HomeMy WebLinkAbout20200895 Ver 1_Shoreline Stabilization_20200709a o aoof9r
State of North Carolina
DWR Department of Environment and Natural Resources
Division of Water Resources
Division of Water Resources 1SA NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization
FORM: SSGP 10-2023
Shoreline Stabilization Application Form
Three copies of the application (including attachments) and the application fee should be sent
to:
Division of Water Resources
401 & Buffer Permitting Unit
1617 Mail Service Center
Raleigh, NC 27699-1617
1. Applicant Information [15A NCAC 02H .0502(a)]
1. Owner Information
Name: Yvonne & Milford Stegall
Mailing Address: 7717 Lawyers Road
Charlotte, NC 28227
Telephone Number: Fax Number:
E-mail Address: ystegall860gmail.com
2. Agent/ Contact Person Information
A signed and dated copy of the Agent Authorization letter (a form can be downloaded here:
http://www.saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTH
ORIZATION FORM.pdf) must be attached if the Agent has signed this application form.
Name: N/A
Company Affiliation:
Mailing Address:
Telephone Number:
E-mail Address:
Person to receive the Certification Approval:
Fax Number:
II. Project Information [15A NCAC 02H .0502(a) & (b)1
1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with
respect to local landmarks such as towns, rivers, and roads.
2. Provide a detailed site plan showing property boundaries and proposed locations of
vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces,
FORM: SSGP 10-2013 Page 1 of 4
etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations,
and construction access corridors. !you may use the diagram provided at the end of this
application form.
3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale
of some sort- a yard stick, shovel handle, etc.)
4. Location of the property (where work is to be conducted)
County: Montgomery i Nearest Town: New London
Subdivision name or site address (include phase/lot number):
Directions to site - please include road names and numbers, landmarks, etc.:
NC Hwy 49 to Blaine Road (SR 1162). right on Uwharrie Point Pkwv, right on Badin shore
Circle, guardhouse at entry to Badin Shores Resort, get man to lot from attendant.
Latitude ft. dsdmardw.) 35.28.386 Longitude fd d id,.) 80.08.081
5. Describe the existing land use or condition of the site at the time of this application
(residential, undeveloped, etc.): developed lot in existing subdivision
6. Property size (acres): 0.10 acres
7. Lake/ river/ ocean adjacent to property: Badin Lake
8. Describe proposed work (include discussion as to how hardening of shoreline has been
avoided, or why it is necessary): To stabilize and eroding shoreline and protect it from
further erosion.
9. Will work be conducted from land? ® From water?
10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.)
below the normal pool take level/ Normal Water Level in square feet or acres:
1 90 Sq. Ft. _
11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining
walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in
square feet or acres: I 515 Sq. Ft.
12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and
50 feet landward to be impacted (number of trees, for instance): No trees will be
removed in order to complete the sItabilization orolect.
i
G - r�1-aoa.v
O er/Agent's Sig ature' l A NCXC O H .050 Date
Agent's signature Is valid only an authorizati
on letter from the owner is provided.
FORM: SSGP 10-2013 1 Page 2 of 3
Lake
Pond/Normal Water Level)
Full Pond/
Normal jte %W
Shoreline
r ti ari NINE rr•
i
SEE ATTACHED SITE PLAN AND DETAILS
I
Please approximately sketch the following information on this plan (provide dimensions for each
item, such as 1Oft x 100 ft)":
1. All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
4. Location of any proposed structures Such as buildings, retaining walls, docks, etc
S. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
6. Location of construction access cordoors
i
I
FORM: SSGP 10-2013 Page 3 of 3
NCDEQ 401 WATER QUALITY
SHORELINE IMPACT AREA CA
APPLICANT: Yvonne & Milford Stegall
Lot 143B, Badin Shores R,
STABILIZATION IMPACT AREA
The attached shoreline site plan shows 45' LF of proposed shoreline stabilization measures.
Detail X indicates a proposed shoreline
normal pool level and the estimated he
level.
Calculation i—Impact Area Below
Area of Impact = Shoreline
_ (45 LF) x (1') x
= 90 sq. ft.
e that is graded at 2:1 and reflects the estimated
of the subject shoreline above the normal pool
Pool Level (item 10 on NCDEQ Form)
x Depth* x Slope
*For this calculation, an average water depth of 1 ft. has been assumed. This will
produce a conservative overestimate of the stabilization impact area.
Calculation 2 — Impact Area Above the Normal Pool Level (Item 11 on NCDEQ Form)
i
Height of Bank Above Normal Pod Varies Across the Shoreline
I
Estimate 35 LF of Shoreline;= 3 ft. Above Normal Pool
Estimate 10 LF of Shoreiinei= 4 ft. Above Normal Pool
Area of Impact = Length x Height x Slope
=(35LFx3'x2)I+(10LFx4'x2)
= 210 sf + BO sf
= 290 sq. ft.
Impact From Construction Above Shoreline Stabilization - Assume 5 ft. Wide Zone
Area of Impact = 45 LF x
= 225 sq. ft.I
i
Total Area of impact Above Normal Pool Level = 515 sq. ft.
I
i
I
I
i
I
0L0
ETZOL
.4
i
i
i
VEGETATION AND EROSION
ONTROL FABRIC
EXISTING GRADE
3
CLASS 2 RIP RAP
I
EROSION CONTROL FAR-
2
—41
IC
1kt�
LAKE BOTTOM
TYPICAL CON'DMONS
36" TO 72"+
I
ERODED CUT
WAVE EXP03URE
III
FOR. YVONNE & 11I
FORD STEGAL
LOCAnON: LOT B143, BAD
BA[I
-IN SHORES RESORT
IN LAKE
RESERVOIR:
PROJECT, SHORELINE S7DIN,
ILIZATION PROGRAM
PHASE ITE
EVALUATION
YADKIN, INC. —
NORTH CAROLINA
ORAVANG lnE:
MODERATE
�
IP RAP STABILIZATION
DETAIL
3
t
Y
7 Radin Slwrc;
Rasnn @vnee f.Ksoal+ X { -
-
— a. _ x
F C
Q Not secure ; google,com,/maps/place/Badin+Shores+Resort+Owner+Association/@35.d98056,-80.1119523,13.39z/data=!dm5!3... O+
t't
L
re)
,1N
t==1
8aaln Lake Beaky
Il6s -1
nw
�bodln Shores Resort
-
GwnerAssociaticln
Whip-O-Will
Campground
Uwharrie Point
Membership Services
Mar data ZK- caned stales Terms s:na 1<xaceQ
soon rt i ._.