Loading...
HomeMy WebLinkAboutSW7120608_CURRENT PERMIT_20200401STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE � CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE DOC DATE &g7B`E61 YYYYMMDD ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN A Cting Director NORTH CAROLINA Environmental Quality April 1, 2020 Timothy Hish, Director of Administration Harvey Point Defense Testing Activity 2835 Harvey Point Road Hertford, NC 27944 Subject: Stormwater Permit No. SW7120608 Renewal Harvey Point Admin Complex Overall Low Density Commercial Development with Areas of High Density Perquimans County Dear Mr. Hish: The Washington Regional Office received a complete Stormwater Management Permit Renewal Application for Harvey Point Admin. Complex project on March 2, 2020. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7120608, dated April 1, 2020, for the construction and operation of the subject project. This permit shall be effective from June 30, 2020 until June 29, 2028, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the fight to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact me at (252) 948-3923. Sincerely, Roger K. Thorpe Environmental Engineer cc. David A. Deel, PE — Deel Engineering, PLLC (dadeeleng@gmail.com) �r, North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources Jl Wa,S ingson Regional Offic- 943 Washington Square Mall 1 Washington, North Carolina 27889 nVnrrvi r,.u;ni uw ��� 252 `?db.hd81 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT OVERALL LOW - DENSITY COMMERCIAL DEVELOPMENT WITH AREAS OF HIGH DENSITY In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Harvey Point Defense Testing Activity Administration Complex Perquimans County FOR THE construction, operation and maintenance of an overall low density commercial development with one wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral, and Land Resources (Division) and considered a part of this permit. This permit shall be effective from the June 30, 2020 until June 29, 2028 and shall be subject to the following specified conditions and limitations: 1. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. The built -upon area percentage for the low density portion of this project must be maintained at 24% per the requirements of 15A NCAC 2H .1000. This project is permitted for a maximum of 224,757 square feet of BUA (for both Low Density and High Density portions of this project). 3. The stormwater systems proposed to treat the runoff generated by the designated high density area has been approved for the management of stormwater runoff as described in Section 1.6 of this permit. S 4. This project will maintain a minimum 50 foot wide vegetated buffers between all impervious areas and surface waters on new development and a minimum 30 foot wide vegetated buffer on all existing and previously permitted impervious areas. 5. Within the low density portions of the permitted project, the only runoff conveyance systems allowed will be vegetated conveyances such as swales with minimum side slopes of 3:1 (H:V) as defined in the stormwater rules and as shown on the approved plan. 6. The following design elements have been permitted for the wet detention pond and must be maintained at design condition: a b c d e f. g h 1 M. n. o. p- q Drainage Area, acres: Total Impervious Surfaces, ftz: Design Storm, inches: Pond Depth, feet: TSS removal efficiency: Permanent Pool Elevation, FMSL: Permanent Pool Surface Area, ftz: Permitted Storage Volume, ft3: Temporary Storage Elevation, FMSL: Predevelopment 1 year 24 hour: Post development 1 year 24 hour: Controlling Orifice: Permitted Forebay Volume, ft3: Fountain Horsepower, HP Receiving Stream/River Basin: Stream index Number: Classification of Water Body: II. SCHEDULE OF COMPLIANCE 13.16 134,886 1.50 3.0 90 % 2.50 20,298 18,054 3.25 7.70 11.30 V notch weir, 30 degrees 7,348 116 hp Perquimans River 1 Pasquotank 30 — 6 — (7) 11SB„ No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot does not exceed the maximum allowed by this permit. 3. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 4. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended Use prior to the construction of any built -upon surface. 5. The runoff from all built -upon area within the drainage area of the high density portion of the project must be directed into the permitted stormwater control systems). 6. Within the low density portions of the permitted project, all roof drains shall terminate at least 50 feet from the mean high water mark of surface waters. 7. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 8. The Director may determine that other revisions to the project should require a modification to the permit. 9. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project must be recorded showing all such required easements, in accordance with the approved plans. 10. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 11. