Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW7120106_HISTORICAL FILE_20191209
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE DOC DATE YYYYMMDD 11111111111111111111".-Annie$�F MO .03-2w,'0RR0gq0p, Bertie County, NC;Register of Deeds page 1 of 6�(l� Supplemental Declaration of Protective Covenants and Easements for Scotch Hall Preserve Phase 2, Block I NORTH CAROLINA — BERTIE COUNTY RFECEIVED ucL U J 2019 Prepared without benefit of title examination and return after recording to: RIAL Corporation 105 Scotch Hall Court, PO Box 159 Merry Hill, NC 27957 f This SUPPLEMENTAL DECLARATION is executed on , 2013, by Rial Corporation, a North Carolina corporation ("Declarant"). WITNESSETH: WHEREAS, Declarant is the owner of certain real property located in Merry Hill, Township, Bertie County, North Carolina, and more particularly described as follows: Being Lots 1-39, inclusive, as shown on that plat of "Scotch Hall Preserve PUD Phase 2, Block I" prepared by Quible & Associates dated August 2, 2012 and bearing the seal of J.H. Miller, Jr., Professional Land Surveyor License Number: 4958 and recorded in Map Cabinet 13 at Pages 716-718, Bertie County Registry; (the foregoing plat is referred to as the "Plat," with the numbered lots shown on the Plat being hereinafter referred to individually as a "Homesite" and collectively as the "Homesites;" the Homesites'and the areas designated as "Open Space" or "Common Elements" shown on the Plat are hereinafter referred to collectively as the "Property"). WHEREAS, Declarant recorded a Declaration of Conditions, Reservations and Restrictions for Innsbrook Subdivision in Book 840 at Page 542 of the Bertie County Registry, 325670vi ll II II ll 111JJJJJJqJJJJJJJJJfi A�9Lil i [JO18 06�03:ib?060 niJnie F. Uil son PROP Sertie County, NC Register of Deeds page 2 of 6 which Declarant has amended and restated pursuant to that certain Amended and Restated Master Declaration of Protective Covenants and Easements for Scotch Hall Preserve, recorded in Book 903 at Page 79, Bertie County Registry (together with all amendments thereto and supplemental declarations recorded in accordance with the provisions thereof, the "Master Declaration") (unless otherwise defined herein, all terms defined in the Master Declaration shall have the same meanings in this Supplemental Declaration); WHEREAS, the Master Declaration establishes certain covenants, conditions, restrictions and easements running with the land, including certain functions and duties of Scotch Hall Preserve Owners Association, Inc. (the "Association") and its Architectural Control Committee (the "ACC"), and easements and other rights reserved by Declarant; WHEREAS, Article VIII, Section 3 of Master Declaration provides that Declarant may annex additi6n6l'land into the Development; WHEREAS, Declarant desires to add the Property to the Development, and subject the Property to the provisions of the Master Declaration and this Supplemental Declaration. NOW, THEREFORE, Declarant hereby declares that the Property is annexed into the Development and shall be held, sold and conveyed subject to the covenants, conditions, restrictions and easements contained in the Master Declaration, and to the following additional covenants, conditions, restrictions and easements, all of which shall run with the land and be binding upon all parties having any right, title or interest in the Property or any part thereof, their heirs, successors and assigns, and shall inure to the benefit of each owner thereof. Definitions. The definitions set forth in the Master Declaration are hereby adopted, except as specifically modified or changed by this Supplemental Declaration. Each of the Homesites is hereby designated as a Homesite, as defined in the Master Declaration. The streets and other Common Elements shown on the Plat are hereby designated as Common Elements, as defined in the Master Declaration. 2. Specific Architectural Controls. In addition to the architectural controls set forth in Article VI of the Master Declaration, all of which shall apply, the Homesites subject to this Supple -mental Declaration, shall be subject to the following additional specific architectural controls: (a) Notwithstanding the terns of Section 5(b) of the Master Declaration, dwellings within the Property subject to this Supplemental Declaration may be erected and allowed to remain on a Homesite if the main structure, exclusive of open porches, garages, carports, basements, decks, and stoops, is less than 1,800 square feet, but only so long as any such dwelling shall be at least 1,200 square feet or greater. (b) In order to maintain the uniform appearance and aesthetics of the exterior of the Homesites, the Association shall maintain, remove, replace and care for all landscaping and lawns located on the Homesites, (the "Landscaping Services"). Such Landscaping Services shall be provided by the Association in the areas of the Homesites that are not improved by structures, patios, porches, driveways and walkways (the "Landscaped Areas") in such manner and frequency as determined by -2- I��l�lilll�lillllllllll 11llil�lil�l1092802 m8 2°,3 P0019 18 03 : 19 , 000 nnie F. Wilson PROP Bertie County, NC Register of Deeds page 3 of 6 `�✓' the Association to be in accordance with generally accepted horticultural practices for residential homes in the Development. The Owner of each Homesite shall be subject to a Segment Assessment as set forth in Article IV, Section 10 of the Master Declaration to defray the Association's cost and expense incurred in connection with the Landscaping Services. The annual Segment Assessment of the Association for the Landscaping Services is ILZOO per year for improved Homesites and S±00 per year for unimproved Homesites (to be paid quarterly) for the year 2012, which is subject to change from time to time in accordance with the terms of the Master Declaration. (c) No Owner shall allow or permit the installation, removal or replacement of any plant or landscaping materials within the Landscaped Areas of his/her Homesite without the prior written consent of the ACC. (d) No Owner shall allow or permit activities that damage or destroy the plants, landscaping materials or irrigation systems within the Landscaped Areas of his/her Homesite without the prior written consent of the ACC. 3. Landscaping Services_ and Lot Line Easements. There is reserved to and for the benefit of Declarant, the: Association, and their successors and assigns, easements in, on, over, across and through (a) each Homesite for the purpose of performing the Landscaping Services and for the construction, installation, repair, maintenance, replacement and improvement of irrigation systems as the Association deems reasonable necessary for the performance of the Landscaping Services and (b) those ` portions of the Homesites designated as "20' Drainage & Utility Easement" and "10' Drainage & Utility Easement" on the Plat, for the purposes of construction, installation, repair, maintenance and improvement of utilities and drainage facilities, including but not limited to drainage swales, pipes and drainage structures. 4. Stormwater Management and Built -Upon Area. For purposes of this Supplemental Declaration and the Property shown on the Plat, Article IX, Section I of the Master Declaration is hereby amended to apply to the Property. furthermore, the Property described in this Supplemental Declaration shall be subject to the following provision regarding Stormwater Management; Impervious Surface Coverage: (a) Stormwater Management; Impervious Surface Coverage — Phase 2. The covenants in this paragraph are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW7120106 Modification, as issued by the Department of Environment and Natural Resources, Division of Water Quality under NCAC 2H.1000. The State of North Carolina is made a beneficiary of the covenants in this paragraph to the extent necessary to maintain compliance with the Stormwater Management Permit referred to in the previous sentence. The covenants in this paragraph are to run with the land and be binding on all persons and parties claiming under them. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. The maximum built upon area per Homesite is shown in the table -3- yll�lyll�y�er f Deeds F. Wi Is' of�g.15.Q OP Berne County. N attached hereto as Exhibit A. This allotted amount includes any built -upon area constructed within the Homesite property boundaries, and that portion of the right-of-way between the front line of the Homesite and the edge of the pavement. Built -upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. For those Homesites within CAMA's Area of Environmental Concern ("AEC"), where the Division of Coastal Management calculates a different maximum built -upon area per Homesite, the most restrictive of the two numbers shall be the governing built -upon area. All runoff on the Homesite must drain into the permitted system. This may be accomplished through providing roof drain gutters, which drain to the street, grading the Homesite to drain toward the street, or grading perimeter swales and directing them into the pond or street. Homesites that will naturally drain into the system are not required to'provide these measures: Built -upon area in excess of the permitted amount will require a permit modification. If permeable pavement credit is requested, the applicable owner must submit a request, with supporting documentation, to the permitteee and receive approval prior to construction of any built -upon area. 5. Amendments. The covenants, conditions, restrictions and other provisions set forth in this Supplemental Declaration may be amended as provided in the Master Declaration. Except as specifically set out in this Supplemental Declaration, the provisions of the Master Declaration remain as set out therein. [signature page follows] llii. yy `` llll ll`` yy 44 �tJ�L� '��IG� mz-ma-zmia000 Deeds F. Page15 ofm8PROP aertie Count . NC Register of IN WITNESS WHEREOF, Declarant has caused this instrument to be duly executed, the day and year first above written. B N T STATE OF Va.. tA4 COUNTY OF I certify that the following person personally a peared before me this d , acknowledging to me that he signed the foregoing document: �� � Rase 7timni.�rell.o Date: 2 /7 % , 201- WNCENT SHUM NOTARY PUBLIC, STATE OF NEW YORK (Official Seal) NO. 01 SH61 79613 QUALIFIED IN QQEENS COUNTY COWS SION EXPIRES DEC. 24,201 � My commission expires: 4 7- r Officia l Signature ofNotary lcO- ' ��.. , Notary Public Printed or typed name -5. `` ` I f l B0928 P00� 02 °e2°' Register 1 I�� 1��� I f Deeds Page 16ao f: 8�15.PROP 6ertie County, NC g %1-) Exhibit State Stormwater Management Systems Permit No. S.W71_20lQ6Modiilc2tion Scotch Hall Press UPhase Ilble i Lot # BU # BUA o #BUA Lot; # BUA 15,0 2 4,298 4. 46 4,492., . 4,084 _. 89 90 3,710 -..-T93 4,026 134 6,603' 3 3;960 47 4,084 91 4,174 135 5,802 4 3,960 48 4,084 92 5,147 136 6,037 5 3,960 49 4,084 ' 93 5,659 137. 6,279 6 3,880 50 4,084 94 3,651 138 6,295 7 3-960 51 4,518 95 3,812 139 6;201 8 3,860 52 4,075 96 3,603 140 6,109 9 3,960- 53 4,075 97' 7,833 141 6,978 10 3,960 54 4,075 98 7,280 142 601 11 A290 55 4,075 99 5,266 143 5,373 12 3,980 58 4,075 100 4,975 144 10,975 13 3.960 57 4,075. 101 .4,727 1455 5,566 14 3,960 58 4,075 102 4,971 140 4,518 15 4,290 59 4,359 103 4,821 147 5,265 16 4,290 60' 4,045 104 4,320 148 6,719 17 4,430 61 4,091 105 4,320 149 5,117 18 4,598 62 4,091 106 4,716 150 ' 4,215 19 4,749 63 4,091 107 4,899 151 3,960 20 3,947 64 4,091 108 4,899 152 4,144 21 3,782 66 4,091 109 5,936 153 4,288 22 3,601 66 3,980 110 5,922 154 4,288 23 3,614 67 4,407 111 7,358 155 4,116 24 3,376 68 4,103 112 6,040 150 4,200 25 3,026 69 4,103 113 e, 031 167 4,260 26 2,941 70 4,103 114 5;981 158 4,076, 27 2,866 71 4,504 115 5,935 159 4,329 28 3,125 72 3,604 116 5,933 .100 4,212 29 6,956 73 3,358 117 5,934 161 4,212 30 6,114 74 3,219 118 5,937 182 4,375 31 5,992 75 4,163 119 4,290 163 4,375 32 5;947 76 - 6,088 120 3,960- 164 4,202 33 5,951 77 5,941 121 3,980 166 3,860 34 5,950 78 5,938 122 3,960 166 5,047 35 5,956 79 5,936 123 3,960 167 6,651 36 5,952 80 5,937 124 3,960- 168 3,829 37 5,946 61 5,938. 125 4,542 189 4,270 38 6,724 82 3,960 126 4,966 170 4,301 39 6,447 83 3,960 127 5,587 171 4,243 40 6,120 84 3,960 128 5,466 172 4,172 41 4,540 85 3,960 129 4,585 173 4,323 42 4,097 86 3,960 130 5,079 43 - 4,097 87 3,960 131 4,726 44 4,097 88 5,895 132 4,150 BUA - built upon area (in square feet) 1012 19922", r1, �J�rl8 0B 2012 b,,z 63-32:0@p^ Bertie County, NC Register of Dee4sapage�l sof g Q,p�jRO. Supplemental Declaration of Protective Covenants and Easements for Scotch Hall Preserve Phase 2, Block 4 NORTH CAROLINA — BERTIE COUNTY Prepared without benefit of title examination and return after recording to: Schell Bray PLLC QCK) 100 Europa Drive, Suite 271 Chapel Hill, NC 27517 This SUPPLEMENTAL DECLARATION is executed on "hsl (9 7 , 2012, by Rial Corporation, a North Carolina corporation ("Declarant"). WITNESSETH: WHEREAS, Declarant is the owner of certain real property located in Merry Hill, Township, Bertie County, North Carolina, and more particularly described as follows: Being Lots 40-51 and 60-69, inclusive, as shown on that plat of "Scotch Hall Preserve PUD Phase 2, Block 4" prepared by Quible & Associates dated July 25, 2012 and bearing the seal of J.H. Miller, Jr., Professional Land Surveyor License Number: 4958 and recorded in Map Cabinet 13 at Pages 712-713, Bertie County Registry; (the foregoing plat is referred to as the "Plat," with the numbered lots shown on the Plat being hereinafter referred to individually as a "Homesite" and collectively as the "Homesites;" the Homesites and the areas designated as "Open Space" or "Common Elements" shown on the PIat are hereinafter referred to collectively as the "Property"). WHEREAS, Declarant recorded a Declaration of Conditions, Reservations and Restrictions for lnnsbrook Subdivision in Book 840 at Page 542 of the Bertie County Registry, 324834v1 i 1 II l I�11I II I I I I lI �� II I �It III I� �� 32.000 8ertie County, NC Register of Deeds page 2 of 6 which Declarant has amended and restated pursuant to that certain Amended and Restated Master Declaration of Protective Covenants and Easements for Scotch Hall Preserve, recorded in Book 903 at Page 79, Bertie County Registry (together with all amendments thereto and supplemental declarations recorded in accordance with the provisions thereof, the "Master Declaration") (unless otherwise defined herein, all terms defined in the Master Declaration shall have the same meanings in this Supplemental Declaration); WHEREAS, the Master Declaration establishes certain covenants, conditions, restrictions and easements running with the land, including certain functions and duties of Scotch Hall Preserve Owners Association, Inc. (the "Association") and its Architectural Control Committee (the "ACC"), and easements and other rights reserved by Declarant; WHEREAS, Article VIII, Section 3 of Master Declaration provides that Declarant may annex additional land into the Development; WHEREAS, Declarant desires to add the Property to the Development, and subject the Property to the provisions of the Master Declaration and this Supplemental Declaration. NOW, THEREFORE, Declarant hereby declares that the Property is annexed into the Development and shall be held, sold and conveyed subject to the covenants, conditions, restrictions and easements contained in the Master Declaration, and to the following additional covenants, conditions, restrictions and easements, all of which shall run with the land and be binding upon all parties having any right, title or interest in the Property or any part thereof, their k1-11 heirs, successors and assigns, and shall inure to the benefit of each owner thereof. I. Definitions. The definitions set forth in the Master Declaration are hereby adopted, except as specifically modified or changed by this Supplemental Declaration. Each of the Homesites is hereby designated as a Homesite, as defined in the Master Declaration. The streets and other Common Elements shown on the Plat are hereby designated as Common Elements, as defined in the Master Declaration. 2, Specific Architectural Controls. In addition to the architectural controls set forth in Article VI of the Master Declaration, all of which shall apply, the Homesites subject to this Supplemental Declaration, shalt be subject to the following additional specific architectural controls: (a) Notwithstanding the terms of Section 5(b) of the Master Declaration, dwellings within the Property subject to this Supplemental Declaration may be erected and allowed to remain on a Homesite if the main structure, exclusive of open porches, garages, carports, basements, decks, and stoops, is less than 1,800 square feet, but only so long as any such dwelling shall be at least 1,200 square feet or greater. (b) In order to maintain the uniform appearance and aesthetics of the exterior of the Homesites, the Association shall maintain, remove, replace and care for all landscaping and lawns located on the Homesites, (the "Landscaping Services"). Such Landscaping Services shall be provided by the Association in the areas of the Homesites that are not improved by structures, patios, porches, driveways and 1 walkways (the "Landscaped Areas") in such manner and frequency as determined by &a 08-08-2012 B0922 0907 112:53:32.000 Belinda S. White PROF Berne County, NC Register of Deeds page 3 of 6 the Association to be in accordance with generally accepted horticultural practices for residential homes in the Development. The Owner of each Homesite shall be subject to a Segment Assessment as set forth in Article IV, Section 10 of the Master Declaration to defray the Association's cost and expense incurred in connection with the Landscaping Services. The annual Segment Assessment of the Association for the Landscaping Services is 1200 per year for improved Homesites and $400 per year for unimproved Homesites (to be paid quarterly) for the year 2012, which is subject to change from time to time in accordance with the terms of the Master Declaration. (c) No Owner shall allow or permit the installation, removal or replacement of any plant or landscaping materials within the Landscaped Areas of his/her Homesite without the prior written consent of the ACC. (d) No Owner shall allow or permit activities that damage or destroy the plants, landscaping materials or irrigation systems within the Landscaped Areas of his/her Homesite without the prior written consent of the ACC. 3. Landscaping Services and Lot Line Easements. There is reserved to and for the benefit of Declarant, the Association, and their successors and assigns, easements in, on, over, across and through (a) each Homesite for the purpose of performing the Landscaping Services and for the construction, installation, repair, maintenance, replacement and improvement of irrigation systems as the Association deems reasonable necessary for the performance of the Landscaping Services and (b) those portions of the Homesites designated as "20' Drainage & Utility Easement" and "10' Drainage & Utility Easement" on the Plat, for the purposes of construction, installation, repair, maintenance and improvement of utilities and drainage facilities, including but not limited to drainage swales, pipes and drainage structures. 4. Stormwater Management and Built -Upon Area. For purposes of this Supplemental Declaration and the Property shown on the Plat, Article IX, Section 1 of the Master Declaration is hereby amended to apply to the Property. Furthermore, the Property described in this Supplemental Declaration shall be subject to the following provision regarding Stormwater Management; Impervious Surface Coverage: (a) Stormwater Management; Impervious Surface Coverage — Phase 2. The covenants in this paragraph are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW7120106 Modification, as issued by the Department of Environment and Natural Resources, Division of Water Quality under NCAC 21-1.1000. The State of North Carolina is made a beneficiary of the covenants in this paragraph to the extent necessary to maintain compliance with the Stormwater Management Permit referred to in the previous sentence. The covenants in this paragraph are to run with the land and be binding on all persons and parties claiming under them. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. The maximum built upon area per Homesite is shown in the table 3- 111111111111111111111111111111111111111 $0922 P0908 09-88-2012 12 63 32 000 Belinda S. White PROF Bertie County, NC Register of Deeds page 4 of 6 attached hereto as Exhibit A. This allotted amount includes any built -upon area constructed within the Homesite property boundaries, and that portion of the right-of-way between the front line of the Homesite and the edge of the pavement. Built -upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. For those Homesites within CAMA's Area of Environmental Concern ("AEC"), where the Division of Coastal Management calculates a different maximum built -upon area per Homesite, the most restrictive of the two numbers shall be the governing built -upon area. All runoff on the Homesite must drain into the permitted system. This may be accomplished through providing roof drain gutters, which drain to the street, grading the Homesite to drain toward the street, or grading perimeter swales and directing them into the pond or street. Homesites that will naturally drain into the system are not required to provide these measures. Built -upon area in excess of the permitted amount will require a permit modification. If permeable pavement credit is requested, the applicable owner must submit a request, with supporting documentation, to the permitteee and receive approval prior to construction of any built -upon area. 5. Amendments. The covenants, conditions, restrictions and other provisions set forth in this Supplemental Declaration may be amended as provided in the Master Declaration. ' Except as specifically set out in this Supplemental Declaration, the provisions of the Master Declaration remain as set out therein. [signature page follows] -4- OB-OB lillllllllillllllllllllll lllli II iIIII Belinda S. U ite�3-32tPROF Bertie County. NC Register of Deeds page 5 of B IN WITNESS WHEREOF, Declarant has caused this instrument to be duly executed, the day and year first above written. Rial Corporation By: A, Ni Name: A41 i-AX14F-C� Title: Pre STATE OF !G j i- orn %� COUNTY OF I certify that the following person personally appeared b fore me this day, acknowledging to me that he signed the foregoing document: emenkI Dedrir4fu- dF +�Oifc�"P. C Date: c�S 20o V 0 m 5 uvJ ea5 e rr�r S , � , O is Signature ofAvotary (Oflicial Seal MARTHA P. BAZAH i GOYM.B tS78FO$ / JA1 �. 8QZ4 P-) , Notary Public � (� NGFAA'1 PuaiIc-CkuFpAMu �, CE 1 � � 14 �r Ca M, 1AF. AY ii sou Printed or typed name My commission expires: CAJ -3- Bertie County, N Register of @@12 12:63:32,@0@NORA t a PROF Deeds page 6 of 6 EXHIBIT A All Phase 2 Block 4 lots have a maximum Built Upon Area ("BUA" ) of 60% of total lot area pursuant to State Stormwater Management Systems Permit No. SW7120106 Modification. 