HomeMy WebLinkAboutWQCS00055_NOV-2020-DV-0270 Response_20200630City of Henderson
Public Works Department
x" 4 Post Office Box 1434.900 S. Beckford Drive
v Henderson, NC 27536-1434
._ego Phone: (252) 431-6030 / Fax: (252) 431-0124
June 30, 2020
Mr. Scott Vinson, Regional Supervisor
Water Quality Regional Operations Section
Raleigh Regional Office
Division of Water Resources, NCDEQ
1628 Mail Service Center
Raleigh, NC 27699-1628
Re: Response to Notice of Violation & Intent to Issue Civil Penalty
Tracking No. — NOV-2020-DV-0270
Sanitary Sewer Overflows — May 2020
Henderson Collection System
Permit No. — WQCS00055
Dear Mr. Vinson:
NC Dept of Environmental Quality
JUL — 7 2020
Ralel ,I, Regional Office
I am writing in response to the above mentioned violation that we received on June 18, 2020. Cause and
actions taken for each incident are listed below.
Incident # 202001511, # 202001512, #202001513
The overflows in these incidents were all due to inflow and infiltration during extended periods of heavy
rainfall. Once the rain event ended, the overflows subsided. Following the overflows, we cleaned and
placed lime as needed around the manholes. Since January, we have smoke tested approximately 8,067
feet of sewer and inspected approximately 7,365 feet of sewer with use of CCTV equipment. We have
also cleaned approximately 55,025 feet of sewer with the use of a combo truck, treated approximately
15,386 feet of sewer for roots and have made several repairs on sewer mains and services. We know of
several issues that are likely contributing to 1/1 that we have scheduled to repair in the coming weeks.
We are continuing to search and repair sources of 1/I.
Incident # 202001518
The overflow in this event was also due to inflow and infiltration during extended periods of heavy
rainfall. once the rain event ended, the overflow subsided. Following the overflow we cleaned debris
and placed lime in the area as needed. In the last year we have scoured the force mains from this station
and had Charles Underwood work on the pumps with hopes of increasing the pumps flow rates.
Unfortunately, we have not had any significant increases from this work. Moving forward, Henderson
City Council has approved a CIP project for an EQ tank at the Sandy Creek Pump Station for fiscal year
2020-2021. This project is contingent on council allocating the funds for the project. The EQ tank will
increase capacity at the pump station and help prevent spills.
Thank you very much for the opportunity to respond. We take our responsibility to maintain compliance
for our collection system very seriously. I trust that you find the City's actions for compliance are
satisfactory. Please feel free to contact our staff or myself should you need any further information.
Sincerely,
Lee Owen
Assistant Public Works Director
Attachments: Work Order Detail —2020—CCTV Inspections
Work Order Detail — 2020 — Smoke Testing
Work Order Detail — 2020 — Sewer Jetting
Work Order Detail — 2020 — Sewer Repairs
Duke's Root Control Invoice
CC: Edward Terrell Blackmon, City Manager
Andy Perkinson, Public Works Director
Joey Long, Distribution & Collection System Supervisor— Collection System ORC
Christy Lipscomb, KLRWP Director/ORC, HWRF ORC
Teddy Felts, Chief Plant Operator
File
Work Order Detail
100000135
Owner Lee Owen
Status In Progress
Task Count 34
Progress 100 00%
2020 - CCTV Inspections
Labor $2,820.03
