PIPES. SEE PLANS FOR PIPE SIZES. SEE DETAIL 732.01 SET MANHOLE ON 12" NO. 57 STONE SEE DETAIL 732.20 FOR PRECAST CONCRETE SEWER MANHOLE NOTES DURHAM 1 8 6 9 CITY OF MEDICINE **** Dept. of Water Management 1600 Mist Lake Dr. Durham, N.C. 27704 City of Durham, NC USE WITH THE STANDARD SPECIFICATIONS ONLY www.durhamnc.gov Voice (919) 560.4381 STANDARD ECCENTRIC CONE PRECAST MANHOLE DETAIL SCALE: Not To Scale DETAIL # 2 732.02 REVISION DATE: Feb., 2017 SHEET #: 2 of 2 Details Provided by APPIAN Consulting Engineers - www.appionengineers.com PLAN A FIELD FORMED INVERT PART MANUFACTURER MODEL SLEEVE BOOTS KOR-N-SEAL or PSX FLEXIBLE RUBBER BOOT ASTM C923 W/STAINLESS STEEL COMPRESSION BAND AND CLAMPS. SEE DETAIL 732,01 PLACE COMPACTED No. 57 STONE AROUND ALL BOOTS USE 5' DIA. MANHOLE W/6" MINIMUM EXTENDED BASE WHEN MANHOLE DEPTH EXCEEDS 18'. 9 4 #57 STONE AROUND BOOT DENOTES FLOW 1 SECTION A -A A PLAN B SEE NOTE 6 PIPE PLAN D PLACE GROUT AROUND ALL OPENINGS BENCH. MIN. 4% SLOPE DURHAM 1 8 6 9 CITY OF MEDICINE **** Dept. of Water Management 1600 Mist Lake Dr. Durham, N.C. 27704 City of Durham, NC USE WITH THE STANDARD SPECIFICATIONS ONLY Voice (919) 560-4381 www.durhamnc.gov TYPICAL SEWER INVERT SCHEMATIC FOR MANHOLES SCALE: Not To Scale DETAIL # 2732.01 REVISION DATE: Feb., 2017 SHEET #: 1 of 2 Details Provided by APPIAN Consulting Engineers - www.oppianengineers.com VARIES, SEE NOTE PRIOR TO SETTING THE IRON CASTING, AND AFTER LAYING TRACER WIRE ACROSS TOP OF THE PRECAST CONE SECTION, PLACE A BUTYL SEALANT SUCH AS RAM-NEK ALONG THE TOP OF THE CONE AND WIRE. ,N- NO. 12 GA. SOLID GREEN INSULATED COPPER TRACER WIRE, TYP. STD. INDUSTRIAL CRIMP (SIMILAR METAL), TYP FLOW SEWER MAIN WRAP TRACER WIRE AROUND CIRCUMFERENCE OF MANHOLE AND SPLICE TO TRACER WIRE FOR DOWNSTREAM SEWER MAIN NOTES: FIBERGLASS GREEN MANHOLE MARKER - LABELED "SEWER MANHOLE", SEE NOTE 2 & DETAIL 739.01 I I II I III I I-1:' II1Ff IF. -I 1 1 SEE NOTE 2 SEWER SADDLE TAP SEWER MAIN \\P SEE OTHER DETAILS FOR MANHOLE INSTALLATION REQUIREMENTS SEWER LATERAL The tracer wire shall be continuous to the greatest extent possible. For gravity main installations less than 8 feet in depth, the tracer wire shall be laid flat and securely affixed to the top of the pipe with zip ties at 10-foot intervals . For pipe installations deeper than 8 feet, the tracer shall be installed at a depth of 7 to 8 feet. The tracer wire shall be protected from damage during the execution of the work. No breaks or cuts in the tracer wire shall be permitted. See detail 732.13. 2. Manhole markers shall be placed adjacent to manholes at the discretion of the Town Representative. 3. In non -neutral pH soils, the City Engineer may require the addition of passive cathodic protection (sacrificial magnesium or zinc anodes) or cathodic shielding (coatings). The need of cathodic protection shall be determined by the Town Engineer. 