24-2012 6�lf DeedsdP geWliof y Bertie County, NC g Supplemental Declaration of Protective Covenants and Easements far Scotch Hall Preserve Phase 2, Blocks 1-8 NORTH CAROLINA — BERTIE COUNTY Prepared without benefit of title examination and return after recording to: Schell Bray PLLC (JCK) 100 Europa Drive, Suite 271 Chapel Hill, NC 27517 This SUPPLEMENTAL DECLARATION is executed on J, 2012, by Rial Corporation, a North Carolina corporation ("Declarant"), WITNESSETH: WHEREAS, Declarant is the owner of certain real property located in Merry Hill, Township, Bertie County, North Carolina, and more particularly described as follows: Being Lots 152-169, inclusive, as shown on that plat of "Scotch Hall Preserve Phase 2, Blocks 2 & 7" prepared by Quible & Associates dated July 2, 2012 and bearing the seal of J.H. Miller, Jr., Professional Land Surveyor License Number: 4958 and recorded in Map Cabinet 13 at Page 705, Bertie County Registry; (the foregoing plat is referred to as the "Plat," with the numbered lots shown on the Plat being hereinafter referred to individually as a "Homesite" and collectively as the "Homesites;" the Homesites and the areas designated as "Open Space" or "Common Elements" shown on the Plat are hereinafter referred to collectively as the "Property"). WHEREAS, Declarant recorded a Declaration of Conditions, Reservations and Restrictions for Innsbrook Subdivision in Book 840 at Page 542 of the Bertie County Registry, which Declarant has amended and restated pursuant to that certain Amended and. Restated 321736v5 25A9.0 13:55:49.004 1 I Belindg S, White PROP Bertie County, N Register of Deeds page 2 of 5 Master Declaration of Protective Covenants and Easements for Scotch Hall Preserve, recorded in Book 903 at Page 79, Bertie County Registry (together with all amendments thereto and supplemental declarations recorded in accordance with the provisions thereof, the "Master Declaration") (unless otherwise defined herein, all terms defined in the Master Declaration shall have the same meanings in this Supplemental Declaration); WHEREAS, the Master Declaration establishes certain covenants, conditions, restrictions and easements running with the land, including certain functions and duties of Scotch Hall Preserve Owners Association, Inc. (the "Association") and its Architectural Control Committee (the "ACC"), and easements and other rights reserved by Declarant; WHEREAS, Article Vill, Section 3 of Master Declaration provides that Declarant may annex additional land into the Development; WHEREAS, Declarant desires to add the Property to the Development, and subject the Property to the provisions of the Master Declaration and this Supplemental Declaration. NOW, THEREFORE, Declarant hereby declares that the Property is annexed into the Development and shall be held, sold and conveyed subject to the covenants, conditions, restrictions and easements contained in the Master Declaration, and to the following additional covenants, conditions, restrictions and easements, all of which shall run with the land and be binding upon all parties having any right, title or interest in the Property or any part thereof, their heirs, successors and assigns, and shall inure to the benefit of each owner thereof. 1. Definitions. The definitions set forth in the Master Declaration are hereby adopted, except as specifically modified or changed by this Supplemental Declaration. Each of the Homesites is hereby designated as a Homesite, as defined in the Master Declaration. The streets and other Common Elements shown on the Plat are hereby designated as Common Elements, as defined in the Master Declaration. 2. Secif c_Architectural Controls. In addition to the architectural controls set forth in Article VI of the Master Declaration, all of which shall apply, the Homesites subject to this Supplemental Declaration, shall be subject to the following additional specific architectural controls: (a) Notwithstanding the terms of Section 5(b) of the Master Declaration, dwellings within the Property subject to this Supplemental Declaration may be erected and allowed to remain on a Homesite if the main structure, exclusive of open porches, garages, carports, basements, decks, and stoops, is less than 1,800 square feet, but only so long as any such dwelling shall be at least 1,200 square feet or greater. (b) In order to maintain the uniform appearance and aesthetics of the exterior of the Homesites, the Association shall maintain, remove, replace and care for all landscaping and lawns located on the Homesites, (the "Landscaping Services"). Such Landscaping Services shall be provided by the Association in the areas of the Homesites that are not improved by structures, patios, porches, driveways and walkways (the "Landscaped Areas") in such manner and frequency as determined by the Association to be in accordance with generally accepted horticultural practices for -2- PZ441m� za zmtiz 13:55T19.000 Belinda S. White PROP Bertie County, NC Register of Deeds page 3 of 5 residential homes in the Development. The Owner of each Homesite shall be subject to a Segment Assessment as set forth in Article IV, Section 10 of the Master Declaration to defray the Association's cost and expense incurred in connection with the Landscaping Services. The annual Segment Assessment of the Association for the Landscaping Services is 1200 per year for improved Homesites and A00 per year for unimproved Homesites (to be paid quarterly) for the year 2012, which is subject to change from time to time in accordance with the terms of the Master Declaration. (c) No Owner shall allow or permit the installation, removal or replacement of any plant or landscaping materials within the Landscaped Areas of his/her Homesite without the prior written consent of the ACC. (d) No Owner shall allow or permit activities that damage or destroy the plants, landscaping materials or irrigation systems within the Landscaped Areas of his/her Homesite without the prior written consent of the ACC. 3. Landscaping Servicesand Lot Line Easements. There is reserved to and for the benefit of Declarant, the Association, and their successors and assigns, easements in, on, over, across and through (a) each Homesite for the purpose of performing the Landscaping Services and for the construction, installation, repair, maintenance, replacement and improvement of irrigation systems as the Association deems reasonable necessary for the performance of the Landscaping Services and (b) those portions of the Homesites designated as "20' Drainage & Utility Easement" and "10' Drainage & Utility Easement" on the Plat, for the purposes of construction, installation, repair, maintenance and improvement of utilities and drainage facilities, including but not limited to drainage swales, pipes and drainage structures. 4. Stormwater Management and Built-Upon_Are a, For purposes of this Supplemental Declaration and the Property shown on the Plat, Article IX, Section 1 of the Master Declaration is hereby amended to apply to the Property. Furthermore, the Property described in this Supplemental Declaration shall be subject to the following provision regarding Stormwater Management; Impervious Surface Coverage: (a) Stormwater Management; Impervious Surface Coverage — Phase 2. The covenants in this paragraph are intended to ensure ongoing compliance with State Stormwater Management Permit Number S W7120106 Modification, as issued by the Department of Environment and Natural Resources, Division of Water Quality under NCAC 2H.1000. The State of North .Carolina is made a beneficiary of the covenants in this paragraph to the extent necessary to maintain compliance with the Stormwater Management Permit referred to in the previous sentence. The covenants in this paragraph are to run with the land and be binding on all persons and parties claiming under them. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. The maximum built upon area per Homesite is shown in the table attached hereto as Exhibit A. This allotted amount includes any built -upon area -3- II I III I I II! III II II I II II I I � I-- B0922 P0443 OT 7-24012 B6-?9. 000 I I1 IIl�I Belinda S. White Bertie County, NC Register of Deeds page 4 of S constructed within the Homesite property boundaries, and that portion of the right-of-way between the front line of the Homesite and the edge of the pavement. Built -upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. For those Homesites within CAMA's Area of Environmental Concern ("AEC"), where the Division of Coastal Management calculates a different maximum built -upon area per Homesite, the most restrictive of the two numbers shall be the governing built -upon area. All runoff on the Homesite must drain into the permitted system. This may be accomplished through providing roof drain gutters, which drain to the street, grading the Homesite to drain toward the street, or grading perimeter swaies and directing them into the pond or street. Homesites that will naturally drain into the system are not required to provide these measures. Built -upon area in excess of the permitted amount will require a permit modification. If permeable pavement credit is requested, the applicable owner must submit a request, with supporting documentation, to the permitteee and receive approval prior to construction of any built -upon area. 5. Amendments. The covenants, conditions, restrictions and other provisions set forth in this Supplemental Declaration may be amended as provided in the Master Declaration. Except as specifically set out in this Supplemental Declaration, the provisions of the Master Declaration remain as set out therein. [signature page follows] -4- ii II . _II II. ``.`` II__II__ll LI.. 8092� P0444 03 T S5:10, I��IIIt�I��1{ Deeds pageW i�tf55:19.PROP Sortie County,Regis IN WITNESS WHEREOF, Declarant has caused this instrument to be duly executed, the day and year first above written. Rial Corporation By: AN I Name: NiLrXigf NrgC�LA:oF1 �L Title: ?V440& t t' 1 STATE OF r e�, COUNTY OF A�� I certify that the following person personally appeared before a this day, acknowled ing to me that he signed the foregoing document: j�, 1 ��. f ti elfe �P e r v vfp ),Pet" s S P �' ecr Date: V , 204D- DANIEL LEVY (Official comet. t 1825963 NOTARY MC-CAUTORNu SAN �iEfl6 Cauxrr Yr Cosa. EXP. DEC. T, 2012 '�' of Notary Printed or typed name My commission expires: �. e- 11 _C 0 Notary Public kIjjjIIjIjjj 111 j?P!k!5j04 Itti-17 artie ounty, Nc Register of Deeds page 1 of a Supplemental Declaration of Protective Covenants and Easements for Scotch Hall Preserve Cottage Subdivision, Lots 1-9 NORTH CAROLINA — BERTIE COUNTY Prepared without benefit of title examination and return after recording to: Schell Bray Aycock Abel & Livingston PLLC, (HHA) 100 Europa Drive, Suite 271 Chapel Hill, NC 27517 This SUPPLEMENTAL DECLARATION is executed on October 51h, 2010, by Innsbrook Golf & Marina, LLC, a North Carolina Limited Liability Company ("Declarant"). WITNESSETH: WHEREAS, Declarant is the owner of certain real property located in Merry Hill, Township, Bertie County, North Carolina, and more particularly described as follows: Being Lots 1-9, inclusive, as shown on that plat of "Cottage Subdivision, Scotch Hail Preserve" prepared by Hobbs, Upchurch & Associates, P.A. dated July, 2010 and bearing the seal of J. Gary Culp, Professional Land Surveyor License Number: L-2950 and recorded in Map Cabinet 13 at Page 511, Bertie County Registry (the "Plat;" with the numbered lots shown on the Plat being hereinafter referred to individually as a "Homesite" and collectively as the "Homesites;" the Homesites and the areas designated as "Common Elements" shown on the Plat are hereinafter referred to collectively as the "Property"). WHEREAS, Declarant recorded a Declaration of Conditions, Reservations and Restrictions for Innsbrook Subdivision in Book 840, Page 542 of the Bertie County Registry, which Declarant has amended and restated pursuant to that certain Amended and Restated �v--'264941_3.DQCX 0-0 B��l lii� � County, NC Register f ��1ofi plel s page Pf s 1T'.s� Master Declaration of Protective Covenants and Easements for Scotch Hall Preserve, recorded in Book 903, Page 79, Bertie County Registry (together with all amendments thereto and supplemental declarations recorded in accordance with the provisions thereof, the "Master Declaration') (unless otherwise defined herein, all terms defined in the Master Declaration shall have the same meanings in this Supplemental Declaration); WHEREAS, the Master Declaration establishes certain covenants, conditions, restrictions and easements running with the land, including certain functions and duties of Scotch Hall Preserve Owners Association, Inc. (the "Association") and its Architectural Control Committee (the "ACC"), and easements and other rights reserved by Declarant; WHEREAS, Article VIII, Section 3 of Master Declaration provides that Declarant may annex additional land into the Development; WHEREAS, Declarant desires to add the Property to the Development, and subject the Property to the provisions of the Master Declaration and this Supplemental Declaration. NOW, THEREFORE, Declarant hereby declares that the Property is annexed into the Development and shall be held, sold and conveyed subject to the covenants, conditions, restrictions and easements contained in the Master Declaration, and to the following additional covenants, conditions, restrictions and easements, all of which shall run with the land and be binding upon all parties having any right, title or interest in the Property or any part thereof, their heirs, successors and assigns, and shall inure to the benefit of each owner thereof. 1. Definitions. The definitions set forth in the Master Declaration are hereby adopted, except as specifically modified or changed by this Supplemental Declaration. Each of the Homesites is hereby designated as a Homesite, as defined in the Master Declaration. The streets and other Common Elements shown on the Plat are hereby designated as Common Elements, as defined in the Master Declaration. 2. Specific Architectural Controls. In addition to the architectural controls set forth in Article VI of the Master Declaration, all of which shall apply, the Homesites subject to this Supplemental Declaration, shall be subject to the following additional specific architectural controls: (a) each And every window ticatment that is visible from the exterior of the dwelling must be white or off-white in color unless otherwise approved in writing by the ACC; (b) In order to maintain the uniform appearance and aesthetics of the exterior of the' Homesites, the Association shall maintain, remove, replace and care for all landscaping and lawns located on the Homesites, including the irrigation of the lawns (the "Landscaping Services"). Such Landscaping Services shall be provided by;the Association in the areas of the Homesites that are not improved by structures, patios, porches, driveways and walkways (the "Landscaped Areas") in such manor and frequency as determined by the Association to be in accordance with generally accepted horticultural practices for residential homes in the Development. The Owner of each Homesite shall be subject to a Segment Assessment as set forth in Article IV, Section 10 of the Master Declaration to defray the Association's cost and --� 264941 3.noCx - 2 - 11111IIIII�If�11111��11lllfll�llllo�m�8���h�t:s:;,,0ma Bartle County, NC agister of Deeds page 3 of 6 expense incurred in connection with the Landscaping Services. The annual Segment Assessment of the Association for the Landscaping Services is 1200 per year (to be paid quarterly) for the year 2010, which is subject to change from time to time in accordance with the terms of the Master Declaration. (c) No Owner shall allow or permit the installation, removal or replacement of any plant or landscaping materials within the Landscaped Areas of his/her Homesite without the prior written consent of the ACC. (d) No Owner shall allow or permit activities that damage or destroy the plants, landscaping materials or irrigation systems within the Landscaped Areas of his/her Homesite without the prior written consent of the ACC. 3. Landscaping ,Services grid Lot Line Easements. There is reserved to and for the benefit of Declarant, the Association, and their successors and assigns, an easement in, on, over, across and through (a) each Homesite for the purpose of performing the Landscaping Services and for the construction, installation, repair, maintenance, replacement and improvement of irrigation systems as the Association deems reasonable necessary for the performance of the Landscaping Services and (b) those portions of the Homesites designated as "15' Drainage Easement," "15' Drainage and Access Easement" and "10' Drainage and Utility Easement" on the Plat and within two (2) feet of the front line along Villa Way, and within three (3) feet of every side and within five (5) feet of every rear property line of such Homesite, for the purpose of construction, installation, repair, maintenance and improvement of utilities and drainage facilities, including but not limited to drainage swales, pipes and drainage structures, including access to the areas on the Plat designated as "Common Element (Storm Water Management)". Where a Lot abuts another Lot the total width of this easement is six (6) feet, centered on the common property line. 4. Stormwater Management and Built -Upon Area. For purposes of this Supplemental Declaration and the Property shown on the Plat, Article IX, Section 1 of the Master Declaration is hereby amended to apply to the Property. Furthermore, the Property described in this Supplemental Declaration shall be subject to the following provision regarding Stormwater Management; Impervious Surface Coverage: (a) Stormwater Management; Impervious Surface Coverage — Cottage Subdivision. The covenants in this paragraph are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW7080320 Modification, as issued by the Department of Environment and Natural Resources, Division of Water Quality. For each Homesite shown on the Plat, the allowable built-u on area is 4300 sguare feet. This allotted amount includes any built -upon area constructed within the Homesite property boundaries, and that portion of the right-of-way between the front line of the Homesite and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina, driveways and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. Homesites within CAMA's Area of Environmental Concern ("AEC") may have the 26494 t 3.DOCX .3- Urtie County, NC Register of eeds page 4 of B permitted built -upon area reduced due to CAMA jurisdiction within the AEC. Filling in, piping, or altering any vegetated conveyances (ditches, swales, etc.) associated with the development, except for average driveway crossings, is prohibited by any Persons. A 30' vegetated buffer must be maintained between all built -upon area and the mean high water line of surface waters. All roof drains shall terminate at least 30' from the mean high water mark. Each designated curb outlet swale or 100' vegetated area shown on the approved plan must be maintained at a minimum of 100' long with 3:1 (H:V) side slopes or flatter, have a longitudinal slope no steeper than 5%, carry the flow from a 10 year storm in a non -erosive manner, and maintain a dense vegetated cover. Such swales are located in either the common elements or a drainage or watercourse easement as shown on the Plat. These covenants pertaining to stormwater may not be altered or rescinded without the express written consent of DWQ. 5. Amendments. The covenants, conditions, restrictions and other provisions set forth in this Supplemental Declaration may be amended as provided in the Master Declaration. Except as specifically set out in this Supplemental Declaration, the provisions of the Master Declaration remain as set out therein. IN WITNESS WHEREOF, Declarant has caused this instrument to be duly executed, the day and year first above written. Innab k Golf & Marina, LLC, a North Carolina Limited Liability Company a . North Carolina Corporation, Sole Member , Vice President STATE OF Z49Z COUNTY OF D rs (Seal) I certify that the following person personally appeared before me this day, acknowledging to me that she sigDe the foregoing document: Rose Tummarello. Date: l� , 20ILI) ( V"' ;�J a Signature o otary (0jr1cial Seal F1sRliZ� 410TAFIY PUBLIC, State of NM Y011 � ��"� ` Y �0�`�-�� Notary Public No. 30-48139uL1 Printed or typed name Quai'f:d inl+lwa su u v '�Mr —;PzLln %%00 �' 264941 3.DOCX - 4 - I �� ilk l�llll�� 11 l� lf�l If ll� vulighl �to 6-�'000 Bertst County, NC t9ittar of Deeds page 5 of S My commission expires: `-�J 26494 [ 3.DOCX - 5 - Quible Quible & Associates, P.C. EPONEOMG • ENVRONKMAC SCIENCES • PLAWNG • SURVEYNG SINCE 19W August 1, 2012 Al Hodge Regional Supervisor NCDENR, DWQ ��, �u�,j� UE 943 Washington Square Malt Washington, NC 27889 RE: Partial Stormwater Management Certification Scotch Hall Preserve PUD, Phase 2 — Stormwater Permit No. SW7120106 Merry Hill Township, Bertie County, NC Dear Mr. Hodge, P.O. Drower870 KAty Hawk NC 279e9 Phone: 252-261-3300 Fax: 42.241.1260 Web: cpble.corn I, Michael W. Strader, Jr., P.E., as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe periodically the construction of the above referenced stormwater management system, hereby state that the construction of Scotch Hall Preserve PUD, Phase 2, Block 1 stormwater management, collection and conveyance has been completed in general conformance of the approved design plans and specifications. The reason for a "partial certification" is because new stormwater management, collection and conveyance has been installed for only Phase 2, Block 1. Other portions (Blocks) of the approved stormwater management system have not yet been installed at this time. The vegetated shelf on Pond 2 has not been installed as the pond continues to serve as a sediment basin as development of additional Blocks continues. Once all Phase 2 construction is complete, the vegetated shelf will be installed. Please do not hesitate to contact me at (252) 261-3300, or mstrader@quible.com should you have any questions and/or concerns. Sincerely, Quible &/Associates, P.C. Mich I W. Strader, Jr., P.E. Encl: Checklist of item on page 2 Cc: Bobby Masters, Rial Corporation ``OI J U 111/1� R 0�i ;�oQ`•'�cESS�o•••�'t''� W SEAL 9•=9037813 w � 1 ��ll r�g��iZoIZ Certification State Stormwater Management Systems Permit No._SW712Q1Q8 Certification Requirements: Page 2 of 2 V 1. The drainage area to the system contains approximately the permitted acreage. ✓ 2. The drainage area to the system contains no more than the permitted amount of built -upon area. ✓ 3. All the built upon area associated with the project is graded such that the runoff drains to the system. V 4. All roof drains are located such that the runoff is directed into the system. 