Equipment $7,375.00
Material $0.00
Other $0.00
Total $10,195.03
InformationTask
Task ID
Activity
Asset
Priority
Status
Total Cost
T013086
TV Inspection
Sewer Main SM01840
None
Completed
345.00
T013088
TV Inspection
Sewer Main SM01879
None
Completed
345.00
T013119
TV Inspection
Sewer Main SM00528
None
Completed
374.00
T013126
TV Inspection
Sewer Main SM01539
None
Completed
115.59
T013127
TV Inspection
Sewer Main SM01534
None
Completed
113.85
T013128
TV Inspection
Sewer Main SM01540
None
Completed
115.59
T013130
TV Inspection
Sewer Main SM01533
None
Completed
172.50
T013131
TV Inspection
Sewer Main SM00934
None
Completed
374.00
T013134
TV Inspection
Sewer Main SM02142
None
Completed
345.00
T013135
TV Inspection
Sewer Main SM02042
None
Completed
345.00
T013136
TV Inspection
Sewer Main SM01463
None
Completed
345.00
T013142
TV Inspection
Sewer Main SM01463
None
Completed
345.00
T013144
TV Inspection
Sewer Main SM02043
None
Completed
138.00
6/30/2020
%--iw ,=Fdttd by Cartegraph
Work Order Detail
100000135 2020 - CCTV Inspections
informationTask
Task ID
Activity
Asset
Priority
Status
Total Cost
T013145
TV Inspection
Sewer Main SM02039
None
Completed
138.00
T013146
TV Inspection
Sewer Main SM02038
None
Completed
138.00
T013147
TV Inspection
Sewer Main SM02035
None
Completed
138.00
T013148
TV Inspection
Sewer Main SM02041
None
Completed
13800
T013149
TV Inspection
Sewer Main SM00528
None
Completed
345.00
T013151
TV Inspection
Sewer Main SM01763
None
Completed
34500
T013153
TV Inspection
Sewer Main SM01504
None
Completed
34500
T013156
TV Inspection
Sewer Main SM03311
None
Completed
34500
T013157
TV Inspection
Sewer Main SM01561
None
Completed
34500
T013165
TV Inspection
Sewer Main SM00350
None
Completed
34500
T013168
TV Inspection
Sewer Main SM00349
None
Completed
34500
T013169
TV Inspection
Sewer Main SM01832
None
Completed
477.00
T013170
TV Inspection
Sewer Main SM01059
None
Completed
34500
T013176
TV Inspection
Sewer Main SM01763
None
Completed
51750
T013177
TV Inspection
Sewer Main SM01746
None
Completed
34500
T013184
TV inspection
Sewer Main SM00059
None
Completed
34500
T013185
TV Inspection
Sewer Main SM01680
None
Completed
345.00
T013189
TV Inspection
Sewer Main SM00648
None
Completed
345.00
T013192
TV Inspection
Sewer Main SM01521
None
Completed
34500
T013194
TV Inspection
Sewer Main SM01680
None
Completed
34500
T013196
TV Inspection
Sewer Main SM00345
None
Completed
345.00
6130/2020 Generated by Cartegraph Page 2
Work Order Detail
100000132
Owner
Lee Owen
Status
In Progress
Task Count
28
Progress
100.00%
2020 - Smoke Testing
Labor
$913 04
Equipment
$700 00
Material
$106.86
Other
$0.00
Total
$1,719.90
T012996
Smoke Testing
Sewer Main SM02409
None
Completed
8250
T012997
Smoke Testing
Sewer Main SM01873
None
Completed
82.50
T012998
Smoke Testing
Sewer Main SM02665
None
Completed
5445
T012999
Smoke Testing
Sewer Main SM01808
None
Completed
5529
T013000
Smoke Testing
Sewer Main SM02663
None
Completed
5529
T013001
Smoke Testing
Sewer Main SM02142
None
Completed
64.00
T013002
Smoke Testing
Sewer Main SM02141
None
Completed
64.00
T013003
Smoke Testing
Sewer Main SM00439
None
Completed
4125
T013004
Smoke Testing
Sewer Main SM01559
None
Completed
41.25
T013005
Smoke Testing
Sewer Main SM01556
None
Completed
41.25
T013006
Smoke Testing
Sewer Main SM01557
None
Completed
41.25
T013007
Smoke Testing
Sewer Main SM01558
None
Completed
4125
T013008
Smoke Testing