4. Where the tracer wire needs be spliced, use connectors designed for use with tracer lines and direct bury such as Copperhead Industries "SnakeBite" connector. This type of connector eliminates the need to cut the main tracer line. DURHAM 1 8 6 9 CITY OF MEDICINE **** * Dept. of Water Management 1600 Mist Lake Dr. Durham, N.C. 27704 City of Durham, NC USE WITH THE STANDARD SPECIFICATIONS ONLY www.durhamnc.gov Voice (919) 560-4381 TRACER WIRE and MARKER POST PLACEMENT at MANHOLES SCALE: Not To Scale DETAIL # 2732.12 REVISION DATE: Feb., 2017 SHEET #: 1 of 1 Details Provided by APPIAN Consulting Engineers - www.appianengineers.com SEE DETAIL 732.20 FOR PRECAST CONCRETE SEWER MANHOLE NOTES NOTES: 1. Concrete shelf should be no lower than the pipe spring line elevation at manhole wall. 2. Radius of invert must have enough room to be able to insert air plugs and TV equipment. 3. Concrete strength to be 4,000 PSI minimum. 4. Concrete formed invert shall be precast wherever possible. Moorbases are permitted. 5. All new laterals into manholes must be core drilled and installed with a flexible rubber boot. 6. Flexible sleeve boots cast in place or installed with stainless steel expander rings as manufactured by Kor-N-Seal or PSX shall be used for pipe connections. Boots shall be secured to pipe using (2) stainless steel bands. 7. Flow shall not be allowed to restrict other lines. Influent lines shall not enter manholes at less than 90' from effluent line unless otherwise approved by City Engineer. Pipe connections to Manhole shall be in accordance with NPCA recommendations. DURHAM 1 8 6 9 CITY OF MEDICINE **** * Dept. of Water Management 1600 Mist Lake Dr. Durham, N.C. 27704 City of Durham, NC USE WITH THE STANDARD SPECIFICATIONS ONLY Voice (919) 560-4381 www.durhamnc.gov STANDARD ECCENTRIC CONE PRECAST MANHOLE DETAIL SCALE: Not To Scale REVISION DATE: Feb., 2017 DETAIL # 2732.01 SHEET #: 2 of 2 Details Provided by APPIAN Consulting Engineers - www.appianengineers.com NOTES: 1. All precast concrete manholes shall conform to the latest revision of ASTM C478. 2. Concrete shall be 4000 psi at 28 days minimum. 3. Steel reinforcement shall be grade 60 billet steel conforming to the latest revision of ASTM A185 for wall reinforcement, and the latest revision of ASTM A615 for the base reinforcement. 4. Standard joints shall be sealed with putty type plastic cement per Fed. Spec. SS C153 or an 0-ring type joint conforming to the latest revision of ASTM C443. 5. Manhole inlets and outlets shall be cast in place flexible rubber sleeve and boots with stainless steel expanding rings per the latest revision of ASTM C923. 6. Inverts to be constructed of precast concrete or brick with a concrete bench (Detail 732.02). 7. The maximum separation between invert in and invert out within a manhole is 0.50 feet. When the separation is greater than 0.50 feet a drop manhole must be used. The minimum allowable distance between the outside drop and the invert in is 2.5 feet. 8. Manholes greater than 18 feet in depth shall have an inside diameter of 5'-0". For sanitary sewer mains greater than eighteen inches (1 8") in diameter, manholes shall be a minimum of 5'-0" in diameter. Dual DIP's are required when the depth exceeds 18 feet. Encasement of these pipes may be required. 