HomeMy WebLinkAboutSW7060813_HISTORICAL FILE_20060908STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
?p HISTORICAL FILE
DOC DATE
YYYYMMDD
�OF W Ar&,,Q Michnei F. Easley, Governor
�0 G William G. Ross Jr., secretary
North Carolina Department of En it mmeni and Natural Resourees
p -C Alan W. KhrrieL. RE, Director
Division o-;- W=7 Quality
September 8, 2006
Mr. Neil 1. Rogers, VP — Facilities Dept.
Ferguson Enterprises, Inc.
12500 Jefferson Avenue
Newport News, VA, 23602
Subject: StormwaterReview SW7060813
Ferguson Enterprises, Inc.
Currituck County
Dear Mr. Rogers:
This office received a Coastal Stormwater permit application and plans for the subject project on
August 18, 2006. A preliminary review of the project indicates that before a State Stormwater permit can
be issued the following additional information is needed.
Please provide the drawdoAn calculations for the 3 infiltration basins to verity_ that the 1" design
storm will infiltrate within a 5 day period.
The above requested information must be received in this office prior to September 15. 2006 or
your. application will be returned as incomplete. The return of this project will necessitate resubminal of
all required items including the application fee. If you need additional time to submit the required
information, please mail or fax your request for time extension to this office at the Letterhead
address.
You should also be aware that the Stormwater Rules require that the permit be issued prior to any
development activity. Construction without a permit is a violation of 15A NCAC 2H.1000 and North
Carolina General Statute 143-215.1 and may result in civil penalties of up to $10,000 per day.
Please reference the Stormwater Project Number above on all correspondence. If you have
questions, please feel free to contact me at (252) 948-3848.
Sincerelv,
`Scott Vinson
Environmental Engineer
Washington Re_ional Office
cc: Sean Robey, PE
'M1ashin,ton Regional Office
N o th Caro
,1 at!!m
North Carolina Division of Water Qualitv Washington Regional Office Phone (252) 946-6481 FAX (2-521946-:21
fntemet: h2o.enr.sta1e.nc.us 943 Washington Square Mail, Washington, NC 27989
An: -:Dual ?poonunitylAffirmative Action Empbyer - 50% Red ciedll O%Post Consumer Pape,'
Custome- scr 'ice
1-877-o -67"8
JZEPORT OF SUBSURFACE INVESTIGATION AND
GEOTECHNICAL ENGINEERING
Proposed Ballast Rock Commerce Center
Currituck County, North Carolina
GET Project No. EC05-265C
September 6, 2005
Prepared For: Ferguson Enterprise, Inc.
RECEIVED
AUG 3 0 2006
DWQ
PHOJ #
SN" 'o1—imIiS E l
US ROUTE 156 (8400 CARATUKE HIGHWAY)
LEGEND
APPROXIMATE SPT BORING LOCATIONS
•— APPROXIMATE LIMITS OF THE
PROPOSED C❑MERCIAL DEVELOPMENT
Project Name,
COMMERCE I
n 7[onmental �- KK1 i u4 Lu " "un l n —yL
Te Ing Project Noy EC05-265G Dra.+n By
Ntlons, Inc.
Date, 8/14/05 Flqure Nc
BRING L❑CATION PLAN I SCALE,
NOT TO
°'": '•�
ed
Env `'Cal l
PROJECT: ProposedBallast Rock Commerce Center _ _ _ PROJECT NO.: EC05-265G
CLIENT: Ferguson Enterprises, Inc. _
PROJECT LOCATION: Cunituck County, North Carolina
. , bons, Inc.
LOCATION: See Attached Bo -ring -ocation Plan - ^ELEVATION: _ INA
LOG OF BORING
DRILLER: J. Brown LOGGED BY: G. Stalls, E.I.T.
