Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW7111003_CURRENT PERMIT_20120113
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPECURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE DOC DATE 0�g`a4l� YYYYMMDD w L)AP r Ar �t NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P.E. Dee Freeman Governor Director Secretary January 13, 2012 Ms. Judy Beasley, Manager Marshy Ridge Retreat, LLC PO Box 237 Kill Devil Hills, NC 27948 Subject: Stormwater Permit No. SW7111003 Marshy Ridge Retreat High Density Project Dare County Dear Ms. Beasley: The Washington Regional Office received a complete Stormwater Management Permit Application for Marshy Ridge Retreat project on October 6, 2011, revised submittal on December 14, 2011 and additional information on January 13, 2012. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Session Law 2008-211 and Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7111003 dated January 13, 2012, for the construction of the subject project. This permit shall be effective from the date of issuance until January 13, 2020, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicator In upon written . request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714, Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional contact Samir Dumpor, or me at (252) 946-6481. information concerning this matter, please Si cerely, � 1Hge AI o I r Regional Supervisor Surface Water Protection Section AH/sd: 1SDIPermits - Infiltration1SW7111003 CC" Actor White, PE, Landmark Eng. & Env., PC (PO Box 1190, Kitty Hawk, NC 27949) 'Division of Coastal Management Dare County Building Inspections -/Washington Regional Office North Carolina Division of Water Quality Internet: www,ncwaterquality.org 943 Washington Square Mall Phone: 252-946-6481 One Washington, NC 27889 FAX 252.946-9215 NorthCarol.i.na An Equal opportunitylAffirmative Action Employer - 50% Recycled110% Post Consumer Paper Aatizral& State Stormwater Management Systems Permit No. SW7111003 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Marshy Ridge Retreat, LLC Marshy Ridge Retreat Dare County FOR THE construction, operation and maintenance of one infiltration basin, in compliance with the provisions of Session Law 2008-211 and 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules'l and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until December 14, 2021, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 on page 3 of this permit. The stormwater control has been designed to handle the runoff from total of 84,777 square feet of impervious area. 3. This project is a development of the 48 units Travel Trailer park with associated road, office building, bath house and boat ramp with access road. 4. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the approved plans. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. 6. The built -upon areas associated with this project shall be located at least 50 feet landward of all surface waters. 7. The following design criteria have been permitted for the infiltration basins and must be provided and maintained at design condition: Page 2 of 7 State Stormwater Management Systems Permit No. SW7111003. INFILTRATION BASINS a. Drainage Area, ftZ: 395,581 b. Total Impervious Surfaces, ft2: 84,777 C. Design Storm, inches: 1.5" d. Basin Depth, feet: 0.40 e. Bottom Elevation, FMS�: 2.50 f. Bottom Surface Area, ft : - 48,460 g. Bypass Weir Elevation, FMSI: 2.90 h. Permitted Storage Volume, ft : 22,689 i. Type of Soil: Fripp/Ousley j. Expected Infiltration Rate, inlhr: 6.00 k. Seasonal High Water Table, FMSL: 1.00 I. Time to Draw Down, days: 3.00 M. Receiving Stream/River Basin: Pasquotank River basin/Collington Creek n. Stream Index Number: 30-21-1-1 o. Classification of Water Body: "SC" II. SCHEDULE OF COMPLIANCE The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface.' 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The perm ittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed .in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowin.9 and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of bypass structure, infiltration media, flow spreader, catch basins, piping and vegetated filter. g. A clear access path to the bypass structure must be available at all times. 4. Records of maintenance activities must be kept for each permitted BMP. The reports will indicate the date, activity, name of person performing the work and what actions were taken. 5. The facilities shall be constructed as shown on the approved plans. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 7. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility Page 3of7 0. State Stormwater Management Systems Permit No. SW7111003 has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. 