5. The outlettbypass structure elevations are per the approved plan. _It/_6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outtet/bypass structure. �B. All slopes are grassed with permanent vegetation. �[ -_9. Vegetated slopes are no steeper than 3:1. ✓ 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. ✓ 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. T13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. �15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DWQ Regional Office Bertie County Building Inspections Par-4A-k Cc?1���'GaC[r one %Or -kJ %WLW k. 69-9,044 Page 9 of 10 `{ " BUSINESS CORPORATION ANNUAL REPORT I0.2017 NAME OF BUSINESS CORPORATION: Rial Corporation SECRETARY OF STATE ID NUMBER: 0123580 STATE OF FORMATION: NC REPORT FOR THE FISCAL YEAR END: 1 2/31 /201 8 SECTION A: REGISTERED AGENT'S INFORMATION 1. NAME OF REGISTERED AGENT: Business Fil 2. SIGNATURE OF THE NEW REGISTERED AGENT: 3. REGISTERED OFFICE STREET ADDRESS & COUNTY 160 Mine Lake Ct Ste 200 International, Inc. E-Filed Annual Report 0123580 CA201801800439 1/18/2018 02:11 ❑ Changes SIGNATURE CONSTITUTES CONSENT TO THE APPOINTMENT Raleigh, NC 27615 Wake County__ SECTION B: PRINCIPAL OFFICE INFORMATION 1. DESCRIPTION OF NATURE OF BUSINESS: Real Estate 4. REGISTERED OFFICE MAILING ADDRESS 160 Mine Lake Ct Ste 200 Raleigh, NC 27615 MEMO 'UtL 0 y 20�g 2. PRINCIPAL OFFICE PHONE NUMBER: (252) 482-5300 - 3. PRINCIPAL OFFICE EMAIL: Privacy Redaction 4. PRINCIPAL OFFICE STREET ADDRESS & COUNTY 5. PRINCIPAL OFFICE MAILING ADDRESS 105 scotch hall court 105 scotch hall court Merry Hill, NC 27957 Merry Hill, NC 27957 6. Select one of the following if applicable. (Optional see instructions) ❑ The company is a veteran -owned small business The company is a service -disabled veteran -owned small business SECTION C: OFFICERS (Enter additional officers in Section E.) NAME: Thomas Niederkofler NAME: Alois Rieder TITLE: President TITLE: Vice President NAME: TITLE: ADDRESS: C/o Scotch Hall Preserve ADDRESS: c/o Scotch Hall Preserve ADDRESS: 105 Scotch Hall Court Merry Hill, NC 27957 105 Scotch HAIL Court Merry Hill, NC 27957 SECTION D: CERTIFICATION OF ANNUAL REPORT. Section D must be completed in its entirety by a person/business enthomas Niederkofler 1/18/2018 SIGNATURE DATE Form must be signed by an officer listed under Section C of this form. Thomas Niederkofler President Print or Type Name of Officer Print or Type Title of Officer This Annual Report has been filed electronically. MAIL TO: Secretary of State, Business Registratlon Division, Post Office Box 29525, Raleigh, NC 27626-0525 1 4 Thorpe, Romer From: Daniel Sumerel <dsumerel@scotchhallpreserve.com> Sent: Friday, December 06, 2019 11:25 AM To: Thorpe, Roger Subject: Re: [External] RIAL Stormwater Permit Renewal SW7120106 Thank you Roger. I just dropped them off at the post office. Thanks. Daniel Get Outlook for iOS From: Thorpe, Roger <roger.thorpe@ncdenr.gov> Sent: Friday, December 6, 2019 11:22:57 AM To: Daniel Sumerel <dsumerel@scotchhallpreserve.com> Subject: RE: [External] RIAL Stormwater Permit Renewal SW7120106 Daniel I got your e-mail with attachments. We will send you an acknowledgement when the get the hard copies in the mail. Thanks Roger From: Daniel Sumerel <dsumerel@scotchhallpreserve.com> Sent: Friday, December 06, 2019 10:44 AM To: Thorpe, Roger <roger.thorpe@ncdenr.gov> Cc: Thomas Niederkofler<thomas.niederkofler@scotchhallpreserve.com>; Michael Strader <MStrader@quible.com> Subject: [External] RIAL Stormwater Permit Renewal SW7120106 Dear Mr. Thorpe, My name is Daniel Sumerel and I am the General Manager of the Scotch Hall Preserve Development in Merry Hill, NC. My apologies for any delays in getting the attached information to you. I have completed the Permit Renewal Application with the assistance of Thomas Niederkofler (President of RIAL Corporation) and Michael Strader (PE for Quible and Associates). Attached are the following documents: Copy of Completed Permit Application signed by Thomas as president of RIAL Corporation Copy of Processing Fee Check to NCDEQ for $505.00 Copy of Recorded Documents Copy of Designer Certification Copy of Latest Annual Report Filing with NC Secretary of State showing Thomas Niederkofler as president of RIAL Corporation. Some attachments are large. Please confirm receipt. I will also be mailing copies to your attention at the Washington Regional Office. I may be reached at 919-300-9316 or dsumerel@scotc_hhallpreserve.com Best Regards, Daniel Sumerel General Manager Scotch Hall Preserve 6)a:Ra NCDENR North Carolina Department of Environment and Natural Resources Division of Energy, Mineral, and Land Resources Land Quality Section Tracy E. Davis, PE, CPM Director August, 9, 2013 Ms. Rose Tummarello, CFO Rial Corporation 55 Beattie Place, Suite 100 Greenville, SC 29601 Pat McCrory, Governor John E. Skvada, III, Secretary Subject: Stormwater Permit No. SW7120106 Modification Scotch Hall Preserve PUD, Phase 2 High Density Subdivision Wet Pond Project Bertie County Dear Ms Tummarello: The Washington Regional Office received a complete Stormwater Management Permit Modification Application for Scotch Hall Preserve PUD, Phase 2 on July 15, 2013. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7120106 Modification, dated August 9, 2013, for the construction of the project. This Modification is for the removal of portions of previously named Street A and Street B as well as cul-de-sac extension of E. and W. Royal Way, reduction of total number of lots from 173 as originally permitted to 169 as proposed and to revise lot sizes and allowable built -upon areas per lot. This permit shall be effective from the date of issuance until April 24, 2020, shall void permit SW7120106 Modification issued on April 24, 2012 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Samir Dumpor, or me at (252) 946-6481. Washington Regional Office 943 Washington Square Mall, Washington, North Carolina 27889 • Phone: 252-946-6481 1 FAX: 252-975-3716 Internet: http:Ilwww.portal.ncdenr.oig/web/lrlland-quality An Equa} Opportunity I Affirmative Action Employer - 50%Recyded11C% Post Consumer Paper Sincerely, Patrick H. McClain, P.E. Regional Engineer PHM/SD: G:ISDIPermits-Wet pond 1SVV7120106MOD2 cc: Michael Strader, Jr, PE, Quible & Associates, P.C. Berne County Inspections Division of Coastal Management WWashington Regional Office State Stormwater Management Systems Permit No. SW7120106Modification STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Rial Corporation Scotch Hall Preserve PUD, Phase 2 Bertie County FOR THE construction, operation and maintenance of two wet detention ponds in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Energy, Mineral, and Land Resources and considered a part of this permit. This permit shall be effective from the date of issuance until April 24, 2020 and shall be subject to the following specified. conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The subdivision is permitted for 169 lots, each allowed a maximum of (see attached Table) square feet of built -upon area and an Amenity Area as shown on plans. 3. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 4. This project proposes a dry detention basin to serve as a stormwater flow reduction BMP to mitigate downstream peak stormwater flows. The credit for TSS removal has not been requested for this BMP. Page 2 of 9 State Stormwater Management Systems Permit No. SW7120106Modification 5 0 The built' -upon areas associated with this project shall be located at least 50 feet landward of all perennial and intermittent surface waters. The following design elements have been permitted for this wet detention pond stormwater facility, and must be provided in the system at all times. a. Drainage Area, ftz: b. Total Impervious Surfaces, ft2: c. Average Pond Design Depth, feet d. TSS removal efficiency: e. Design Storm: f. Permanent Pool Elevation, FMSL: g. Permitted Surface Area @PP ft2: h. Permitted Storage Volume, ft�: i. Storage Elevation, FMSL: j. Predevelopment 1 year 24 hour: k. Post development 1 year 24 hour: I. Controlling Orifice: m. Permanent Pool Volume, ft3 n. Forebay Volume, ft3: o. Maximum Fountain Horsepower: p. Receiving Stream / River Basin: q. Stream Index Number: r. Classification of Water Body: II. SCHEDULE OF COMPLIANCE Pond # 1 1,477,280 412,041 3.50 90% 1.5 10.10 44,486 97,263 at temp 12.00 1.02 1.92 4.0"0 pipe 146,829 26,995 1/2 HP Chowan River 25 "B; NSW" Pond # 2 1,385,474 712,768 4.0 90% 1.5 10.70 110,941 pool 153,501 12.00 1.09 3.09 5.0" 0 pipe 446,788 115,720 1.0 HP Salmon Creek 25-24 C, NSW No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot does not exceed the maximum allowed by this permit. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Energy, Mineral, and Land Resources, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. If an Architectural Review Board or Committee is set up by the permittee to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. 4. The Director may notify the permittee when the permitted site does not meet'one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 5. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. Page 3 of 9 State Stormwater Management Systems Permit No. SW71201 o6Modification 6. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area, e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as ail property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 7. The permittee shall submit for approval, final site layout and grading plans for any permitted future development areas shown on the approved plans, prior to construction. 8. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 9. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 10. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 11. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 12. The permittee shall at all times provide the operation and maintenance necessary to a"ssure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and re -vegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 13. Records of maintenance activities must be kept by the permittee. The records will indicate the date, activity, name of person performing the work and what actions were taken. 14. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Page 4 of 9 State Stormwater Management Systems Permit No. SW7120106Modification 15. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW7120106 Modification, as issued by the Division of Energy, Mineral, and Land Resources under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. c. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Energy, Mineral, and Land Resources. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Energy, Mineral, and Land Resources. f. The maximum built -upon area per lot is (see attached Table) square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. For those lots within CAMA's Area of Environmental Concern, where DCM calculates a different maximum lot built -upon area, the governing lot BUA shall be the most restrictive of the two numbers. h. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain.gutters, which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. i. Built -upon area in excess of the permitted amount will require a permit modification. j. If permeable pavement credit is requested, the property owner must submit a request, with supporting documentation, to the permittee and receive approval prior to construction of BUA. 16. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain ail of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 17. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 18. Decorative spray fountains will be allowed in the stormwater treatment systems, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. Page 5 of 9 State Stormwater Management Systems Permit No. SW7120106Modification d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump power for a fountain in pond #1 is % HP and pond #2 is 1.0 HP. 19. If permeable pavement credit is desired, the permittee must submit a request to modify the permit to incorporate such language as required by the Division of Energy, Mineral, and Land Resources. The request to modify must include a soils report identifying the type of soil, the Seasonal High Water Table elevation and the infiltration rate. Upon the successful completion of a permit modification, the individual lot owners that request to utilize permeable pavements must submit the necessary forms and documentation to the permittee and receive approval prior to construction of the permeable pavement: 20. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form signed by both parties, to the Division of Energy, Mineral, and Land Resources, accompanied by the supporting documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves a request to transfer the permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Energy, Mineral, and Land Resources, in accordance with North Carolina General Statute 143- 215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. Page 6 of 9 State Stormwater Management Systems Permit No. SW7120106Modificati6n 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008- 211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et. al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. This permit shall be effective from the date of issuance until April 24, 2020. Application for permit renewal shall be submitted 180 days prior to the expiration ,date of this permit and must be accompanied by the processing fee. Permit issued this the 9th day of August, 2013. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION ..v- for TFacy E. Davis, PE, CPM, Director Division of Energy, Mineral and Land Resources By Authority of the Environmental Management Commission Permit Number SW7120106 Modification Page 7 of 9 State Stormwater Management Systems Permit No. SW7120106Modification Scotch Hall Preserve PUD, Phase 2 Page 1 of 2 Stormwater Permit No. SW7120106 Modification Bertie County Designer's Certification 1, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 8 of 9 State Stormwater Management Systems Permit No. SW7120106Modification Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved . plan. cc: NCDENR-DEMLR Regional Office Bertie County Building Inspections Page 9 of 9 LOT # TOTAL AREA BUA % BUA sq.ft. 1 8,473.63 sf 0.19 ac 60.00% 5,084.18 sf 2 7,163.66 sf 0.16 ac 60.00% 4,298.20 sf 3 6,606.00 sf 0.15 ac 60.00% 3,960,00 sf 4 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf 5 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf 6 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf 7 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf 8 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf 9 6,600.00 sf 0,15 ac 60.00% 3,960.00 sf 10 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf _ e11. 7.,150.00 sf. 0.16 ac 60.00% 4,290.00 sf 12 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf 13 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf 14 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf 15 7,150.00 sf 0.16 ac 60.00% 4,290,00 sf 16 7,150.00 sf 0.16 ac 60.00% 4,290.00 sf 17 7,383.96 sf 0.17 ac 60.00% 4,430.37 sf 18 7,664.05 sf 0.18 ac 60.00% 4,598.43 sf 19 7,914.44 sf 0.18 ac 60.00% 4,748.67 sf 20 6,578.19 sf 0.15 ac 60.00% 3,946.92 sf 21 6,304.02 sf 0.14 ac 60.00% 3,782.41 sf 22 5,834.24 sf 0.13 ac 60,00% 3,500.54 sf 23 6,022.79 sf 0.14 ac 60.00% 3,613.67 sf 24 5,624.92 sf 0.13 ac 60.00% 3,374.95 sf 25 5,044.15 sf 0.12 ac 60.00% 3,026.49 sf 26 4,901.98 sf 0.11 ac L 60,00% 2,941.19 sf 27 4,776.80 sf 0.11 ac 60.00% 2,866.08 sf 28 5,208.48 sf 0.12 ac 60.00% 3,125.09 sf 29 9,925.87 sf 0.23 ac 60.00% 5,955.52 sf 30 10,189.79 sf 0.23 ac 60.00% 6,113.88 sf 31 9,986,65 sf 0.23 ac 60.00% 5,991.99 sf 32 9,911.90 sf 0.23 ac 60.00% 5,947.14 sf 33 9,917.51 sf 0.23 ac 60.00% 5,950.50 sf 34 9,922.49 sf 0.23 ac 60.00% 5,953.50 sf 35 9,927.48 sf 0.23 ac 60.00% 5,956.49 sf 36 9,920.09 sf 0.23 ac 60.00% 5,952.05 sf 37 9,910.71 sf 0.23 ac 60.00% 5,946.42 sf 38 6,827.59 sf 0.16 ac 60.00% 4,096.55 sf 39 6,827.59 sf 0.16 ac 60.00% 4,096.55 sf 40 23,604.70 sf 0.54 ac 60.00% 14,162.82 sf 41 19,917.62 sf 0.46 ac 40.00% 7,967.05 sf 42 19,283.29 sf 0.44 ac 40.00% 7,713.32 sf 43 18,092.46 sf 0.42 ac 40.00% 7,236,99 sf 44 18,085.87 sf 0.42 ac 40.00% 7,234.35 sf 45 18,295.32 sf 0.42 ac 40.00% 7,318.13 sf 46 18,696.30 sf 0.43 ac 60.00% 11,217.78 sf 47 18,929.18 sf 0.43 ac 40.00% 7,571.67 sf 48 18,713.58 sf 0.43 ac 60,00% 11,228.15 sf 49 18,187.40 sf 0.42 ac 40.00% 7,274.96 sf 50 17,630.07 sf 0.40 ac 40.00% 7,052.03 sf 51 17,072.71 sf 0.39 ac 40.00% 6,829.08 sf 52 15,601.84 sf 0.36 ac 60.00% 9,361.10 sf 53 14,055.90 sf 0.32 ac 60.00% 8,433.54 sf 54 19,443.36 sf 0.45 ac 60.00% 11,666.02 sf 55 9,966.42 sf 0.23 ac 60.00% 5,979.85 sf 56 9,697.93 sf 1 0.22 ac j 60.00% 5,818.76 sf LOT # TOTAL AREA BUA % B_ UA sg.ft. 57 18,950.54 sf 0.44 ac 60.00% 11,370.32 sf 58 11,768.94 sf 0.27 ac 60.00% 7,061.37 sf 59 14,141.90 sf 0.32 ac 60.00% 8,485.14 sf 60 15,167.38 sf 0.35 ac 40.00% 6,066.95 sf 61 15,180.20 sf 0.35 ac 40.00% 6,072.08 sf 62 15,173.79 sf 0.35 ac 40.00% 6,069.52 sf 63 15,068.85 sf 0.35 ac 40.00% 6,027.54 sf 64 15,005.58 sf 0.34 ac 40.00% 6,602.23 sf 65 15,073.42 sf 0.35 ac 40.00% 6,029.37 sf 66 15,085.98 sf 0.35 ac 40.00% 6,034.39 sf .,-.-67. 15,012.20 sf 0.34 ac 40.00% 6,004.88 sf fib 15,007.71 sf 0,34 ac 40.00% 6,003.08 sf 69 18,846.72 sf 0.43 ac 40.00% 7,538.69 sf 70 6,791.56 sf 0.16 ac 60.00% 4,074.93 sf 71 6,791.56 sf 0.16 ac 60.00% 4,074.93 sf 72 6,791.56 sf 0.16 ac 60.00% 4,074.93 sf 73 6,791.56 sf 0,16 ac 60.00% 4,074.93 sf 74 6,791.56 sf 0.16 ac 60.00% 4,074.93 sf 75 6,791.56 sf 0.16 ac 60.00% 4,074.93 sf 76 6,791.56 sf 0.16 ac 60,00% 4,674.93 sf 77 7,265.54 sf 0.17 ac 60.00% 4,359.32 sf 78 7,487.41 sf 0.17 ac 60.00% 4,492.44 sf 79 6,806.84 sf 0.16 ac 60.00% 4,084.10 sf 80 6,806.84 sf 0.16 ac 60.00% 4,084.10 sf 81 6,806.84 sf 0.16 ac 60.00% 4,084.10 sf 82 6,806.84 sf 0.16 ac 60.00% 4,084.10 sf 83 7,480.61 sf 0.17 ac 60.00% 4,488.37 sf 84 10,146.20 sf 0.23 ac 60.00% 6,087.72 sf 85 9,901.35 sf 0.23 ac 60.00% 5,940.81 sf 86 9,897.19 sf 0.23 ac 60.00% 5,938.31 sf 87 9,893.20 sf 0.23 ac 60.00% 5,935,92 sf 88 9,894.22 sf 0.23 ac 60.00% 5,936.53 sf 89 9,895.95 sf 0.23 ac 60.00% 5,937.57 sf 90 5,840.34 sf 0.13 ac 60.00% 3,504.20 sf 91 5.597.12 sf 0.13 ac 60.00% 3,358.27 sf 92 5,364.63 sf 0.12 ac 60.00% 3,218.78 sf 93 6,939.03 sf 0.16 ac 60.00% 4,163,42 sf. 94 7,344.67 sf 0.17 ac 60.00% 4,406.80 sf 95 6,838.03 sf 0.16 ac 60.00% 4,102.82 sf 96 6,838.03 sf 0.16 ac 60.00% 4,102.82 sf 97 6,838.03 sf 0.16 ac 60.00% 4,102.82 sf 98 7,506.31 sf 0.17 ac 60.00% 4,503.79 sf 99 6,742.03 sf 0.15 ac 60.00% ' 4,045.22 sf 100 6,818.02 sf 0.16 ac 60.00% 4,090.81 sf 101 6,818.02 sf 0.16 ac 60.00% 4,090.81 sf 102 6,818.02 sf 0.16 ac 60.00% 4,090.81 sf 103 6,818.02 sf 0.16 ac 60.00% 4,090.81 sf 104 6,818.02 sf 0.16 ac 60.00% 4,090.81 sf 105 6,632.96 sf 0.15 ac 60.00% 3,979.77 sf 106 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf 107 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf 108 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf 109 6,600.00 sf 0,15 ac 60.00% 3,960.00 sf 110 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf 111 6,600.00 sf 0.15 ac 60,00% 3,960.00 sf 112 9,826.82 sf 0.23 ac 60,00% 5,895.49 sf LOT # TOTAL AREA BUA % BUA_ sq.ft. 113 6,184.14 sf 0,14 ac 60.00% 3,710.48 sf 114 6,709.56 sf 0.15 ac 60.00% 4,025.74 sf 115 8,854.02 sf 0.20 ac 60.00% 5,312.41 sf 116 7,748.51 sf 0.18 ac 60.00% 4,649.11 sf 117 9,109.83 sf 0.21 ac 60.00% 5,465.90 sf 118 9,311.58 sf 0,21 ac 60.00% 5,586.95 sf 119 8,276.52 sf 0.19 ac 60.00% 4,965.91 sf 120 7,570.09 sf 0.17 ac 60.00% 4,542,05 sf 121 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf 122 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf _,123 6,6©OAO,sf......0.15 ac 60.00% 3,960.00 sf 124 6,600.00 sf 0.i5 ac 60.00% 3,960.00 sf 125 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf 126 7,150.00 sf 0.16 ac 60.00% 4,290.00 sf 143 6,956.76 sf 0.16 ac 60,00% 4,174.06 sf 144 8,578.68 sf 0.20 ac 60.00% 5,147.21 sf 145 9,431.98 sf 0.22 ac 60.00% 5,659,19 sf 146 6,085,36 sf 0.14 ac 60.00% 3,651.21 sf 147 6,353.95 sf 0.15 ac 60.00% 3,812.37 sf 148 6,005.37 sf 0.14 ac 60.00% 3,603.22 sf 149 21,076.54 sf 0.48 ac 60.00% 12,645.92 sf 150 19,853.10 sf 0.46 ac 60.00% 11,911.86 sf 151 23,448.94 sf 0.54 ac 60.00% 14,069.37 sf 152 24,076.79 sf 0.55 ac 60.00% 14,446.07 sf 153 23,546.70 sf 0.54 ac 60.00% 14,128.02 sf 154 19,534.77 sf 0.45 ac 40.00% 7,813.91 sf 155 17,336.88 sf 0.40 ac 40.00% 6,934.75 sf 156 32,987.82 sf 0.76 ac 40.00% 13,195.13 sf 157 28,976.43 sf 0.67 ac 40.00% 11,590.57 sf 158 24,316.06 sf 0.56 ac 40.00% 9,726,42 sf 159 18,860.28 sf 0.43 ac 60.00% 11,316.17 sf 160 16,239.85 sf 0.37 ac 60.00% 9,743.91 sf 161 16,999.55 sf 0.39 ac 60,00% 10,199.73 sf 162 17,172.54 sf 0.39 ac 60.00% 10,303.52 sf 163 14,531.73 sf 0.33 ac 60.00% 8,719.04 sf 164 13,825.84 sf 0.32 ac 40.00% 5,530.34 sf 165 i 3,597.29 sf 0.31 ac 40.00% 5,438.92 sf 166 13,826.84 sf 0.32 ac 40.00% 5,530.74 sf 167 14,187.15 sf 0.33 ac 40.00% 5,674.86 sf 168 14,552.84 sf 0.33 ac 40.00% 51821.14 sf 169 14,782.72 sf 0.34 ac 60.00% 8,869.63 sf DWQ USE ONLY Date Received Fee Paid Perinit Number -.s-3 A s rya Applicable Rules: ❑ Coastal SW —1995 ❑ Coastal SW — 2008 ❑ Ph I1- Post Construction (select rill that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M rnt Plan: j State of North Carolina ujcz�o Department of Environment and Natural Resource _ ��• Division of Water Quality i.... .�' �.... V C- D STORMWATER MANAGEMENT PERMIT APPLICATION FORM 5 2a13 Tlris form'nay I)e pliolocopied for use as are original I. Project GENERAL INFORMATION I-should 1. roject Name. (subdivision, facility, or establishment name - should be consistent �� of c ramie onlp#ai specifications, letters, operation and maintenance agreements, etc.): Scotch Hall Presence PUD, Phase 2 2. Location of Project (street address): Avoca Farm Road City:Merry_Hill Township County:Bertie Zip:27957 3. Directions to project (from nearest major intersection): Beginning at the intersection of U.S. 17 and NC 45proceed south on NC 45approximately 1.63 miles to the intersection of NC 45 and Avoca Farm Road. Turn left onto Avoca Farm Road and proceed approximately 4.25 miles. Turn left onto Scotch Hall Lane and enter gate into project. 4. Latitude:36° 00' 26" N L0ngitude:76° 41' 34" W of the main entrance to the project. IL PERMIT INFORMATION: 1. a. Specify whether project is (check one): []New ®Modification ❑ Renewal w/ Modification' 'Re?1CZ0(11S will? MO(lifartiarrs also requires SWU-102 Rerievul Applicaliorr Forrx b.If this application is being; submitted as the result of a modification to an existing permit, list the existing permit numberSW7120106 , its issue date (if knowrn)04 24/12 , and the status of construction: ❑Not Started []Partially Completed* ® Completed* *provide a designer's ccrtificatiwr 2. Specify the type of project (check one): ❑Lots Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑LAMA Major ❑Sedimentation/Erosion Control: ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number issue date and the type of each permit:Scotch Hall Preserve PUD, Phase 2, Berti-2012-002, 4/20/12, Erosion _ and Sedimentation Control Plan Permit 5. Is the project located within 5 miles of a public airport? ®No ❑Yes If yes, see S.L. 2012-200, Part VI: htipalportal.ncdenr.or/web/wq/wslsulstatesw>Irulcs laWs Form SWU-l0l Version 06Aug2012 Page I of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:IZial Corporation Signing Official & Title:[Zose Tummarello, CFO b.Contact information for person listed in item 1a above: Street Address:55 Beattie Place, Suite 100 City:Greenville State:SC Zip:29601 Mailing Address (if applicable):55 Beattie Place, Suite 100 City:Greenville State:SC Zip:29601 Phone: (252 } 482-4006 Fax: ( ) E; ma i I: rtum ma re I I o-ass oc.com c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below-) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable): City: State: Zip: Phone: ( } Fax: ( } Email: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:Scotch Hall Preserve Signing Official & Title:Dutch Remkes, Project -Manager b.Contact information for person listed in item 3a above: Mailing Address:101 Villa Way City:Merry Hill State:NC Zip:27957 Phone: (252 ) 267-8259 Fax: { �� Email: dremkes@scotchhallpreserve.cone 4. Local jurisdiction for building permits: Bertie County Point of Contact:Traci White Phone #: (252 ) 794-5336 Form SWU-101 Version 06Aug2012 Page 2 o1'6 IV. PROJECT INFORMATION 1. In the space provided below, bri�_ef1y summarize how the stormwater runoff will be treated. Stormwater runoff will be collected through a combination of curb and gutter, roadside vegetated swales, and storm sewer collection piping and then conveyed to two separate wet retention basins located at opposite ends of the uroiect a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUDApproval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph 11 - Post Construction 3. Stormwater runoff from this project drains to the Chowan River basin. 4. Total Property Area: 50.74 acres Total Coastal Wetlands Area: 0 acres Total Surface Water Area: 0 acres 7. Total Property Area (4) -Total Coastal Wetlands Area (5) -Total Surface Water Area (6) = Total Project Area': 50.74 acres Total project area shall be calculated to exclude the follorving: the normal pool of impounded structures, the area between the banks of sircarus and rivers, the area below the Normal High Water (NHW) line or Mean 1 it h Water (MHW) line, and coastal w0lands landroard from the NHW (or MHW) lure. The resultant project area is used to calculate overall percerrl built upon area (BL1A). Non -coastal wetlands landroard of the NHW (or MHW) line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 51.8 9. 