DRILLING METHOD: Mud Rotary (wash) DATE: 8-19.05
No. B-1
_ _
DEPTH TO - WATER> INITIAL: s 5-feet) AFTER 24 HOURS:�3 _ _ CAVING> L
�w
c m
o"�-
Description
o
o.
cc
o
E z
o a
o
m v
o
o
TEST RESULTS
Plastic Limit Liquid Limit
Water Content - •
Penetration -
10 2D 30 40 50 60 70
0
, •
2
1
9-inches Topsoil
. e
Tan, moist, Silty fine SAND (SM) with trace clay, very loose
ta: t }•
1;4"
:I;L'r1
; :I: [ •I:
r I}+
z
3
s
$
5
Tan, moist, poorly graded fine to medium SAND (SP) to poorly
graded fine to tncdium SAND (SP-SI\4) with silt, very loose to
medium dense
Wet from 5-feet
2
3
.... ..
:I:I'C1
4
B
g
....... .......... ...,. ... ..
•4:1,id•
r I
12
12
.... .......... :.....:.... :. :.....
5
10
3.5
I I F i
4
'i'I:7 L l
..... ... :. : .
Gray from 18-feet
Trace Peat from 18 to 20-feet
ra; r• 1:
3
3
7
20
l:l.Cl'
.., :. .. ...'... :...
r:KL1:
'L7:tJ.
g
9
25
Boring terminated at 25 ft.
30
Figure PAGE 1 of 1
,.
.
PROJECT: Proposed Ballast Rock Commerce Center PROJECT NO.:eo
Cal
Env' '' nental
CLIENT: Ferguson Enterprises, Inc.
PROJECT LOCATION: Currituck County North Carolina
= u . m
- d tions, Inc.
LOCATION: See Attached Bofing Location Plan ELEVATION: 1NA
LOG OF BORING
DRILLER. J. Brown LOGGED BY: G. Stalls, E.1.T
DRILLING METHOD: Mud Rotan, (wash) DATE: 8-19-05
No. B-3
DEPTH TO - WATER> INITIAL: $ 5.5-feet AFTER 24 HOURS: T, T CAVING> L
�
�,
N
TEST RESULTS
c w
n a)
Description
E z
o
Plastic Limit Liquid
O
m v
Water Content - o
0
Penetration - .
10 20 30 40 50 60 7
0
2
8-inches Topsoil
r, •
III: L r 1
. i � •
a:I: r 1
•1:1: i
t
2
2
2
6
Tan, moist, poorly graded fine to medium SAND (SP) to poorly
graded fine to medium SAND (SP-SA) with silt, very loose to
medium dense
2
1:rr t.
z
......... ........ .........
5
I.I:Cl
3
:
s
Wet froth 5.5-feel
r t 1
3
:.................. .
S:L'C C.
4
6
:.. -.. ..
4:<<i
5
io
_.. :.............. ...............
10
t:l.C1,
i1
_....:.....:.....:. ....:......:.....:...,.:
! :I'. t •I .
............:...... ....................... .
6
a
is
rrri
.... ._ ....... : ... :... . .
{.!•h I•
7
8
.......... .......... .. ................ ...
20
Ee:ia•
e
...... :
.... :..... :....:......:.... ...... :
i I h {•
-'.
:.... :.. :, ..
23
Gray, wet, Silty CLAY (CH) with trace sand, very soft
g
woH
WOH
...........
25
WOH
•„
:.....:......:... :.,...:
27
Gray, wet, poorry graded fine to medium SAND (SP-SNI) with silt
and marine shell fragments, dense
10
18
30
1
16
:..............................-.....:
.
Boring terminated at 30 ft.
35
W. O. 11. = Weight Of Hammer
Figure PAGE 1 of 1
PROJECT: Proposed Ballast Rock Commerce Cenler
PROJECT NO.: EC05-265G
ed cal mental
CLIENT: Ferguson Enterprises, Inc.
PROJECT LOCATION: Cunituck Countv, North Carolina
lions. lnc.
LOCATION: See Attached Boring Vocation Plan
ELEVATION: INA
LOG OF BORING
DRILLER: J. Brown
LOGGED BY: G. Stalls E.I.T.