Sewer Main SM01653
None
Completed
4125
613urzuzu
venerated by Cartegraph
Page 1
Work Order Detail
100000132 2020 - Smoke Testing
Task Information
Task ■
Activity
Asset
Priority
Status
Total Cost
T013009
Smoke Testing
Sewer Main SM01745
None
Completed
36.30
T013010
Smoke Testing
Sewer Main SM01763
None
Completed
36.30
T013011
Smoke Testing
Sewer Main SM01746
None
Completed
37.12
T013012
Smoke Testing
Sewer Main SM01764
None
Completed
37.12
T013013
Smoke Testing
Sewer Main SM01767
None
Completed
36.30
T013014
Smoke Testing
Sewer Main SM01766
None
Completed
36.30
T013015
Smoke Testing
Sewer Main SM01761
None
Completed
36.30
T013016
Smoke Testing
Sewer Main SM01762
None
Completed
37.12
T013017
Smoke Testing
Sewer Main SM01765
None
Completed
37.12
T013018
Smoke Testing
Sewer Main SM01812
None
Completed
5529
T013019
Smoke Testing
Sewer Main SM01815
None
Completed
55.29
T013020
Smoke Testing
Sewer Main SM01817
None
Completed
54.45
T013041
Smoke Testing
Sewer Main SM01559
None
Completed
118.12
T013042
Smoke Testing
Sewer Main SM01556
None
Completed
200.62
T013150
Smoke Testing
Sewer Main SM01763
None
Completed
200.62
6/30/2020 Generated by Cartegraph Page 2
Work Order Detail
100000133
Owner Lee Owen
Status In Progress
Task Count 141
Progress 100 00%
Task Information #
T010144
T010159
T010164
T010772
T011324
T012976
T013023
T013024
T013025
T013026
T013027
T013028
T013029
6/30/2020
JettinglRodding
JettinglRodding
Jetting/Rodding
JettinglRodding
JettinglRodding
Jetiing/Rodding
JettinglRodding
JettinglRodding
JettingiRodding
JettinglRodding
JettinglRodding
JettinglRodding
Jetting/Rodding
2020 - Sewer Jetting
6. "
Sewer Lateral 62
None
Sewer lateral 60
None
Sewer Main SM00629
None
Sewer Main SM03348
None
Non -Asset
None
Sewer Main SM00842
None
Sewer Main SM00210
None
Sewer Main SM01121
None
Sewer Main SM00210
None
Sewer Main SM02199
None
Sewer Main SM02198
None
Sewer Main SM00343
None
Sewer Main SM00342
None
vq lGl Otud by Cartegrapn
Labor
$10,130.24
Equipment
$16,350,00
Material
$614,01
Other
$0.00
Total
$27.094.25
Completed
296.25
Completed
272.50
Completed
499.75
Completed
55650
Completed
19750
Completed
391,00
Completed
122.50
Completed
122.50
Completed
137,00
Completed
fib 50
Completed
68.50
Completed
68.50
Completed
6850
Page 1
Work Order Detail
100000133 2020 - Sewer Jetting
www%=-w--
i
Activity
Asset
Priority
Statusl
T013030
JettinglRodding
Sewer Main SM02237
None
Completed
137.00
T013031
JettinglRodding
Sewer Main SM02642
None
Completed
137.00
T013032
JettinglRodding
Sewer Main SM00529
None
Completed
68.50
T013033
JettinglRodding
Sewer Main SM00528
None
Completed
68.50
T013034
JettinglRodding
Sewer Main SM00528
None
Completed
68.50
T013035
JettinglRodding
Sewer Main SM00529
None
Completed
68.50
T013036
JettinglRodding
Sewer Main SM01121
None
Completed
13700
T013037
JettinglRodding
Sewer Main SM00934
None
Completed
45.19
T013038
JettinglRodding
Sewer Main SM03530
None
Completed
4519
T013039
JettinglRodding
Sewer Main SM03529
None
Completed
4658
T013040
Jetting/Radding
Sewer Main SM02142
None
Completed
13700
T013043
JettinglRodding
Sewer Main SM01879
None
Completed
275.00
TO13044
JettinglRodding
Sewer Main SM02237
None
Completed
251.00
T013045
JettinglRodding
Sewer Main SM01024
None
Completed
61.25
T013046
JettinglRodding
Sewer Main SM01023
None
Completed
61.25
T013047
JettinglRodding
Sewer Main SM01840
None
Completed
25300
T013048
JettinglRodding