9. Rim elevations shall be at grade in streets & parking lots. 10. Rim elevations along outfalls shall be a minimum of 3' above existing ground elevation. If the outfall is located within the flood plain, rim elevations shall be 2' above the 100-year flood elevation (While still maintaining the 3' above the existing ground elevation minimum requirement). The 100-year flood elevation shall be noted on the construction drawings. 11. Flat top manholes shall be used when the height from the ground to the top of the manhole exceeds 4 feet. 12. All services shall tie into the manhole at the bench. 13. Manholes located in the floodplain shall have watertight iron castings. 14. Pipes entering MH will be grouted inside and out. 15. See detail 732.01 for typical invert shaping. 16. Service laterals into existing manholes to be core drilled and booted. 17. For watertight applications, place butyl rubber between frame and cone. 18. All banded connections shall be double banded. For pipe connections 12" and larger, 2 sets of bands shall be required. 19. Lubricate the following: Pipe exterior, boot interior, boot exterior, S.S. bands (Top & bottom) 20. Place manhole opening over the effluent line. 21. When vents are permitted, vent every 3rd manhole, not exceeding 1,000 LF between vents. Vents shall be placed a minimum of 24" above the 100 Yr. BFE. See detail 732.10. 22. Outfall manholes regardless of manhole top elevation, shall be vented only when sealed manholes are required. 23. Buoyancy calculations required for manholes & pipes located in floodplain areas. DURHAM 1 8 6 9 CITY OF MEDICINE **** Dept. of Water Management 1600 Mist Lake Dr. Durham, N.C. 27704 City of Durham, NC USE WITH THE STANDARD SPECIFICATIONS ONLY PRECAST CONCRETE SANITARY SEWER MANHOLE NOTES Voice (919) 560.4381 www.durhamnc.gov SCALE: Not To Scale REVISION DATE Feb., 2017 DETAIL # 2 732.20 SHEET #: 1 of 1 NOTES 1. SEE C-101 FOR GENERAL NOTES. THESE RECORD DRAWINGS HAVE BEEN PREPARED BASED UPON INFORMATION FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, THE DESIGN PROFESSIONAL CANNOT ASSURE ITS ACCURACY, AND THUS IS NOT RESPONSIBLE FOR THE ACCURACY OF THIS RECORD DRAWING OR FOR ANY ERRORS OR OMMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO IT AS A RESULT. THOSE RELYING ON THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE. RECORD DRAWING J U LY 8, 2020 REVISIONS NO. DATE DESCRIPTION PROJECT MANAGER: GSM PROJECT ENGINEER: JPH DRAWN BY: JDH CHECKED BY: GSM DATE: OCTOBER 7, 2019 ,,,,111111 17069 i • .E►yG INS:• tr -. 1y .....• 00 .t LICENSE No. C-1039 MacCONNELL & Associates, P. C. 501 CASCADE POINTE LANE, SUITE 103 CARY, NORTH CAROLINA 27513 P. O. BOX 129 MORRISVILLE, NORTH CAROLINA 27560 TEL: (919) 467-1239 FAX: (919) 319-6510 FIRST PENTECOSTAL CHURCH OF DURHAM SEWER CONNECTION DURHAM COUNTY, NC DETAILS - 1 OF 3 PROJECT NUMBER A63202.00 DRAWING NUMBER D-101 COPYRIGHT © 2019 A63202.00 — FIRST PENTECOSTAL CHURCH OF DURHAM — SEWER CONNECTION A63202.00 - FIRST PENTECOSTAL CHURCH OF DURHAM - SEWER CONNECTION Z:\T-Drive (Projects)\Library\2018\A63202.00 - First Pentecostal Church of Durham - Sewer