DRILLING METHOD: Mud Rotary (wash
DATE: 8-I9-05
NO. B-5
DEPTH TO -WATERS INITIAL: $ 5-feet
_
AFTER 24 HOURS:
-Z� CAVING L
U
N
o
TEST RESULTS
Plastic Limit I I Liquid Limit
;E
o
Description
L
o
Z
3
in
o
Water Content - o
Penetration -
10 20 30 40 50 BO 70
a
a
15
2D
30
5
I0-inches Topsoil
�
1
2
2
.8
Tan, moist, Silty fine SAND (SM) with clay, very loose
1
+ I' F 1:
3
2
Tan, moist, poorly graded fine to medium SAND (SP) to poorly
graded fine to medium SAND (SP-SM) with silt, very loose to
1;r I, r
2
3
medium dense
;i �I. F
5
Wet from 5-feet
1
:I :i: c i
3
5
Fi•1•i•
4
6
11
5
11
14
•l:l:if
r�l�ri•
7:It r t 1
�I�rFi
.t a; r I•
4
J:G C L 1
5
Boring terminated at 15 ft.
140.11. = Weight Of Hammer
Figure PAGE 1 of 1
eoC h cal
Env' mental
�S
tiom, Inc.
LOG OF BORING
No. B-7
PROJECT: Proposed Ballast Rock Commerce Center PROJECT NO.: Et
CLIENT: Ferguson Enterprises. Inc. "t
PROJECT LOCATION: Currituck County, North Carolina
LOCATION: See Attached Boring Location PlanELEVATION: INA �
DRILLER: J. Brown_ _- LOGGED BY: G. Stalls, E.iA
DRILLING METHOD: Mud Rotary (wash) _ DATE: 8-19-05
DEPTH TO - WATER> INITIAL: -V 5-feet AFTER 24 HOURS: -Zr CAVING> L
c7
Description
E6
N
N
_o z
m U0
oa
v
TEST RESULTS
Plastic Limit Liquid Li
Water Content - e
Penetration -
10 20 30 40 50 60 70
0
s
1
3
2
2
4
3
4
s
4
$
-]aches Topsoil
.l:i.E! 1
:! :!: t 1
''!: V !'
i f b'i•'
.
•FIId
�:l:rt1
r�•��•
C14
I i' i •
=
....... ...................... ...... .
...................... ................ .......
..................
, moistl graded ., _._ __7
Tan, poorly
' p y gr fine to medium SAND (SP) to poorly
graded fine to medium SAND (SP-SM) with silt, very loose to
lneditnse
un de
_ Wet from 5-feet
2
5
3
4
10
15 15
Boring terminated at 15 ft.
20
25
30
35
W O. tI. = Weight Of Hammer
Figure PAGE 1 of 1
+ '..
C) veal
' mental
f-�T
bons, Inc.
LOG OF BORING
NO. B-9
PROJECT: Proposed Ballast Rock Comrnrrc_e Center_ PROJECT NO.: EC05-265G
CLIENT: Ferguson Enterprises, Inc.
PROJECT LOCATION: Currituck County, North_ Carolina
LOCATION: See Attached Bonne Location Plan ELEVATION: 1NA
DRILLER: J. Browm LOGGED BY: G. Stalls. EJ.T.
DRILLING METHOD: Mud Rotary (wash) DATE: 5-19-05
DEPTH TO - WATER> INITIAL: 8 5.5-feet AFTER 24 HOURS: 1w CAVING> L
Y W
°'
Description
a
w
N
o o
m U
o
°
#[Penetration
TEST RESULTS
stic Limit Liquid Limit
ter Content - P
-
10 20 30 40 50 60 70
a
3
z
2
2
2
5
1D
12
10
5
5
12-inches Topsoil
J J J
J J J
:. .. .. . ....: . .
..............................................
.
:. .........:.....
:
7.
5
Tan, moist, Silty fine SAND (SM), loose
I t r
I• h 1
' 'I' L
'.Ctr
r9•ri
J:I:ril
J:I:rL1
Tan, moist, poorly graded tine to medium SAND (SP) to poorly
graded fine to medium SAND (SP-SM) with silt, very loose to
medium dense
Wet from 5.5-feet
2
3
'-
4
10
5
6
15
Boring terminated at 15 ft.
20
25
30
35
W 0.H. = Weight OfHanuner
Figure PAGE 1 of 1
r
:., :
�.
nip " s` e , nical
Env- 'mental
'
{ -,�
-cv , tions, Inc.
LOG OF BORING
No. B-1 I
PROJECT: 1'roposed Ballast Rock Commerce Center PROJECT NO.: ECOS•~
_ T m
��� . 71
CLIENT; I erguson Enterprises. rises. Inc.