Sewer Main SM02673
None
Completed
255.00
T013049
JettinglRodding
Sewer Main SM01463
None
Completed
183.75
T013050
JettinglRodding
Sewer Main SM01464
None
Completed
183.75
T013051
JettinglRodding
Sewer Main SM01463
None
Completed
683.00
T013052
JettinglRodding
Sewer Main SM01858
None
Completed
253.00
6/30/2020 ueneraiea by Cartegraph page 2
Work Order Detail
100000133
2020 - Sewer Jetting
Task
Information
Task ID
Activity
Asset
Priority
Status
Total
T013053
JettinglRodding
Sewer Main SM01159
None
Completed
251.00
T013054
JettinglRodding
Sewer Main SM01463
None
Completed
12250
T013055
JettinglRodding
Sewer Main SM02236
None
Completed
255.00
T013056
JettinglRodding
Sewer Main SM02238
None
Completed
255.00
T013057
JettinglRodding
Sewer Main SM03350
None
Completed
98.00
T013058
JettinglRodding
Sewer Main SM03348
None
Completed
98.00
T013059
JettinglRodding
Sewer Main SM03349
None
Completed
122.50
T013060
JettinglRodding
Sewer Main SM03352
None
Completed
98.00
T013061
JettinglRodding
Sewer Main SM03353
None
Completed
98.00
T013062
JettinglRodding
Sewer Main SM01488
None
Completed
255.00
T013053
JettinglRodding
Sewer Main SM01497
None
Completed
251.00
T013064
JettinglRodding
Sewer Main SM00502
None
Completed
251.00
T013065
JettinglRodding
Sewer Main SM01139
None
Completed
12250
T013066
JettinglRodding
Sewer Main SM01136
None
Completed
122.50
T013067
JettinglRodding
Sewer Main SM01140
None
Completed
122.50
T013068
JettinglRodding
Sewer Main SM01133
None
Completed
12250
T013069
JettinglRodding
Sewer Main SM01139
None
Completed
13965
T013070
JettinglRodding
Sewer Main SM01136
None
Completed
140.87
T013071
JettinglRodding
Sewer Main SM01140
None
Completed
13965
T013072
JettinglRodding
Sewer Main SM01133
None
Completed
139.65
T013073
JettinglRodding
Sewer Main SM03714
None
Completed
139.65
6/30/2020 utimarated by Cartegraph
Work Order Detail
100000133 2020 - Sewer ,letting
• .
ow
__
Task ID
Activity
Asset
Priority
Status
Total I
T013074
JettinglRodding
Sewer Main SM01135
None
Completed
140.87
T013075
Jetting/Rodding
Sewer Main SM01159
None
Completed
139.65
T013075
JettinglRodding
Sewer Main SM00262
None
Completed
196.00
T013077
JettinglRodding
Sewer Main SM00758
None
Completed
196.00
T013078
JettinglRodding
Sewer Main SM00259
None
Completed
196.00
TO13079
JettinglRodding
Sewer Main SM00033
None
Completed
196.00
T013080
JettinglRodding
Sewer Main SM00034
None
Completed
196.00
T013081
JettinglRodding
Sewer Main SM00033
None
Completed
12250
T013082
JettinglRodding
Sewer Main SM00034
None
Completed
12250
T013083
JettinglRodding
Sewer Main SM02193
None
Completed
12250
T013084
JettinglRodding
Sewer Main SM02172
None
Completed
122.50
T013085
JettinglRodding
Sewer Main SM02814
None
Completed
122.50
T013087
JettinglRodding
Sewer Main SM00528
None
Completed
162.91
T013089
JettinglRodding
Sewer Main SM01035
None
Completed
16291
T013090
Jetting/Rodding
Sewer Main SM02407
None
Completed
122.50
T013091
JettinglRodding
Sewer Main SM02408
None
Completed
122.50
T013092
JettinglRodding
Sewer Main SM01030
None
Completed
16291
T013093
JettinglRodding
Sewer Main SM01033
None
Completed
16415
T013094
JettinglRodding
Sewer Main SM01034
None
Completed
164.15
T013095
JettinglRodding
Sewer Main SM01494
None
Completed
162.91
TO13096
Jetting/Rodding
Sewer Main SM01871
None
Completed
109.01
6/30/2020 Generated by Cadegraph Page 4
Work Order Detail
100000133 2020 - Sewer Jetting
Task
Information