Connection\Drawings\A63202.00 - Detail.dwg Jul 08, 2020 10:34am Details Provided by APPIAN Consulting Engineers - www.oppianengineers.com REMOVE EX. CAP CUT EX. PVC AS REQUIRED TO INSTALL COUPLING BRASS PLUG CONCRETE COLLAR (18"x18"x4") CAST IRON SOIL PIPE (LENGTH VARIES) CUT EX. PVC RISER & INSTALL PVC TO DIP COUPLING EX. SCH 40 PVC RISER PIPE SEE DETAIL 733.01 OR 733.03 FOR CONTINUATION TO SAN. l \ SEWER MAIN / MANHOLE REMOVE EX PVC CAP, INSTALL COUPLING, AND CONTINUE WITH SAN. SEWER SERVICE AS REQUIRED EX. SCH 40 PVC PIPE SEE DETAIL 733.01 OR 733.03 FOR CONTINUATION TOWARDS SAN. SEWER MAIN / MANHOLE CLEAN OUT DETAIL INSTALLED BY PLUMBER / �; N I ICI �IIII` r I 1 Z 0 �1 \ \ \\ , ,`Ire tf/ .BPSetitf NOTES: 1. The full length of the service trench shall be compacted in 6" layers with mechanical tamp. 2. Solvent cement for pvc pipe and fittings to be ASTM D-2564. 3. PVC wye, bend, lateral, & clean -out assembly must be bedded in #57 stone. Bedding and handling of service pipe must comply with Class B bedding (See bedding detail for gravity mains.) 4. All fittings to be the same size as the existing wye. DURHAM 1 8 6 9 CITY OF MEDICINE **** Dept. of Water Management 1600 Mist Lake Dr. Durham, N.C. 27704 City of Durham, NC USE WITH THE STANDARD SPECIFICATIONS ONLY WWW.durhamnc.gov Voice (919) 560-4381 CLEAN OUT DETAIL (INSTALLED BY PLUMBER) SCALE: Not To Scale DETAIL # 2733.02 REVISION DATE: Feb., 2017 SHEET #: 1 of 2 Details Provided by APPIAN Consulting Engineers - www.oppionengineers.com I MANHOLE WALL --I GROUT FORMED INVERT TOP OF BENCH, SEE NOTE 3 #57 STONE AROUND BOOT PRO. RUBBER BOOT, SEE NOTE 7 LATERAL CONNECTION •/ fi • F. Y �`� ` TOP OF BENCH, 1 .1 11 1 • SEE NOTE 3 . PRO. LATERAL, SEE NOTES 6, 7, & 8. 1\ SEE STD. \ DETAILS 1' 733.01 & I ' 733.02 FOR I , STUB OUT. \ t-- r. / • LATERAL PIPE �qT F,p q<' FLOW 6" MIN. SEE NOTE 1 8 • \. \ LATERAL ' \ \ SEWER MAIN ANGLE GREATER THAN OR EQUAL TO 90' SF R A, PRO. RUBBER BOOT, SEE NOTE 7 PROPOSED FORMED INLET SEE NOTE 5 EXISTING FORMED INLET MANHOLE (SHOWN FLOW ISOMETRIC VIEW CUT -AWAY FOR CLARITY) 0 z cc PLAN VIEW NOTES: 1. The minimum spacing from the edge of a core for a lateral to the edge next core shall be 6 inches. 2. Sewer lateral shall not enter a manhole at an angle less than 90' to the pipe. 3. All laterals to be installed at the top of the bench. 4. Provide brick or concrete for invert. 5. Inverts to be built from lateral to effluent pipe. 6. The maximum number of laterals for any one manhole is five 7. All new laterals into manholes must be core drilled and installed rubber boot. (5). with FLOW of the effluent a flexible DURHAM 1- 1869 CITY OF MEOICINE **** Dept. of Water Management 1600 Mist Lake Dr. Durham, N.C. 27704 City of Durham, NC USE WITH THE STANDARD SPECIFICATIONS ONLY Voice (919) 560-4381 www.durhamnc.gov SANITARY SEWER LATERAL AT MANHOLES SCALE: Not To Scale DETAIL # 2 733.03 REVISION DATE: Feb., 2017 SHEET #: 1 of 1 -LcR1 TOP EL. ±341.50' INV. IN EL.: 338.0' 86' PVC LAG/ALARM: 337.83 N N PUMP ON: 335.21 PUMP OFF: 335.00 BOTTOM ELEV: 333.5' PROVIDE A MIN. 6"x6" COLLAR (3CF) OF