PROJECT LOCATION: Curf'stuck Countv, North Carolina
LOCATION: See Attached Borinp, Location Plan ELEVATION: INA
DRILLER: .1, Brown LOGGED BY: G. Stalls, E.
DRILLING METHOD: Mud Rotary (wash} DATE: 9-19.05
DEPTH TO - WATER> INITIAL: $ 5-feet AFTER 24 HOURS: 4- CAVING> f-
4) R
0
Desuiption
z
m
o o
+� V
o
*
v
6
TEST RESULTS
Plastic Limit Liquid Limit
Water Content - o
Penetration -
10 20 30 40 50 60 70
0
2
z
2
a
s
4
s
7
tic
3
5
6
1.9
12-inches Topsoil
J J ✓
✓ J J
=
... ,.. ..
:....: ....:......:... ..:. .. ' ... ..
:o
.................
...
.. .... .:.............................
. .:... .. .............................. ...
:.....:......:......:..........
:.....:.....:.....:......:.................
...........: ....:.....'...,.:.....:.....
Reddish Tan, moist, Clayey fine SAND (SC) with silt, very loose
+;I: R'{
y'I;' r
.
:I'a: 1
I:I:Cf
r�:(a•
�rrt
.1:1:[ r
I' -I: s ;
)
Tan, moist, poorly graded fine to medium SAND (SP) to poorly
graded fine to medium SAND (SI'-SNI) with silt, very loose to
medium dense
Wet from 5-feet
Tan -Brown from 6-feet
Tan from 13-feet
2
5
3
4
10
6
15
Boring terminated at I5 ft.
20
2.9
30
35
IV.0.H. = JdfeightOfI-Iansnier
Figure PAGE 1 Of 1
KEY TO SYMBOLS
iDescription
ca symbols
Topsoil
Silty sand
Poorly graded sand
with silt
High plasticity
Symbols
clay
Clayey sand
Peat
Poorly graded s
Water table during
drilling
Notes
1. Exploratory borings were drilled on 8-19-05 using a
4-inch diameter continuous flight power auger.
2. No free water was encountered at the time of drilling or
when re -checked the following day.
3. Boring locations were taped from existing features and
elevations extrapolated from the final design schematic plan.
4. These logs are subject to the limitations, conclusions, and
recommendations in this report.
S. Results of tests conducted on samples recovered are reported
on the loos,
-
•I•I: F l i
2 1
1
✓ J J
2
3
J✓ J
3 3
3
JJJ
2
JJJ
2 2
•.`i
NM=5.9
.IJ;✓[ f j
3
NM=7,2
:i:I:r.l
•i:I:4•I•
:I:r.[i
.I:I:4i
• •
••
33
..
34
:I:Cr•I
2 2
3
:I:I:CI
;}:I:[1
• ��
,
Sr
•4'J.
2
1 •I' h
1•
4
I :I'• 4 I.
2
2 2
! :I: L I•
2 3
.�,
l J.L•a.
1 a.
.1 •I' I h
.1•I; [ h
"'I. I. h
,
4 4
I. {
L'•I. 1 J .
•I • I• } I {
L a, i J .
• LJ. l
8 7
2 2
:1- G-i
2 2 Nh1=16.e —•:
�i�1
3 e
2 3
5
i •I • } 1•
{ .h• } t:
=
: € :I: [ 1
—
i :I' F 'I •
-I :I: C I
_
.1 :1: L r
i + 1- l• F
,1 :1: [ r
i -I�•'r I•
{ :€: �'k:
} 1. V i• f
4 7
4 7
5 to
S2
f•J. V�•
6 H
9
.1:I:C f
4 5 NM=21.8
''
4 4
'I;I;�E]
;l;i;kll
•Fi:l �•E
.I ;I:fit 1
Fi.}{.,
5
-
SS9
; .I: r..
g g
:I :I: i
9 tD
i •1-r
1217
:I :}: F {
7 9
a 10
[Ei
j:1:[t1
ri ri I
-I�P>•i
J:e{E3
�€:I=Li
7:I:r[]l
7;r.[L1
F
€
.1 :I; l"
' II F I
I '1•' h l'
' II' l
' II' F 1
}
1
`
.7 :1[ F ?•
.1:I; T l' j•i
:I: L l
.I : I: [ !' ,
.1 :1,' I; l'
f:Cl.l:
a 4
l r. 1;
3 4
I:I.if
-
7.1:C E}
5
.l'.