1-Iow many drainage areas does the project have?2 (For high density, count 1 for each proposed cngine(,red st ornmlater BMP. For low density and other projects, use 1 for the whole property area) 10, Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basil Information Drainage Area 1 Drainage Area 2 Drainage Area Drains e Area Receiving Stream Name cAcwa Albemarle5ound Salmon Creek Stream Class R-1ver B;NSW QNSW Stream Index Number 7- 25-24 Total Drainage Area (sf) gay! 11 1,477,280 ✓ 1,417,950 t/ W_< 5 On -site Drainage Area (sf) 1,477,280 tin 1,417,950 Off -site Drainage Area (sf) n/a ✓ n/a Proposed Impervious Area** (sf) 412,041 732,340 '% Impervious Area** (total) 27.9% 51.6% Impervious" Surface Area Drainage Area 1 Drainage Area 2 Drainage Area _ Drainage Area _ On -site Buildings/Lots (sf) 299,225 584,916 r3 h1v On -site Streets (sf) 11,794 31,897 D,`j j On -site Parking (sf) 0 0 On -site Sidewalks (sf) 7,028 13,114 a � Other on -site (sf) 45,310 1,457 6'JY Future (sf) 0 0 Off -site (sf) 0 0 Existing BUA*** (so 48,684 100,956 Total (sf): 1 412,041 K732,340 * Stream Class and Index Number can be determined at: lrrtp: r.rrcdcrrr.or�>hucb/rr�rl[j�s/esrrlclrrssif7crrtiorrs ** lnt pervious area Is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sicleroalks, gravel areas, etc. ** Report only that amount of existing BUA that will remain after deaclopnient. Do not report any existing BLIA Unit is to be removed and rVhich Will be replaced by new BL1A. Form SWU-101 Version 06Aug2012 Page 3 of 6 11. How was the off -site impervious area listed above determined? Provide documentation. N/A Proiects in Union County: Contact DIVA Central Office staff to check if lice project is located within o Threatened & Didangered Species watershed that nta), be snbject to more stringent stornlimter rerlrrir-ernews as per 15A NCIC 02B ,0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.or}�/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/well/wq/ws/sti/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http//portal.ncdenr.org/weir/wq/ws/su/maw.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from litt_t)://_portal.ncdenr.org/web/wq/►vs/su/statesw/forms does. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. Mr�S 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants Form. (if required as per Part Vll below) 3. Original of the applicable Supplement Form(s) (sealed, signed ned and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to TAWS http://www.envhelp.org/pa�,es/onestopexpress.litml for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management fors.. — ptavtw,,r • the project. This is required in addition to the brief summary provided in tine Project Information, item 1. 6, A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations (one copy). S. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. Rw" p-S.A b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). Form SWU-101 Version 06Aw,2012 Pagc 4 of 6 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedude a site visit for DWQ to verify the SHWT prior to mbfnitial, (970) 796-7378J 10. A copy of the most current property deed. Deed book: 867 Page No: 660 ]]. For corporations and limited liability corporations (LLC): Provide documentation from the NC Lk Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http: / /www.secret,iry.state.nc.us/Corporations/CScarch.asl2x VI1. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from httl2://://portal.ncdenr.or6,/web/wq/�vs/su%statesw[forms_docs. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting I.ngineer:Michael W. Strader, fr., P.E. Consulting Firm: Ouible & Associates, P.C. Mailing Address: P.O. Drawer 870 City:Kitty Hawk State:NC Zip:27949 Phone: (252 } 261-3300 Fax: (252 ) 261-1260 _ LmaiL•mstrader�a quible.com IX. PROPERTY OWNER AUTHORIZATION (if Contact lrrforaarratiorr, item 2 has bcon filled out, corrapdele this section) 1, (print or l ype nrrnte of person listed in Contact Inforrrration, iterra 2a) , certify that own the property identified in this permit application, and thus give permission to (print or type rtat)te of person listed in Contact lraforanation, itean Ira) with (print or type name of organization listed in Colatact Inforanation, iteua 7a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 06Aug2012 Page 5 of'6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: 1, , a Notary Public for the State of , County of , do hereby certify that personally appeared before me this ____ day of , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICATION 1, (print or hjpe name of person listed in Contact Information, item In) Rose Tumirrnrello, CFO, Rial Corporation certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in nformance with the approved plans, that the required deed restrictions and protective'cQvenants will be recor d, and that the proposed project complies with the requirements of the applica�lerstorlfiwater rules \un A bLGA4G ,)H .1000 and any other applicable state stormwater requirements. Signa re-: r Date: I, �+F'*� �0 -� a Notary Public for the State of �� y'� � County of xrsS.�.� do hereby certify that rC.C�5e—�C.rihA! AtICCA0 personally appeared before me this ;�Oday of _--yLA&/Q V O/ and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, _ MATTHEW BROWN NOTARY PUBLIC, STATE OF NEW YORK Re9iwviion No. 01BR6213893 Qualified in Nassau County Commission Expires November 23.20 / SEAL My commission expires %l A Form SWU-10i Version 06Aug2012 Page 6 of 6 LOT # TOTAL AREA BUA 0A BUA sp.ft. 1 { 8,473.63 sf j 0.19 ac j 60.00% { 5,084.18 sf 2 7,163.66 sf { 0.16 ac { 60.00% { 4,298.20 sf 3 6,600.00 sf j 0.15 ac { 60.00% ' 3,960.00 sf 4 6,600.00 sf { 0.15 ac { 3,960.00 sf 5 M 6,600.00 sf 0.15 ac { _60.00% 60.00% { 3,960.00 sf 6 { 6,600.00 sf { 0.15 ac { 60.00% { 3,960.00 sf 7 { 6,600.00 sf { 0.15 ac { 60.00% { 3,960.00 sf 8 { 6,600.00 sf { 0.15 ac { 60.00% { 3,960.00 sf 9 { 6,600.00 sf { 0.15 ac 60.00% 3,960.00 sf 10 { 6,600.00 sf { 0.15 ac 60.00% j 3,960.00 sf 11 { 7,150.00 sf 1 0.16 ac i 60.00% 4,290.00 sf 12 { 6,600.00 sf 0.15 ac _{ 60.00% { 3,960.00 sf 13 { 6,600.00 sf 0.15_ac 60.00_%_ 3,960.00 sf 14 6,600.00 sf { 0.15 ac { _{ 60.00% 3,960.00 sf 15 { 7,150.00 sf { 0.16 ac J 60.00% { 4,290.00 sf 16 { 7,150.00 sf J 0.16 ac J 60.00% { 4,290.00 sf 17 { 7,383.96 sf 0.17 ac 60.00% { 4,430.37 sf 18 J 7,664.05 sf { 0.18 ac { 60.00% 4,598.43 sf 19 J 7,914.44 sf { 0.18 ac { 60.00% 4,748.67 sf 20 J 6,578.19 sf { 0.15 ac 60.00% 3,946.92 sf 21 6,304.02 sf { 0.14 ac { 60.00% 3,782.41 sf 22 5,834.24 sf { 0.13 ac { 60.00% 3,500.54 sf 23 6,022.79 sf { 0.14 ac { 60.00% 3,613.67 sf 24 5,624.92 sf { 0.13 ac , 60.00% { 3,374.95 sf 25 { 5,044.15 sf { 0.12 ac j 60.00% { 3,026.49 sf 26 { 4,901.98 sf j 0.11 ac j 60.00% { 2,941.19 sf 27 { 4,776.80 sf { 0.11 ac { 60.00% { 2,866.08 sf 28 { 5,208.48 sf j 0.12 ac 60.00% { 3,125.09 sf 29 { 9,925,87 sf 0.23 ac 60.00% { 5,955.52 sf 30 { 10,189.79 sf 0.23 ac 60.00% { 6,113.88 sf 31 9,986.65 sf 0.23 ac 60.00% { 5,991.99 sf 32 9,911.90 sf 0.23 ac 60.00% 5,947.14 sf 33 J 9,917.51 sf 1 0.23 ac l 60.00% j 5,950.50 sf 34 9,922.49 sf j 0.23 ac { 60.00% j 5,953.50 sf 35 j 9,927.48 sf 0.23 ac j 60.00% J 5,956.49 sf 36 j 9,920.09 sf 0.23 ac { 60.00% J 5,952.05 sf 37 J 9,910.71 sf { 0.23 ac { 60.00% { 5,946.42 sf 38 J 6,827.59 sf { 0.16 ac { 60.00% 4,096.55 sf 39 J 6,827.59 sf { 0.16 ac { 60.00% 4,096.55 sf 40 23,604.70 sf 0.54 ac { 60,00% 14,162.82 sf 41 19,917.62 sf 0.46 ac 40.00% 7,967.05 sf 42 19,283.29 sf 0.44 ac { 40.00% 7,713.32 sf 43 18,092.46 sf ' 0.42 ac { 40.00% { 7,236.99 sf 44 { 18,085.87 sf { 0.42 ac { 40.00% 7,234.35 sf 45 f 18,295.32 sf { 0.42 ac { 40.00% 7,318.13 sf 46 J 18,696.30 sf J 0.43 ac 60.00% { 11,217.78 sf 47 j 18,929.18 sf { 0.43 ac 40.00% 7,571.67 sf 48 j 18,713.58 sf { 0.43 ac { 60.00% { 11,228.15 sf 49 { 18,187.40 sf 0.42 ac 40.00% 7,274.96 sf 50 ` 17,630.07 sf i 0.40 ac 40.00% { 7,052.03 sf 51 { 17,072.71 sf { 0.39 ac { 40.00% { 6,829.08 sf 52 { 15,601.84 sf { 0.36 ac { 60.00% { 9,361.10 sf 53 { 14,055.90 sf { 0.32 ac { 60.00% { 8,433.54 sf 54 { 19,443.36 sf { 0.45 ac J 60.00% { 11,666.02 sf 55 { 9,966.42 sf J 0.23 ac J 60.00% { 5,979.85 sf 56 { 9,697.93 sf J 0.22 ac J 60.00% { 5,818.76 sf U U €. 1 5 2013 DMA]- I °AV O-ARC LOT # TOTAL AREA BUA % BUA sp.ft. 57 18,950.54 sf 0.44 ac 60.00% 11,370.32 sf 58 11,768.94 sf 0.27 ac j 60.00% 7,061.37 sf 59 14,141.90 sf 0.32 ac J 60.00% 8,485.14 sf 60 15,167.38 sf 0.35 ac 40.00% 6,066.95 sf 61 15,180.20 sf 0.35 ac 40.00% 6,072.08 sf 62 15,173.79 sf 0.35 ac 40.00% 6,069.52 sf 63 15,068.85 sf 0.35 ac 40.00% 6,027.54 sf 64 15,005.58 sf 10.34 ac 1 40.00% 6,002.23 sf 65 15,073.42 sf 0.35 ac 40.00% _ 6,029.37 sf 66 15,085.98 sf 0.35 ac 40.00% 6,034.39 sf 67 15,012.20 sf 0.34 ac 40.00% 6,004.88 sf 68 15,007.71 sf 0.34 ac 40.00% 6,003.08 sf 69 18,846.72 sf 0.43 ac 40.00% 7,538.69 sf 70 6,791.56 sf 0.16 ac 60.00% 4,074.93 sf 71 6,791.56 sf 10.16 ac I 60.00% 4,074.93 sf 72 6,791.56 sf 0.16 ac 60.00% 4,074.93 sf 73 6,791.56 sf 0.16 ac 60.00% 4,074.93 sf 74 6,791.56 sf 0,16 ac 60.00% 4,074.93 sf 75 6,791.56 sf 0.16 ac 60.00% 4,074.93 sf 76 6,791.56 sf 0.16 ac 60.00% 4,074.93 sf 77 7,265.54 sf 0.17 ac I 4,359.32 sf 78 7,487.41 sf 0.17 ac _60.00% 60.00% 4,492.44 sf 79 6,806.84 sf 0.16 ac 60.00% 4,084.10 sf 80 6,806.84 sf 0.16 ac 60.00% 4,084.10 sf 81 6,806.84 sf 0.16 ac 60.00% 4,084.10 sf 82 6,806.84 sf 0.16 ac 60.00% 4,084.10 sf 83 7,480.61 sf 0.17 ac 60.00% 4,488.37 sf 84 10,146.20 sf 0.23 ac 60.00% 6,087.72 sf 85 9,901.35 sf 0.23 ac 60.00% 5,940.81 sf 86 9,897.19 sf 0.23 ac 60.00% 5,938.31 sf 87 9,893.20 sf 0.23 ac 60.00% 5,935.92 sf 88 9,894.22 sf 0.23 ac 60.00% 5,936.53 sf 89 9,895.95 sf 0.23 ac 60.006/6 5,937.57 sf 90 5,840.34 sf 0.13 ac 60.00% 3,504.20 sf 91 5,597.12 sf 0.13 ac 60.00% 3,358.27 sf 92 5,364.63 sf 0.12 ac I 60.00% 3,218.78 sf 93 6,939.03 sf 0.16 ac 60.00% I 4,163.42 sf 94 j 7,344.67 sf 0.17 ac 60.00% 4,406.80 sf 95 6,838.03 sf 0.16 ac 60.00% 4,102.82 sf 96 6,838.03 sf 0.16 ac 60.00% 4,102.82 sf 97 6,838.03 sf 0.16 ac 60.00% sf 98 7,506.31 sf 0.17 ac 60.00% _4,1_02.82 4,503.79 sf 99 6,742.03 sf 0.15 ac 60.00% 4,045.22 sf 100 6,818.02 sf 0.16 ac 60.00% 4,090.81 sf 101 j 6,818.02 sf 0.16 ac 60.00% 4,090.81 sf 102 6,818.02 sf 0.16 ac 60.00% 4,090.81 sf 103 ' 6,818.02 sf 0.16 ac 60.00% 4,090.81 sf 104 6,818.02 sf 0.16 ac 60.00% 4,090.81 sf 105 6,632.96 sf 10.15 ac I 60.00% 3,979.77 sf 106 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf 107 j 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf 108 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf 109 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf 110 ' 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf 111 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf 112 9,825.82 sf 0.23 ac 60.00% 5,895.49 sf LOT # TOTAL AREA BUA % BUA sq.ft. 113 6,184.14 sf 0.14 ac 60.00% 3,710.48 sf 114 6,709.56 sf 0.15 ac 60.00% 4,025.74 sf 115 8,854.02 sf j 0.20 ac j 60.00% j 5,312.41 sf 116 7,748.51 sf , 0.18 ac , 60.00% 4,6_49.11 sf 117 9,109.83 sf 0.21 ac 60.00% 5,465.90 sf 118 I 9,311.58 sf J 0.21 ac J 60.00% 5,586.95 sf 119 8,276.52 sf 0.19 ac 1 60.00% 4,965.91 sf 120 7,570.09 sf 0.17 ac j 60.00% 4,542.05 sf 121 6,600.00 sf 0.15 ac 60,00% 3,960.00 sf 122 I 6,600.00 sf J 0.15 act 60.00% 3,960.00 sf 123 6,600.00 sf , 0.15 ac 60.00% 3,960.00 sf 124 6,600.00 sf 0.15 ac 60.00% 3,960.00 sf 125 6.600.00 sf 0.15 ac 60.00% 3,960.00 sf 126 7,150.00 sf 0.16 ac 60.00% j 4,290.00 sf 143 6,956.76 sf 0.16 ac 60.00% 4,174.06 sf 144 8,578.68 sf 0.20 ac 60.00% 5,147.21 sf 145 j 9,431.98 sf 0.22 ac 60.00% J 5,659.19 sf 146 , 6,085.36 sf J 0.14 ac 60.00% 3,651.21 sf 147 6,353.95 sf 0.15 ac 60.00% J 3,812,37 sf 148 J 6,005.37 sf j 0.14 ac J 60.00% 3,603.22 sf_ 149 21,076.54 sf ! 0.48 ac ' 60.00% 12,645,92 sf 150 J 19,853.10 sf 0.46 ac j 60,00% J 11,911.86 sf 151 23,448.94 sf 0.54 ac J 60.00% 14,069.37 sf 152 24,076.79 sf 0.55 ac �_ 60.00% j 14,446.07 sf 153 23,546.70 sf 0.54 ac 60.00% 14,128.02 sf 154 19,534.77 sf 0.45 ac 40,00_% 7,813.91 sf 155 17,336.88 sf 0.40 ac 40.00%ij 6,934.75 sf _ 156 32,987.82 sf J 0.76 ac 40.00% ' 13,195.13 sf 157 28,976,43 sf 0.67 ac 40.00% 11,590.57 sf 158 24,316.06 sf 0.56 ac 40.00% 9,726.42 sf 159 J 18,860.28 sf 0.43 ac 60.00% 11,316.17 sf 160 16,239.85 sf 0.37 ac I 60.00% 9,743.91 sf 161 ` 16,999.55 sf 0.39 ac 60.00% 10,199.73 sf 162 17,172.54 sf 0.39 ac 60.00% 10,303.52 sf 163 14,531.73 sf j 0.33 ac 1 60.00% J 8,719.04 sf 164 13,825.84 sf 0.32 ac 40.00% I 5,530.34 sf 165 13,597.29 sf 0.31 ac 40.00% 5,438.92 sf 166 13,826.84 sf 10.32 ac 40.00% 5,530.74 sf 167 14,187.15 sf 10.33 ac 40.00% I 5,674.86 sf 168 14,552.84 sf 0.33 ac 40.00% 5,821014 sf 169 J 14,782.72 sf 0.34 ac 60.00% 8,869.63 sf 4 m1a NCDENR North Carolina Department of Environment and Natura Division of Water Quality Pat McCrory Governor Ms. Rose Tummarello, Rial Corporation 55 Beattie Place, Suite Greenville, SC 29601 CFO 100 Thomas A. Reeder Activity Director July 29, 2013 Resources John E. Skvarla, III Secretary Subject: Request for Additional Information Stormwater Permit No. SW7120106 MOD Scotch Hall Preserve PUD, Phase 2 Bertie County Dear Ms. Tummarello: The Washington Regional Office received a Coastal Stormwater Permit Modification Application for the Scotch Hall Preserve PUD, Phase 2 project on July 15, 2013. A preliminary review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. Revised calculations and wet detention supplement forms for both wet detention basins (drainage areas 1 and 2). The requested information should be received in this Office prior to August 29, 2013, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. Please reference the State assigned project number on all correspondence. If you have any questions concerning this matter please feel free to call me at (252) 948-3959 or email me at Samir.Dumpor@ncdenr.gov. Sincerely, 1 Samir Dumpor Environmental Engineer CC: lchael Strader, PE, Quible & Associates, P.C. Washington Regional Office North Carolina Division of Watcr Quality Internet: w%v%v.ncwaterqualitv.org 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer — 50% Recycled/10% Post Consumer Paper None rthCarolina Natural& Dum or, Samir From: Michael Strader <MStrader@quible.com> Sent: Friday, August 02, 2013 5:01 PM To: Dumpor, Samir Subject: FW: letter of request for additional info RE: Scotch Hall Preserve PUD Phase 2 Attachments: Scotch Hall Preserve PUD Ph 2 - request for additnl info.pdf; P03207 SHP Ph2 SWM Mod Comps.pdf; P03207 SHP Ph2 SWM Mod DAMaps.pdf; P03207 SHP Ph2 SWM Mod Wet Det Supplements.pdf Follow Up Flag: Follow up Flag Status: Flagged Categories: Red Category Samir, In response to your request for additional information, please find the attached pdfs containing the following documentation: • Updated computations • Updated wet detention basin supplements • Updated drainage area maps Please let me know if you require hard copies. Please review and do not hesitate to contact me should you have any questions and/or concerns. Thank you, Michael W. Strader, Jr., P.E. Director of Engineering Quible & Associates, P.C. 8 Juniper Trail P.O. Drawer 870 Kitty Hawk, NC 27949 t 252.261.3300 f 252.261.1260 m 252.207.6751 www.guible.com LEGAL DISCLAIMER The information transmitted is intended solely for the individual or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of or taking action in reliance upon this information by persons or entities other than the intended recipient is prohibited. If you have received this email in error please contact the sender and delete the material from any computer. From: Michael Strader Sent: Tuesday, July 30, 2013 10:37 AM To: Dumpor, Samir (samir.dumpor(@ncdenr.gov) Subject: FW: letter of request for additional info Samir, I am in receipt of your voicemail and the attached request for additional information. I should be able to provide this information to you this week via email and will follow up with a hard copy to you. Thank you, Michael W. Strader, Jr., P.E. Director of Engineering Quible & Associates, P.C. 8 Juniper Trail P.O. Drawer 870 Kitty Hawk, NC 27949 t 252.261.3300 f 252.261.1260 m 252,207.6751 www.ouible.com LEGAL DISCLAIMER The information transmitted is intended solely for the individual or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of or taking action in reliance upon this information by persons or entities other than the intended recipient is prohibited. If you have received this email in error please contact the sender and delete the material from any computer. From: Robbins, Della [mail Ila.robbins ncdenr. ov] Sent: Tuesday, July 30, 2013 10:30 AM To: Michael Strader Subject: letter of request for additional info Please see the attached for your copy. Della Robbins NCDFNR Administrative Assistant 943 Washington Square Mall Washington, NC 27889 (ph) 252-946-6481 (fax) 252-946-9215 Scotch Hall Preserve PUD, Phase 2 Revision - August 2013 Pre Redeviopment Pond No. 1 Storage Analysis For Compliance with NCDENR Storage Requirement Overall Pond Drainage Area = 1312206 sq.ft. 30.12 ac Runoff Volume of 1.5" Storm Drainage Area 1 Area = 1312206 sf Suface area (sf) C - Coef Storm (in) Storm (ft) Storage req. (cf) BUA 44902 0.95 1.5 0.125 5332.1 Pond 35625 1.00 1.5 0.125 4453.1 Landscape 1231679 1 0.20 1.5 0.125 30792.0 Rational C = 0.25 Total Storage Required (1.5" storm)= 40577.2 cf Temporary Storage Provided In Wet Pond Elev Area (sf) Avg area (sf) Volume (Cf) Cum Vol (cf) 10.10 35625 0 39311 35379.9 11.00 42997 35379.9 46796 46795.5 12.00 50594 82175.4 53953 53953 13.00 57312 136128.4 57312 1 57312 14.00 1 57312 193440.4 Total Storage Provided = 193440.4 cf Rain Fall Equivalent = 7.15 in. storm Scotch Nall Preserve PUD, Phase 2 Revision - August 2013 Proposed Pond No.1 Storage Analysis For Compliance with NCDENR Storage Requirement Overall Pond Drainage Area = 1477280 sq.ft. Runoff Volume of 1.5" Storm Drainage Area 1 Area = 1477280 sf BUA = 412041 sf 33.91 ac 33.91 ac 9.46 ac 27.89% Suface area (sf) C - Coef Storm (in) Storm (ft) Storage req. (cf) Amenity Imp. R/W impervious 45310 67506 0.95 0.95 1.5 0.125 5380.6 1.5 0.125 8016.3 Lots* 534176 0.57 1.5 0.125 38060.0 Pond 44486 1.00 1.5 0.125 5560.8 Landscape 785802 0.20 1.5 0.125 19645.1 * Cumulative Lot BUA percentage reduced from 60% to 56% within drainage area Rational C = 0.42 Total Storage Required (1.5" storm)= Temaorary Storaee Provided In Wet Pond Elev Area (sf) Avg area (5f) Volume (cf) Cum Vol (cf) 10.10 44486 0 47720 42948 11.00 50954 42948.0 54315 54315 12.00 57676 97263.0 Total Storage Provided = 97263.0 cf Rain Fall Equivalent = WetPond SA/DA Ratio Surface Area = 44486 Drainage Area = 1477280 SA/DA Ratio = 0.030 or 76662.7 cf 1.90 in. storm 3.01% Scotch Hall Preserve PUD, Phase 2 Amenity Mod. Drainage Calculations Pre Redevilopment Pond No. 2 Storage Analysis For Compliance with NCDENR Storage Requirement Overall Pond Drainage Area = 1136576 sq.ft. 26.09 ac Runoff Volume of 1.5" Storm Drainage Area 2 Area = 1136576 sf Suface area (sf) C - Coef Storm (in) Storm (ft) Storage req. (cf) BUA 55408 0.95 1.5 0.125 6579.7 Pond 103187 1.00 1.5 0.125 12898.4 Landscape 977981 0.20 1.5 0.125 1 24449.5 Rational C = 0.31 Total Storage Required (1.5" storm)= 43927.6 cf Temporary Storage Provided In Wet Pond Elev Area (sf) Avg area (sf) Volume (cf) Cum Vol (cf) 10.70 103187 0 105208 31562.4 11.00 107229 31562.4 112461 112460.5 12.00 117692 1 1 144022.9 Total Storage Provided = 144022.9 cf Rain Fall Equivalent = 4.92 in. storm Scotch Hall Preserve PUD, Phase 2 Revision - August 2013 Proposed Pond No. 2 Storage Analysis For Compliance with NCDENR Storage Requirement Overall Pond Drainage Area = 1385474 sq.ft. 31.91 ac Runoff Volume of 1.5" Storm Drainage Area 2 Area = 1385474 sf 31.81 ac BUA = 712768 sf 16.36 ac 51.45% Suface area (sf) C - Coef Storm (in) Storm (ft) Storage req. (cf) Amenity Imp. 1457 0.95 1.5 0.125 173.0 R/W impervious 132853 0.95 1.5 0.125 15776.3 Lots 792076 0.72 1.5 0.125 71286.8 Pond 110941 1.00 1.5 0.125 13867.E Landscape 349604 0.20 1.5 0.125 8740.1 * Cumulative Lot BUA percentage increased from 60% to 74% within drainage area Rational C = 0.63 Total Storage Required (1.5" storm)= Temoorary Storage Provided In Wet Pond Elev Area (sf) Avg area (SO Volume (cf) Cum Vol (cf) 10.70 110941 0 113111 33933.15 11.00 115280 33933.2 119568 119567.5 12.00 123855 153500.7 Total Storage Provided = 153500.7 cf 109843.9 cf Rain Fall Equivalent = 2.10 in. storm WetPond SA/DA Ratio Surface Area = 110941 Drainage Area = 1385474 SA/DA Ratio = 0.080 or 8.01% Scotch Hall Preserve PUD, Phase 2 Revision -August 2013 Wet Pond Supplement Calculations DAl - Pond i Pre development lyr, 24hr peak flow Q = CIA C = 0.25 1 = 0.135 in/fir A = 30.12 ac Q = 1.02 Post development lyr, 24hr peak flow * Area increased with addition of ponds Q = CIA C = 0.42 1 = 0.135 in/hr A = 33.91 ac Q = 1.92 Orifice Draw Down Calculations Pond 1 Q = CA(2gH)^0.5 H=Driving Head = D/3 = 0.63 C = arific coefficient = 0.6 Try orifice diameter= 4 inch A = Area = 3.14*(dA2)/ 0.087 sf Q = CA(2gH)^0.5 = 0.334 cfs DA2 - Pond 2 Pre development lyr, 24hr peak flow Q = CIA C = 0.31 1 = 0.135 in/hr A = 26.09 ac Q = 1.09 Post development lyr, 24hr peak flow * Area increased with addition of ponds Q = CIA C = 0.72 1 = 0.135 in/hr A = 31.81 ac Q = 3.09 Required Storage Volume = 77408.0 cf Drawdown = Required Storage Volume / Q = 2.68 days Orifice Draw Down Calculations Pond 2 Q = CA(2gH)^0.5 H=Driving Head = D/3 : 0.43 C = orific coefficient = 0.6 Try orifice diameter = 5 inch A = Area = 3.14*(d"2)/ 0.136 sf Q = CA(2gH)"0.5 = 0.432 cfs Required Storage Volume = 99930.1 cf Drawdown = Required Storage Volume / Q = 2.68 days Scotch Hall Preserve PUD, Phase 2 Revision - August 2013 Wet Pond Supplement Calculations DA1-Pond 1 Pre development iyr, 24hr peak flow Q = CIA C = 0.25 1 = 0.135 in/hr A = 30.12 ac Q = 1.02 Post development 1yr, 24hr peak flow Area increased with addition of ponds Q = CIA C = 0.42 1= 0.135 in/hr A = 33.91 ac Q = 1.92 Orifice Draw Down Calculations Pond 1 Q = CA(2gH)^0.5 H=Driving Head = D/3 : 0.63 C = orific coefficient = 0.6 Try orifice diameter = 4 inch A = Area = 3.14*(dA2)/ 0.087 sf Q= CA(2gH)^0.5 = 0.334 cfs DA2 - Pond 2 Pre development 1yr, 24hr peak flow Q = CIA C = 0.31 1 = 0.135 in/hr A = 26.09 ac Q = 1.09 Post development 1yr, 24hr peals flow * Area increased with addition of ponds Q = CIA C = 0.72 1= 0.135 in/hr A = 31.81 ac Q = 3.09 Required Storage Volume = 77408.0 cf Drawdown = Required Storage Volume / Q = 2.68 days Orifice Draw Down Calculations Pond 2 Q = CA(2gH)^0.5 H=Driving Head = D/3 : 0.43 C = orific coefficient = 0.6 Try orifice diameter= 5 inch A = Area = 3.14*(d^2)/ 0.136 sf Q = CA(2gH)A0.5 = 0.432 cfs Required Storage Volume = 99930.1 cf Drawdown = Required Storage Volume / Q = 2.68 days j� 44Z 7 I+� . _ F ly I SI-1 Ok Ilk Al Il r i II � .. ., rlrlr � I ,. i 1 �- , aar^, br �,i� •�•r_ - `, �� _ � v / 1 / % ✓ ' . �.1 ��{1 Est � � � 'ter/, _�' ~" •\ � . I'� 1 '• + 'lr:1 1`5� =5 Clio .._J1 i ; p PRE DEV. DRAINAGE AREA MAP z:�--3'_=",`,"'° . Quibla - _+ 3" PHASE 2 Min A.w�i.rn�P.C. 'a _ SCOTCH HALL PRESERVE PUA ,� M•=-- m — _T 11'1 •` .' '- 1 I I i,�j `�':'�4�i/Ili f •4 i'F; �1•M�i '::: IL WE E �N '< �x I;!..-C ��'-,1 �1�\;may r �1' �'�.`�. •C u .e .f g '�L -r Y� a �11, " ... �, r���` �j,Ly, i .I A-ti_�.•r, • . 'yr:.:: / 11 - � �\�__-,- .may ti r -I- ';`; `i:•.y-�ti='-;. ,n f r'.� e ; PO,S`I' DEV. DRAINAGE AREA MAP llc�luible Aewciva P.C. PHASE 2 SCOTCH NAIL PRHSeR VA PUD �,^" _ 2 •' ry �d S Ri[ Permit (to be provided by DWO) HCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled oul, printed and submitted. The Required Items Checkfisl (Part 111) must be printed, filled out and submitted along with all of the required information. � o F W A TFq�� 7 1.9P.RtJ;fECTdNFORMATION rL_ �,,.�Z.:,-WT T;,r:,�- w.' �-r Project name Scotch Hall Preserve PUD, Phase 2 Contact person Michael W. Slrader, Jr., P.E. Phone number 252.261.M Dale A6/2012 Drainage area number 2 ll:1Dl:51GN'INFORMATION 1,`',� :_:,;`l�^�9�=.`�a._.5`x:�,-s"_:.�?.,..,:�::.,.. ;"-. _��y���"'' �` r,.f.-r�.f r• `...