8. Access to the stormwater facilities shall be maintained via appropriate easements at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Project name change. C. Transfer of ownership. d. Redesign or addition to the approved amount of built -upon area or to the drainage area. e. Further subdivision, acquisition, lease or sale of all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The permittee shall submit final site layout and grading plans for any permitted future areas shown on the approved plans, prior to construction. 11. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 12. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. III. GENERAL CONDITIONS This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event of a change of ownership, or a name change, the permittee must submit a completed Name/Ownership Change form to the Division of Water Quality, signed by both parties, and accompanied by the appropriate documentation as listed on page 2 of the form. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all permit conditions until such time as the Division approves the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. 5. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or Page 4 of 7 State Stormwater Management Systems Permit No. SW7111003 replacement stormwater management systems. 6. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 7. The permit issued shall continue in force and effect until revoked or terminated. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 8. Unless specified elsewhere, permanent seeding requirements for the stormwater controls must follow the guidelines established in the North Carolina Erosion_ and Sediment Control Planning and Design Manual. 9. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 10. The issuance of this permit does not prohibit,the Director from reopening and modifying the permit, revoking and reissuing the permit, or terminating the permit as allowed by the laws, rules and regulations contained in Session Law 2008-211, Title 15A NCAC 2H.1000, and NCGS 143-215.1 et. al. 11. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. 12. This permit shall be effective from the date of issuance until January 13, 2020. Application for permit renewal shall be submitted 180 days prior to the expiration date of this permit and must be accompanied by the processing fee. Permit issued this the 13th day of January, 2012. N TH AROLINA ENVIRONMENTAL MANAGEMENT COMMISSION t� for harles WaWFFDirector Division of Water Quality By Authority of the Environmental Management Commission Permit No. SW7111003 Page 5 of 7 } State Stormwater Management Systems Permit No. SW7111003 Marshy Ridge Retreat Stormwater Permit No. SW7111003 Dare County Designer's Certification I, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 6of7 State Stormwater Management Systems Permit No. SW7111003 Certification Requirements: 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. 3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The bypass structure weir elevation is per the approved plan. 6. The bypass structure is located per the approved plans. 7. A Trash Rack is provided on the bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. All required design depths are provided. 13. All required parts of the system are provided. 14. The required system dimensions are provided per the approved plans. cc: NCDENR-DWQ Regional Office Dare County Building Inspections Page 7 of 7 tk_)�'fZ_> C) DWQ USE ONLY Date Received FmPaid Permit Number S 1, T Applicable Rules: ❑ Coasta] SW - 1995 ❑ Coastal SW - 2008 ❑ Ph I1- Post Construction (select all that apply) ❑ Non -Coastal SW- FIQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: ' j� j p ��/ 1. State of North Carolina Department of Environment and Natural Resources Division of Water Quality OCT - 6 2011 STORMWATER MANAGEMENT PERMIT APPLICATION F�$N� .������ 77tis forte may be photocopied for use as an original W I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Marshy Ridge Retreat 2. Location of Project (street address): Marshy Ridge Road (off of Colington Road) City:Colington Island County:Dare %ip:27948 3. Directions to project (from nearest major intersection): Turn on to Ocean Bay Blvd from US Highway 158 in Kill Devil Hills, travel 0.5 miles and bear right onto Co[ington road. Marshy Ridge Road is on left approximately 1.8 miles._Project is located at end of Marshy Ridge Road. 4. Latitude:36' 0' 44.2" N Longitude:75° 41' 38.1" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): NNew ❑Modification b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known) , and the status of construction: ❑Not Started ❑Partially Completed* ❑ Completed* *provide a designer's certification Specify the type of project (check one): ❑I.ow Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state Stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4.a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): NCAMA Major ❑NPDES Industrial Stormwater ❑Sedimentation/Erosion Control: 9.08 ac of Disturbed Area 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit:application pending for CAMA Major Permit, SESCP package filed concurrently with Stormwater - I!,., . , -1 T30 III. CONTACT INFORMATION I.a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the pro&t): Applicant/Organization: Marshy Ridge Retreat, LLC Signing Official & Title:tudy Beasley, b.Contact information for person listed in item I above: Street Address: City: Mailing Address (if applicable):P.O. Box 237 City:Kill Devil Hills Phone: (252 ) 256-0561 E-mail: State: Zip: Sta te: N C Z ip:27948 Fax: ( ) c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 213 below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (`Phis is the person who owns the property that the project is located on): - MWO AVW& r Property Owner/Organi IVED Signing Official & Title: 11 b.Contact information for person listed in item 2a above: Street Address: City: Mailing Address (if applicable): State: Zip: City: Sta te: Zip: Phone: ( ) Fax: Email: 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/ Organization:Victor White, P.E., Landmark Eng. & Env., P.C. Signing Official &'I'itle:Victor White, P.E., President b.Contact information for person listed in item 3a above: Mailing Address:P.0. Box 1190 City:Kitt_y I-lawk Phone: (252 ) 491-2125 l mail:victor@landmarkeng.net 4. Local jurisdiction for building permits: Dare County„ State:NC Zip:27949 Fax: (252 ) 491-2285 Point of Contact:Donna Creef, Planning Director. Phone #: (252___ ) 475 5873 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Stormwater will be conveyed via sheet flow to shallow Infiltration Basins, where it will infiltrate locally. Direct storage of 3.3 inches of stormawater from 100% of impervious surfaces is provided, with an additional 2.82 inches provided in soil voids below the infiltration basins and above the seasonal huh water table. Basins are hydraulically connected, with an overflow structure to a level spreader and vegetative filter if capacity is exceeded. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulations) the project has been designed in accordance with: ❑ Coastal SW - 1995 ❑ Ph 11 - Post Construction 3. Stormwater runoff from this project drains to the Pasnoutank River basin. 4. Total Property Area: 50.95 acres 5. Total Coastal Wetlands Area: 0 (only sec404)acres 6. Total Surface Water Area: 0.605 acres Total Property Area (4) -Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+:50.345 acres Total project area shall be calculated to exclude thefollowing. the normal pool of impounded structures, the area between the hanks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NNW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Noti-coastal wetlands landward of the NHW (or MHW) line roar/ be included inthe total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 3.87 % 9. How many drainage areas does the project have?1 (For high densihl, count 1 fir each proposed engineered stornwater BMP. For loin derzsihj and other projects, use 1 for the whole properhf area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Draina Area _ Drainage Area _ Receiving Stream Name -Hiounts-Ba" �3h�nntsBa �n�j u� r Stream Class * sc sc 5 C. Stream Index Number * ?p--,? 1-1- J Total Drainage Area (so 395581 1797447 On -site Drainage Area (so 395581 1797447 Off -site Drainage Area (so 0 0 Proposed Impervious Area** (so 84777 0 % Impervious Area" total 21.43 0 Impervious— Surface Area Draina a Area Draina e Area Draina e Area _ Draina e Area On -site Buildings/Dots (so 17704 0 On -site Streets (so 46864 0 On -site Parking (so '19809 0 On -site Sidewalks (so 0 0 Other on -site (so 400 0 Future (so 0 0 Off -site (so 0 0 Existing BUA*** (so 0 1 0 Total (so: M777 1 0 * Stream Class and Index Number can be determined at: http.&c)rtal.ticdenr.orZ/ yebltvgZi lesu/classocations * 1tn ervious area is defined as the built upon area including, but nat lintited to, buildings, roads, parking areas, sidpezvalks, gravel areas, etc. *** Report only that ainount of existing BUA that zoill remain after development. Do not report any existing BUA that is to he removed and which will be replaced by new BUA. 11. I -low was the off -site impervious area listed above determined? Provide documentation. N/A ^ Yroiects in Union County: Contact DWQ Cenlrul Office stuff to check if the project is located u,ilhin a Threatened A Endangered Species watershed that may he subject to more stringent slorniwater requirements as per NCAC 02B .0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http-//`,Vortal.ncdenr.gWweb/wq/ws/su/bmp-manual. Vt. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://Portal.ncdenr.orgZweb/wq/ws/su/statesw/forms does. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://12ortal.ncdenr.orgZwebjwil/ws/su/nial2s.