J:hCE1
4
4
5
3 5
4 4
15
'tTt!.
'J:r•c E}
�I�rFi
'Ja:r EI
J:I-i Et
15
}
2p
20
i
25 L-- 25
Strala symbols
Topsoil
Silty sand
Poorly graded sand
.:° r
with silt
fz
High plasticity
iC !J
clay
Clayey sand
R Peat
EjPoorly graded sand
GET Solutions, Inc.
GENERALIZED SOIL PROFILE
Hop.MNIAL
:
SCWDRAWN BYIAPPROVED BY DATE DRAWN
VEW7
sc F"
L I -s GWS 9/6/2005
Proposed Ballast Rock Commerce Center
FIGURE NUMBER
PROJECT NO. EC05-265G
Ferguson
h
Subject: Ferguson
From: "Kim Hamby" <kim@hymanrobey.com>
Date: Mon, 11 Sep 2006 15:05:02 -0400
To: <scott.vinson@ncmai1.net>
Scott,
I have added the basic drawdown calculation to the bottom of the spreadsheet for each basin. Please
let me know if this is not sufficient.
Thank you for your help.
Kim
Kimberly D. Hamby, Project Manager
Hyman & Robey, PC
252.335.1888
Content -Type: application/vnd.ms-excel
050635 infiltration basin #1.XLS Content -Encoding: base64
050635 infiltration basin #2.XLSContent-Type: application/vnd.ms-excel
Content -Encoding: base64
050635 infiltration basin #3.XLS Content -Type: application/vnd.ms-excel
Content -Encoding: base64
I of 1 9/11/2006 4:34 PM
INFILTRATION BASIN
RUNOFF CALCULATIONS
Ferguson - Basin #1
10 Yr, 24 Hr Storm
DETENTION POND
WATERSHED AREA:
WATERSHED % IMPERVIOUS:
BASIN BOTTOM ELEVATION:
VOLUME OF P RAINFALL
2.83 ACRES
54.06 %
I I FT
Hyman and Robey, PC
P. O. Box 339
Camden, NC 27921
(252)-335-1888
09/ 11 /06
Page 1
AREA OF ROOFS: 0.63 AC
AREA OF PARKING/CONCRETE: 0.9 AC
AREA OF GREEN AREAS: 1.3 AC
VOLUME OF RUNOFF 6334.35 CF
VOL (CF)=I(ROOF* 1.0)+(PARKING*.95)+(GRASS*0.2)1*43,560/12
POND VOLUME CALCULATIONS
AREA FZ
BASIN BOTTOM SURFACE AREA 10,157.41
SURFACE AREA AT STORAGE ELEVATION 12,285.70
ELEVATIONS F
BASIN BOTTOM ELEVATION 11.00
ELEVATION OF STORAGE 12.25
VOLUME CALCULATIONS F3
STORAGE VOLUME 14,026.94
MINIMUM INFILTRATION RATE 0.6 INCHES/HOUR
STORAGE DEPTH 1.25 FEET
DRAWDOWN TIME 25 HOURS
INFILTRATION BASIN
RUNOFF CALCULATIONS
Ferguson - Basin 92
10 Yr, 24 Hr Storm
DETENTION POND
WATERSHED AREA:
WATERSHED % IMPERVIOUS:
BASIN BOTTOM ELEVATION:
VOLUME OF V RAINFALL
4.25 ACRES
59.29 %
6 FT
Hyman and Robey, PC
P. 0. Box 339
Camden, NC 27921
(252)-33 5-1888
09/ 1 1 /06
Page I
AREA OF ROOFS: 0.63 AC
AREA OF PARKING/CONCRETE: 1.88 AC
AREA OF GREEN AREAS: 1.74 AC
VOLUME OF RUNOFF 10033.32 CF
VOL (CF)=[(ROOF* 1.0)+(PARKING*.95)+(GRASS*0.2)1*43,560/12
POND VOLUME CALCULATIONS
AREA FZ
BASIN BOTTOM SURFACE AREA 21,175.17
SURFACE AREA AT STORAGE ELEVATION 24,780.14
ELEVATIONS F
