HomeMy WebLinkAboutNCC202585_ESC Approval Submitted_20200708ROY COOPER Governor MICHAEL S. REGAN secretary BRIAN WRENN Acting Director NORTH CAROLINA Environmental Quality June 10, 2020 LETTER OF APPROVAL WITH MODIFICATIONS City of Statesville Attention: William E. Vaughan, PE 301 South Center Street Statesville, North Carolina 28677 RE: Project Name: Larkin Development Water Supply Project Acres Approved: 12.52 Project ID: IREDE-2020-013 County: Iredell City: Statesville Address: Moose Club, Amity Hill, & Dover Road River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: City of Statesville Date Received by LQS: May 20, 2020 Plan Type: New Dear Mr. Vaughan, This office has revie%Ned the subject erosion and sedimentation control plan. We End the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is revie%ved and found to be complete, you will receive a link with payment instructions for the S 100 annual permit fee. After the fee is received, you will receive the COC via email. You MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at Annette.lucas uncdenr.go� or Paul Clark at Paul.clark,dmederingov, If the owner/operator of this project changes in the future, the new responsible party is required to apply for his/her own COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. D E Q�14 � North Carolina Department of Environmenta; Quality I Division of Energy, Mineral and Land Resources e:!r0::fMooresville Regional OTce 610 East Center Avenue, Suite 301 Mooresville. North Carolina 26i15 '�� 704.663.1699 Letter of Approval with Modifications City of Statesville June 10, 2020 Page 2 of 3 Also, this letter gives the notice required by G_S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute i 13A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage «will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office ofthe proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. cer !y, 4GC-4 Christopher Graybeal Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet Hazen & Sawyer Attention: Ellie Mierzejewski, PE 9101 Southern Pine Blvd, Suite 250 Charlotte, North Carolina 28273 Inspection Department Letter of Approval with Modifications City of Statesville June 10, 2020 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Larkin Development Water Supply Project Project ID: IREDE-2020-013 County: IredeIl 1. Implement the latest NCGOI Standards for Ground stabilization and Self -Inspection approved April I.2019. Fact Sheet on the New NCG01 Permit p`EQ5 April 2019 The NC NC Construction General Permit (also known as "NCG01") was renewed on April 1, 2019. The updated permit does not significantly change the measures that are required to be implemented on construction sites. However, there are some organizational and technical updates to the permit as described below. Most notably, there is a new process in which construction sites will obtain official coverage under an NCG01 permit through an electronic process. DEMLR worked with a broad team of stakeholders to make -all of these updates. If you have questions, contact Annette Lucas at Annette.lucas@ncdenr.eov of (919) 70.7-3639. Organizational Updates The new permit. • Repeats state requirements for E&SC Plans and organizes them with federal construction activity requirements; • Is clearly organized by topic; and • Has less text and more tables. Technical Updates The new permit: • Requires that the E&SC Plan meet SWPPP requirements (p. 2); • Provides a list of items that must be inc'uded in the SWPPP, such as the construction sequence, plans, calculations, etc. (p. 2-4);1 • Has updated language on bypasses and upsets that is tailored to construction activities (p. 10); • Puts all timeframes for inspections, record -keeping and reporting .n "calendar days" for clarity and consistency (p. 11-14);2 • Changes the inspection frequency (during business hours) to at least once per 7 calendar days and after every storm > 1.0 inch (previously 0.5 inch);' and • Excludes weekends, state and federal holidays from normal business hours unless construction activit-es take place (p. 23). This list is based on webs:te guidance by the DEMLR Sediment Program. = The number of calendar days was selected to be as equivalent as possible Wth the previous permit. The `ntent is to provide predictability to the inspection schedu;e. Acronyms to Know COC: Certificate of Coverage, proof of coverage under an NCG01 permit DEMLR: NC Division of Energy, Mineral, and Land Resources E&SC: Erosion & Sedimentation Control e-NOI. Notice of Intent, application form for the NCGO1 permit e-NOT: Notice of Termination, form for closing out the NCG01 permit SWPPP: Stormwater Pollution Prevention Plan, required by the NCG01 The NCG01 Process The new NCG01 applies to permits approved on or after April 1, 2019. Permittees will no longer receive a copy of the NCG01 permit in the mail with their E&SC Plan approvals and be considered as covered under the permit. Federal rules require that DEMLR receive an NO1 on each construction project and issue each construction project its own COC. Linder the new NCGO1 