Loading...
HomeMy WebLinkAboutSW7120305_CURRENT PERMIT_20191112STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW����'J`� DOC TYPE F CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE DOC DATE �//`g//Ia YYYYMMDD L ✓WRO ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality November 12, 2019 Bertie County Schools Attention: Matthew Boyd, Maintenance Director P.O. Box 10 Windsor, NC 27983 Subject: Permit No. SW7120305 Renewal Bertie County High School High Density Stormwater Project Bertie County Dear Mr. Boyd: The Washington Regional Office received a Stormwater Management Permit Application for renewal of permit SW7120305 on October 8, 2019. Staff review of the submittal has determined that the permit can be reissued. We are forwarding Permit No. SW7120305 dated November 12, 2019, for the construction and operation of the subject project. This permit, upon its effective date, will replace all previous State Stormwater permits for this site. This permit.shall be effective from March 28, 2020 until March 27, 2028 and shall be subject to the conditions and limitations as specified therein, and does not supercede any other agency permit that may be required. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have, any questions, or need additional information concerning this matter, please contact me at (252) 948-3923. Sincerely, Roger K. Thorpe Environmental Engineer ,forth Carolina Department of Environmental Quality ; Division of Energy. Mineral and Land Resources Washington Regional Office i 943 Washington Square Mall ! Washington. Forth Carolina 27889 ucm, cnna�wi � 252.946.6481 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Bertie County Bertie County High School Located on NC Hwy 13, north of the Town of Windsor, Bertie County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral, and Land Resources (Division) and considered a part of this permit. This permit shall be effective from the March 28, 2020 until March 27, 2028, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The stormwater control has been designed to handle the runoff from 482,340 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Section I. of this permit, and per approved plans. The built -upon area for the future development is limited to 34,512 square feet. Plans for any future built -upon area not currently shown on the approved plans must be submitted and approved by the Division prior to the start of construction. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The built -upon areas associated with this project shall be located at least 50 feet landward of all perennial and intermittent surface waters. 7. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: 18.0 b. Total Impervious Surfaces, ftz: 482,340 C. Design Storm, inches: 1.50 d. Pond Depth, feet: 3.69' avg. e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMSL: 24.50 g. Permanent Pool Surface Area, ft2: 47,223 h. Permitted Storage Volume, ft3: 59,164 at temporary pool elev. i. Temporary Storage Elevation, FMSL: 25.63 j. Predevelopment 1 year 24 hour: 5.24cfs k. Post development 1 year 24 hour: 29.51 cfs (0.58cfs from orifice) 1. Controlling Orifice: 4.00" O pipe . M. Permitted Forebay Volume, ft3: 44,017 n. Fountain Horsepower, HP 314 HP pump maximum o. Receiving Stream/River Basin: Cashie River 1 Roanoke p. Stream Index Number: 24-2-1 q. Classification of Water Body: "C; Sw" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shalt be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes, in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, level spreader, filter strip, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Access to the stormwater. facilities shall be maintained via appropriate easements at all times. 6. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in this pond is 314 horsepower. 7. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 13. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DEQ Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.ai. 11. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. This permit shall be effective from March 28, 2020 until March 27, 2028. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 121h day of November, 2019. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for S. Daniel Smith, Director Division of Energy, Mineral, and Land Resources By Authority of the Environmental Management Commission Permit Number SW7120305 State Stormwater Management Systems Permit No. SW7120305 New Bertie County High School Stormwater Permit No. SW7120305 Bertie Coun Designer's Certification IJ. S. Janowski , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe eriodica 1 weekly/ full time) the construction of the project, Bertie County High School (Project) for Bertie County Schoolos (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: SEAL Signature Registration Number Date 9/24/14 012324 12324 y�����►EN`�` 4�``�% Page 6 of 7 State Stormwater Management Systems Permit No. SW7120305 Certification Requirements: isi 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. isi 