MIN. 2,500 PSI CONCRETE BALLAST 2" PVC VENT WITH CARBON FILTER BY ODORHOG AND SS SCREEN OR EQUAL PVC BALL VALVE (TYP) 2" SCH. 80 PVC DISCHARGE 2"X3" REDUCER BALL CHECK VALVE 1 1/4" STAINLESS STEEL RAILS 2" SCH80 PVC PIPE AND PIPE FITTINGS 2 SEWAGE PUMP STATION DETAIL 1b Lilt§ Pumps �3E3E3E3E3E3E3E3E3E3 KKK FIBERGLASS COVER SHOWN 1 1/4" STAINLESS STEEL RAILS 11 THESE RECORD DRAWINGS HAVE BEEN PREPARED BASED UPON INFORMATION FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, THE DESIGN PROFESSIONAL CANNOT ASSURE ITS ACCURACY, AND THUS IS NOT RESPONSIBLE FOR THE ACCURACY OF THIS RECORD DRAWING OR FOR ANY ERRORS OR OMMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO IT AS A RESULT. THOSE RELYING ON THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE. RECORD DRAWING J U LY 8, 2020 UPPER PIPE GUIDE BRACKET LSG202M SERIES GRINDER PUMPS 3.90 NOTES: 1. DUPLEX PUMPS SHALL BE PRG SERIES MODEL 102A GRINDER PUMP BY LIBERTY PUMPS. 2. CONTROL PANEL SHALL BE MODEL AE24L=3 NEMA 4X BY LIBERTY PUMPS. 3. PROVIDE MANUAL TRANSFER SWITCH AND PLUG FOR PORTABLE GENERATOR TO BE ON SITE. 4. NO JUNCTION BOX SHALL BE INSTALLED IN WETWELL; HARD -WIRE TO PANEL. 5. TOP OF PIPE SHALL BE ±12" FROM TOP OF WETWELL IN ORDER TO ACCESS VALVE. 6.. ALL PIPE INTERIOR TO WET WELL SHALL BE SCH. 80 PVC. BURIED PIPE SHALL BE SCH. 40 PVC. 7. WET WELL TO BE PROVIDED BY LIBERTY PUMP OR TOPP INDUSTRIES, INC. D-102 NTS NOTES 1. SEE SHEETS C-101 AND D-101 FOR NOTES. REVISIONS NO. DATE DESCRIPTION PROJECT MANAGER: GSM PROJECT ENGINEER: JPH DRAWN BY: LHB CHECKED BY: GSM DATE: OCTOBER 7, 2019 '11,,lilI •Y SUM' • 17069 ��•'1r y • H� /h/ /o LICENSE No. C-1039 MacCON ELL & Associates, P. C. 501 CASCADE POINTE LANE, SUITE 103 CARY, NORTH CAROLINA 27513 P. O. BOX 129 MORRISVILLE, NORTH CAROLINA 27560 TEL: (919) 467-1239 FAX: (919) 319-6510 FIRST PENTECOSTAL CHURCH OF DURHAM SEWER CONNECTION DURHAM COUNTY, NC DETAILS - 2 OF 3 PROJECT NUMBER A63202.00 DRAWING NUMBER D-102 COPYRIGHT © 2019 A63202.00 — FIRST PENTECOSTAL CHURCH OF DURHAM — SEWER CONNECTION A63202.00 - FIRST PENTECOSTAL CHURCH OF DURHAM - SEWER CONNECTION Z:\T-Drive (Projects)\Library\2018\A63202.00 - First Pentecostal Church of Durham - Sewer Connection\Drawings\A63202.00 - Detail.dwg Jul 08, 2020 10:34am 1-00 1-01 1-02 1-03 1-04 1-05 1-06 1-07 1-08 1-09 1-10 1-11 1-12 1-13 1-14 1-15 1-16 1-17 1-18 1-19 1-20 1-21 1-22 1-23 1-24 1-25 1-26 1-27 1-28 1-29 1-30 1-31 1-32 1-33 1-34 1-35 1-36 1-37 1-38 1-39 rNFEED POWER C L/AIAAII Li II ❑ 4 TB1 TB1 1 CB106 l 10A 0 ■ ■I i. I :+r� INFEED POWER P, GND L2/N L 1 128I2ee/2411 VAC EMI II I I I I I I TB1 TB1 TB1 aAQAT DAMN 1 03 2 20A 4 CB104 cncurr BREAKER 1 °3 2 20A 4 CB108 El ix ❑N COMM POMP PC113 FLOAT CONNECTIONS L CR116 PB122 30 04 AN AMA 8 12 TB1 LFLT139J Wo-B STOP 13 TB1 14 TM F LT139AJ -0o-B LEAD 15 TB1 16 TM F LT139BJ Wo-B All 17 TM LFLT139CJ Woo-B (OPTIIOONAL) 19 TM A11131 1E2 O Gli TB1 TBS AUX ALARM (OUT) 2 DEMAND DUPLEX CONTROL PANEL CAUTION: HANDLE WITH CARE Do NOT drop Do NOT impact Do NOT roll Do NOT wrap cable or chain around basin Compacted sub -base minimum 12" or 6" when used with