BASIN BOTTOM ELEVATION 6.00
ELEVATION OF STORAGE 7.00
VOLUME CALCULATIONS F3
STORAGE VOLUME 22,977.66
MINIMUM INFILTRATION RATE 0.6 INCHES/HOUR
STORAGE DEPTH 1.00 FEET
DRAWDOWN TIME 20 HOURS
INFILTRATION BASIN
RUNOFF CALCULATIONS
Ferguson - Basin #3
10 Yr, 24 Hr Storm
DETENTION POND
WATERSHED AREA:
WATERSHED % IMPERVIOUS:
BASIN BOTTOM ELEVATION:
VOLUME OF I" RAINFALL
3.31 ACRES
60.24 %
6 FT
Hyman and Robey, PC
P. O. Box 339
Camden, NC 27921
(252)-335-1888
09/ 11 /06
Page 1
AREA OF ROOFS: 0 AC
AREA OF PARKING/CONCRETE: 2 AC
AREA OF GREEN AREAS: 1.31 AC
VOLUME OF RUNOFF 7848.06 CF
V01, (CP)=((ROOF* 1,0)+(PARKING*.95)+(CRASS*0.2)I*43,560/12
POND VOLUME CALCULATIONS
AREA F2
BASIN BOTTOM SURFACE AREA 14,951.06
SURFACE AREA AT STORAGE ELEVATION 18,030.93
ELEVATIONS F
BASIN BOTTOM ELEVATION 6.00
ELEVATION OF STORAGE 7.00
VOLUME CALCULATIONS F3
STORAGE VOLUME 16,491.00
MINIMUM INFILTRATION RATE 0.6 INCHESMOUR
STORAGE DEPTH 1.00 FEET
DRAWDOWN TIME 20 HOURS
INFIL•1'RATION 13ASIN
RUNOFF CALCULATIONS
l4erpson - Basin #1
1.
[0 Yr, 24 I-Ir Storm
I)E"I'E'NTION POND
WATELRS1-11 D ARE -A:
WA'I'I:iE2SFII D % IMPERVIOUS:
13ASIN 130170NA ELl"WATION:
VOLUME OF I" RAINFALL
Hyman and Robey, PC
1". 0. Box 339
Canulen, NC 27921
(252)-335-1888
0,8/ 17/06
Page I
2.83 ACRI S
54.06
11 Fr ,-
AUG 18 2006
A Hu
AREA OF ROOFS: 0,63 AC
AP.EA OF PARKING/CONCRE'I'L; 0,9 AC
AREA Ol-' GIZFaEN AREAS: 1.3 AC
VOLUII,IE OF RUNOFF 6334.35 CF VOL (CF)=((ROOP1.0)+(PARKINC, *.95)+(GRASS*0.2)]*43,560/l2
AREA
POND VOLUME CALCULATIONS
F2
BASIN BOTTOM SURFACE AREA 10,157.41
SURFACE AREA AT STORAGE ELEVATIO 12,285.70
ELEVATIONS
BASIN BOTTOM ELEVATION
ELEVATION OF STORAGE
VOLUME CALCULATIONS
STORAGE VOLUME
F
11.00
12.25
Fa
14,026.94
/• � SEAL
A C
i�
j� �•'�;yQfNF-0 ��
INF1i-TRATION 13ASIN
RUNOFF CALCULATIONS
FCrgLISOn - Basin #2
10 Yr, 24 Hr Slornl
DE-1'EMI'ION POND
WATERSHF-D AREA:
WA'I'ERSHFI D % IMPERVIOUS:
BASIN 130170N4 E-LEVATION:
VOLUME- OF I " RAINFALL
ARE -'A OF ROODS: 0.63 AC
AREA OF PARKING/CONCRETE: 1.88 AC
ARIA OF GREEN AREAS: 1.74 AC
VOLUME OF RUNOFF 10033.32 C17
4,25 ACRES
59,29 %
6 FT
POND VOLUME CALCULATIONS
Hyman and Robey, PC
1". 0. Box 339
Camden, NC 27921
(252)-335-1888
08/ 17/06
Page I
VOL (C],)=I(ROOF* 1.0)+(PARKINC, *.95)+(GRASS*0.2)I*43,560/12
AREA F2
BASIN BOTTOM SURFACE AREA 21,175.17
SURFACE AREA AT STORAGE ELEVATION 24,780.14
ELEVATIONS F
BASIN BOTTOM ELEVATION 6.00
ELEVATION OF STORAGE 7.00
VOLUME CALCULATIONS
STORAGE VOLUME
F3
22,977.66
*g,rVAL
18550
pe4ty C.