Task ID
Activity
Asset
Priority
Status
Total Cost
T013097
Jetting/Rodding
Sewer Main SM01873
None
Completed
109.01
T013098
Jetting/Rodding
Sewer Main SM01872
None
Completed
107.80
T013099
Jetting/Rodding
Sewer Main SM01870
None
Completed
10901
T013100
Jetting/Rodding
Sewer Main SM01493
None
Completed
10901
T013101
Jetting/Rodding
Sewer Main SM01578
None
Completed
109.01
T013102
Jetting/Rodding
Sewer Main SM01575
None
Completed
109.01
TO13103
JettingJRodding
Sewer Main SM01494
None
Completed
109.01
T013104
Jetting/Rodding
Sewer Main SM01020
None
Completed
109.01
T013105
Jetting/Rodding
Sewer Main SM00934
None
Completed
260.00
T013105
Jetting/Rodding
Sewer Main SM03530
None
Completed
260.00
TO13107
Jetting/Rodding
Sewer Main SM03529
None
Completed
275.00
T013108
Jetting/Rodding
Sewer Main SM01745
None
Completed
122.50
T013109
JettinglRodding
Sewer Main SM01763
None
Completed
12250
T013110
Jetling/Rodding
Sewer Main SM01746
None
Completed
25250
T013111
Jetting/Rodding
Sewer Main SM01767
None
Completed
25250
T013112
Jetting/Rodding
Sewer Main SM01766
None
Completed
252.50
T013113
Jetting/Rodding
Sewer Main SM01762
None
Completed
25250
T013114
Jetting/Rodding
Sewer Main SM00455
None
Completed
174.15
T013115
Jetting/Rodding
Sewer Main SM02672
None
Completed
17291
T013116
Jetting/Rodding
Sewer Main SM00457
None
Completed
172,91
T013117
Jelling/Rodding
Sewer Main SM01869
None
Completed
190.75
6/30/2020 Gene atcd by Cartegraph Page 5
Work Order Detail
100000133 2020 - Sewer Jetting
Task Irifformation
Task ID
Activity
Asset
Priority
Status
Total Cost
T013118
JettinglRodding
Sewer Main SM01868
None
Completed
190.75
T013120
JettinglRodding
Sewer Main SM01537
None
Completed
124.50
T013121
JettinglRodding
Sewer Main SM01536
None
Completed
124.50
T013123
JettinglRodding
Sewer Main SM01539
None
Completed
127.17
T013124
JettinglRodding
Sewer Main SM01534
None
Completed
127.17
T013126
JettinglRodding
Sewer Main SM01540
None
Completed
127.17
T013129
JettinglRodding
Sewer Main SM01533
None
Completed
12850
T013133
JettinglRodding
Sewer Main SM02042
None
Completed
125.50
T013137
JettinglRodding
Sewer Main SM02043
None
Completed
101.20
T013138
JettinglRodding
Sewer Main SM02039
None
Completed
101.20
T013139
JettinglRodding
Sewer Main SM02038
None
Completed
101.20
T013140
JettinglRodding
Sewer Main SM02041
None
Completed
101.20
T013141
Jelling/Rodding
Sewer Main SM02035
None
Completed
101.20
T013152
JettinglRodding
Sewer Main SM00331
None
Completed
261.00
T013154
JettinglRodding
Sewer Main SM01504
None
Completed
249.00
T013155
JettinglRodding
Sewer Main SM03311
None
Completed
248.00
T013158
JettinglRodding
Sewer Main SM01561
None
Completed
249.00
T013159
JettinglRodding
Sewer Main SM03732
None
Completed
249.00
T013160
JettinglRodding
Sewer Main SM01832
None
Completed
377.50
TO13161
JettinglRodding
Sewer Main SM01059
None
Completed
253.00
TO13162
JettinglRodding
Sewer Main SM03112
None
Completed
249.00
6/30/2020 Generated by Cartegraph Page 6
I
Work Order Detail
100000133 2020 - Sewer Jetting
InformationTask
Task ID
Activity
Asset
Priority
Status
Total Cost
T013163
JettinglRodding
Sewer Main SM00348
None
Completed
189.75
T013164
JeRinglRodding
Sewer Main SM00347
None
Completed
18975
T013165
JettinglRodding
Sewer Main SM00350
None
Completed
520.00
TO13167
JettinglRodding
Sewer Main SM00349
None
Completed
263.00
T013171
JettinglRodding
Sewer Main SM01767
None
Completed
