Loading...
HomeMy WebLinkAbout20200895 Ver 1_Shoreline Stabilization_20200709a o aoof9r State of North Carolina DWR Department of Environment and Natural Resources Division of Water Resources Division of Water Resources 1SA NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization FORM: SSGP 10-2023 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699-1617 1. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: Yvonne & Milford Stegall Mailing Address: 7717 Lawyers Road Charlotte, NC 28227 Telephone Number: Fax Number: E-mail Address: ystegall860gmail.com 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http://www.saw.usace.army.mil/Portals/59/docs/regulatory/regdocs/Permits/SAMPLE AGENT AUTH ORIZATION FORM.pdf) must be attached if the Agent has signed this application form. Name: N/A Company Affiliation: Mailing Address: Telephone Number: E-mail Address: Person to receive the Certification Approval: Fax Number: II. Project Information [15A NCAC 02H .0502(a) & (b)1 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, FORM: SSGP 10-2013 Page 1 of 4 etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. !you may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Montgomery i Nearest Town: New London Subdivision name or site address (include phase/lot number): Directions to site - please include road names and numbers, landmarks, etc.: NC Hwy 49 to Blaine Road (SR 1162). right on Uwharrie Point Pkwv, right on Badin shore Circle, guardhouse at entry to Badin Shores Resort, get man to lot from attendant. Latitude ft. dsdmardw.) 35.28.386 Longitude fd d id,.) 80.08.081 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): developed lot in existing subdivision 6. Property size (acres): 0.10 acres 7. Lake/ river/ ocean adjacent to property: Badin Lake 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): To stabilize and eroding shoreline and protect it from further erosion. 9. Will work be conducted from land? ® From water? 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool take level/ Normal Water Level in square feet or acres: 1 90 Sq. Ft. _ 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: I 515 Sq. Ft. 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): No trees will be removed in order to complete the sItabilization orolect. i G - r�1-aoa.v O er/Agent's Sig ature' l A NCXC O H .050 Date Agent's signature Is valid only an authorizati on letter from the owner is provided. FORM: SSGP 10-2013 1 Page 2 of 3 Lake Pond/Normal Water Level) Full Pond/ Normal jte %W Shoreline r ti ari NINE rr• i SEE ATTACHED SITE PLAN AND DETAILS I Please approximately sketch the following information on this plan (provide dimensions for each item, such as 1Oft x 100 ft)": 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures Such as buildings, retaining walls, docks, etc S. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access cordoors i I FORM: SSGP 10-2013 Page 3 of 3 NCDEQ 401 WATER QUALITY SHORELINE IMPACT AREA CA APPLICANT: Yvonne & Milford Stegall Lot 143B, Badin Shores R, STABILIZATION IMPACT AREA The attached shoreline site plan shows 45' LF of proposed shoreline stabilization measures. Detail X indicates a proposed shoreline normal pool level and the estimated he level. Calculation i—Impact Area Below Area of Impact = Shoreline _ (45 LF) x (1') x = 90 sq. ft. e that is graded at 2:1 and reflects the estimated of the subject shoreline above the normal pool Pool Level (item 10 on NCDEQ Form) x Depth* x Slope *For this calculation, an average water depth of 1 ft. has been assumed. This will produce a conservative overestimate of the stabilization impact area. Calculation 2 — Impact Area Above the Normal Pool Level (Item 11 on NCDEQ Form) i Height of Bank Above Normal Pod Varies Across the Shoreline I Estimate 35 LF of Shoreline;= 3 ft. Above Normal Pool Estimate 10 LF of Shoreiinei= 4 ft. Above Normal Pool Area of Impact = Length x Height x Slope =(35LFx3'x2)I+(10LFx4'x2) = 210 sf + BO sf = 290 sq. ft. Impact From Construction Above Shoreline Stabilization - Assume 5 ft. Wide Zone Area of Impact = 45 LF x = 225 sq. ft.I i Total Area of impact Above Normal Pool Level = 515 sq. ft. I i I I i I 0L0 ETZOL .4 i i i VEGETATION AND EROSION ONTROL FABRIC EXISTING GRADE 3 CLASS 2 RIP RAP I EROSION CONTROL FAR- 2 —41 IC 1kt� LAKE BOTTOM TYPICAL CON'DMONS 36" TO 72"+ I ERODED CUT WAVE EXP03URE III FOR. YVONNE & 11I FORD STEGAL LOCAnON: LOT B143, BAD BA[I -IN SHORES RESORT IN LAKE RESERVOIR: PROJECT, SHORELINE S7DIN, ILIZATION PROGRAM PHASE ITE EVALUATION YADKIN, INC. — NORTH CAROLINA ORAVANG lnE: MODERATE � IP RAP STABILIZATION DETAIL 3 t Y 7 Radin Slwrc; Rasnn @vnee f.Ksoal+ X { - - — a. _ x F C Q Not secure ; google,com,/maps/place/Badin+Shores+Resort+Owner+Association/@35.d98056,-80.1119523,13.39z/data=!dm5!3... O+ t't L re) ,1N t==1 8aaln Lake Beaky Il6s -1 nw �bodln Shores Resort - GwnerAssociaticln Whip-O-Will Campground Uwharrie Point Membership Services Mar data ZK- caned stales Terms s:na 1<xaceQ soon rt i ._.