Ilfllillll
V.
IN1"IL;1'RATION 13ASIN
RUNOFF CALCULATIONS
Ferguson - Basin #3
10 Yr, 24 Hr Storm
1)1"1'EN"PION POND
WAI'ERSHED AREA:
WATE,RSHI D °lo IMPERVIOUS:
13ASIN BO'I"I'OM ELEVATION:
VOLUME OF 1" RAINFALL
3.31 ACRES
60.24 %
6 F1'
Hyman and Robey, PC
P. O. Box 339
Camden, NC 27921
(252)-335-1888
08/ 17/06
Page I
AREA OL" ROODS: 0 AC
AREA OF PARKING/CONCRETE: 2 AC
AREA OF GREEN ARF.,AS: 1.31 AC
VOLUME OF RUNOFF 7848.06 CF V01.(CF)=[(R001,*].0)+(PARKIN(.,*.95)-+(GRASS*0.2)1*43,560/12
AREA
POND VOLUME CALCULATIONS
FZ
BASIN BOTTOM SURFACE AREA 14,951,06
SURFACE AREA AT STORAGE ELEVATION 18,030.93
ELEVATIONS
BASIN BOTTOM ELEVATION
ELEVATION OF STORAGE
F
6.00
7.00
VOLUME CALCULATIONS F3
STORAGE VOLUME
16,491.00
C'S SEAL
18550
S
,�44
HrC 1IR0sV\`�,
TROJECYDESCRIPTION
_AOG T2006
Ferguson Enterprises
Currituck County - North Carolina-'�1
August 17, 2006
Ferguson Enterprises is proposing to construct a new facility on a 14.75 acre site
on Caratoke Highway. The site is Lot 6 of Phase 2 of Ballast Rock Commerce Center. It
is currently vacant and is zoned General Business.
Development will include construction of a new building, parking lot, paved
storage yard, septic system, three infiltration basins with required drainage ditches, and
the installation of required landscaping.
The proposed 36,730 sf building will contribute 37,375 sf of impervious area due
to the roof overhangs. Allowance has been made for the future building expansion that
will be 18,200 sf. The parking, yard, and drives will contribute another 112,138 sf. The
1,040 sf of asphalt that will exist at the rear of the building has not been included in the
overall calculations as it will be covered by the future building addition. The concrete
sidewalks and dumpster pad will be 1,241 sf. The future yard will be an additional 2
acres of pavement. Allowance has also been made for 7,198 sf of future parking that will
be added as the county sees the need. The maximum impervious area will be 6.05 acres
or 41.02% of the overall tract.
