HomeMy WebLinkAboutNC0003719_Compliance Evaluation Inspection_20200702United States Environmental Protection Agency
Form Approved.
EPA Washington, D.C. 20460
OMB No. 2040-0057
Water Compliance Inspection Report
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 IN 1 2 u 3 I NC0003719 I11 121 20/06/24 I17 18I � I 19 I s I 201 I
211IIIII 111111III II III III1 I I IIIII IIIIIIIII II r6
Inspection
Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---------------------- Reserved -------------------
67
I 72 I ni I 71 I 74 79 I I I I I I I80
70I I 71 I LL -1 I I
LJ
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
Entry Time/Date
Permit Effective Date
POTW name and NPDES permit Number)
09:OOAM 20/06/24
18/08/01
Cedar Creek Site
3216 Cedar Creek Rd
Exit Time/Date
Permit Expiration Date
Fayetteville NC 28301
01:OOPM 20/06/24
22/10/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
Other Facility Data
Conrad Adair Lyle/ORC/910-433-8224/
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Elizabeth M Wike,425 Wayne Dr Wilmington NC 28403//910-512-4883/
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit 0 Flow Measurement Operations & Maintenar Records/Reports
Self -Monitoring Progran 0 Sludge Handling Dispo: Facility Site Review Effluent/Receiving Wate
Laboratory 0 Storm Water
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Hughie White DocuSigned by: DWR/FRO WQ/910-433-3300 Ext.708/
s+�41 r. Z(IUr. 7/2/2020
49EO6C80007E432...
Signature of Managemt q A Reviewer Agency/Office/Phone and Fax Numbers Date
igned
cu y:
Mark BrantleyFK"R/FRO WQ/910-433-3300 Ext.727/ 7/7/2020
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#
NPDES yr/mo/day Inspection Type
NC0003719 I11 12I 20/06/24 117 18 i c i
(Cont.)
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Records and log books were very well organized and maintained. A copy of the current NPDES permit
was on -site and available for review. Calibration records appeared to be properly documented. Afield
parameter checklist, for field parameter certification, was completed during this inspection. Laboratory
data was reviewed and all data appeared to be correct, as reported on the DMR's. All treatment units
appeared to be in good working order and the facility appeared to be operated satisfactorily. The
effluent was very clear at the time of this inspection.
Page#
Permit: NC0003719
Inspection Date: 06/24/2020
Operations & Maintenance
Is the plant generally clean with acceptable housekeeping?
Owner -Facility: Cedar Creek Site
Inspection Type: Compliance Evaluation
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
Comment:
Permit
(If the present permit expires in 6 months or less). Has the permittee submitted a new
application?
Is the facility as described in the permit?
# Are there any special conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
Comment:
Record Keeping
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain -of -custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operatc
on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility classification
Is a copy of the current NPDES permit available on site?
Yes
No
NA
NE
❑
❑
❑
❑
❑
❑
Yes No NA NE
❑ ❑ ■ ❑
■ ❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
■ ❑ ❑ ❑
Yes No NA NE
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ■ ❑
■ ❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
Page# 3
Permit: NC0003719 Owner -Facility: Cedar Creek Site
Inspection Date: 06/24/2020 Inspection Type: Compliance Evaluation
Record Keeping Yes No NA NE
Facility has copy of previous year's Annual Report on file for review? ❑ ❑ 0 ❑
Comment:
Effluent Pipe
Yes
No
NA
NE
Is right of way to the outfall properly maintained?
0
❑
❑
❑
Are the receiving water free of foam other than trace amounts and other debris?
0
❑
❑
❑
If effluent (diffuser pipes are required) are they operating properly?
❑
❑
0
❑
Comment:
Flow Measurement - Effluent
Yes
No
NA
NE
# Is flow meter used for reporting?
0
❑
❑
❑
Is flow meter calibrated annually?
0
❑
❑
❑
Is the flow meter operational?
0
❑
❑
❑
(If units are separated) Does the chart recorder match the flow meter?
❑
❑
❑
Comment:
Secondary Clarifier
Yes
No
NA
NE
Is the clarifier free of black and odorous wastewater?
0
❑
❑
❑
Is the site free of excessive buildup of solids in center well of circular clarifier?