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. isi 4. All roof drains are located such that the runoff is directed into the system. isi 5. The outlet/bypass structure elevations are per the approved plan. isi 6. The outlet structure is located per the approved plans. �Si. 7. Trash rack is provided on the outlet/bypass structure. isi 8. All slopes are grassed with permanent vegetation, A 9. ' Vegetated slopes are no steeper than 3:1. isi 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. isi 11. The permitted amounts of surface area and/or volume have been provided. isi 12. Required drawdown devices are correctly sized per the approved plans. isi 13. All required design depths are provided. isi 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. isi 15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Washington Regional Office Bertie County Planning / Building Inspections Page 7 of 7 �A �r'^T7 NCDEN North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, PE Dee Freeman Governor Director Secretary March 27, 2012 Mr. Morris Rascoe, County Manger Bertie County �l �?--A 1 p /P�e e�� 106 Dundee Street Windsor, NC 27983 Subject: Stormwater Permit No. SW7120305 New Bertie County High School High Density Commercial Wet Pond Project Bertie County Dear Mr. Roscoe: The Washington Regional Office received a complete Stormwater Management Permit Application for the New Bertie County High School on March 13, 2012. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7120305 dated March 27, 2012, for the construction of the subject project. This permit shall be effective from the date of issuance until March 27, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. If you have.any questions, or need additional information concerning this matter, please contact Scott Vinson, or me at (252) 946-6481. Aice7lL AI odg Regional Supervisor Surface Water Protection Section AHl sv: K:IWQSISTORMWATERIPERMIT1SW7120305 cc: Stephen Janowski, PE (e-ma-il) Bertie County Planning 1 Building Inspections L,-'Washington Regional Office North Carolina Division of Water Quality Internet: www.ncwalcrqualityot One 943 Washington Square Mail Phone; 252-946-6481 Washington, NC 27989 FAX 252-946-9215 NorthOffolina An Equal Opportunity/Affrmadve Action Employer— 50% Recycled110% Post Consumer Paper Iv. Vat /ra11 ff 14 State Stormwater Management Systems e Permit No. SW7120305 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Bertie County New Bertie County High School Located on NC Hwy 13, north of the Town of Windsor, Bertie County FOR THE construction, operation and maintenance of a wet detention pond in compliance with the provisions of Session Law 2008-21T and 15A NCAC 2H A 000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until March 27, 2020, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The stormwater control has been designed to handle the runoff from 482,340 square feet of impervious area. 3. The tract will be limited to the amount of built -upon area indicated in Section I. of this permit, and per approved plans. The built -upon area for the future development is limited to 34,512 square feet. Plans for any future built -upon area not currently shown on the approved plans must be submitted and approved by the Division prior to the start of construction. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The built -upon areas associated with this project shall be located at least 50 feet Page 2 of 7 State Stormwater Management Systems Permit No. SW7120305 landward of all perennial and intermittent surface waters. 7. The following design criteria have been provided in the wet detention pond and must be maintained at design condition: a. Drainage Area, acres: 18.0 b. Total Impervious Surfaces, ft2: 482,340 C. Design Storm, inches: 1.50 d. Pond Depth, feet: 3.69' avg. (6.13' total) e. TSS removal efficiency: 90% f. Permanent Pool Elevation, FMS�: 24.50 9. Permanent Pool Surface Areq, ft : 47,223 h. Permitted Storage Volume, ft : 59,164 at temporary pool el i. Temporary Storage Elevation, FMSL: 25.63 j. Predevelopment 1 year 24 hour: 5.24cfs k. Post development 1 year 24 hour: 29.51cfs (0.58cfs from orifice) I. Controlling Orifice: 4.00" O pipe M. Permitted Forebay Volume, ft3: 44,017 n. Fountain Horsepower, HP 314 HP pump o. Receiving Stream/River Basin: Cashie River 1 Roanoke P. Stream Index Number: 24-2-1 q. Classification of Water Body: "C; Sw" II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The permittee shall at all time provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of slopes and the vegetated filter strip. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, level spreader, filter strip, catch basins and piping. g. Access to the outlet structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. Access to the stormwater facilities shall be maintained via appropriate easements at all times. s 6. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the Page 3 of 7 State Stormwater Management Systems Permit No. SW7120305 deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for a fountain in this pond is 314 horsepower. 