concrete hold-down pad 30° maximum I t " Z 4 4 4 A.A.4 4 4 4 4 S 4F 4F 4F 4F 4F 4F 4F 4F 4F 4F 4F 4F 4F 4` . . . . . . . . . . . . . Lr Lr L. L. L. L. L. Lr Lr L. L. L. L. L. Li Adjacent structure, foundation, footing, or property line 111t11lI_ lIl_IlIl- \ 45° , minimum \ In the absence of building codes or regulations, \ maintain a minimum distance of 5 feet plus a slope of 45° from the bottom of the compacted sub -base to the bottom of the adjacent structure's foundation, footing, or property line. Pea Gravel Crushed Rock BACKFILL MATERIAL REQUIREMENTS 1 Lifting cable or chain Spreader bar Finish grade • Optional lifting lugs Slope and size of excavation as per OSHA and engineer's specification. In the absence of these, consider condition of soil, depth of excavation, and safety considerations. Basin anti -flotation flange Compacted sub -base and/or concrete slab as per engineer's specification. — 12" minimum backfill compacted to a minimum soil modulus of 700 lbs per sq ft Finish grade f r F P P F F F F F ° F 4,4,4,4,4,4,4,4,4,4,4,4,4,4, r r r r r r r r r r r r F 4 4 4 4 4 4 4 4 4 4 4 4 4 Fiberglass basin as required per engineer's specification Backfill material Concrete grout as required per engineer's specification NOTE: The intent of these installation instructions and illustrations is to ensure that damage or premature failure to the basin will not occur. These installation instructions and illustrations are NOT intended to preclude normal safety procedures which should be followed to prevent injury to personnel. SAFE INSTALLATION PROCEDURES SHALL BE ENTIRELY THE RESPONSIBILITY OF THE INSTALLER. FIBER GLASS WET WELL DETAIL D-103 NTS CR116 116 2 6118 CR116 CR118 1 118 6118 CR118 POWER RELAY M2 1-03,1-04 NC POKER RELAY 1-87,1-BB AUDIBLE ALARM PUMP 1 — 1 I -J PUMP 2 — 1 I -J 1-40 1-41 1 -42 1-43 1 -44 1-45 1 -46 1 -47 1 -48 1 -49 1-50 1-51 1 - 52 1-53 1 - 54 1-55 1 - 56 1 - 57 1-58 1 - 59 1-60 1-61 1-62 1-63 1-64 1-65 1-66 1-67 1-68 1-69 1-70 1-71 1-72 1-73 1-74 1-75 1-76 1-77 1-78 1-79 TORIVE 1-3 TO: 13.3-15.9 IN -LB TOME 4-21 TO: 5.3-7.1 IN -LB TB1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 NOTE: INFEED POWER P 120/208/240VAC PUMP n PUMP 1 I J PUMP 2 STOP FLT139 J F LT139A W - B I FLT139B J F LT139C W - o—° I J LEAD HIGH ALARM LAG (OPTIONAL) AUXILIARY ALARM (OUT) INFEED POWER C 120dAC CONTROL/ALARM CAUTION: THE USE OF A PRESSURE SITCH OR WIDE ANGLE FLOAT IN LIEU OF START AND STOP SWITCH NOT ALLOWED. NOTES: 1. FIELD WIRING IS SHOWN 2. TEMPERATURE RATING OF FIELD INSTALLED CONDUCTORS MUST BE AT LEAST 140° F. (60° C.). 3. FIELD WIRING WILL ACCEPT COPPER CONDUCTORS ONLY. 4. CONNECT GROUND LUG IN PANEL TO A SECURE EARTH GROUND. 5. THE USE OF SEPARATE POWER SOURCES FOR PUMP AND ALARM ARE RECOMMENDED. 6. OVERLOAD PROTECTION, MAIN DISCONNECT AND OVER CURRENT PROTECTION OF INCOMING FEEDER CIRCUIT PROVIDED BY OTHERS AND MUST BE SIZED ACCORDING TO THE PUMP/MOTOR MANUFACTURER SPECIFICATIONS. 1. NEW PANEL IS REQUIRED, USE PANEL BY LIBERTY MODEL AE24L=3 OR ENGINEER APPROVED EQUAL. ELECTRICAL SPECIFICATIONS 1. CONTROL PANEL(S) WILL BE APPROXIMATELY 10" X 10" X 6" HIGH AND A NEMA 4X, UL RATED ENCLOSURE. PANEL(S) SHALL BE SUPPLIED BY THE CONTRACTOR. 