-•,��� She Characteristics Drainage area Impervious area, post -development % impervious Design rainfall depth Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1-yr, 24-hr runoff Post -development 1-yr, 24-hr runoff Minimum vohane required Volume provided Peak Flow Calculations Is the prolpost control of the 1yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre -development Rational C, posl-davelopment Rainfall intensity: 1-yr, 24-hr storm Pre -development 1-yr, 24-hr peak flow Post -development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-ht peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1Oft vegetated shall elevation Bottom of 10fl vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there add'lional vohime stored above the state -required temp. pool? Elevation of the top of the additional volume 1,385,474 Rr 712,768 R' 51.45 % 1.5 In 109,844 R' OK 153,501 n3 OK, volume provided is equal to or In excess of volume required. R3 R3 n3 fl' ft' Y (Y ar N) 3,2 in 0.31 {unhiess) 0.72 (unnless) a TT Whr OK 1,09 n'Isec 3.09 fl3lsec 2•00 R3lsec 12,00 hnsl 10,70 tmsl 10.70 " 11.20 tmsi 10.20 tmst Data not needed for ca$culation option 1t1, but OK if provided. 6.00 hasl 5.00 fmsl Data not needed for calculation option A1, but CK 9 provided, 1.00 n y (Y or N) 12.0 tmsl OK Form SW401-Wet Detant'bn Basin-Rev.8•907/09 Pana t, a II. Dealan Summary, Pago r of 2 Permit No. (to be provided by DWO) I1.1DESIGN,INFORMATION Surface Areas Area, temporary pool 123,855 1' Area REQUIRED, permanent pool 47,383 ft' SAIDA ratio 3,42 (unitlass) Area PROVIDED, permanent pool, Ap,._,,,, 110,941 lt' OK Area, bottom of 1 Oft vegetated shell, A i ow 77,441 It' Area, sediment cleanout, top elevation (bottom of pond), Ab j_ ,,,d 61,827 fi' Volumes Volume, temporary pool 153,501 ft' OK Votume, permanent pool, Vpm_pod 446,7a8 ft3 Volume, forebay (sum of forebays If more than one forebayl 115,720 ft3 Forebay % of permanent pool volume 25.9% % Insufficient forebay volume. SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mourrtain/Pledmont SAIDA Table Used? SAIDA ratio Average depth (used In SAIDA table): Calculation option 1 used? (See Flgura 10.2b) Volume, permanent pool, Vp. ,y� Area provided, permanent pool, Ap„._,,, Average depth calculated Average depth used In SAIDA, d,,, IRound to nearest 0.5lt) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Ajw ,_ ,,, Area, bottom of 10ff vegetated shelf, Aw , o Area, sediment cieanout, lop elevation (bottom of pond), Ab„_,,d 'Depth' (distance blw bottom of 1Off shelf and top of sediment) Average depth calculated Average depth used In SAlDA, d,,, (Round to nearest 0.5111) Drawdown Calculations Drawdown through orifice? Diameter of orifice lit circular) Area of orifice (II -non -circular) CoafBciem of discharge (Co) Driving head (FU Drawdown through weir? Weir type Coefficient of dlSCharge (C.) Length of weir (L) Driving head (H) Pre -development 1-yr, 24-hr peak flew Post -development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time AddMfonal Information Vegetated side slopes Vegetated shatl slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures an runoli at ultimate build -out? Drain mechanism for maintenance or emergencies Is: Form SW4D1 -Wei ❑etnMon Basin-Rev.6.9117109 90 % Y (Y or N) N . (Y or N) 3.42 (uMless� Y (Y or N) 446,788 tt' 110,941 it' 4.02 It OK 4.0 If OK n (Y or N) 110,941 ft2 77,441 It 61,827 fi' 4,20 ft It ft Y (Y or N) 5.00 in In2 0.60 (unitless) 043 it n (Y or N) (unliess) (unitless) It It 1.09 ftlIsec 3.09 fl'lsoc 0.43 M'Isec 2.68 days OK, draws down In 2.5 days. 3 :1 OK 10 :1 OK 10,01 OK 4 :1 OK 3.8 :1 OK y (Y or N) OK 3.0 fl OK n (YorN) OK y (Y or N) OK y (Y or N) OK PUTR Parrs I. S II. Design Summary. Page 2 of 2 Permit (10 be provkasd by owo) ®A%A NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part fit) must be printed, (Ned out and submitted along w)lh all of the required information, IjP.ROJECT,INFORMA71ON =i _ ,-- ' —, —•* - .� -- T _ -n r.:T it r =—e:- - —t• -= - Pra{ect name Scotch Hall Preserve Pi Phase 2 Contact person Michael W. Strader, Jr., P.E. Phone number 252-261.33M Data 4113012 Drainage area number t O�ot W A T �.q I L , DESIGN INFORMATION — -- r - �- --�� - -r'. r r .r -a —p r• ,--, She Characteristics Drainage area 1,477,280 n' Impervious area, post -development 412,041 fl2 % impervtous 27.69 % Design rainfall depth 1.5 in Storage Volume: Non -SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5' runoff volume Pre -development 1 -yr. 24-hr runoff Post-developmenl 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the preiposl control of the lyr 24hr stone peak flow required? 1-yr. 24-hr rainfall depth Rational C, pre -development Rational C, post-davatopment Rainfall intensity: 1-yr, 24-hr storm Pre -development 1 •yr, 24-hr peak flaw Post-developmenl 1-yr, 24-hr peak flow PreJPosi 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Tap of 10n vegetated shall elevation Bottom DI 10n vegetated shelf elevation Sediment cleaned, lop elevation (bottom of pond) Sediment cleanoul, bottom elevation Sediment storage provided Is there additional volume stored above the state -required temp. pool? Elevation of the top of the additional volume 76.663 fe OK 97,263 tt3 OK, volume provided Is equal to or in excess of volume required. n3 n' tl� If 03 n (Y or M 3.2 in 0.25 (unilless) 0.42 (unitless) 0.14 Inthr OK 1.02 ft isec 1.92 n'isec 0.90 n3isec 12.00 fmsl 10.10 fmsa 10;10 frrrsf 10.60 frnsl 9.60 fmsl Data not needed for calculation option A1, but OK If provided. 6.00 hnsl 5,00 hnsl Data not needed for calculation option 111, but OK If provided. 1.00 n (Y or N) 12.0 tmsl OK Form SW401•Wa1 Detention Basin-Rev.8-9117109 Parts I. a II. Oasign Summary, Page 1 of 2 Permit (to be provkled by D WO) I1.90ESIGN INFORMATION Elf- — i_. ; .,., _' R : _ _ » . Surface Areas Area, temporary pool 57,676 ft2 Area REQUIRED, permanent pool 41,364 ft' SNDA ratio 2.80 (unRlass) Area PROVIDED, permanent pool, Apm_,,, 44,486 ft2 OK Area, bottom of fOtt vegalaled shelf, A yMr 37,097 fl2 Area, sediment cleanoO, lop elevation (bottom o(pond), A,,y,,,a 25,505 flz Volumes Volume, temporary pool 97,263 ft3 OK Volume, permanent pool. Vo,._ 146,829 ft' Volume, forebay {sum of forebays 11 more than one forebay) 26,995 ft' Forebay % of permane it pool volume 18.4% % OK MMA Table Data Design TSS removal 90 % Coastal SWDA Table Used? Y (Y or N) MounidinlPtedmonl SWDA Table Used? N (Y or N) SAMA ratio 2.80 (unMass) Average depth (used in SWDA table): Calculation Option 1 used? (See Figure 10.2b) Y (Y or N) ' Volume, permanent pool, Vp,�_.,j 146,829 ft3 Area provided, permanent pool. Aj m_m0j 44,4a6 ft3 Average depth calculated 3130 ft OK Average deplh used in SWDA, d,r, (Round to nearest 0.5ft) 3.5 fl OK Calculation option 2 used? (See Figure 10-2b) N (Y or N) Area provided, permanent pool, Aa,,,_,Q, 44,486 1112 Area, bottom of 1Oft vegetated shelf, Ab,_Otl 37,097 ff2 Area, sediment cleanoul, top elevation (bottom of pond), Abx_p" 25,505 ft' 'Depth' (distance b/w bottom of 1 Oft shelf and top of sedimersl) 3.60 ft Average depth calculated ff Average depth used In SWDA, d,y, (Round t0 nearest 0.5ft) It Orawdown Calculations Drawdown through orifice? y (Y or N) Diameter of orifice (it circular) 4.00 in Area of orifice (If•non-circutar) In2 Coefficient of discharge (Co) 0.60 (un$lass) Driving head (H,j 0.60 0 Drawdown through weir? (Y or N) Weir type (unitless) Coefficient of discharge (C„) (unflless) Length of weir (L) ft Driving head (H) It Pre -development 1 •yr, 24•hr peak flow 1.02 ft'lsec Post -development 1 •yr, 24-hr peak flow 1.92 ft'lsec Storage volume discharge rate (through discharge orifice or web) 0,33 ft'/sec Storage volume drawdown time 2.68 days OK, draws down in 2.5 days. Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio ' Trash rack for overflow 8 orifice? Freaboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate bultd-out? Draln mechanlsm for maintenance or emergencies is: Form SW401•Wet Detention Sasin•Rov,e•91i7109 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 3.0 :1 OK Y (Y or N) OK 1.0 It OK N (Y or N) OK Y (Y or N) OK Y (Y or N) OK Pump Party 1. 6 II. Design Summary, Page 2 of 2 Quible Quible & Associates, P.C. ENGINEERING • ENVIRONMENTAL SCIENCES • PiANNING • SURVEYING &NCE 1959 July 1, 2013 Samir Dumpor NCDENR, DWQ 1601 Mail Service Center Raleigh, NC 27699-1601 P.O. Drawer 870 Kitty Howk, NC 27949 RCViDPhoFrae EEi : 252-261-3300 Web2qu ble,com JUL 15 2013 DWQ-WA�O Re: Scotch Hall Preserve, Phase 2 Stormwater Management Permit Mod. (Permit No. SW7120106) Merry Hill, Bertie County, NC Mr. Dumpor, Please find the following attached documents for a Stormwater Management Permit Modification per our recent telephone conversation: 1. One (1) original and one (1) copy of the Stormwater Management Permit Modification Application Form; 2. An application fee of $505.00 made to NCDENR; 3. A copy of the most current lot built upon area (BUA) list; 4. Sheets 1, 3, 4 & 5 of the revised Plan Set. The Permit Modification is for the removal of portions of previously named Street A and Street B as well as cul-de-sac extensions of E. and W. Royal Way. The lot configurations have been adjusted accordingly, therefore warranting submitted copies of the revised lot layouts and maximum built upon area (BUA) list. The percent BUA on Phase 2 is 60% for lots less than 13,000 sq.ft. and 40% for lots greater than or equal to 13,000 sq.ft. All lots that have been sold or are in the process of being sold have been kept at the previously permitted 60% as well. The enclosed BUA list clarifies the percent for each lot. The previously permitted storm ponds continue to meet the storage requirements, and the total surface area runoff within drainage area 1 to pond 1 is actually a reduction. Please do not hesitate to contact me by phone at (252) 261-3300 or email at mstrader@quible.com should you have any questions and/or concerns. Thank you for your attention to this project. Sincerely, Quible & Associates, P.C. Michay . Strader, Jr., P.E. Encl: as stated Cc: Rose Tummarello, CFO, Rial Corporation QUIBL.E & ASSOCIATES P.C. P.O. BOX 870 KITTY HAWK, NC 27949 (252) 261-3300 I N PAY TO THE ORDER OF FIRST BANK FOR aa,.G&��'� Q )I DATE /- ! y �L 2072 f � 66,456.531 11 $ _DOLLARS 8 J RECEIVED JUL 15 2013 pWq_WARO Pt. 300, App. C 40 CFR Ch. 1 (7-1-03 Edition) I. The 10 ml of DCM extract (from Sample ml/minute. Collect all eluent in the I0-rnl Procedure step 8 above) is placed in a small flask. vial and concentrated to dryness by nitrogen 9. Transfer a known volume of eluent to blowdown techniques using a steady stream another scintillation vial and blow down to of nitrogen (pre -purified gas). If the ail is se- dryness (nitrogen). verely biodegraded. a larger volume of DCM 10. Determine and retard weight (>10 ml) may be necessary for the 11. Dissolve in 1.0 ml hexane for the GUMS gravimetric analysis. analysis procedure (see below). 2. The residue is weighed 3 times for the 4.6.37 2 GC/MS analysis procedure,- gravimetric weight of oil. Record the weight Immediately prior to injection, an internal of the oil. standard solution of four deuteraLed coin- 3. Compare statistically (p a 0.05) the pounds is spiked into the sample extracts weight of the product treatment versus the and injected.. Samples are quantified usinge J, ,x weight of the control from each respective the Internal standard technique (10) for both the aliphatic and arornatic'fractions of the- >,:, time period. If a significant decrease is ob- served in the sampling (flask containing bio- oil extracts in order to provide sufficient in- remedlation agent) weight, then proceed formation that the oil is being degraded. To with the remainder of the sample procedure, help ensure that the observed declinerin,tar- 4.6.3 GUMS analysis. Often, analysis of get analytes is caused liy biodegradation saturated and aromatic hydrocarbons by rather than by physical loss from mis- capillary gas chromatography of DCM ex- handling or inefficient extraction, it Is nec- tracts leads to column fouling and deteriora- essary to normalize the .concentrations of the target analytes via a "conserved internal - Lion of separation characteristics. An alter- marker." Conserved internal markers that, native. simple "one-step" alumina sample have been found useful for quantification are cleanup procedure can be performed on oil - Cz- or C,-phenanthrene. Ci-chrysene, and before injection; this cleanup removes both C3o17oc(H),2I0(H)-hopanc. DeuteraLed internal asphaltenes and polar compounds and can be standards are used to calculate the relative applied to DCM extracts as well. This prate- response factor (RRF) for the target described dure Is described In steps 1-11 below. analyte(s). To compute the "normalized con - 4.6.Is A in GUMS sample cleanup centrations," the target analyze concentra- procedure: tion at a given sampling time is simply di- l. Weigh 9.0 alumina (neutral, BO-200 g g vided by the selected conserved analyte con - mesh) into scintillation vials covered loosely centration at the same sampling time (11). with aluminum foil caps. Prepare one scin- Conduct the GC1MS analysis using the fol- tillation vial per sample. Heat for 18 hours at lowing procedure. 300 °C or longer. Place in a desiccator of aili- 1. One (1) ml of the hexane extract (from ca until needed. Sample Procedure step 15 above) Is placed Z. Add 5.0 ml of DCM to a glass luerlok into a 1.5-ml vial for use on the autosampler multi -Fit syringe (e.g_ BD #2471) with stop- of the GUMS Instrument. cock (e.g., Perfecturn 46021) in closed posi- 2, To this solution, 20 pl of a 500-nglµl solu- tion, stainless steel syringe needle (19 Lion of the internal standards is added and gauge), and PTFE fries. Clamp in a vertical the vial is capped for injection. The final position. concentration of the internal standards in 3. Transfer 4.0 g of prepared alumina to a each sample is 10 nglpl. This solution con - plastic weighing boat and Dill syringe slowly tains 4 deuteraLed compounds: d,aaph- while applying continuous vibration (e.g., thalene, dig-anthracene, d12-chrysene. and Conair # HM I IFF1), d„-perylene. 4. Add a second PTFR frit and push into 3. At the start of any analysis period, the place on Lop of the alumina bed. mass spectrometer (MS) is tuned to PFTBA 5, Drain 5.0 all DCM to the top level of the by an autotune program, such as the Hew - column frit to await sample addition and dis- Jett -Packard quicktune routine, to reduce card DCM. operator variability. Set the CC/MS in the 6. Weigh 50 mg f 0.1 mg ANS521 oil into a SIM mode at a scan rate of 1.5 scans/second tared vial, to maximize the linear quantitative range 7. Premeasure 10 ml of DCM into a grad- and precision of the instrument. Set all uated cylinder. Add 0.2 to 0.3 ml of the DCM other conditions to those specified in Instru- to the tared oil vial. Mix and transfer sol- ment Configuration and Calibration section vent to the column bed with a Pasteur pi- below. pette. Open stopcock and collect in a 10-ml 4. An instrument blank and a daily stand - volumetric flask. Repeat until approxi- and are analyzed prior to analysis of un- mately 1,0 ml (do not exceed 1.0 ml) of DCM knowns. Internal standards are combined has rinsed the vial and inner walls of the sy- with the sample extracts and coinjected with range body into the 10-ml flask. each analysis to monitor the instrument's 8. Transfer balance of DCM from the grad- performance during each run. uated cylinder to the column and regulate 5. Information that should be included on the solvent flow rate to approximately 1 to 2 the acquisition form Include operator's name 238 FINALLY! LOWER RATE511 Affordable Health Insurance for North Carolina ! With ALL These Features Included Dr. Visits, Hospitalization, RX Lowest Rates In The Industry: Starting at: $129/mo Individual Starting at: $179/mo Couple Starting at: $299/mo Family THESE LOW RATES EXPIRE SOON!! Vision, Hearing & Dental No Co -Pay For Doctors 70%, 80%, & 100% Plans No annual Deductible A italization and Surgical Great Prescription Benefits xisting conditions ok Wellness Visits Nation Wide Doctor Network Diagnostic, X-Rays & Labs J 4'Depending on the plan type & enrollment, rates may be based on age & gender along with other factors such as medical questions. We Stand Behind Our Plans..:30,Day Free Look! 866©. 307�3242 To opt out from future faxes go to www.removemyfaxnumber.com and enter PIN# 16369, or call 877-284-7885. The recipient may make a request to the sender not to send any future faxes and that failure to comply with the requestwithin 30 days is unlawful. Dumpor, Samir From: Michael Strader <MStrader@quible.com> Sent: Friday, May 31, 2013 2:45 PM To: Dumpor, Samir Subject: Scotch Hail Preserve Attachments: P03207-base-ph2-blk2-drainage-052813.pdf; Scotch Hall Preserve Ph 2 permit.pdf Follow Up Flag: Follow up Flag Status: Flagged Categories: Red Category Samir, Good afternoon. I trust this email finds you doing well. The development layout within Scotch Hall Preserve PUD, Phase 2, Block 2 has been revised slightly with the removal of a loop roadway from the high density permit no. SW7120106. The attached exhibit illustrates the removal of the loop road and the lengthening of the soundfront lots from new lot numbers 152 through 169. With the removal of the roadway and associated roadside swales the lots become much longer but the allowable built upon area remains 60% of the total lot area as originally permitted. Since the permit is a high density permit, the developer wishes to replace the roadside swale that would have collected all impervious runoff from the developed lots along W. Royal Way with a storm sewer piping collection system with drain basins located at each front lot corner to allow roof drains to connect directly into the storm sewer for conveyance to the previously permitted BMPs. The attached exhibit shows the proposed storm sewer piping and basin improvements in red. Please review the plan and let us know if a letter of revision to address this change to the permitted plan set would suffice for the developer to implement these changes and remain in compliance with the high density permit. Please do not hesitate to contact me should you have any questions and/or concerns. Thank you, Michael W. Strader, Jr., P.E. Director of Engineering Quible & Associates, P.C. 8 Juniper Trail P.O. Drawer 870 Kitty Hawk, NC 27949 t 252.261.3300 f 252.261.1260 m 252.207.6751 www.guible.com LEGAL DISCLAIMER The information transmitted is intended solely for the individual or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of or taking action in reliance upon this information by persons or entities other than the intended recipient is 000, 8 0 00076 C� C I d Feder Package 11 Express US Airbill 1 From MUR4 Numbs 8033 807,5 3426 IDNo. 0215 Tr king Perm 1 r 1 4 Express Package Service •Teenkrad.x Packages up tor30rbs. ROM S.M.. We, has changed. Pla— wiecl carefully. hKAYeExp aFiNp a541G'11. , Senders �i �N Neme D T�LLETT t ''6i "33C)(i Phone 2 2 FedExFrstOvemight ❑ Fad&Way A,M. ❑ se:.d hufowfa Eariefl next ou"w morrdwyolikry m aelem bcedwr. Fritlay.hipmemf ril bedali—wi on moming� S.ardayO6-VNOT evakde. Moeryun1.q yVURDAY Deliya ealaerad. y Company GUIBLE & ASSOCIATES FedExPriorhry.0vemight ❑ N.db.mrrm morr.rg.•rridey ep .a d. FedE,2Day ElS.caM befirl.ss eRarmari TMxsd.y shmneads webadeli—edAnM-day140MSATURDAY lefesaTu daINaAdWUar'dayundRonvoerery 1s wl.Md. Deanery's elected. " Address �3 JUNIPER TfiL. Ned ExfSta adard O ❑ N=bu StandardQvemighs XFedbL Express Saver Fed Eritrea Express 0eputhor.rI a Sacxday O.bewy NOT-0WbI.. Sablydey D.Mn NDTa iebW. y Y c SOUTHERN SHORES State NC zIP 27949-3732 5 Packaging DeJ@o.dM.IxitS50a a ; I 2 Your Internal Billing Reference P!)3ZQ7, ❑ FedEx Envelope* Fed& Pak* ❑ FedEx ❑ FedEx ❑ Ofher sox Tube d EyJ IU 3 To 6 Special Handling and Delivery Signature Options Recipient's � \A 4 p Name I"T 1 1� D t �%`� � 2 q Phone Z 5 7- 1 � � � I ❑ SATURDAY Delivery NOT an&A.mrFodE�suw.mow dgn r.dEx2O.AM,o.FedE.Eeg .S— Comparry i 1 rJ lL UC NoSignatuteRequired Direct Signature [�Paewe sew e o sdn.Aeaan �.tlY.dhe3f Indirect Signature If."I.e yble.er.-*Wlp ❑ edmQ fotrr�l„.,en.lyrb,eq a , 9 a ee.. g e eq u.ue a ae.e. Y m.y a v /a d.i ay. r..,s� mma nwdgn o d.Lyrr ra dead.l d.gw h.eRfa o 9 !! /' 1 iQo! y�� `L 5 fZU1 C F_ HOLDWeekday FoErlocedonaddraa Does this shipment colltaindangerous goods? {r;NTC TL I�x hnx ea of any sa Address I ►ri .el.tl.l° Wmmdah—wPO baxoswPD Mcudes- f� ane moat bechecked. F9dE--� F,V m Y aepAloodS.M%_ J Yes Yes HOLD Saturday F.dE.locatlmedtlra Address REWIRE] hnii"ONLY w ❑red, Ariomy - eM Use Shia kne I., Lhe HOLD Ipcedan edd,.. or fir baatifu.bon ct your {hipping ad dreg. nF.dEA 2DW m r•I•cT City �A LE I &M State MIC ZIP 7�-1� — U 1QQ1 0107384645 w U 1 I 1 lel elllll le Ills flll ellln ells lell I✓t IIII{I 111 lel Ilelll ell IAIIM 1.11 111 e 8033 8015 3426 E&Na ❑ Afiiara thw ❑ srob.teeeclereean ❑ Dry :csuNlss . k shaper' DerWegon. apiredured - Danger.gwm[edleingdr. v.o—mat besrIpPW.FadbA.cUgirg ❑ CargoAircraftonly j a plead rn a fedEx Errpese Dmp e... i T Payment stlax Emu Fedtx Am1Na.ar Credit Card Na.b.Im obAcct ciD. Acct ND. ❑ Sender N,.d es mn ❑ Recipient ❑ Third Party ❑ Credit Card -; ❑ CeshlCheck lXrQ Uh. vu Total Packages Total Weight I r,.&C dAWt 16. to. lubifl'ekneed aUST100uAW. d.tlnmalrgir A.SeeCravmxWESur—Oumdebdmai. � 5J11 I - Ora 2112-Pon r1&113/•®1M-tplg Fad Ex• PRINTED INU. SA. SAS �N w,``*R�• SWcl�c w e ei i r! i r7�� I I iJ C! �1 rn to .....--- ...- i 3 �A X. IN IIF- 1 ! � .,fir- t � " `.-.-.:+.t..,.-...r.�. `1\'" ', /1// � � •, � + �1 ` I — y `+ � p MOCK 2 f � � a•' ..P' f � � � � r I n N f GRADING & DRAINAGE PLAN :�o +� Quibla - N PHASE 2 . r~� .� ...�,. m�efa�.ep P.C. ,„ , �m ' .e • ,,� . — SCCYFCH HALL PPJ35MVE PUD "�" � ���• "� • tp ���� NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P.E. Dee Freeman Governor Director Secretary Ms. Rose Tummarello, CFOS Rial Corporation 55 Beattie Place, Suite 100 Greenville, SC 29601 Subject: Stormwater Permit No. SW7120106 Modification Scotch Hall Preserve PUD, Phase 2 High Density Subdivision Wet Pond Project Bertie County Dear Ms Tummarello: The Washington Regional Office received a complete Stormwater Management Permit Modification Application for Scotch Hall Preserve PUD, Phase 2 on April 18, 2012. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7120106 Modification, dated April 24, 2012, for the construction of the project. This Modification is to add an Amenity Area to the previously permitted 173 lot residential subdivision. This permit shall be effective from the date of issuance until April 24, 2020, shall void permit SW7120106 issued on January 27, 2012 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Samir Dumpor, or me at (252) 946-6481. in erely, L Al Hod e Regiona upervisor Surface Water Protection Section AH/sd: K:ISD1Permits-Wet pond 1SW7120106MOD CC'. Michael Strader, Jr, PE, Quible & -Associates, P.C. Bertie County Inspections Ivision of Coastal Management Washington Regional Office North Carolina Division of Water Quality Internet: www.ncwatergnality,org 943 Washington Square Mall Phone: 252-946-6481 One Washington, NC 27889 FAX 252-946-9215 NorthCarofina An Equal Opportunity/Affirmative Action Employer-50% Recycled110% Post Consumer Paper ;Vatural& State Stormwater Management Systems Permit No. SW7120106Modification STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Ria! Corporation Scotch Hall Preserve PUD, Phase 2 Bertie County FOR THE construction, operation and maintenance of two wet detention ponds in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until April 24, 2020 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.6 on page 3 of this permit. The subdivision is permitted for 173 lots, each allowed a maximum of (see attached Table "A") square feet of built -upon area and an Amenity Area as shown on plans. 3. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 4. This project proposes a dry detention basin to serve as a stormwater flow reduction BMP to mitigate downstream peak stormwater flows. The credit for TSS removal has not been requested for this BMP. Page 2 of 10 State Stormwater Management Systems Permit No. SW7120106Modification C The built -upon areas associated with this project shall be located at least 50 feet landward of all perennial and intermittent surface waters. The following design elements have been permitted for this wet detention pond stormwater facility, and must be provided in the system at all times. a. b, C. d. e. f. 9. h. i. j. k. I. m n. o. p_ q• r. Drainage Area, ft2: Total Impervious Surfaces, ft2: Average Pond Design Depth, feet TSS removal efficiency: Design Storm: Permanent Pool Elevation, FMSL: Permitted Surface Area @PP ft2: Permitted Storage Volume, ftJ: Storage Elevation, FMSL: Predevelopment 1 year 24 hour: Post development 1 year 24 hour: Controlling Orifice: Permanent Pool Volume, ft3 : Forebay Volume, ft3: Maximum Fountain Horsepower: Receiving Stream / River Basin: Stream Index Number: Classification of Water Body: II. SCHEDULE OF COMPLIANCE Pond # 1 Pond # 2 1,477,280 1,417,950 413,720 618,905 3.50 4.0 90% 90% 1.5 1.5 10.10 10.70 44,486 110,941 97,263 at temp. pool 153,501 12.00 12.00 1.02 1.09 1.79 2.46 4.0"0 pipe 5.0" 0 pipe 146,829 446,788 26,995 115,720 1/2 HP 1.0 HP Chowan River Salmon Creek 25 25-24 '{B; NSW' C; NSW No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot does not exceed the maximum allowed by this permit. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. If an Architectural Review Board or Committee is set up by the permittee to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. 4. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 5. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. Page 3 of 10 State Stormwater Management Systems Permit No. SW7120106Modification 6. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 7. The permittee shall submit for approval, final site layout and grading plans for any permitted future development areas shown on the approved plans, prior to construction. 8. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 9. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 10. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 11. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 12. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. ' Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and re -vegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 13. Records of maintenance activities must be kept by the permittee. The records will indicate the date, activity, name of person performing the work and what actions were taken. 14. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Page 4 of 10 State Stormwater Management Systems Permit No. SW7120106Modification 15. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW7120106 Modification, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built -upon area .per lot is (see attached, Table "A") square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. For those lots within CAMA's Area of Environmental Concern, where DCM calculates a different maximum lot built -upon area, the governing lot BUA shall be the most restrictive of the two numbers. h. Ail runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters, which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. i. Built -upon area in excess of the permitted amount will require a permit .modification. j. If permeable pavement credit is requested, the property owner must submit a request, with supporting documentation, to the permittee and receive approval prior to construction of BUA. 16. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 17. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date.will be required. 18. Decorative spray fountains will be allowed in the stormwater treatment systems, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pooi surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. Page 5 of 10 State Stormwater Management Systems Permit No. SW7120106Modification d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump power for a fountain in pond #1 is'/z HP and pond #2 is 1.0 HP. 20. If permeable pavement credit is desired, the permittee must submit a request to modify the permit to incorporate such language as required by the Division of Water Quality. The request to modify must include a soils report identifying the type of soil, the Seasonal High Water Table elevation and the infiltration rate. Upon the successful completion of a permit modification, the individual lot owners that request to utilize permeable pavements must submit the necessary forms and documentation to the permittee and receive approval prior to construction of the permeable pavement. 21. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS 1. This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form signed by both parties, to the Division of Water Quality, accompanied by the supporting documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves a request to transfer the permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit Page 6 of 10 State Stormwater Management Systems Permit No. SW7120106Modification as allowed by the laws, rules and regulations contained in Session Law 2008- 211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et.al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at'least 30 days prior to making such changes. 12. This permit shall be effective from the date of issuance until April 24, 2020. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 24th day of April, 2012. NORTH CAIROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Charles IWakild, P.., Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW7120106 Modification Page 7 of 10 State Stormwater Management Systems Permit No. SW7120106Modification Scotch Hall Preserve PUD, Phase 2 Page 1 of 2 Stormwater Permit No. SW7120106 Modification Bertie County Designer's Certification I, as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 8 of 10 State Stormwater Management Systems Permit No. SW7120106Modif!cation Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains. to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3.1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DWQ Regional Office Bertie County Building Inspections Page 9 of 10 State Stormwater Management Systems Permit No. SW7120106Modification Scotch Hall Preserve PUD, Phase 2 Table "A" Lot # BUA Lot # BUA Lot # BUA Lot # BUA 1 5,084 45 4,492 89 3,710 133 4,230 2 4,298 46 4,084 90 4,026 134 5,803 3 3,960 47 4,084 91 4,174 135 5,862 4 3,960 48 4,084 92 5,147 136 6,037 5 3,960 49 4,084 93 5,659 137 6,279 6 3,960 50 4,084 94 3,651 138 6,295 7 3,960 51 4,518 95 3,812 139 6,201 8 3,960 52 4,075 96 3,603 140 6,109 9 3,960 53 4,075 97 7,833 141 5,978 10 3,960 54 4,075 98 7,280 142 6,561 11 4,290 55 4,075 99 5,266 143 8,373 12 3,960 56 4,075 100 4,975 144 10,975 13 3,960 57 4,075 101 4,727 145 5,566 14 3,960 58 4,075 102 4,971 146 4,518 15 4,290 59 4,359 103 4,821 147 5,255 16 4,290 60 4,045 104 4,320 148 6,719 17 4,430 61 4,091 105 4,320 149 5,117 18 4,598 62 4,091 106 4,716 150 4,215 19 4,749 63 4,091 107 4,899 151 3,960 20 3,947 64 4,091 108 4,899 152 4,144 21 3,782 65 4,091 109 5,936 153 4,288 22 3,501 66 3,980 110 5,922 154 4,288 23 3,614 67 4,407 111 7,356 155 4,116 24 3,375 68 4,103 112 6,040 156 4,260 25 3,026 69 4,103 113 6,031 157 4,260 26 2,941 70 4,103 114 5,981 158 4,075 27 2,866 71 4,504 115 5,935 159 4,329 28 3,125 72 3,504 116 5,933 160 4,212 29 5,956 73 3,358 117 5,934 161 4,212 30 6,114 74 3,219 118 5,937 162 4,375 31 5,992 75 4,163 119 4,290 163 4,375 32 5,947 76 6,088 120 3,960 164 4,202 33 5,951 77 5,941 121 3,960 165 3,860 34 5,956 78 5,938 122 3,960 166 5,047 35 5,956 79 5,936 123 3,960 167 6,651 36 5,952 80 5,937 124 3,960 168 3,829 37 5,946 81 5,938 125 4,542 169 4,270 38 6,724 82 3,960 126- 4,966 170 4,301 39 6,447 83 3,960 127 5,587 171 4,243 40 6,120 84 3,960 128 5,466 172 4,172 41 4,540 85 3,960 129 4,585 173 4,323 42 4,097 86 3,960 130 5,079 43 4,097 87 3,960 131 4,726 44 4,097 88 5,895 132 4,150 BUA - built -upon area (in square feet) Page 10 of 10 Stormwater Management Plan Narrative Scotch Hall Preserve PUD, Phase 2 — Bertie County Modification to Permit No. SW7120106 April 13, 2012 EXPRESS General APR 18 2012 ESS •� . 1, �i,� i. of oy. ° a Sr -AL r. 033759 — ° The following narrative will detail the mmodifieTsttormwater management plan for the Phase 2 development of the Scotch Hall Preserve PUD in Bertie County. The property owner intends to add an Amenity Area to the previously permitted 173 lot high density residential subdivision. The Proposed Amenity area will consists of a clubhouse, swimming pool, playground, walking trails, and associated parking facilities. The proposed Amenity Site is located on a 3.40 acre waterfront parcel of land centrally located within the subdivision. This parcel was not included in the original subdivision stormwater management permit. Stormwater runoff generated by the site will be directed to the two previously permitted detention basins located to the south of the subdivision. The stormwater detention basins were designed with adequate capacity to manage the additional volumes generated by the proposed Amenity area. The following narrative, application and calculations will demonstrate the parameters of the proposed modification, which will illustrate an effective stormwater management system in full compliance with all State regulations. Summary of Existing Conditions The Scotch Hall Preserve PUD, Phase 2 subdivision is situated on 50.74 acres of land. As aforementioned, the site is a permitted 173 lot high, density subdivision. Prior to being permitted as a high density subdivision, the site was permitted as a 54 lot low density subdivision. Infrastructure including roads, sewer utilities, and water service that were constructed to serve the 54 lots subdivision currently remains in place. Planned improvements included in the 173 lot high density permit are under construction at this time. Summary of Proposed Conditions The project proposes to add an Amenity area consisting of a clubhouse, swimming pool, playground, walking trails, and associated parking facilities on a 3.40 acre waterfront parcel of land centrally located within the subdivision. Proposed improvements for the Amenity area will be integrated with the subdivision and will serve as a recreation area for the residents of the subdivision. The Amenity Area improvements are proposed to be incorporated into the existing high density stormwater management plan currently serving the subdivision. Stormwater runoff generated by the site will be directed to either one of two previously permitted detention basins located to the south of the subdivision identified as Pond 1 and Pond 2 in Drainage Areas 1 and Drainage Area 2 (respectively) on the design drawings. The stormwater detention basins were designed with adequate capacity to manage the additional volumes generated by the proposed Amenity Area. The following sections will outline the permitted and proposed modified drainage characteristics of each Drainage Area. Drainage Area 1 The majority of the Amenity Area's BUA including all buildings, parking areas, and pool decks will be directed to Drainage Area 1 (DA1). The proposed improvements will add 49,212 sq.ft. of BUA and 73,330 sq.ft. of total area to DA1. Drainage Area 1 (DA1) is generally characterized by all land within the subdivision east of the intersection of Rieder Blvd and Royal Way and a portion of land located to the southeast of the subdivision. DA1 encompasses a total area of 1,477,280 sq.ft. (33.91 ac) and will have a total BUA of 413,720 sq.ft. (9.50 ar,) at final hiiild-nit. ✓ Collection Stormwater draining from the Amenity Area within DA1 will flow via overland to a discrete collection system or to vegetated swales located on -site. Stormwater collected by the Amenity Area's discrete collection system will be directed to a dry detention basin located on -site. The dry detention basin will serve as a flow reduction bmp designed to mitigate peak discharge flows. The basin is designed to reduce Amenity Area's peak flow of 9.30 cfs to 3.97 cfs during the 10 year rainfall event. The dry detention basin will discharge to the subdivision's permitted Stormwater collection system via a drawdown and overflow structure located within the basin. The basin will connect to the subdivision's drainage through an overflow pipe connection to a new downstream roadside drop inlet. Previously permitted stormwater collection via road side swales or roadside discrete collection system will be constructed or maintained as previously permitted with the exception of the basin's connection to the collection system. Two additional drop inlets and connecting culverts are proposed immediately downstream of the Amenity Area. The stormwater collection will direct stormwater to the permitted wet detention basin (Pond 1) located in the southeast portion of the Subdivision. Treatment The primary method of treatment will be via the wet detention basin. Several modes of treatment are available in the wet detention basin. Runoff first entering the basin will lose velocity and large particulates and sediment will settle out, primarily in the torebay. I he vegetated side slopes and vegetated shelf will provide filtration of runoff and nutrient uptake through natural biological processes. Preliminary treatment measures will include the dry detention basin located on the Amenity Site and the vegetated roadside swales located throughout the subdivision. Vegetation lining the dry detention basin and the roadside swales will allow for filtration of small particulates and nutrients prior to entering the wet detention basin. The dry detention basin will also allow for the removal 2 and precipitation of large particulates and sediments when the when higher velocity runoff is deenergized upon entering the basin. Storage The permitted wet detention basin is located in the southeast portion of the drainage area was originally sized with a storage volume in excess of the 1.5 inch rainfall event over the drainage area. The basin as designed has adequate storage volume to accommodate the proposed addition of the Amenity Area. The storage required to completely capture the first 1.5 inch rainfall event after the addition of the Amenity Area is 77,408 cf. The wet detention basin as permitted has a temporary storage volume of 97,185 cf. This storage volume is equivalent to the 1.88 inch rainfall event over the drainage area. Disposal The permitted wet detention basin was designed with sufficient storage capacity to manage in excess of the 1.5 inch storm event. At such time that the capacity is exceeded, additional flows will exit system via an overflow structure located at the east end of the detention basin. The overflow structure will is to be constructed with an orifice drawdown device that will drawdown the 1.5" rainfall volume in two to five days. The overflow structure will direct stormwater to a pair of existing 15" culverts that currently serve as a pond overflow device and convey excess stormwater to an existing drainage way and wetlands upstream of Salmon Creek. Drainage Area 2 A small portion of the Amenity Area's BUA will be directed to Drainage Area 2 (DA2). Propose Amenity Area BUA within DA2 will be limited to sidewalks and a playground area. the proposed improvements will add 1,372 sf of BUA and 11,283 sq.ft of total area to DA2. Drainage Area 2 (DA2) is generally characterized by all land within the subdivision west of the intersection of Rieder Blvd and Royal Way and a portion of land located to the southwest of the subdivision. DA2 encompasses a total area of 1,417,950 sq.ft. (32.55 ac) and will have a total BUA of 618,905 sq.ft. (14.21 ac) at final build -out. Collection Stormwater draining from the Amenity Area within DA2 will flow via overland to a vegetated swale located on the Amenity Site. The vegetated swale will connect to the permitted roadside swale collection system. Previously permitted stormwater collection via road side swales or roadside discrete collection will be constructed or maintained as previously permitted. The stormwater collection will direct stormwater to the permitted wet detention basin (Pond 2) located in the southwest portion of the Subdivision. 3 Treatment The primary method of treatment will be via the wet detention basin. Several modes of treatment are available in the wet detention basin. Runoff first entering the basin will lose velocity and large particulates and sediment will settle out, primarily in the forebay. The vegetated side slopes and vegetated shelf will provide filtration of runoff and nutrient uptake through natural biological processes. Preliminary treatment measures will include the vegetated roadside swales located throughout the subdivision. Vegetation lining the roadside swales will allow for filtration of small particulates and nutrients prior to entering the wet detention basin. Storage The permitted wet detention basin located in the southwest portion of the drainage area was originally sized with a storage volume in excess of the 1.5 inch rainfall event over the drainage area. The basin as designed has adequate storage volume to accommodate the proposed addition of the Amenity Area. The storage required to completely capture the first 1.5 inch rainfall event after the addition of the Amenity Area is 99,930 cf. The wet detention basin as permitted has a temporary storage volume of 153,501 cf. This storage volume is equivalent to the 2.30 inch rainfall event over the drainage area. Disposal The permitted wet detention basin was designed with sufficient storage capacity as to manage in excess of the 1.5 inch storm event. At such time that the capacity is exceeded, additional flows will exit system via an overflow structure located in the southern portion of the detention basin. The overflow structure is to be constructed with an orifice drawdown device that will drawdown the 1.5" rainfall volume in two to five days. The overflow structure will direct stormwater via a 36" culvert to an existing wetland drain located approximately 200 feet south of the wet detention basin. Calculations A copy of the Drainage Calculations are provided in the appendix of this narrative Conclusions The proposed stormwater management plan for this site provides stormwater treatment in excess of the required 1.5 inch rainfall event for all proposed impervious surfaces. The proposed system will offer preliminary and primary methods of treatment as well as an alternate method of disposal should the capacity be exceeded. This proposed design will more than adequately serve the stormwater management requirements of the site. 4 g DWQ USE ONI.Y ! ate Received Fee Paid Pernnil Number A ?o Applicable Rules: ❑ Coastal SW — 1995 ❑ Coastat'SW — 2008 ❑ Ph II - Post Construction (select all 0H1 OME"K,bn-Coastal SW- HQW/ORW Waters ElUniversal Stormwater Management Plan Other WQ M mt Plan: State of North Carolina CA - J Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form rimy be photocopied for rise as air original 1. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Scotch Hall Preserve PUD, Phase 2 2. Location of Project (street address): Avoca Farm Road City:Merry Hill Township County:13ertie Zip:27957 3. Directions to project (From nearest major intersection): Beginning at the intersection of U.S. 17 and NC 45, proceed south on NC 45 approximately 1.63 miles to the intersection of NC 45 and Avoca Farm Road. Turn left onto Avoca Farm Road and }proceed approximately__ 4.25 miles. Turn left onto Scotch Hall Lane and enter gate into project. 4. Latitude:36° 00' 26" N Longitude:0760 41' 34" W of the main entrance to the project. IL PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW7120106 , its issue date (if known)1-27-2012 , and the status of construction. ❑Nat Started ®Partially Completed* ❑ Completed* *provide a desiy)ier's cerlificatim Specify the type of project (check one): ❑Low Density ®High Density ❑Drains Loan Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state Stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®SedimentaLion/ Eros ion Control: 50.68 ac of Disturbed Area ❑NPDFS Industrial Stormwater ❑404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: Form SWU-l0l Version 07Jun20ltl Pave I ol'6 } III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Ilial Corporation Signing Official & Title:Rose Tumnnarello, CFO b.Contact information for person listed in item la above: Street Address:55 Beattie Place, Suite 100 City:Greenville State:SC Zip:29601 Mailing Address (if applicable):55 Beattie Place, State 100 City:Greenville State:SC Zip:29601 Phone: (252 1. 482-4006 Fax: { ] Email: r tum ma re l lo-assoc.com c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee's (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b.Contact information for person listed in item 2a above: Street Add City: Mailing Address (if applicable): City: Phone: l 1 Email: State: Zip: Sta Fax: Zip: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:Scotch Hall Preserve Signing Official & Title:Bobby Masters Project Manager b.Contact information for person listed in item 3a above: Mailing Address:101 Villa Way __ _ City:Merry Hill State:NC Zip:27957 Phone: C386, -_) 931-1693 l;mai1:bobby.masters23@gmaiI-corn 4. Local jurisdiction for building permits: Bertie County Fax: ( ) Point of Contact:Traci White Phone #: (252 ) 794-5336 Form SWU-101 Version 07RM2010 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater runoff will be collected _through a _combination of curb and };Litter and roadside vegch, ted swales and then conveyed to two separate wet retention basins located at olposite ends of the project. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUDApproval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ❑ Coastal SW —1995 ❑ Ph I i — Post Construction 3. Stormwater runoff from this project drains to the Chowan River basin. 4. Total Property Area: 50.74 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) — Total Coastal Wetlands Area (5) — Total Surface Water Area (6) = Total Project Area': 50.74 acres Total project area shall be calculated to e.rclucte the folloz0in the rrorntal pool of impounded structures, the area between the banks of streams artd rivers, the area below clue Nonual High Water (NHW) lime or Mean Higlt Willer (Ml-1W) line, and coastal wetlands landzoard from t)te NH W (or MI-IW) lure. The resultant project area is used to calculate overall percent built upon rarea (BUA). Non -coastal ztretlands landward of the NWW (or M1-IW) lure rraay be included in llre local project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 46.7 % 9. How many drainage areas does the project have?2 (For ]tip lr densil y, cowit 7 for each proposed engineered storuaztrater BMP. For low densily and other projects, use 1 for the Whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Draina e Area 2 Draina e Area _ Draina e Area _ Receiving Stream Name4400Jan Albe " rleSound Salmon Creek~ Stream Class UFU B;NSW C;NSW Stream Index Number * 25-24 Total Drainage Area (sf) 1,477,280 v 1,417,950 On -site Drainage Area (sf) 1,477,280 V 1,417,950 Off -site Drainage Area (sf) n/a n/a Proposed Im ervious Area** (sf) 413,720 618,905 `, Impervious Area** (total) 27.6P% 43.65% Im ervious" Surface Area Drainage Area! Drainage Area 2 Draina e Area Drainage Area _ On -site Buildings/Lots (sf) 264,844 448,265 On -site Streets (sf) 47,012 100,480 On -site Parking (sf) On -site Sidewalks (sf) 7,750 13,380 Other on -site (sf) 49,212 1,372 Future (sf) Off -site (sf) Existing BUA*** (sf) 44,902 55,408 Total (sf): 413,720 618,905 * St ream Class toad luda.( Number carr be determined at: lrtl p://portrtl.ucclr�rrr.or�>/mcb/tual/�s/c,u/carrssifrcaticrtrs ** !m )erviorts arc+a is dt fined as the built upon area including, but riot liuritrd to, buildings, roads, parkbig areas, I it eztralks, gravel areas, etc. *** Report only that autount of existing BLIA that mill remain after devc1op11ut11. Do not report any existing BLIA that is to be removed turd zoltich will be replaced by new BLIA. Form SWU-101 Version 07Jun2010 Page 3 of 6 11. How was the off -site impervious area listed above determined? Provide documentation. N/A l'ro'ects in Union County. Contact DWQ Central Office staff to check if the project is located within a Threatener! & Endangered .Species +t,atershed that niay be subject to more stringent storinu'ater requi.reatews as per NCAC 02B .0000. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http:Z/portal.iicdeiir.org/web/wq/ws/su/biiiP-MaIILIl1. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/sLl/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be foLlnd by locating project on the interactive online map at llttp://portal.ncdenr.or6,web/�wq/s�_s/SLI maL)s.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http�//portai.ncdenr.ort;/web/wq/1WS/SLi/StitesW/forms does. initials 1. Origiwd acid one copy of the Stormwater Management Permit Application Form. MA S 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants KQS Form. (if required as per Part Vll belozo) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to http://www.envlielp.orgLpagesZonestol2exl2ress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management for the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6. A USGS map identifying the site location. if the receiving stream is reported as class SA or the receiving stream drains to class SA waters within'/z mile of the site boundary, include the'h mile radius on the map. 7. Sealed, signed and dated calculations. 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. In. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). Forin SWU-101 Version 07,iun2010 Page 4 of 6 M'.) S Mw r P�kw -5 NQ -5 row s PN" 5 9. Copy ofany applicable soils report with the associated SHWT elevations (Please identify OM elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xI I" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method ofdetermining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verb the SIDYT prior tosubmitial, (910) 796-7378.) 10. A copy of the most current property deed, heed book: 827 Page No: 504 MvdS 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC M`�5 Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/ or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. htt :/ / www.secretary.state,nc,tis/ Corporations/ CSearch.as x VI1. DEED RESTRICTIONS AND PRO7'ECTIVECOVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. if lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants futius can be downloaded from http:l I portal.nedenr.orgl web/ wd/ wsl sit/ statesw/ forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded, By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the (onus available on the website, that the covenants will be binding on all parties and persons claiming underthem, that they will run with the land, that the required covenants cannot be changed ordeleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. VII1. CONSULTA N`F INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/ or firm (such as a consulting engineer and/ or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Michael W. Strader, Jr., P.E. Consulting Firm: Quible & Associates. P.C. Mailing Address:P.O. Drawer 870 City: Kitty_ I-lawk State:NC Iip:27949 ]'hone: (252 i 261-3300 Fax: (252 ) 261-1260 Email:mstrader.cr uible.com IX. PRO PERT]' OWN ER A U'1'1101ZI .A'I'ION (if Contact Information, item 2 has been filled out, complete this section) 1, (print or type name ofperson listccl in Conlad Information, item 2o) U e`�'err fy that I own the property identified in this per it lkion,and thu giv permission to (print oriyperxuneofperson listed in Contact Infortnaliun, item !c th (print or Type name of organization listccl in Contact Infarmolion, item la) velop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance ofthe stormwater system. Form SWU-101 Version 07Jun2010 Page 5 of 6 As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/ or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/ O hip Change Form within 30 days; otherwise l will be operating a stormw ater treatment facility w' ou id permr . nderst t at the operation ofa stormwater treatment facility without a valid permit 's a viol tion fNC Genera tat e 1 -215.1 and may result in appropriate enforcement action including the as essme 5 o penalties of u o -5,000 per day, pursuant to NCGS 143-215.6. Sign a1t'r Date:` a Notary Public for the State of �v¢� ,, �s 1 County of do hereby certify that q-I�— �,f, ,4jio personally appeared before me this day of r, Z (Z , and /acknoowwled d.u."-xocu4io4L-Qfthe application for a stormwater permit. Witness my hand and official seal, VINCENT SHUM NOTARY PUBLIC, STATE OF NEW YORK NO. 01 SH61795 t 3 QUAUFVED IN QUEENS COUNTY COMMISSION EXPIRES DEC. 24, 201 r \. APPLICANT'S CERTIFICATION SEA L My commission expires 12/2,q o) 1, (print or type naane ofperson listed in Contact Infor•mcrtion, item la) Rase Txnrnacuello CFO Rial Cotymw-alion certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCAC 2H .1000, SL 2006-246 (Ph, 11 — Post Construction) or SL 2008-21 1. Signatu re: Date: a Notary Public for the State of , County of , do hereby certify that before me this _day of personally appeared , and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEA L My commission expires Form SWU-101 Version 07Jun2010 Page 6 of 6 rrcpfveo% 6 wo on Y/,7,0//z Quible Qulble & AssoGiotes, P.C. P.O.Drcwef870 IGlty Hawk• NC 27949 FNC,tNEERING • ETIVIRONMENTAL SCIENCES • PLANNNG • SURWEMNG Phone; 252261,1.3M SINCE 1959 F= 252.261-1260 Web: gLAUe.com Ms. Kim Hedrick NC Division of Coastal Management 943 Washington Square Mall Washington, NC 27889 April 27, 2012 RE: CAMA Major 176-05 Scotch Hall Preserve (formerly Innsbrook) Letter of Refinement Request Dear Kim, The purpose of this correspondence is to request a letter of refinement to CAMA Major 176-05 for proposed work within the CAMA 75 it AEC in association with the proposed Amenity Area. The Site is located on a 3.40 acre parcel of land centrally located within the subdivision. Enclosed are two copies of plans (Sheet 1 of 11 and Sheet 3 of 11) that pertain to this request. Land disturbing activities associated with the Amenity Area primarily consist of clearing, addition of fill for buildings and swimming pool areas, land grading for parking and stormwater infrastructure, and trenching for site utilities. Proposed work within the 75 ft AEC includes: ■ 195 it of post supported fence within the 75 ft AEC ■ 95 sq.ft. of pool patio impervious cover within the 75 it AEC 7,649 sq.ft. of land grading within the 75 it AEC This does not include a sandy beach area on the north side of the pool as we previously discussed. Instead, the land area to be graded within the 75 it AEC will be grassed and permanently stabilized. This work recently received both a State Stormwater Permit (SW7120106 Modification) and an approved SESCP Plan (Berti-2012-002). Copies of these permits that were issued through the Express Program are enclosed. Please provide me a copy with the letter of refinement when you are able to do so. Thank you for your attention to this matter. I can be reached at 252.261.3300 or brubino@quible.com if you have any questions. Sincerely, Quible & Associates, P.G. D{LIL� Brian D. Rubino CC: Rose Tummarello, Rial Corp. Bobby Masters, SHP NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Beverly Paves Perdue Braxton C. Davis Governor Director 3 May 2012 Quible & Associates, P.C. CIO Brian Rubino P.O. Drawer 870 Kitty Hawk, NC 27949 Dear Mr. Rubino: Dee Freeman Secretary This letter of refinement is in reference to your 27 April 2012 correspondence (attached), requesting a modification of Major CAMA Permit No. 176-05. This permit was originally issued to Innsbrook, for the Rial Corporation, on 9 November 2005 for the development of a new subdivision with 399 single family lots, a golf course with clubhouse, shoreline stabilization, access roads, and parking areas adjacent the Chowan River. A Major Modification was issued for Permit No. 176-05 on 9 December 2010 to Rial Corporation for the development of a 107- slip marina and associated boat ramp, parking areas, roads, ship store and pool adjacent to Salmon Creek. This authorized development, formerly known as Innsbrook, at Scotch Hall Preserve is located on the Chowan River and Salmon Creek, near the Merry Hill Township, at the end of SR 1502 in Bertie County, North Carolina. The permit has been refined on several occasions and currently has an expiration date of 22 January 2015. Your request to amend the permit to allow for impacts of 195 linear feet of post -supported fence, 95 ftz of impervious pool patio, and 7,649ft2 of land grading and seeding within the 75-ft. Estuarine Shoreline Area of Environmental Concern (AEC) of the Chowan River, all in association with the construction of a proposed central amenity area within Phase 2, Block 1 is hereby authorized. All permit conditions including the 22 January 2015 expiration date still apply and remain unchanged. Your plats, sheets 1 and 3 of 11, titled Central Amenity Center, Scotch Hall Preserve PUD — Phase 2, both dated revised 24 April 2012, will become a permanent part of the file. Thank you for your time and cooperation in this matter. If you have any questions about this or related matters, please don't hesitate to contact me or Kimberly Hedrick in the Washington Regional Office. Sincerely, q (Z. Mw— David W. Moye District Manager Washington Regional Office Cc: Doug Huggett — Major Permit Coordinator, DCM Kimberly Hedrick — Compliance & Enforcement Representative, DCM Traci White — Ber-tie County Planning & Inspections, P.O. Box 530, Windsor, NC 27983 Al 1-lodge —NCDENR, Division of Water Quality, Washington Regional Office Pat McClain — NCDENR, Division of Land Resources, Washington Regional Office Tracey Wheeler — USACE, Washington Regulatory Field Office 943 Washington Square Mall, Washington, NC 27889 Phone: 252-946-6481 1 FAX 252-948-0478 Internet: www.nccoastalmanagement net An Equal Opportunity 1 Affirmative Action Employer Nne orthCaroiirla Natimally Quible & Associates, P.C. ENGINEERING • ENVIRONMENTAL SCIENCES • PLANNING • SURVEYING SINCE 1959 April 16, 2012 Lyn B. Hardison One -Stop Permitting Coordinator Customer Service Center NCDENR Washington Regional Office 943 Washington Square Mail Washington, North Carolina 27889 APR 18 2012 NC ®ENR P.O. Drawer 870 Kith/ Hawk, NC 27949 Phone 252-261-3300 Fax, 252-261-1260 Web: quible.com Re: Stormwater Management and Soil Erosion and Sedimentation Control Plan Review Scotch Hall Preserve PUD, Phase 2 (modification, Amenity Area) Merry Hill Township, Bertie County Dear Ms. Hardison: On Behalf of Rial Corporation, Quible & Associates, P.C. hereby submits for Express Review and approval High Density Stormwater Management Permit Modification and Soil Erosion and Sedimentation Control Permit Modification packages for the above referenced project in Merry Hill, Bertie County. The following items are included for the Stormwater Management Permit Express Review: 1. Two (2) copies of the Stormwater Management Permit Application Form w/one (1) copy of the Wet Detention Basin Supplements 2. One (1) copy of the signed Operation and Maintenance Agreements for the Wet Detention Basins (no change from previous submittal) 3. One (1) copy of the Deed Restrictions & Protective Covenances (no change from previous submittal 4. Stormwater Management Plan Narrative with Calculations 5. Property Deed 6. NC Secretary of State print-out for Rial Corporation 7. USGS quad excerpt with property identified 8. Two (2) copies of the Subdivision Plan Sheets 1-5, 13-19, & 22 and Amenity Center Sheets 1-6 The follow items are included in the Soil Erosion and Sedimentation Control Permit Express Review: 1. Two (2) copies of the Plan Sheets 2. Two (2) copies (one original) of the 4. Project Narrative 5. Property Deed 1-5, 13-19, & 22, and Amenity Center Sheets 1-6 Financial Responsibility/Ownership Form The review fee in the amount of $4,000 for both the Stormwater and SESC Permit Express Modification Reviews. If you have any questions, or require any additional information, please do not hesitate to contact me at (252) 261-3300. Sincerely, Quible & Associates, P.C. Derek A. Dail, P.E. encl: as stated cc: Rose Tummarello, Rial Corporation REAL CORPORATION INC. 96aT. , 261.6 OPERATING ACCOUNT- BRANCH BANKING AND TRUST COMPANY ,1-800-8ANK BBT, BBT.Oom ` PO BOX 244467-160/532 GREENVILLE, SC29602 .3120l2012 PAY TO THE " NCDENR � $ **4 Og0,.00 ORDER OF Four Thousand and DOLLARS NCDENR Division'of Water Quality TWO slaNaTvResReaulRen 1617 Mail Service'Center ' Raleigh, NC `27699-1617 MEMO Scotch Hall Preserve Pool, Park permits _ I AUTHORIZED SIGNATURE II900. CORPORATION INC. OPERATING ACCOUNT 2616 . NCDENR 3/20/2012 Pool Park permit 4,000.00 EXPRESS APR 18 2012 NC ®ENR Operating Account -BB Scotch Hall Preserve Pool Park permits 4,000.00 aoF ,,�ek rERQG CIO y William C. Stillwagon Rial Corporation P.O, Box 248 Merry Hill, NC 27957 Dear Mr. Stillwagon: Michael P. Gculey, Guven:or William G, Ross 1r„ Secrclary Nunh Carolina Department of Fnvirunmenl and Nutural RCSOUrCCS Cniecn N. Sunins, Dir"lor Division of A':,tcr Qualny January 29, 2008 - - - Subject: Stormwater Permit No. SW7070613 Modification Innsbrook Golf Course & Residential Phase II Low Density Subdivision Bertie County The Washington Regional Office received a complete Stormwater Management Permit Application for Innsbrook Golf Course & Residential Phase 11 on June 15, 2007. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7070613, dated June 28, 2007, for the construction of the subject project. This permit shall be effective from the date of issuance until rescinded, shall void Permit No. SW7070613 dated June 28, 2007 and shall be subject to the conditions and limitations as specified therein, and does not supercede any other agency permit that may be required. If any parts, requirements, or limitations contained in this permit are unacceptable, you have Ile right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150E of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O, Drawer 27447, Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding. ,f you have any questions, or need additional information concemic L. i -,-natter, ciease contact either Samir Dunn?or ;r rr.,e at (252) 946-0^481. incerely, 1� L11�; AI !-t,oage t Regional Supervisor Surface Water Protection Section AH/sd: JWVPDATAIWQSI State SW-SD1Permits - Low Density cc: frank Wanko, Hobbs, Upchurch & Associates, P.A.(PO Box 1737, Southern Pines, NC 28387). Bertie County Building Inspections Washington Regional Office Central Files `:girth C;mJina Di%i±inn of N'arcr �?�ralilti nrrrncl ; ,�.: ! ' ` One :at l 'Xasil mgton 1:gij is t .dl "hone i 2:4 1' 46-6� S i = N1611 h C al-011113 "Al .4n EruaI QPD9rtundy,A.iP Ms lN,e nC ion Emplc'jer - K"' Recyc'ev10% Pov Con sUrner Papor - t State Storm; ....er Management Systems ' Permit No. SW7070613 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT LOW DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules and Regulations PERMISSION IS HEREBY GRANTED TO Ria! Corporation Innsbrook Golf Course & Residential Phase 11 Bertie County FOR THE construction, operation and maintenance of a 30% low density subdivision in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rulesand the approved stormwater management plans and ' specifications, an other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. The Permit shall be effective from the date of issuance until rescinded and shall be subject to the following specific conditions and limitations: 1. DESIGN STANDARDS Each of the 157 lots in this 202.19 acre residential development is limited to a maximum of (see attachment) square feet of built -upon area, as defined by the stormwater rules, and as indicated in the approved plans. 2. The overall tract built -upon area percentage for the project must be maintained at 30%, per the requirements of Section .1005 of the stormwater rules. 4. No piping shall be allowed except those minimum amounts necessary to direct runoff beneath an impervious surface such as a road or under driveways to provide access to lots. 5. Runoff conveyances, such as roadside swales and perimeter ditches, must be vegetated with side slopes no steeper than 3:1 (KV). 6. Approved plans and specifications for projects covered by this permit are incorporated by reference and are enforceable parts of the permit. 11. SCHEDULE OF COMPLIANCE Roadside swales, vegetated areas and other vegetated conveyances shall be constructed in their entire X vegetated, and be operational for their intended use prior to the construction of any built -upon surface, per the approved plans. Page 2 of 5 State Storm�,ter Management Systems ,? Permit No, SW7070613 2. During construction, erosion shall be kept to a minimum and any eroded areas of the swales or other vegetated conveyances will be repaired immediately, 3. The permittee shall at all times provide the operation and maintenance necessary to operate the permitted stormwater management systems at optimum efficiency to include: a. Inspections b. Sediment removal, C. Mowing, and revegetating of the side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Cleaning and repair of catch basin grates, flumes, piping, and the flow spreader mechanism. 4. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition or sale of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval was sought. f. Filling in, piping, or altering any vegetative conveyance shown on the approved plan. 5. The Director may determine that other revisions to the project should require a modification to the permit. 6. The permittee is responsible for verifying that the proposed built -upon area does not exceed the allowable built -upon area. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner, provided that the permittee has complied with the requirements of Section 11.12 of this permit. 7. The permittee must certify in writing that the project's stormwater controls, and impervious surfaces have been constructed within substantial intent of the approved plans and specifications. Any deviation from the approved plans must be noted on the Certification. The permittee shall submit the Certification to the Division within 30 days of completion of the project. 8. The permittee shall submit all information requested by the Director or his representative within the time frame specified in the written information request. 10. All roof drains must terminate at least 30' from the Mean High Water mark. 11. Deed restrictions are incorporated into this permit by reference and must be recorded with the Office of the Register of Deeds prior to the sale of any lot. Page 3 of 5 State Storm „"ar Management Systems Permit No, SW7070613 12. Recorded deed restrictions must include, at a minimum, the following statements related to stormwater management: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW7070613 Mod, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. The maximum built -upon area per lot is (see attachment) square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina, driveways, and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. Filling in, piping or altering any 3:1 vegetated conveyances (ditches, swales, etc.) associated with the development except for average driveway crossings, is prohibited by any persons. h. Filling in, piping or altering any vegetated area associated with the development is prohibited by any persons. A 30' vegetated buffer must be maintained between all built -upon area and the Mean High Water line of surface waters. All roof drains shall terminate at least 30' from the Mean High Water mark. 13. The permittee must submit a copy of the recorded deed restrictions within 30 days of the date of recording. 14. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 15. Prior to transfer of ownership, the swales must be inspected and determined to be in compliance with the permit. Any deficiencies will be repaired or rep{aced prior to the transfer. 16. The final plats for the project will be recorded showing all required swale easements and common areas, in accordance with the approved plans. Page 4 of 5 State Storr— ter Management Systems :wr Permit No. SW7070513 Ill. GENERAL CONDITIONS Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to an enforcement action by the Division of Water Qualittyy, in accordance with North Carolina General Statutes 143-215.6A to 143-215.2. 2. The permit issued shall continue in force and effect until revoked or terminated. 3. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance, or termination does not stay any permit condition. 4. The issuance of this permit does not prohibit the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules, and regulations contained in Title 15A of the North Carolina Administrative Code, Subchapter 2H.1000; and North Carolina General Statute 143-215.1 et. ai. 5. The permit is not transferable to any person or entity except after notice to and approval by the Director. The Director may require modification or revocation and reissuance of the permit to change the name and incorporate such other requirements as may be necessary. A formal permit transfer request must be submitted to the Division of Water Quality accompanied by the appropriate fee, documentation from both parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits, and may or may not be approved. The permttee is responsible for compliance with all the terms and conditions of this permit until the ❑ivision approves the permit transfer. 6. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances imposed by other government agencies (local, state and federal) which have jurisdiction. If any of those permits or approvals result in revisions to the plans, a permit modification must be submitted. 