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from hn://////portal.ncdenr.orq/web/wq/ws/su/statesw/`forms_docs. Initials 1. Original and one cope of the Stormwater Management Permit Application Form. }/ 2. Original and oire copy of the signed and notarized Deed Restrictions & Protective Covenants V Form. (if required as per Part V11 belmv) 3. Original of the applicable Supplement I;orm(s) (sealed, signed and dated) and O&M agreement(s) for each BMP. 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to V http://www.envhelp.org/pages/oiiestopexpress.htnit for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) KA 5. A detailed narrative (one to two pages) describing the stormwater treatment/managementfor the project. This is required in addition to the brief summary provided in the Project Information, item 1. 6, A USGS map identifying the site location. If the receiving stream is reported as class SA or the receiving stream drains to class SA waters within 1/z mile of the site boundary, include the'/z mile radius on the map. 7. Sealed, signed and dated calculations. V/ 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NI1W line of tidal waters, and any coastal wetlands landward of the MHW or NFIW lines. + Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). p. Vegetated buffers (where required). 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"x11" copy of the NKCS County Soils map with the projectarea clearly delineated. For projects with infiltration BMPs, the reportshould also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submttal, (910) 796-7378.) '/ V 10. A copy of the most current property deed. Deed book: 1681 Page No: 272 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC V Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item 1a, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. http:/Zwww.secretary.state.iic.us/Cori2oratiotisZCSearch.aspx VI1. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms_docs. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Victor White, Consulting Firm: Landmark Engineering & Environmental, P.C. Mailing Address:P.O. Box 1.190 City:Kitty Hawk State:NC Zip:27949 Phone: (252 ) 491-2125 Fax: (252 _ ) _491-2285 hntail:victor©landmarkeng.net IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or hjpe name of person listed in Contact Information, item 2a) , certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listen in Contact Information, item In) with (print or hjpe name of organization listed in Contact Information, item In) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil nalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: tri 1, a Notary Public for the State of 'VA -county of P� do he by certify that �� E�S�-� personally appeared before me thig 4ay at acknowledge the due exec on of the application for a stormwater permit. Witness my hand and official seal, n MCG ary 814P%ffiOre 0 U 9" Elm SEAL My commission expires a X. APPLICANT'S CERTIFICATION 1, (print or type Barrie of person listed in Contact Information, iteru 1a) ludy Beasley certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable stormwater es under 15A NCAC 21-1 .1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211. Signature: Gcc� Date: / r 1, Y G J a Notary Public for the State ofCounty of do he by certify that L( E personally appeared before me thiQ=2v day �U �� ,arc cknowledge the di e :ecuti of the application for a stormwater permit Wihless my hand and official seal, McGOYBP00; 0C Old = m tP�Y p4' -to 0 I ~ r O/4n Ex9ti� J���'��• $re CO SEAL My commission expires /� G ROY GOOPER r loll CI! . MICHAEL S. REGAN Serrerary .S. DANIEL SNIIi-E-{ lnrrrirr� f.lrtr,arn Marshy Ridge Retreat, LLC Attention: Judy Beasley, Manager P.4- Box 237 Kill Devil Hills, NC 27948 Dear Ms. Beasley: Nioj! i-i� :lAr� c)i.iitll\ L"n0rono ncal Quotity June 5, 2019 Subject: Stormwater Permit Renewal Stormwater Management Permit SW7111003 Marshy Ridge Retreat Dare County �V " �, 6 A Division of Energy, Mineral, and Land Resources file review has determined that Stormwater Permit SW7111003 for a Stormwater treatment system consisting of infiltration basins serving Marshy Ridge Retreat located on Colington Island expires on January 13, 2020. This is a reminder that permit renewal applications are due 180 days prior to expiration. We do not have a record of receiving a renewal application. Please submit a completed permit renewal application along with a $505.00 fee for permit renewal. Also, it was noted in the file review that a designer's certification that the project was constructed in accordance with the approved plans as required by the permit has not been submitted. Please include this with your application. Permit application forms for renewal can be found on our website at: I�c,_u-.J�Ii.v_isi(�:'�:� _'31�::i ;y 3iiiEle�:. k �F11+1-1('tit?l.ki;4 c:sft:l7t�l ;yz?lll.fl( I_al-l4zrld= 1►lls ��tii,_o:'il��v�Ilc l I'ri=ci�,t'iln�r�sr c_t}:15� titil)13. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. Failure to maintain a permit subjects the owner to assessment of civil penalties. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you. If you would like, I can a --mail you a copy of the application forms. You can request a copy by e-mailing me at i-oger.thorPe(@ncdenr. ov, Sincerely, Roger Thorpe Environmental Engineer Q �WIdNnr1h Carolina Dcpar[mcnr of'lirwiromnentak Quality 11Jivlsirm offincryy, fvFUtrral.rid Landand { C!i[TiAfCCS ae.ngtnn hr.,linnal 011lrr on. 1443 Washinglon tigrinre Mall I WashingtNorlh Carolina )..7Hfi'1 ,xw,n ' K�_wn n�.e�ear +wru++r\ 4� 252f146.6481 LANDMARK ENGINEERING & ENVIRONMENTAL, P.C. MAILING: P.O. Box 1 1 90 • KITri-Y HAWK. NC 27949 P►aYSICAL: 8460 CARATOKE Hwy. — SUITE 202 • POwELLS POINT, NC 27966 PHONE: 252.491.2125 • FAX; 252.491.2285 • EMAIL: OFFICE@LANDMARKENG.NET MARSHY RIDGE RETREAT Stormwater Management Plan Design Narrative September 27, 2011 (Revised December 9,201 1) REr:'ED . DEC *1 4 2011 �l�iii� �� rW li•.. I The above referenced project is a development of the subject property into an a Travel Trailer Park, with associated infrastructure. The site is located on Marshy Ridge Road, off of Colington Road on Colington Island, Dare County, North Carolina. Although The site is relatively large, the stormwater management plan is considered two drainage areas. The First Drainage area includes all the area of impervious surfaces and the stormwater management infiltration basins. The second area is the remaining area which will remain in its natural state. The fist drainage area consists of a perimeter infiltration basin system, along with infiltration basins in the center of the loop road. All the infiltration basin are hydraulically connected to provide equalization. This infiltration system recieves runoff from 100% of all the impervious surfaces at the site. Stormwater runoff from proposed impervious surfaces will be conveyed to the stormwater infiltration system via sheet flow. The proposed Stormwater management system also incorporates pipes to provide hydraulic connections, providing equalization of the infiltration basins. The entire system provides well in excess of the design storm, conservatively assuming that 100% of all stormwater is conveyed to the proposed basin system. Stormwater in excess of the proposed infiltration basins capacity will overflow out an overflow structure as shown on the plans, be conveyed to a level spreader and vegitative filter before flowing into the wetlands as shown on the attached plans. The soils present at the site (Fripp and Ousley Sands ) provide suitable infiltration rates which are more than adequate to meet the criteria for the required draw down of the basins. Listed depths to the seasonal high water table for the Fripp series is in excess of six feet and for the Ousley series is 1.5 to 3.0 feet, as listed in the UDSA's Soil Survey of Dare County North Carolina. Soil borings conducted at the site agreed with this published data, with the development taking place mainly in the Ousley series soils. Based on existing elevations at the site and both published and soil boring information, a seasonal high water table elevation of 1.0 msl (NAVD 88 datum) was calculated and used for design purposes. REVISION (12/9/11) Site plan has been modified to: I,) Add a boat ramp and drive to access the existing canal. 2.) Revise access road and select Travel Trailer sites to provide the required 50 foot setback From surface waters. 3.) Provide updated deed information, area and coverage percentages. a Permit N (to be provided by DWG?) �oF wn r�q a TALAM o STORMWATER MANAGEMENT PERMIT APPLICATION FORM o HCDENR 401 CERTIFICATION APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project Name Marshy Ridge Retreat Contact Person Judy Beasley Phone Number 252 256-0561 Date 9/2712011 Drainage Area Number 1 II, DESIGN INFORMATION Site Characteristics Drainage area 395,581.44 f12 Impervious area 94,777,00 ft2 Percent impervious 21.43 % Design rainfall depth 3.00 in t U = 1v Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.10 in 1-yr, 24-hr intensity 0.13 inlhr Pre -development 1-yr, 24-hr discharge 0.18 ft/sec Post -development l-yr,24-hrdischarge 0.37 ft3lsec Pre/Post 1-yr, 24-hr peak flow control 0.19 ftlisec Storage Volume: Non -SA Waters Minimum design volume required 6,898.60 ft' Design volume provided 22,689.22 ft' Storage Volume: SA Waters 1.5- runoff volume ft3 Pre -development 1-yr, 24-hr runoff volume ft3 Post -development l-yr, 24-hr runoff volume ft3 Minimum required volume ft 3 Volume provided ft, Soils Report Summary Soil type Frippl0usley Infiltration rate 6.00 inlltr SHWT elevation 1.00 fmsI Basin Design Parameters Drawdown time 3.00 days Basin side slopes 4.00 :1 Basin bottom elevation 2.50 fmsI Storage elevation 2.90 fmsl Storage Surface Area 64,987.00 tt2 Top elevation 3.40 fmsl Basin Bottom Dimensions Basin length 510.00 ft Basin width 127,40 ft Bottom Surface Area 48,460.00 ft2 DEC 14 2011 DWQ-WARO OK for non -SA wafers OK OK Raise basin bottom, Must be at least 2-ft above SHWT Form SW401-Inrittration Basin-Rev.5 11Apr2011 Parts I. & II. Design Summary, Page 1 of 2 4. Permit (to be provided by DWQ) Additional Information Maximum runoff to each inlet to the basin? 