7. The facilities shall be constructed as shown on the approved plans. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 8. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 9. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 10. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion 'Control Plan approval or a CAMA Ma'or permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 11. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 12. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 13. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. Ill. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form, to the Division of Water Quality, signed by both parties, and accompanied by supporting documentation as listed on page 2 of the form. The project must be in good standing with the Page 4 of 7 State Stormwater Management Systems Permit No. SW7120305 Division. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having,jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008- 211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. This permit shall be effective from the date of issuance until March 27, 2020. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 27 1h day of March, 2012. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION nrana for Uharles MOO H.t., Uirector Division of Water Quality By Authority of the Environmental Management Commission Stormwater Permit No. SW7120305 Page 5 of 7 State Stormwater Management Systems Permit No. SW7120305 New Bertie County High School Stormwater Permit No. SW7120305 Bertie County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6 of 7 State Stormwater.Management Systems h. Permit No. SW7120305- Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11_ The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, and a forebay. .15. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Washington Regional Office Bertie County Planning / Building Inspections Page 7 of 7 II ULML:K'U:jt'GNCT Date Received Fee Paid Permit Number i 0 1 be 11,0i ls'• oo r�1,J''117 L)JD5 y NC DEQ Division of Energy, Mineral and Land Resources STATE STORMWATER: PERMIT RENEWAL APPLICATION FORM In accordance with 15A NCAC 2H.1045(3), the current permit holder shall renew their high density permit 180 days prior to its expiration. Renewed permits are valid for a period of 8 years per Session Law 2011-398 (SB 781) Section 60.(c). This application form is for permit renewals only. A. PROJECT INFORMATION 1. State Stormwater Permit Number: SW 71 A 03406 2. Project name: f3&r`b'e_ CO(4114� 6i/ h SCyy U _ 3. Project street address: 71A U 5 .OL,24 13 City: I! L()! r _N A -72 0 3 County: ����` � ZIP : a 79 e-3 4. What, if any, changes have been made to the project as permitted? 0 If the project has changed from the original approved plans, please complete SWU-101 for a Major Modification or Minor Modification Application form available at: https://deg.nc.gov/about/divisions/energy- mineral-land-resourceslenergy-mineral-land-ruleslstormwater-programlpost-construction. B. PERMITTEE INFORMATION If changes to the permittee or project name have been made, please complete either the Permit Update form or the Permit Transfer form available at, https:lldeg.nc.gov/about/divisions/energy-mineral-land- resourceslenergy-mineral-land-ruleslstormwater-programlpost-construction. State Stormwater Permits do not automatically transfer with the sale of the property. 1. Current Permit Holder's CMCI. ) 2. Signing Official's Name: 3. Signing Official's Title: Motiq rgap tion: �/, er .e (.Durl CC 1 ), rr G 4. Mailing Address: Y i-, B n x 10 City: _� t1 e�.�o�!�I'ye- a qg V 3 State: ZIP 5. Street Address: S W /V City: SO t' State: L�G ^ ZIP : a3 6. Phone: I(nI3 Email: m b0n J ner•Li5 Stormwater Permit Renewal Form Page 1 of 3 May 11, 2018 C. SUBMITTAL REQUIREMENTS Submit the application package to the appropriate DEMLR Regional Office (Coastal, SA Waters) orDEMLR Central Office (Urbanizing Areas Ph 2, USMP, Non -Coastal NQW/ORW). Only applications packages that include all required items listed below will be accepted and reviewed. Initial each item below to indicate that the required information is provided in the application package: 1. A permit application processing fee of $505.00 payable to NCDEQ. One original signed hard copy and one electronic copy of this completed form. The signing official named on this application to represent the current permittee must meet one of the following: a. Corporation — a principle executive officer of at least the level of vice-president- b. Limited Liability Company (LLC) — a manager or company official as those terms are defined in G.S. 57D "North Carolina Limited Liability Company Act;" c. Public Entity — a principal executive officer, ranking official, or other duly authorized employee; d. Partnership or limited partnership — the general partner; e. Sole proprietor; or f. Letter of authorization signed by one of the signatories noted in a — e above authorizing the signature of another entity. 