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 12. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 13. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 14. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 15. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 16. Records of maintenance activities must be kept by the permittee. The records will indicate the date, activity, name of person performing the work and what actions were taken. 17. The permittee shall submit to the Division an annual summary report of the maintenance and inspection records for each BMP. The report shall summarize the inspection dates, results of the inspections, and the maintenance work performed at each inspection. 18. Prior to transfer of the permit, the stormwater facilities will be inspected by Division personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. III. GENERAL CONDITIONS 1. This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a completed "Name/Ownership Change Form" must be submitted to the Division, signed by the parties involved, along with the applicable documents as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and ail statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal), which have jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 7. Permittee-grants permission to staff of the Division to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 9. The permittee shall notify the Division in writing of any name, ownership or mailing address changes within 30 days. 10. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 11. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in 15A NCAC 2H.1000, and NCGS 143-215.1 et -al. 12. This permit shall be effective from June 30, 2020 until June 29, 2028. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 1 st day of April 2020. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Brian Wrenn, Acting Director Division of Energy, Mineral, and Land Resources By Authority of the Environmental Management Commission Permit Number SW7120608 i DEMLR USE ONLY Date Received Fee Paid Permit Number C, yy (7 P—c,4a NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICl�dG,�FEIVEDMMAR p 2 l0'tCY /n accordance with 15A-NCAC 2H.1045(3), the currentpermit holdershal/renew theirhigh densilypermil 180 days prior to lts expiralion. Renewed permits are valid fora period af 8 years per Session Law 2011-398 TSB 781) Section 60. /c/. T171s application form is forpermit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW7120608 2. Project name: Harvey Point Administration Complex 3. Project street address: 2835 Harvey Point Road City: Hertford County: Perquimans ZIP: 27944 4. What, if any, changes have been made to the project as permitted? Permit Modified 511 1/17 8/6/2018 and 6/14/2019 to add im ervious covers c if the project has changed from the original approved plans, please complele SWU-101 fora Major Modification or MinorModifcalionApplicallon form available at.- htt s://de .nc. ov/about/divisions/ener - mi neral-land-resources/energy-mine rat-land-ru I es/stormwater-grog ram/post-const ruction. B. PERMITTEE INFORMATION lfChanges 101f7e permillee orprojecl name have been made, please complete either the Permit U,odale form orthe Permit Transferform available at., httr)s://deci.nc,gov/about/divisions/energy-mineral-land- resources/energy-mineral-land-rut eslstormwater-program/post-construction, Slate SlormwaterPermils do not automatically transfer with the sale of the property. 1. Current Permit Holder's Company Name/Organization: Harvey Point Defense Testing ActivitX 2. Signing Official's Name: Timothy Hish 3. Signing Official's Title: Director of Administration 4. Mailing Address: 2835 Harvey Point Road City: Hertford State: NC ZIP: 27944 5, Street Address: same as above City: 6. Phone: (252) 426-4360 Email: ZIP : Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) or DEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal HOMORW). Only applicallons packages fhat include all required items listed below will be accepted and re viewed. Initial each item below to indicate that the required information is prowdedin the application package. r"M 1. A permit application processing fee of $505.00 payable to NCDEQ. 2. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president; b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BUA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. 4. O&M Agreements, Please select one.- ® I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded 0&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. Designer Certifications, Please select one.