1.14 ac-in OK Length of vegetative filter for overflow 75.00 ft OK Distance to structure 15.00 ft OK Distance from surface waters 30.00 ft OK for non -SA waters Distance from water supply well(s) 200.00 ft OK Separation from impervious Soil layer 20.00 ft OK Naturally occuring soil above shwa 2.00 ft OK Bottom covered with 4-in of clean sand? y (Y of N) OK Proposed drainage easement provided? y (Y or N) OK Capures all runoff at ultimate build -out? y (Y or N) OK Bypass provided for larger storms? y (Y or N) OK Pfetreatment device provided n Form SW401-Infiftration Basin-Rev.5 11Apr2011 Parts I. & II. Design Summary, Page 2 of 2 Permit Number: (to be provided by DWQ) Drainage Area Number: Infiltration Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area will be carefully managed to reduce the sediment load to the infiltration basin. — Immediately after the infiltration basin is established, the vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). — No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the vegetation. -- The vegetation in and around the basin will be maintained at a height of approximately six inches. After the infiltration basin is established, it will be inspected once a quarter and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem-, How I will remediate theproblem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the Areas of bare soil and/or Regrade the soil if necessary to infiltration basin erosive bullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. The inlet device: pipe or The pipe is clogged (if Unclog the pipe. Dispose of the Swale applicable . sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged (if applicable). Erosion is occurring in the Regrade the Swale if necessary to Swale (if applicable). smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. RECEIVED OCT -62011 Form SW401-Infiltration Basin O&M-Rev.3 Page I of 3 DWQ-WARO BMP element: The forebay The main treatment area The embankment The outlet device The receiving water Potential problem: Sediment has accumulated and reduced the depth to 75% of the original design depth. Erosion has occurred or riprap is displaced. Weeds are present. A visible layer of sediment has accumulated. Water is standing more than 5 days after a storm event. Weeds and noxious plants are growing in the main treatment area. Shrubs or trees have started to grow on the embankment. An armual inspection by an appropriate professional shows that the embankment needs repair. Clogging has occurred. The outlet device is damaged Erosion or other signs of damage have occurred at the outlet. How I will remediate the problem: Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Remove the weeds, preferably by hand. If pesticides are used, wipe them on the plants rather than spraying. Search for the source of the sediment and remedy the problem if possible. Remove the sediment and dispose of it in a location where it will not cause impacts to streams or the BMP. Replace any media that was removed in the process. Revegetate disturbed areas immediately. Replace the top few inches of filter media and see if this correct-, the standing water problem. If so, revegetate immediately. If not, consult an appropriate professional for a more extensive repair. Remove the plants by hand or by wiping them with pesticide (do not Remove shrubs or trees immediately. Make all needed repairs. Clean out the outlet device. Dispose of the sediment off -site. Repair or replace the outlet device. Contact the NC Division of Water Quality 401 Oversight Unit at 919- 733-1786. Form SW40 I -Infiltration Basin O&M-Rev.3 Page 2 or 3 Permit Number: F� (to be provided by UWQ) I acknowledge and agree by my signature below that 1 am responsible for the performance of the maintenance procedures listed above. 1 agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: T ' iZ-s N `f ZI t�:CaE- _? P,-EqT- BAIP drainage area number: Print name: Ual b-E/46(_E,7 __..._ Title: Address: SigAure: Date: 1�K/ CL DEVIL 52-) --d5(111 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. M Ju day o a Notary Public for the State of 411 County of do hereby certify that MC_,WY3 it personally appeared before me this -, and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness hand and official seal, 14iO11118,11/ .�� Q+• MC ©pY Ink � Ory 4.0 I ark? CoZo%, O4,riiW%1' SEAL My commission expires Dorm SW401-Infiltration Basin O&M-Rev.3 Page 3 of')