7. The permittee grants permission to DENR Staff to enter the property during business hours for the purposes of inspecting the stormwater control systern and it's components. S. The perrnittee shall notify the Division of Water Quality of any name, ownership er mailing address changes within 30 days. Permit issued this the 29th day of January, 2008. N RTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION -----------------_----------------- for Coleen H. Sullins, Director Division of Water Quality By Authority of the Environmental Management Commission Permit No. SW7070613 Modification Page 5of5 INNSBROOK DEVELOPMENT -PHASE 2 LOW DENSITY SUPPLEMENT Number of Lots Lot Numbers Lot Sizes Allowable Built Upon Area S.F. AC S.F. AC 1 244 32,531 0,75 7,000 0,16 2 245 32,085 0,74 7,000 0.16 3 246 34,254 0.79 7,000 0.16 4 247 34,028 0.78 7,000 0.16 5 248 40,796 0,94 7,000 0,16 6 249 48,655 1.12 7,000 0.16 7 250 55,818 1.28 7,000 0.16 8 251 39,219 0.90 7,000 0.16 9 252 30,632 0.70 7,000 016 10 253 27,849 0.64 7,000 0.16 11 254 30,746 0.71 7,000 0.16 12 255 35,622 0.82 7,000 0.16 13 256 32,845 0.75 7,000 0.16 14 257 34,344 0,79 7,000 0.16 15 258 43,130 0.99 7,000 0.16 16 259 37,870 0.87 7,000 0.16 17 260 35,089 0.81 7,000 0,16 18 261 34,538 0.79 7,000 0.16 19 262 48,304 1.11 7,000 0.16 20 263 33,290 0.76 7,000 0.16 21 264 28,473 0.65 7,000 0.16 22 256 28,192 0.65 7,000 0.16 23 266 30,174 0.69 7,000 0,16 24 267 37,423 0,86 7,000 0.16 25 2S8 35,782 0.82 7.000 0.16 26 269 36,897 0.85 7,000 0.16 27 270 32,263 0.74 7,000 0.16 28 271 29,828 0,68 7,000 0.16 29 272 32.803 0.75, 7,000 C.16 30 273 34,151 0.78 7,000 0.16 31 274 37,194 0.85 7,000 0.16 32 275 42,318 0.97 7,000 0.16 33 276 1 26,708 0.611 7,000 0.16 34 i 277 28,281 6 51 7,000 0.15: 35 278 29,203 0.67 7,000 0.16 36 279 30,390 0.70 7,000 0.16 37 280 30,609 0.70 7,000 0.16 38 281 31,859 0,73 7,000 0.16 39 232 32,726 0.751 7,000# 0,16 40 283 26,385 0.61 7,000{ 0.15 41 224 28,332 0.65 7,000 0.15 42 285 25.373 0.58 71000 0.16 43 286 37.338 0.86 76000 0.16 44 287 42,754 0.98 7,000 0.16 45 288 48,992 1.12 7.0001 0.16 �6 289 35,5e3 0.82 7,OCC I 0,15 "7 YI 290 33 491 0.77 7.00,01 ,, ] ;P:iaSe 2 raye 1 '11 LH 48 291 31,448 0.72 7,000 0.16 49 292 34,412 0.79 7.000 0,16 50 293 29,153 0,67 7,000 0.18 51 294 22,757 0.52 7,000 0.16 52 295 31,087 0.71 7,000 0.16 53 296 34,537 0.79 7,000 0.16 54 297 30.499 0.70 7,000 016 55 298 25,284 0.58 7,000 0.16 56 299 26,920 0.52 7,000 0.16 57 300 35,867 0.82 7,000 0.16 58 301 37,617 0.86 7,000 0.16 59 302 37,450 0.86 7,000 0.16 60 303 28,588 0.66 7,000 0,16 61 304 29,397 0,57 7,000 0,16 62 305 33,456 0.77 7,000 0.16 63 306 33,695 0.77 7,000 0.16 64 307 39,276 0,90 7,000 0.16 55 308 33,238 0.76 7,000 0.16 66 309 25,846 0.59 7,000 0.16 57 310 25,146 0.58 7.000 0.16 fib 311 25,744 0.59 7,000 0.16 69 312 27,283 0.63 7,000 0.16 70 313 29,778 0.68 7,000 0,15 71 314 20,321 0.47 7,000 0.16 72 315 21,762 0.50 7,000 0.16 73 316 62,807 1.44 7,000 0.16 74 317 53.682 1.23 7,000 0.16 75 318 25,970 0.62 7,000 0.16 76 319 24,217 0,56 7,000 0.16 77 320 44,377 1.02 7,000 0.16 78 321 36,348 0.83 7,000 0.16 79 322 31,771 0.73 7,000 0.16 80 323 27,773 0.64 7,000 0.16 81 324 38,482 0,88 7.000 0.16 62 325 36,294 0.83 7.000 ^5 83 326 39,0961 7.90 % 000 84 327 32,058 0.74 7,000 85 328 29,910 0,69 7,000 0.15 86 329 29,770 0,68 7,000 0.15 87 330 28, 087 0.64 %, 000 C. 1F a 83 .31 i 28,594 0.66 39 332 29,217 0.67 - 000 1J 90 323 28,168 0.65 7,000 I7.15 91 334 25,780 0.59 7,000 0.15 92 335 27,183 0.62 7,D00 0D 16 93 336 40,317 0.93 7,000 0.15 ?4 337 { 29.531 0 68 7,000 ; i6 95 338 26,245 0.60 7.000 J.16 ?6 339 26,226 0.60 7.000 0.16 97 �40 26.2C8j 0.60 7,000 0 1 98 �41 25,1971 0.50 7,000 ?.16 99 342 25,6181 0.611 7, 0,0 I? 16 100 343 32,490 0.75 7 {,00 •a Phase 2 ?ag,A 2 �j 101 344 27,141 0,62 7,000 0.16 102 345 27,299 0.63 7,000 0.16 103 346 27,463 0.63 7,000 0.16 104 347 25 335 0.58 7,000 0.16 105 348 47,015 1.08 7,000 0.16 106 349 38,097 0.87 7,000 0.16 107 350 52,453 1,20 7,000 0.16 108 351 36,506 0.84 7,000 0.16 109 352 76,433 1.75 7,000 0.16 110 353 43,731 1.00 7.000 0.16 111 354 52,684 1,21 7,000 0.16 112 355 56,459 1.30 7,000 0.16 113 356 36,135 0.83 7,000 0.16 114 357 30,138 0.69 7,000 0.16 115 358 30,325 0.70 7,000 0.16 116 359 30,291 0.70 7,000 0,16 117 360 29,252 0.67 7,000 0.16 118 361 31,049 0.71 7,000 0.16 119 362 33,087 0.76 7,000 0.16 120 363 34,509 0.79 7,000 0.16 121 364 35,013 0.80 7,000 0.16 122 365 34,548 0.79 7,000 0.16 123 366 34,176 0.78 7,000 0,16 124 367 35,038 0.80 7,000 0.16 125 368 35,745 0.821 7,000 0.16 126 369 34,934 0.80 7,000 0,16 127 370 36,245 0.83 7,000 0.16 128 371 41,435 0.95 7,000 0.16 129 372 43,106 0.99 7,000 0,16 130 373 42,778 am 7,000 0,16 131 374 42,537 0,98 7,000 0.16 132 375 41,581 0,95 7,000 0.16 133 376 39,838 0.91 7,000 0.16 134 f 377 40.318 0.931 7,000 0.16 135 136 378 1 379 i 11,428 =8,406 0.951 ^ ? ; 7.000 7.0001 0.1311 --..is 137 380 65,090 1.49 7,000 0.16 138 381 43,478 1.00 7,0001 0.16 139 381-A 1 38.314 13.88 7.0001 0,16 382 E 25,832f 1821 7.0001 C,.16 141 383 _ 50' ?51 000` 142 384 4Z,088 0,97i 7,000 0.16' 143 385 36,571 0.84 7,000 0.16 144 386 35,188 0.81 7,000 0.16 145 387 34,701 0.90 7.000 0.16 146 388 35,074 0,81 7,000 0.16 1147 389 38,771 0.89 7,000 0,16 148 390 40,424 0.93 7.000 0.16 149 391 39,124 0.90 7.000 0.16 150 392 28,088 0.54 7,000 0.16 51 393 26,167 0.60 7,000 0.16 152 394 25,144 058 7,000 0.16 153 395 34,564 0,79 7,000 0.16 lnrsbrock Develcpimer.: P';,ase 2 Page 3 of 4 JLM h •oI 154 396 38,973 0.89 7,000 0.16 155 397 34,222 0.79 7,000 0.16 156 398 34,377 0.79 7,000 0.16 157 399 67,197 1.54 7,000 0.16 Total 1 5,507,641 SFJ 126.44 AC 1,099,000 SFJ 25.23 AC irn;-3r:) =- v e ic p m, e r,! Phase 2 page -+ 0f 4 JLH NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P.E. Dee Freeman Governor Director Secretary January 27, 2012 Ms. Rose Tummarello, CFOZit 2 c Z Rial Corporation 55 Beattie Place, Suite 100 LAJ� aw me-nTl y kr-P-c-, Greenville, SC 29601 Subject: Stormwater Permit No. SW7120106 Scotch Hall Preserve PUD, Phase 2 High Density Subdivision Wet. Pond Project Bertie County Dear Ms Tummarello: The Washington Regional Office received a complete Stormwater Management Permit Application for Scotch Hall Preserve PUD, Phase 2 on January 17, 2012. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7120106, dated January 27, 2012, for the construction of the project. This permit shall be effective from the date of issuance until January 27, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Samir Dumpor, or me at (252) 946-6481. erel , /—AffkAo- dge Regional Supervisor Surface Water Protection Section AHlsd: K:ISDIPermits-Wet pond ISW7120106 cc: Michael Strader, Jr, PE, Quible & Associates, P.C.r1) Bertie County Inspections vision of Coastal Management WWashington Regional Office North Carolina Division of Water Quality Internet: www.newaterguality.org 943 Washington Square Mall. Phone: 252-946-6481 One Washington, NC 27889 FAX 252-946-9215 NorthCarohna An Equal Opportunity/Affirmative Action Employer — 50% Recycled110% Post Consumer Paper ;Vatural& State Stormwater Management Systems Permit No. SW7120106 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Rial Corporation Scotch Nall Preserve PUD, Phase 2 Bertie County FOR THE construction, operation and maintenance of two wet detention ponds in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until January 27, 2020 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 on page 3 of this permit. The subdivision is permitted for 173 lots, each allowed a maximum of (see attached Table "A") square feet of built -upon area. 3. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 4. The built -upon areas associated with this project shall be located at least 50 feet landward of all perennial and intermittent surface waters. 5. The following design elements have been permitted for this wet detention pond stormwater facility, and must be provided in the system at all times. Page 2 of 10 State Stormwater Management Systems Permit No. SW7120106 Pond # 1 Pond # 2 a. Drainage Area, ft2: b. Total Impervious Surfaces, ft2: c. Average Pond Design Depth, feet: d. TSS removal efficiency: e. Design Storm: f. Permanent Pool Elevation, FMSL: g. Permitted Surface Area @PP ft2. h. Permitted Storage Volume, ft�: i. Storage Elevation, FMSL: j. Predevelopment 1 year 24 hour: k. Post development 1 year 24 hour: I. Controlling Orifice: m. Permanent Pool Volume, ft3 : n. Forebay Volume, ft3: o. Maximum Fountain Horsepower: p. Receiving Stream 1 River Basin: q. Stream Index Number: r. Classification of Water Body: II. SCHEDULE OF COMPLIANCE 1,403,950 364,508 3.50 90% 1.5 10.10 44,486 97,263 at temp 12.00 1.02 1.74 4.0"0 pipe 146,829 26,995 112 HP Chowan River 25 "B; NSW" 1,406,667 617,533 4.0 90% 1.5 10.70 110,941 pool 153,501 12.00 1.02 1.74 5.0" 0 pipe 446,788 115,720 1.0 HP Salmon Creek 25-24 C; NSW 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built -upon area for the entire lot does not exceed the maximum allowed by this permit. Once the lot transfer is complete, the built -upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built -upon area limit is transferred to the individual property owner. 3. If an Architectural Review Board or Committee is set up by the permittee to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built -upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. 4. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. 5. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. 6. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. C. Transfer of ownership. Page 3 of 10 State Stormwater Management Systems Permit No. SW7120106 d. Redesign or addition to the approved amount of built -upon area. e. Further subdivision, acquisition, or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 7. The permittee shall submit for approval, final site layout and grading plans for any permitted future development areas shown on the approved plans, prior to construction. 8. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final .plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 9. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 10. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 11. if the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 12. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and re -vegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. 13. Records of maintenance activities must be kept by the permittee. The records will indicate the date, activity, name of person performing the work and what actions were taken. 14. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 15. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW7120106, as issued by the Division of Water Quality under NCAC 2H.1000. Page 4 of 10 State Stormwater Management Systems Permit No. SW7120106 b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. C. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built -upon area per lot is (see attached Table "A") square feet. This allotted amount includes any built -upon area constructed within the lot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. For those lots within CAMA's Area of Environmental Concern, where DCM calculates a different maximum lot built -upon area, the governing lot BUA shall be the most restrictive of the two numbers. h. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters, which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. i. Built -upon area in excess of the permitted amount will require a permit modification. j. If permeable pavement credit is requested, the property owner must submit a request, with supporting documentation, to the permittee and receive approval prior to construction of BUA. 16. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 17. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. 18. Decorative spray fountains will be allowed in the stormwater treatment systems, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump power for a fountain in pond #1 is HP and pond #2 is 1.0 HP. 20. If permeable pavement credit is desired, the permittee must submit a request to modify the permit to incorporate such language as required by the Division of Water Quality. The request to modify must include a soils report identifying the type of soil, the Seasonal High Water Table elevation and the infiltration rate. Page 5 of 10 State Stormwater Management Systems Permit No. SW7120106 Upon the successful completion of a permit modification, the individual lot owners that request to utilize permeable pavements must submit the necessary forms and documentation to the permittee and receive approval prior to construction of the permeable pavement. 21. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. III. GENERAL CONDITIONS This permit is not transferable except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form signed by both parties, to the Division of Water Quality, accompanied by the supporting documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves a request to transfer the permit. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the pur ose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re -issuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit the Director from reopening and modifying the permit,- revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008- 211, Title 15A NCAC 2H.1000, and N C G S 143-215.1 et. al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. Page 6 of 10 State Stormwater Management Systems Permit No. SVV7120106 12. This permit shall be effective from the date of issuance until January 27, 2020. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 27th day of January, 2012. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION a/ — " (_..s" — for Charles Wakild, P.E.', Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW7120106 Page 7 of 10 State Stormwater Management Systems Permit No. SW7120106 Scotch Hall Preserve PUD, Phase 2 Stormwater Permit No. SW7120106 Bertie County Designer's Certification Page 1 of 2 I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction} of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification. Noted deviations from approved plans and specifications: Signature Registration Number Date SEAL Page 8 of 10 State Stormwater Management Systems Permit No. SW7120106 Certification Requirements: Page 2 of 2 .1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. .12. Required drawdown devices are correctly sized per the approved plans. .13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. .15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DWQ Regional Office Bertie County Building Inspections Page 9 of 10 State Stormwater Management Systems Permit No. SW7120106 Scotch Hall Preserve PUD, Phase 2 Table "A" Lot # BUA Lot # BUA Lot # BUA 1 5,084 45 4,492 89 3,710 2 4,298 46 4,084 90 4,026 3 3,960 47 4,084 91 4,174 4 3,960 48 4,084 92 5,147 5 3,960 49 4,084 93 5,659 6 3,960 50 4,084 94 3,651 7 3,960 51 4,518 95 3,812 8 3,960 52 4,075 96 3,603 9 3,960 53 4,075 97 7,833 10 3,960 54 4,075 98 7,280 11 4,290 55 4,075 99 5,266 12 3,960 56 4,075 100 4,975 13 3,960 57 4,075 101 4,727 14 3,960 58 4,075 102 4,971 15 4,290 59 4,359 103 4,821 16 4,290 60 4,045 104 4,320 17 4,430 61 4,091 105 4,320 18 4,598 62 4,091 106 4,716 19 4,749 63 4,091 107 4,899 20 3,947 64 4,091 108 4,899 21 3,782 65 4,091 109 5,936 22 3,501 66 3,980 110 5,922 23 3,614 67 4,407 111 7,356 24 3,375 68 4,103 112 6,040 25 3,026 69 4,103 113 6,031 26 2,941 70 4,103 114 5,981 27 2,866 71 4,504 115 5,935 28 3,125 72 3,504 116 5,933 29 5,956 73 3,358 117 5,934 30 6,114 74 3,219 118 5,937 31 5,992 75 4,163 119 4,290 32 5,947 76 6,088 120 3,960 33 5,951 77 5,941 121 3,960 34 5,956 78 5,938 122 3,960 35 5,956 79 5,936 123 3,960 36 5,952 80 5,937 124 3,960 37 5,946 81 5,938 125 4,542 38 6,724 82 3,960 126 4,966 39 6,447 83 3,960 127 5,587 40 6,120 84 3,960 128 5,466 41 4,540 85 3,960 129 4,585 42 4,097 86 3,960 130 5,079 43 4,097 87 3,960 131 4,726 44 4,097 88 5,895 132 4,150 BUA -- built -upon area (in square feet), Lot # BUA 133 4,230 134 5,803 135 5,862 136 6,037 137 6,279 138 6,295 139 6,201 140 6,109 141 5,978 142 6,561 143 8,373 144 10,975 145 5,566 146 4,518 147 5,255 148 6,719 149 5,117 150 4,215 151 3,960 152 4,144 153 4,288 154 4,288 155 4,116. 156 4,260 157 4,260 158 4,075 159 4,329 160 4,212 161 4,212 162 4,375 163 4,375 164 4,202 165 3,860 166 5,047 167 6,651 168 3,829 169 4,270 170 4,301 171 4,243 172 4,172 173 4,323 Page 10 of 10 DWQ USE ONLY Date Received Fee Paid *g I Permit Number AN o &'0-4 w .Z l Zo Applicable Rules: &astal SW -1995 ElCoastal S - 2008 ❑ I'll11 - Post Construction lr(select all t _—Non-CoastalSW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources / Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FO Plus form may be photocopied fir use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name- should be consistent th project name on plans, specifications, letters, operation and maintenance agreementstetc.): 2. Location of Project (street address): Avoca Farm Road City:Merry Hill Township Co"I 3. Directions to project (from nearest major intersection): � J Be innin at the intersection of U.S. 17 and NC 45 roce�ti intersection of NC 45 and Avoca Farm Road. "Turn I t of o A 4.25 miles. Turn left onto Scotch Hall Lane,and enter to intc 4. Latitude:36° 00' 26" N Longitucf;�760 r 34" W Z Farm Zip:27957 45 approximately 1.63 miles to the Road and proceed approximately of the main entrance to the project. II. - PERMIT INFORMATION: - "/ 1.a.Specify whether project is (check on� / ew ❑Modification b.If this application is being submi ' I as t e result of a modification to an existing permit, list the existing permit number issue date (if known) _ _ and the status of construction: ❑Not Sta e '� rtially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (che one): ❑1_ow Density ®I -sigh D nsity ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is bei DWQ requesting a sta if assigned, proposed, 4.a.Additional Projec equirements (check applicable blanks, information on required state permits can be obtained by coi acting the Customer Service Center at "I-877-623-6748): ❑CAMA M or ®Sedimentation/Erosion Control: 50.34 ac of Disturbed Area ❑NPD - dustrial Stormwater ❑404/401 Permit: Proposed Impacts b.lf any o these permits have already been acquired please provide the Project Name, Project/Permit Num r, issue date and the type of each permit: ubmitted as the result of a previously returned application or a letter from ormwater management permit application, list the stormwater project number, and the previous name of the project, if different than currently Form SW U- l01 Version 071un2010 Page I of 6 Ill. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the project): Applicant/Organization:Rial Corporation Signing Official & Title:Rose Tummarello, CFO b,Contact information for person listed in item 1a above: Street Address: City:Greenvi Mailing Address (if applicable City:Greenvil Phone: (252 ) 482-4006 Email:rtu mmarello-assoc.com Zip:29601 State:SC Zip:29601 Fax: ( ) c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ I.essee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & Title: b.Contact information for person listed in item 2a above Street Address: City: State: Zip: Mailing Address (if applicable): City: State: zip: Phone: ( ) Fax: ( ) Email: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization:Scotch Hall Preserve Signing Official & Title:Bobby Masters, Project Manager b.Contact information for person listed in item 3a above: Mailing Address:101 Villa Way City:Merry Hill _ State:NC Zip:27957 Phone: (386 _) 931-1693 Fax: Lmail:bobby.masters23<+gmail.coiri 4. Local jurisdiction for building permits: Bertic County Point of Contact:Traci White Phone #: 252 794-5336 Form SWU-101 Version 07Jun2010 ['age 2 of7 IV. PROJECT INFORMATION 1. In the space provided below, hriefly summarize how the stormwater runoff will be treated. Stormwater runoff will be collected through a combination of curb and gutter and roadside vegetated 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regu lation(s) the project has been designed in accordance with: ❑ Coastal SW -1995 ❑ Ph 11 - Post Construction 3. Stormwater runoff from this project drains to the Chowan River basin. 4. Total Property Area: 50.74 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. "Total Property Area (4) -Total Coastal Wetlands Area (5) -Total Surface Water Area (6) = "Total Project Area':50.74 acres Total project area shall be calculated to exclude the follozoingg: tire normal pool of impomided structures, the area behoeex the banks of streanis and rivers, the area below the Normal High Water (NHW) lure or Mean HiNh Water (MHW) lure, and coastal wetlands landward from fire NHW (or MHW) lure. Tire resultmit project area is used to calculate overall percent built upon area (BL1A). NO)? -coastal wetlands landward of fire NHW (or MHW) lure may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 44.4 9. Howl many drainage areas does the project have?2 (For high density, count 1 for each proposed engineered storrn7valer BMP. For lorry density and other projects, rise 1 far the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Drainage Area _ Drainage Area _ Receiving Stream Name cj rowan A per ound Salmon Creek Stream Class * `-' B;NSW QNSW Stream Index Number * _26- 25- 25-24 Total Drainage Area (so 1,403,950 ✓ 1,406,667 On -site Drainage Area (sf) -1,403,950 ✓ 1,406,667 J Off -site Drainage Area (sf) n/a n/a Proposed Impervious Area** s 364,508 617,533 V % Impervious Area** (total) 25.96% ti/ 43,90% J Impervious- Surface Area Drains e Area 1 Drains e Area 2 Drainage Area _ Drainage Area On -site Buildings/Lots (so 264,844 448,265 On -site Streets (so 47,012 100,480 On -site Parking (sf) On -site Sidewalks (so 7,750 13,380 Other on -site (so Future (sf) Off -site (sf) Existing BUA*** (so 44,902 55,408 Total (sf): 364,508 ,/ 617,533 f Stream Class and !rides Number can be determbied at: httl!:��porfal.rrcdeur'.ort�(zy�b�inq/frs/csrr cJerssificatlorrs Form SWU-101 Version 07.lun2010 Page 3 of7 Quible Quible & Associates, P.C. ENGINEERING • ENVIRONMENTAL SCIENCES • PLANNING • SURVEYING SINCE 1959 January 4, 2012 Lyn B. Hardison One -Stop Permitting Coordinator Customer Service Center NCDENR Washington Regional Office 943 Washington Square Mall Washington, North Carolina 27889 1 EXPRESS co'telt, X5iY YP�C7� P.O Drawer 871) �� �E� /��1 IGtty Hawk, NC 27949 Phone: 252-261-1260 , AN l 7 20Q Web: q� oe.COm NC ®OR Re: Stormwater Management and Soil Erosion and Sedimentation Control Plan Review Scotch Hall Preserve PUD, Phase 2 Merry Hill Township, Bertie County Dear Ms. Hardison: On Behalf of Rial Corporation, Quible & Associates, P.C. hereby submits for Express Review and approval High Density Stormwater Management Permit and Soil Erosion and Sedimentation Control Permit Application packages for the above referenced project in Merry Hill, Bertie County. The following items are included for the Stormwater Management Permit Express Review: 1. Two (2) copies of the Stormwater Management Permit Application Form wlone (1) copy of the Wet Detention Basin Supplements 2. One (1) copy (original signature) of the Operation and Maintenance Agreements for the Wet Detention Basins 3. One (1) copy (original signature) of the Deed Restrictions & Protective Covenances 4. Stormwater Management Plan Narrative with Calculations 5. Property Deed 6. NC Secretary of State print-out for Rial Corporation 7. USGS quad excerpt with property identified 8. Two (2) copies of the Plan Sheets 1-5, 13-19, & 22 The follow items are included in the Soil Erosion and Sedimentation Control Permit Express Review: 1. Two (2) copies of the Plan Sheets 1-5, 13-19, & 22 2. Two (2) copies (one original) of the Financial Responsibility/Ownership Form 4. Project Narrative 5. Property Deed The review fee in the amount of $7,315 was submitted under separate cover and is for both the Stormwater and SESC Permit Express Reviews ($4,000 Express fee + $3,315 for 50.34 acre land disturbance). If you have any questions, or require any additional information, please do not hesitate to contact me at (252) 261-3300. Sincerely, Quible & ssociates, P.C. Michael . Strader, Jr., P.E. encl: as stated cc: Rose Tummarello, Rial Corporation Suzie Binder From: Suzie Binder Sent: Friday, January 06, 2012 3:45 PM To: 'bobby. masters23@gmail.com; 'MStrader@quible.com'; 'lyn.hardison@ncdenr.gov' Cc: Darrell Whitaker Subject: RE: SHP Ph2 Express fee check Attachments: image001.png We have issued a stop payment on the previous check and reissued the two checks as replacement per your request. The checks will be placed in the mail today to the attention of "Lyn B. Hardison" at the address indicated in your email below. Thanlx you! Suzie Binder Accounting Manager 864,678.7611 (p) 864.233.3099 (f) sbinder@imiliving.com From: bobby. masters23@gmail.com[ma ilto:bobby. masters23@gmaii.com] Sent: Friday, January 06, 2012 12:30 PM To: Darrell Whitaker; Suzie Binder Subject: Fw: SHP Ph2 Express fee check The state lost the check Sent via B1ackBerry by AT&T From: "Michael Strader" <MStrader@quible.com> Date: Fri, 6 Jan 2012 11:41:35 -0500 To: Bobby Masters<bobby.masters23@gmail.com> Subject: SHP Ph2 Express fee check Bobby, Lyn Hardison, NCDENR, just called and made the suggestion that a new check be issued for the Scotch Hall Preserve PUD, Phase Express Review for stormwater and soil erosion. She has requested that the checks be separated to $4000 and $3315 accordingly. The original check could be voided (and may already be on its way back to sender). Could you please confirm if two checks could be issued and sent directly to Lyn? I recommend a cover or transmittal addressed to: Lyn B. Hardison One -Stop Permitting Coordinator NCDENR Washington. Regional Office 943 Washington Square Mall Washington, NC 27889 Her telephone number is (252) 948-3842. Her email is Iyn.hardisonPncdenr.gov. . It would be best to send her an email as confirmation that the new checks have been issued and addressed to her attention. Thank you, Mike Michael W. Strader, Jr., P.E. Director of Engineering Quible & Associates, P.C. 8 Juniper Trail P.O. Drawer 870 Kitty Hawk, NC 27949 t 252.261.3300 f 252.261.1260 m 252.207.6751 www.guible.com LEGAL DISCLAIMER The information transmitted is intended solely for the individual or entity to which it is addressed and may contain confidential and/or privileged material. Any review, retransmission, dissemination or other use of or taking action in reliance upon this information by persons or entities other than the intended recipient is prohibited. If you have received this email in error please contact the sender and delete the material from any computer.