3. One hard copy and one electronic copy of recorded documents required by the original permit that have not yet been received by DEMLR, including: deed restrictions, protective covenants, condominium/planned community declaration and easements. If the project has been built, include documentation that the maximum BLIA per lot or maximum total BUA has not been exceeded. If the project has not been built, include a signed agreement that the final recorded deed restrictions and protective covenants will be submitted at a later date. 4. O&M Agreements, Please select one: ❑ I have a copy of the current recorded O&M Agreement for all SCMs, and I will continue to keep this on file with the permit; or ❑ I do not have a copy of the current recorded O&M Agreement for all SCMs and am requesting a copy be sent to me. I agree to keep this on file with the permit. 5. Designer Certifications, Please select one: ❑ A copy of the certification (s) confirming that the project was built in accordance with the approved plans have been previously provided to the Division; or ❑ A copy of the certification(s) confirming that the project was built in accordance with the approved plans are enclosed; or ❑ The project has not yet been built. & [IF APPLICABLE] If the project has been built, one original hard copy and one electronic copy of a signed, sealed, and dated letter from a licensed professional stating that the SCMs have been inspected, and that they have been built and maintained in accordance with the permit. 7. [IF APPLICABLE] When the permittee is a corporation or a limited liability corporation (LLC): Provide one hard copy and one electronic copy of documentation from the NC Secretary of State, or other official documentation, which supports the titles and positions held by the persons listed in Section C.2 per 15A NCAC 2H. 1043(3)(b). https:llwww.sosnc.govlonline_serviceslsearchlby title/ _Business Registration Stormwater Permit Renewal Application Form Page 2 of 3 May 11, 2018 D. PERMITTEE'S CERTIFICATION I" / 6:L-L� , the person legally responsible for the permit, certify that I have a copy of the Permit and O&M Agreement on site (or I will obtain a copy and it will be kept on site), that I am responsible for the performance of the maintenance procedures, and the site has been and will be maintained according to the O&M Agreement and approved plans. I agree to notify DEMLR of any problems with the SCMs or built -upon area and to submit the proper forms to modify or transfer the permit prior to any changes to the project, SCMs, or ownership. All informs . n provided on this permit renewal application is, to the best of my knowledge, corr ct and omplete. / Signature: Date: Z'Lf —t NOTARIZATION: I,i� �1_ 'n� . �'Y�P_r a Notary Public for the State of ! _ ' County of 1f'_ , do hereby certify that lylf�}111 personally appeared before me this the day of &Z, C re,r , 20 10, and acknowledge the due execution of the forgoing instrument. Witness my hand and official seal, i111N N. C (Notary Sea!) NOTAAY 4 MY OOMMt8WN EXPIRES Notary Signature.,-*dmw -On G My commission expiresQ 3 �,� BL► Stormwater Permit Renewal Application Form Page 3 of 3 May 11, 2018 i ROY COOPER M1QiAEL SzREGAN See:rerm; s� S. DANIEL SMHTIA lrrterim Director NORTH CAROLINA Environmental Quality August 21, 2019 Bertie County Schools Attention: Mr. Matthew Bond, Maintenance Director P.O. Box 10 715 US Hwy 13 North Windsor, NC 27983 Subject: Stormwater Permit No. SW7120305 Renewal Bertie County High School High Density Stormwater Project Bertie County Dear Mr. Bond: A Division of Energy, Mineral, and Land Resources file review has determined that Stormwater Permit SW7120305 for a stormwater treatment system consisting of a wet detention pond serving the Bertie County High located on US Hwy 13, in Bertie County expires on March 27, 2020. This is a reminder that permit renewal applications are due 180 days prior to expiration. We do not have a record of receiving a renewal application, Please submit a completed permit renewal application along with a $505.00 fee for permit renewal. Permit application forms for renewal can be found on our website at: _gles w NoTn�tia er- �� ca t- �.T <t� u4t�c�r�. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. Failure to maintain a permit subjects the owner to assessment of civil penalties. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you. If you would like, I can e-mail you a copy of the application forms. You can request a copy by e-mailing me at Log g r.tiior�e c ncde9L (cv_ Sincerely, Ro er K. TT hor'pe Environmental Engineer Norfls Carolina bcpartmrnt of i=nvironntentai Quality I Division of F.nea qy. 411nrra4 and fond Resou+'Cr g x��% Washingtnn Rrylnnal O(flcr ; �4a Waslstnc�tnn tigLiarc 1`lafl I Washingum, I�+>rth Carufina T7$h+I ra�n.ke.e.mr m.r+h� y- JSZ. 1b.b4$I Roy COOPER, (iR4 ['l l lUr MiCI IAI=i. ;�. RAN SI'r'15'rrerz S. CAMEL SMITH l nftrr rm f :q rrrn[' NOF,, l } I ,''APOL N?