251.00
T013172
Jetting/Rodding
Sewer Main SM01766
None
Completed
37550
T013173
JettingJRodding
Sewer Main SM01762
None
Completed
25100
T013174
JetlinglRadding
Sewer Main SM01746
None
Completed
249.00
T013175
JettinglRodding
Sewer Main SM01763
None
Completed
385.50
T013178
JettinglRodding
Sewer Main SM01746
None
Completed
37360
T013179
JettinglRodding
Sewer Main SM00360
None
Completed
12650
T013180
JettinglRodding
Sewer Main SM00257
None
Completed
275.00
T013181
JettinglRodding
Sewer Main SM01521
None
Completed
25300
T013182
JettinglRadding
Sewer Main SM00049
None
Completed
249.00
T013183
JetlinglRodding
Sewer Main SM00059
None
Completed
253.00
T013186
JettinglRodding
Sewer Main SM01680
None
Completed
514.00
T013187
JellinglRodding
Sewer Main SM00103
None
Completed
28400
T013188
Jelling/Rodding
Sewer Main SM00648
None
Completed
249.00
T013191
JettinglRodding
Sewer Main SM01521
None
Completed
251.00
T013193
Jelling/Rodding
Sewer Main SM01680
None
Completed
51600
T013195
JetlinglRodding
Sewer Main SM00345
None
Completed
385.50
6130/2020
ueneraied by Cartegraph
Page 7
Work Order Detail
100000133
2020 - Sewer Jetting
Task ID Activity Asset Priority Status Total Cost
T013197 JettinglRodding Sewer Main SM00345 None Completed 251.00
T013198 Jetling/Rodding Sewer Main SM00345 None Completed 251,00
6/3012020 Generated by Cartegraph Page 8
Work order Detail
100000131
Owner Lee Owen
Status In Progress
Task Count 17
Progress 100 00%
2020 - Sewer Repairs
Labor $2,177.65
Equipment
$3,092.50
Material
$1,386.20
Other
$568.00
Total $7,224.35
Task Information
Task ID
Activity
Asset
Priority
Status
Total Cost
T009991
Repair
Sewer Manhole MH00744
None
Completed
304700
T010163
Repair
Non -Asset
None
Completed
19908
T010899
Repair
Non -Ansel
None
Completed
1972.44
T011524
Repair
Non -Asset
None
Completed
725.98
T012983
Repair
Non -Asset
None
Completed
9845
T012984
Repair
Non -Asset
None
Completed
98.45
T012985
Repair
Non -Asset
None
Completed
98.45
T012986
Repair
Non -Asset
None
Completed
98.45
T012987
Repair
Non -Asset
None
Completed
9845
T012988
Repair
Non -Asset
None
Completed
98.45
T012989
Repair
Non -Asset
None
Completed
98.45
T012990
Repair
Non -Asset
None
Completed
98.45
T012991
Repair
Non -Ansel
None
Completed
9845
6/30/2020
generated by Cartegraph
Page 1
Work Order Detail
100000131 2020 - Sewer Repairs
Task
• rmation
F
Task ID
Activity
Asset
Priority
Status
Total Cost
T012992
Repair
Non -Asset
None
Completed
98.45
T012993
Repair
Non -Asset
None
Completed
98.45
T012994
Repair
Non -Asset
None
Completed
98.45
T012995
Repair
Non -Asset
None
Completed
98.45
6/30/2020 Generated by Carlegraph Page 2
DUKE'S
Root Control, Inc.
1020 Hiavvaft Blvd, West
Syracuse, NY 13204.1131
(900) 447.6687 4315) 475.4203 (FAX(
ACCOMS PAYABLE
SOLD CITY OF HENDERSON
To P.O. BOX 1434
IMHOERSCN, NC 21536
INVOICE
No. 17201
Auth by ANDY PERKINSON
Drpt SEWER I"AINTENANCE
Job MFi a
Cnsi
my sZe Date
Cwtorar aO f
Abip vi^
20-0 7
I12266
4/30/2020
N/A
N/A
401
2931.100
MIt:T
6' PIPE SEWER ROOT CONTROL
1.59
40.97
13,925.00
FEET
B' PIPE SETTER ROOT CONTROL
1.59
22,140.75
936.00
FEET
10' PIPE SEWER PXW CONTROL
1.76
1,647.36
242.00
MET
12' PIPE SEWER ROOT CONTROL
1.92
464.64
Federal Tax Number: 75.3026901
NET INVOICE
24, 702.72
FREIGHT
0.00
TERMS NET 30 DAYS
SALES TAX
0.00
INVOICES NOT PAID WITHIN 30 DAYS ARE SUBJECT TO A SERVICE
TOTAL
24, 702.72
CHARGE OF 1 1/2% PER MONTH. WHICH IS AN ANNUAL RATE OF 18%