- ® A copy of the certification(s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. T ri11 1 6. [IF APPLICABLE) If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). httr)s://www.sosnc.gov/online services/search/by title/ Business Registration Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEPS CERTIFICATION 1, TrtiranyY BAN &a& , the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All information provided on this permit renewal application is, to the best of my knowledge, correct and complete. Signature: si• Date: NOTARIZATI fO�N: ` I I, �7�rr�r 1'��1 ��� a Notary Public for the State of r+ C oi1,no- County of r_� !' uih, l _5 do hereby certify that 11. personally appeared before me this the tyn day of ��`)rUQ ►'�_� 20 2 and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, S. (Notary Seal/ " Notary Signatur , My commission expi I'—/ 3 -�5 ��'-,; fcc Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 V., " L 6 �! * - ,, , " t:, �, "', I I ."", Deel Engineering, PLLC NC Firm License P-1045 February 4, 2020 Mr. Roger Thorpe NCDEQ ` RECEIVED MAR 0 2 1U10 Division of Water Quality 943 Washington Square Mall Washington, North Carolina 27889 Re: Harvey Point Administration Complex Stormwater Permit #SW7120608 Hertford, Pcrquimans County, North Carolina Dear Mr. "Thorpe; On behalf of Harvey Point Defense Testing Activity (I-IPDTA), we hereby submit for processing a Stormwater Management Permit Renewal Application for the above referenced Permit. The following items are included with and shall be considered part of this submittal package: l . Review fee check in the amount of $505,00 for the Stormwatcr Management Permit Renewal Application, made payable to the NCDEQ 2. One (1) copy (original signature) of the Stormwater Management Permit Renewal Application 3. One (1) copy (original signature) of the Engineer's ,Maintenance Inspection Certification 4. Operation & Maintenance Checklist and Protocol for Stormwater Permit #SW7120608 '(Admin Complex) developed by HPDTA as part of their facility -wide stormwater maintenance program. Please review and approve the attached information. If you have any questions, or if you require any additional information, please do not hesitate to contact me at (252) 202-3803. incerely I C;Lc David A. eel, PE./-L- P.O. Box 3901 Kill Devil Hills, NC 27948 (252)202-3803 Harvey Point Administration Complex Stormwater Permit #SW7120608 (6/29/2012) Permit Modification #1 (5/1 1/2017) Permit Modification #2 (6/14/2017) Enm,ineer's Maintenance Inspection Certification Deel Engineering, PLLC NC Firm License P-1045 'I IRMCIE'vLo PAR 0 2 '202# David A. Decl, P.E. conducted an inspection of the Stormwater Management System on January 16, 2020 and found it to be properly constructed, properly functioning, and properly maintained. Harvey Point Defense Activity has a program to actively maintain its stormwater management system, conducts regular inspections in accordance with issued NCDEQ (NCDENR) Permits, and submits annual inspection reports to NCDEQ for all stormwater permits issued for the facility. raj Engineer: Date: Z 20 P.O. Box 3901 Kill Devil Hills, NC 27948 (252)202-3803 SWALE INSPECTION REPORT Harvey Point Defense Testing Activity Low & High Density Permits This report covers: DATE: 0 Quarterly Inspection for (quarter —15t, 2"1, 3rd, or 4th, year) Post -Storm Inspection (required after rainfall events in excess of 1.5 in.) Storm Date: Rainfall Amount: See Stormwater Inspections Field Manual for Low Density & High Density Permit Location Key Maps & additional information. Low Density Stormwater Permits Inspected: (see attached reports) SW7150305 Stockpile Area SW7050927 New Const. Access Rd. SW7120206 Power Line Access Road C, SW7050119 Magazine Storage Facility ! 1 SW7040711 Harvey Pt Sewage System SW7130205 Bldg 7-30 Logistics Warehouse D SW7040502 Area 3 Hangar Bldg El SW7040503 Runway Upgrades D SW7030217 Transient Personnel Lodging D SW7130101 Bldg 2-73 Rec Housing 0 D SW7060810 SW7000126 New PBI Road Bldg 1-15 1 j SW7000925 Bldg 1-1 i] SW7070225 New Range C SW7091107MOD Bldg 6-39 & b 40 DJI SW7040501 Area 6 Bldg El SW7090214 G Range Road ❑ SW7060133 Small Arms / Long Gun Range SW7150514 Building 8-70 C, SW7051018 New Range Road Li SW7040624 Rec Housing / Bldg 3 (8-60) r i SW7051017 New Berm & Perimeter Rd SW7180907 A -Range Dry Basin Retrofit High Density Stormwater Permits Inspected: (see attached reports) ++ SW7070121 CTEC Facility u SW7060917 Admin Headquarters _ u SW7120608 Admin Complex , SW7080717MOD PBI Site Expansion E,E SW7060104 UTS Site SWALE INSPECTION CHECKLIST ADMIN COMPLEX Page 1 of 2 Permit No. SW7120608 DATE: Visual inspection was made of entire swale system. • Swale was free from trash / debris: !1 Yes ❑ No ❑ Trash / debris was cleaned from swale on (date) • Swale is free of bare soil / gullies: u Yes D No D Bare soil was repaired on (date). Describe: • Swale bottom is free of sediment: Yes No D Sediment was removed on (date) and swale was reseeded as necessary. Describe: U Source of Sediment was identified and repaired. Describe: • Swale vegetation is maintained at a manageable height (tail enough to provide stable groundcover, short enough to allow maintenance and not