� 6nvironn:ental Qtrafriy August 21, 2019 Bertie County Schools Attention: Mr. Matthew Bond, Maintenance Director P.O. Box 10 715 US Hwy 13 North Windsor, NC 27983 Subject: Stormwater Permit No. SW7120305 Renewal Bertie County High School High Density Stormwater Project Bertie County Dear Mr. Bond: A Division of Energy, Mineral, and Land Resources file review has determined that Stormwater Permit SW7120305 for a stormwater treatment system consisting of a wet detention pond serving the Bertie County High located on US Hwy 13, in Bertie County expires on March 27, 2020. This is a reminder that permit renewal applications are due 180 days prior to expiration. We do not have a record of receiving a renewal application. Please -submit a completed permit renewal application along with a $505.00 fee for permit renewal. Permit application forms for renewal can be found on our website at: North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. Failure to maintain a permit subjects the owner to assessment of civil penalties. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you. If you would like, I can e-mail you a copy of the application forms. You can request a copy by e-mailing me at Sincerely, '� Ro er K. AT Thorpe Environmental Engineer �.�_ I+f[�s'11i[srnlina!}rlsurltr.rnl�{I:nuirrsnuu•rllsl(luarliiy'11sivf�'rol'ir�fls.r[ci�l„!4lirtrrsl;ra5rll.,u!rlf:rNsrrrrr:ti 1N:;,Stlnrllnn itriiii irlf lh i['r ; 0,13 1•Vu:;hi11rtnn Silu:srr Ad:rl(i LV:Islthi(}tisn, Nhr(lo (;or(<slil,a yits19r1 iN; �.;rt'�;rinv��r�.nnvn�• r 2.'i'7_'1.�}t�.hd;ll Thorpe, Roger From: Thorpe, Roger Sent: Tuesday, September 03, 2019 8:37 AM To: Ray, Maxine Subject: RE: [External] Stormwater Permit Application Attachments: SSW- Permit- Renewal -Application-Form-20180517_FINAL (1).docx Attached is a copy of the renewal application. We don't send out invoices. Let me know if you have questions. Thanks Roger From: Ray, Maxine <mray@bertie.kl2.nc.us> Sent: Wednesday, August 28, 2019 3:17 PM To: Thorpe, Roger <roger.thorpe@ncdenr.gov> Subject: [External] Stormwater Permit Application External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spamCa�nc. oov Dear Mr. Thorpe Mathew Bond, Maintenance Director for Bertie County Schools would like to request an application to be emailed to him. mray@bertie.kl2.nc.us is my email address. Also, is it possible that an invoice could be emailed to me for the $505.00. Maxine Ray, Operations Asst. Bertie Maintenance/Technology/CTE Depts. Email: mray@bertie.kl2.nc.us 252-794-6035 (Phone) 252-794-6098 (Fax) People will forget what you said, but they won't forget the way you made them feel.. This email was sent by a staff member of the Bertie County School District in Windsor, North Carolina. All email correspondence to and from this address is subject to the North Carolina Public Records Law, which may result in monitoring and disclosure to third parties, including law enforcement. Compliance Inspection Report Permit: SW7120305 Effective:03/27/12 Project: New Bertie County High School Owner: Bertie County County: Bertie Region: Washington Expiration: 03/27/20 Adress: NC Hwy 13 City/StatelZip: Windsor NC 27983 Contact Person: Scott Sauer Title: Phone: 252-794-5300 Directions to Project: North from Windsor on Hwy 13, the site is across the street from the existing high school, adjacent and north to the existing middle school Type of Project: State Stormwater - HD - Detention Pond Drain Areas: 1 - (Cashie River) (03-02-10) ( C;Sw) 2 - (Cashie River) (03-02-10 } ( C;Sw) On -Site Representative(s): Related Permits: Inspection Date: 12/11/2019 Entry Time 09:OOAM Primary Inspector: William J Moore Secondary Inspector(s): Reason for Inspection: Routine Permit Inspection Type: State Stormwater Facility Status: 0 Compliant ❑ Not Compliant Question Areas: State Stormwater (See attachment summary) Exit Time: 09:30AM Phone: 252-946-6481 Ext.264 Inspection Type: Compliance Evaluation page 1 Permit: SW7120305 Owner - Project: Bertie County Inspection date: 12/11/2019 Inspection Type Compliance Evaluation Reason for Visit: Routine Inspection Summary: Site inspection 12/11/2019 at New Bertie County High School located off NC Hwy 13 near Windsor. Project & sw controls appear to be constructed according to plans. PE Certification received 09/24/2014. Signed O&M in file. Built Upon Area Yes No NA NE Is the site BUA constructed as per the permit and approval plans? ® ❑ ❑ ❑ Is the drainage area as per the permit and approved plans? ■ ❑ ❑ ❑ Is the BUA (as permitted) graded such that the runoff drains to the system? ■ ❑ ❑ ❑ Comment. - SW Measures Yes No NA NE Are the SW measures constructed as per the approved plans? M ❑ ❑ ❑ Are the inlets located per the approved plans? M 110 ❑ Are the outlet structures located per the approved plans? 0 ❑ ❑ ❑ Comment: Operation and Maintenance Yes No NA NE Are the SW measures being maintained and operated as per the permit requirements? M ❑ ❑ ❑ Are the SW BMP inspection and maintenance records complete and available for review or provided to ❑ ❑ ❑ ❑ DWQ upon request? Comment: page 2