0
❑
❑
❑
Are weirs level?
0
❑
❑
❑
Is the site free of weir blockage?
0
❑
❑
❑
Is the site free of evidence of short-circuiting?
0
❑
❑
❑
Is scum removal adequate?
0
❑
❑
❑
Is the site free of excessive floating sludge?
0
❑
❑
❑
Is the drive unit operational?
0
❑
❑
❑
Is the return rate acceptable (low turbulence)?
0
❑
❑
❑
Is the overflow clear of excessive solids/pin floc?
0
❑
❑
❑
Is the sludge blanket level acceptable? (Approximately'/ of the sidewall depth)
0
❑
❑
❑
Comment:
Disinfection -Liquid
Yes
No
NA
NE
Is there adequate reserve supply of disinfectant?
0
❑
❑
❑
(Sodium Hypochlorite) Is pump feed system operational?
0
❑
❑
❑
Page# 4
Permit: NC0003719 Owner -Facility: Cedar Creek Site
Inspection Date: 06/24/2020 Inspection Type: Compliance Evaluation
Disinfection -Liquid
Yes
No
NA
NE
Is bulk storage tank containment area adequate? (free of leaks/open drains)
0
❑
❑
❑
Is the level of chlorine residual acceptable?
0
❑
❑
❑
Is the contact chamber free of growth, or sludge buildup?
0
❑
❑
❑
Is there chlorine residual prior to de -chlorination?
❑
❑
0
❑
Comment: Chlorine is added before wastewater enters the secondary clarifier. Due to the long
detention time in the clarifier and contact chamber, dechlorination is not required prior to
discharge.
Pumps-RAS-WAS
Are pumps in place?
Are pumps operational?
Are there adequate spare parts and supplies on site?
Comment:
Aerobic Digester
Is the capacity adequate?
Is the mixing adequate?
Is the site free of excessive foaming in the tank?
# Is the odor acceptable?
# Is tankage available for properly waste sludge?
Comment:
Chemical Feed
Is containment adequate?
Is storage adequate?
Are backup pumps available?
Is the site free of excessive leaking?
Comment:
Drying Beds
Is there adequate drying bed space?
Is the sludge distribution on drying beds appropriate?
Are the drying beds free of vegetation?
# Is the site free of dry sludge remaining in beds?
Yes No NA NE
■ ❑ ❑ ❑
❑ ❑ ❑ ■
❑ ❑ ❑ ■
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ❑ ■
■ ❑ ❑ ❑
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
Page# 5
Permit: NC0003719 Owner -Facility:
Inspection Date: 06/24/2020 Inspection Type:
Cedar Creek Site
Compliance Evaluation
Drying Beds
Yes
No
NA
NE
Is the site free of stockpiled sludge?
0
❑
❑
❑
Is the filtrate from sludge drying beds returned to the front of the plant?
0
❑
❑
❑
# Is the sludge disposed of through county landfill?
❑
❑
0
❑
# Is the sludge land applied?
❑
❑
0
❑
(Vacuum filters) Is polymer mixing adequate?
❑
❑
0
❑
Comment: McGill Environmental accepts the sludge for use at their composting facility.
Effluent Sampling
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0 degrees
Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Comment:
Aeration Basins
Mode of operation
Type of aeration system
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin's surface?
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/1)
Comment:
Yes No NA NE
■ ❑ ❑ ❑
■ ❑ ❑ ❑
■ ❑ ❑ ❑
❑ ❑ ❑
❑ ❑ ❑
■ ❑ ❑ ❑
Yes No NA NE
Ext. Air
Surface
■
❑
❑
❑
■
❑
❑
❑
❑
❑
■
❑
■
❑
❑
❑
■
❑
❑
❑
❑
❑
❑
❑
❑
❑
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type, an( 0 ❑ ❑ ❑
sampling location)?
Comment: The upstream/downstream sampling is performed through the Middle Cape Fear River
Basin Association, which this facility is a member.
Page# 6
Permit: NC0003719
Inspection Date: 06/24/2020
Upstream / Downstream Sampling
Owner -Facility: Cedar Creek Site
Inspection Type: Compliance Evaluation
Yes No NA NE
Page#