2. PANEL(S) SHALL BE MOUNTED, BY THE ELECTRICIAN WITHIN 10' OF THE TANK UNITS AND 48" — 60" OFF THE FINISHED GRADE TO THE BOTTOM OF THE ENCLOSURE. 3. THE ELECTRICIAN SHALL MAKE THE INTERNAL PANEL CONNECTIONS OF THE PUMP AND CONTROL CORDS. CONTROL PANELS WILL CONTAIN A WIRING SCHEMATIC IDENTIFYING ALL TERMINAL CONNECTIONS. THE SYSTEM INSTALLER WILL BUNDLE AND MARK EACH CORD WITH THE APPROPRIATE IDENTIFICATION AND SECURE IN THE ACCESS RISER AT THE PUMP POINT. 4. THE DUPLEX DEMAND DOSE CONTROL PANEL REQUIRES DEDICATED CIRCUITS OF 20 AMPS, 115 VOLTS, SINGLE PHASE SUPPLIED FOR THE PUMP. 5. THE CONTROL PANEL REQUIRES A DEDICATED CIRCUIT OF 15 AMPS, 115 VOLTS SUPPLIED FOR THE ALARM/CONTROL SIDE OF THE PANEL. 6. A MINIMUM CONDUIT SIZE OF 11 " SHALL BE FURNISHED AND INSTALLED BY THE ELECTRICIAN AS A CONNECTION BETWEEN THE CONTROL PANEL AND THEIR RESPECTIVE TERMINATION POINTS ON THE BUILDING. 7. ALL OPEN CONDUIT ENDS SHALL HAVE REMOVABLE CLAY TYPE DUCT SEAL EMBEDDED TO PREVENT GASES AND MOISTURE FROM ENTERING THE CONTROL PANEL. DO NOT USE PERMANENT SILICONE OR EXPANDABLE FOAM PRODUCTS. 8. ALL PUMP AND FLOAT CONTROL CORDS WILL BE SUPPLIED WITH EITHER 30' OR 50' LEADS. THIS WILL HELP KEEP SPLICES TO A MINIMUM AND SHOULD BE AVOIDED IF AT ALL POSSIBLE. IF A SPLICE MUST BE USED, IT MUST BE MADE ABOVE GRADE IN A PLASTIC NEMA 4X JUNCTION BOX. 9. ALARMS SHALL BE AUDIBLE AND VISUAL. PROVIDE OMNI BEACON WITH DIALER. 10. AUDIBLE/VISIBLE ALARMS SHALL BE EXTERNAL TO ANY STRUCTURE. 11. PROVIDE DISCONNECT PER N.C.B.C. 12. ALL ELECTRICAL INSTALLATION SHALL BE PER N.C.B.C. 13. PROVIDE MANUAL TRANSFER SWITCH AND PLUG FOR PORTABLE EMERGENCY GENERATOR. PROVIDE DISCONNECT PER NCBC AND NEC. 14. PANEL SHALL BE TIMED DOSE CONTROL PANEL BY SJE RHOMBUS OR ENGINEER APPROVED EQUAL. 15. PROVIDE METER BASE AND SERVICE TO PANEL PER N.E.C. MEET ALL FEDERAL, STATE AND LOCAL BUILDING CODES. D-103 NTS THESE RECORD DRAWINGS HAVE BEEN PREPARED BASED UPON INFORMATION FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, THE DESIGN PROFESSIONAL CANNOT ASSURE ITS ACCURACY, AND THUS IS NOT RESPONSIBLE FOR THE ACCURACY OF THIS RECORD DRAWING OR FOR ANY ERRORS OR OMMISSIONS WHICH MAY HAVE BEEN INCORPORATED INTO IT AS A RESULT. THOSE RELYING ON THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE. RECORD DRAWING J U LY 8, 2020 NOTES 1. SEE SHEETS C-101 AND D-101 FOR NOTES. REVISIONS NO. DATE DESCRIPTION PROJECT MANAGER: GSM PROJECT ENGINEER: JPH DRAWN BY: LHB CHECKED BY: GSM DATE: OCTOBER 7, 2019 %%%%%till• SEAL- • 17069 E • i170 LICENSE No. C-1039 MacCONN ELL & Associates, P. C. 501 CASCADE POINTE LANE, SUITE 103 CARY, NORTH CAROLINA 27513 P. O. BOX 129 MORRISVILLE, NORTH CAROLINA 27560 TEL: (919) 467-1239 FAX: (919) 319-6510 FIRST PENTECOSTAL CHURCH OF DURHAM SEWER CONNECTION DURHAM COUNTY, NC DETAILS - 3 OF 3 PROJECT NUMBER A63202.00 DRAWING NUMBER D-103 COPYRIGHT © 2019 A63202.00 — FIRST PENTECOSTAL CHURCH OF DURHAM — SEWER CONNECTION A63202.00 — FIRST PENTECOSTAL CHURCH OF DURHAM — SEWER CONNECTION