significantly impede flow): D Yes ' No E Maintenance department was contacted on (date) to coordinate future vegetation management. R SWALE INSPECTION CHECKLIST ADMIN COMPLEX (Cont'd) Page 2 of 2 Permit No. SW7120608 D Visual inspection was made of all culverts / pipes. • Culverts / pipes were free from trash / debris: 17 Yes 71 N o Trash / debris was cleaned from pipe system on (date) + Culvert pipes are free of sediment: ❑ Yes 1 11 N o ! Sediment was removed on (date) ❑ Source of sediment was identified and repaired. Describe: + Culvert inlet & outlets are free from erosion: Yes No El Area was repaired & protection modified as necessary on (date) Describe: J There IS NO evidence of erosion or other damage to downstream wetlands or other "waters of the state". f l There IS evidence of erosion or other damage to downstream wetlands or other "waters of the state". NC Division of Water Quality 401 Oversight Unit (919-733-1786) was contacted on (date). Describe coordinated repair / remediation: Additional Notes (feel free to continue on back of page or attach additional pages as necessary): Inspected by: do 5A►^ 0 WET BMP SYSTEM INSPECTION REPORT Harvey Point Defense Testing Activity High Density — Wet BMP System Permits DATE: This report covers: 1-1 Monthly Inspection for (month) 0 Post -Storm Inspection (required after rainfall events in excess of 1.5 in.) Storm Date: Rainfall Amount: See Stormwater Inspections Field Manual for High Density Permit Location Key Maps & additional information. Stormwater Permits Inspected: (see attached reports) ❑ _ SW7120608 Admin Complex SW7080717MOD PBI Site Expansion 11 SW7060104 UTS Site SAS WET DETENTION BASIN INSPECTION CHECKLIST ADMIN COMPLEX Permit No. SW7120608 Page 1 of 4 DATE: 71 Visual inspection was made of the perimeter area surrounding basin & basin, • Area was free from trash / debris: El Yes No 0 Trash / debris was cleaned on • Basin is free of bare soil / gullies / erosion: Yes t No (date) D Bare soil was repaired on (date). Describe: • Vegetation outside of basin is maintained at approx. 6 inches height: i Yes No 71 Maintenance department was contacted on (date) to coordinate future vegetation management at approx. 6" height. D Visual inspection was made of all culverts / pipes. • Culverts / pipes were free from trash / debris: Yes No Trash / debris was cleaned from pipe system on • Culvert pipes are free of sediment: F] Yes No !D Sediment was removed on (date) Source of sediment was identified and repaired. Describe: • Culvert inlet & outlets are free from erosion: Yes a No date) i] Area was repaired & protection modified as necessary on (date) Describe: SN^f WET DETENTION BASIN INSPECTION CHECKLIST ADMIN COMPLEX Page 2 of 4 Permit No. SW7120608 Visual Inspection was made of Wet Detention Basin: • Sediment has accumulated in Forebay bottom such that depth is less than 1.0': 1-1 N o 7 Yes u Sediment was removed on (date) and basin was reseeded as necessary. Describe: F- i Source of Sediment was identified and repaired. Describe: • Sediment has accumulated in Main Bay bottom such that depth is less than 2.25': No Yes D Sediment was removed on (date) and basin was reseeded as necessary. Describe: Source of Sediment was identified and repaired. Describe: • Basin & shelf vegetation is free from weeds / noxious plants: u Yes i] No F- I Weeds / Noxious plants were removed on (date) via o Pulling by Hand o Wiping with pesticide (do not spray). Describe: SNr^� WET DETENTION BASIN INSPECTION CHECKLIST ADMIN COMPLEX Page 3 of 4 Permit No. SW7120608 • Basin & shelf vegetation is dead / diseased: No D Yes Describe source of problem and remedial activities (one tie fertilization allowed if soil is determined to be problem): • Basin & shelf vegetation consists of less than 50% cattails, phragmites, or other invasive vegetation: D Yes i] No D Unwanted plants were removed on (date) via o Pulling by Hand o Wiping with pesticide (do not spray). Describe: • Basin & shelf vegetation is in need of pruning or other management: 1-1 No LJ Yes J Pruning / management was performed on (date). Describe: + Algal growth covers over 50% of the pond area: No J Yes ❑ A professional was consulted to remove algal growth and removal was performed on (date) Describe: WET DETENTION BASIN INSPECTION CHECKLIST, ADMIN COMPLEX Permit No. SW7120608 Page 4 of 4 • Basin fully draws -down within 5 days after a storm event (no standing water): 7 Yes ❑ No 7 outlet was checked and clog removed on (date) 7 outlet was not found to be clogged: Professional was consulted to determine cause and appropriate remediation. The following remediation was performed: • Basin Berm (outfall side of Main Bay) is free of shrubs and trees and there is no evidence of beaver or muskrat activity: 7 Yes i] No 17 Describe source of problem and remedial activities: Additional Notes (feel free to continue on back of page or attach additional pages as necessary): Inspected by: OR