process, construction sites will continue to receive approval for E&SC Plans from either DEMLR or the delegated local E&SC program just like before. After receiving E&SC Plan approva , permittees will officially obtain coverage under the NCGO1 by completing an a-NO1 (available at deg.nc. ov NCG01). The a-NO1 will only take about 20 minutes to fi:l out and submit on-line. Initially, there will be no charge associated with applying for an NCG01 permit but on or around June 1, 2019, DEMLR will begin charging a $100 annua: general permit fee as required per §143-215.3D. DEMLR is working on creating a single application form that will allow an applicant to simultaneously apply for an E&SC permit and an NCG01 COC. That effort is part of a larger Permit Transformation project at DEMLR. Q&A About the New NCG01 Permit Why do construction sites have to do this extra application step? DEMLR is required by the EPA to issue a specific COC to every construction site that disturbs one acre or more. DEMLR is working to create a form that combines the E&SC plan approval and a-NOI processes, but that will take more time. For now, DEMLR has created an efficient a-NOl process. If an E&SC Plan is approved before April 1, which permit applies? Projects with already approved E&SC Plans will automatically follow the new NCGO1 permit, but will not need to fill out an a-NOI or pay an annual permit fee. However, the permittees should print the new permit and the two standard detail sheets and have them on site. Will DEMLR offer tools to help permittees comply with the new NCG01? Yes, DEMLR will provide two sample plan sheets at deQ.nc.gov/NCGO1 that can be placed into the E&SC plan set. The first covers the site stabilization and materials handling portions of the permit. The second sheet covers the inspection, record -keeping and reporting portions of the permit. How will the new a-NOI submittal and CDC process work? Permittees will apply for E&SC Plan approvals from DEMLR or the local E&SC program like before. The E&SC approval letter will instruct the permittee to visit de4.nc.eov/NCGO1 to submit an a-N01 form to DEMLR. The permittee may begin the construction activity after receipt of the COC (within three days*). The permittee must print and retain a copy of the permit and the COC on site. Initially, the COC will be issued for free but on or around June 1, 2019, a $100 annual general permit fee will be charged. Who is allowed to submit an a-NOI form? Submittal must be by a responsible corporate officer that owns or operates the activity, such as a president, secretary, treasurer, or vice president or a manager that is authorized in accordance with IV.I3.6 of the NCGO1 permit. Additional signatory options are set forth in IV.13.6 of the permit. It is possible for consultant to prepare the a-NOI, save it as a draft: and email it to the responsible entity for signature & submittal. What happens to the COC when the construction activity is complete? When a project is complete, the permittees will contact DEMLR or the local delegated program to close out the E&SC Plan. After DEMLR or the local E&SC program inform the permittee of the project close out via inspection report, the permittee will visit deg.nc.gov/NCG01 to submit an a -NOT. Will there be a grace period for adherence to the new process? DEMLR does not have the authority to grant a grace period from a federally mandated permit. Permittees will be informed of the new process via web site, E&SC Plan approval letters and list servs. If a construction activity disturbs one acre or more (or is part of common plan of development that disturbs one acre or more) fails to submit an a-NOI after approval of its E&SC Plan, this is a violation of federal permitting requirements and the permittee could be subject to a penalty assessment. How does the new NCGO1 affect the delegated local E&SC Programs? Local programs will continue to review and approve E&SC plans. However, they will no longer send copies of the NCGO1 with E&SC Plan approvals. DEMLR will provide sample language to use in local E&SC Plan approvals to advise permittees that they must submit an a-NOI to DEMLR. Local programs are not required to check if permittees have submitted e- NOIs to DEMLR. However, if they wish to do this voluntarily, there will be a tool available on DEMLR's web site for them to view a list of construction projects that have submitted a-NOls. When local programs c ose out an E&SC Plan, the close-out letter will advise permittees that they must submit an e- NOT. DEMLR will provide sample language. Local programs may approve E&SC plans that meet state sediment laws and rules even if those plans are not compliant with all of the NCG01 requirements. However, their permittees will be required to add two plan sheets (which will be provided by DEMLR) to their E&SC Plans to ensure that they fully comply with the ground stabilization, materials handling, and inspection, record -keeping and reporting portion of the NCGO1 permit. " Or 24 business hours for a project approved under the DEMLR Express review program.