Drainage Area 1 contains 2.83 acres and consists of the front of the site and the
north side of the site to the center ridge of the building. This drainage area will contain
18,414 sf of building initially and another 9,100 sf of building when the future building
addition is constructed. It also contains 30,851 sf of pavement and 985 sf of sidewalk. if
the county determines that the parking provided is insufficient, another 7,198 sf of
parking and 298 sf of sidewalk will be added. All of the potential future development has
been included in the calculations for the infiltration basin. Runoff from the northern half
of the building will sheet flow across the fire lane and the grassed yard to a Swale that will
route the runoff to a front swale that drains into the infiltration basin. The entrance road
will also sheet flow into a Swale that drains to the front swale. All swales will have 3:1
Side slopes. The front parking lot will sheet flow to curb and gutter along the edge of
the parking lot where it will be directed into the front Swale. The front Swale has been
designed to provide pre-treatment. A berm between this front Swale and the infiltration
basin is to be sodded to provide a stable surface at elevation 12.0 and will act as the level
spreader. As the Swale fills and tops the berm, stormwater will sheet flow across the
berm into the infiltration basin, across the width of the basin. The basin has been
designed to store runoff from the first two inches (2") of a rain event. The required
storage volume for Drainage Area 1 is 6,334 cf. The basin will actually store 14,027 cf or
the equivalent of runoff from 2.21" of rain. In addition to the storage in the basin, the
swale will provide additional storage. The basin bottom is at elevation 11.0. This
provides 24" of separation between the seasonal high water table (estimated at 9.0) and
the bottom of the basin. The storage elevation is 12.25. Using the minimum infiltration
rate for this soil of 0.6 in/hr for the soils, the water in the basin should draw down in
approximately 25 hours. Runoff in excess of the 2.21" will overflow through a vegetated
filter into the NC Dept. of Transportation drainage ditch that currently drains this property
and the highway. The drainage system discharges into a tributary that drains into the
Currituck Sound. The peak discharge from this bypass should be less than 1 cfs during
the 10 year storm. Utilizing the rational method to estimate runoff, the existing runoff to
the roadside ditch is 3.7 cfs; therefore, this design meets the Currituck County
requirement that post -development discharge during a 10-year rain event shall not exceed
the pre -development discharge.
Drainage Area 2 contains 4.25 acres and consists of the south side of the building
and the paved yard to the south and west of the site. The drainage area will contain an
additional 9,100 sf of green space until the future building is constructed. This drainage
area will contain 18,961 sf of building initially and another 9,100 sf of building when the
future building addition is constructed. It also contains 81,287 sf of pavement, 240 sf of
concrete for the dumpster pad and 25 sf of sidewalk. There is an additional 1,040 sf of
pavement that is located within the future building area. This pavement area has not been
included in the calculations because the future building has been included. The drainage
area will contain an additional 9,100 sf of green space until the future building is
constructed. This increased area has been included in the calculations to insure that the
maximum runoff to the basin has been taken into consideration. All of the runoff within
this drainage area will sheet flow across pavement to drop inlets with a sump depth of one
foot for sediment collection. The underground pipe system will discharge into a Swale at
the southwest corner of the yard. Stormwater will run through over 700 if of grassed
swale with 3:1 side slopes before entering the portion of the Swale that will parallel the
infiltration basin. Like the front basin, the rear basin will be separated from the swale
with a sodded berm that will act as a level spreader. The basin has been designed to store
runoff from the first two inches (2") of a rain event. The required storage volume for
Drainage Area 2 is 10,033 cf. The basin will actually store 22,978 cf or the equivalent of
runoff from 2.29" of rain. In addition to the storage in the basin, the swale will provide
additional storage. The basin bottom is at elevation 6.0. This provides 24" of separation
between the seasonal high water table (estimated at 4.0) and the bottom of the basin.
The storage elevation is 7.0. Using the minimum infiltration rate for this soil of 0.6 inlhr
for the soils, the water in the basin should draw down in approximately 20 hours. Runoff
in excess of the 2.29" will discharge through a vegetated filter. From the vegetated filter,
it will sheet flow to the wetlands of the Albemarle Sound. The peak discharge from this
bypass should not exceed 1 cfs during the 10 year storm. Utilizing the rational method to
estimate runoff, the existing runoff from the rear portion of the site is 5.95 cfs. To meet
the Currituck County requirement that post -development discharge during a 10-year rain
event shall not exceed the pre -development discharge, the discharge from Drainage Areas
2, 3, and 4 cannot exceed 5.95 cfs.
Drainage Area 3 is 3.31 acres that includes the future 2 acre paved yard and the
area adjacent to the ditch draining to Infiltration Basin #3. As with Drainge Area 2, all of
the runoff within this drainage area will sheet flow across pavement to drop inlets with a
sump depth of one foot for sediment collection. The underground pipe system will
discharge into a swale at the northwest corner of the yard. Stormwater will run through
over 500 If of flat grassed swale with 3:1 side slopes before entering the portion of the
swale that will parallel the infiltration basin. Like the other two basins, the rear basin will
be separated from the swale with a sodded berm that will act as a level spreader. The
basin has been designed to store runoff from the first two inches (2") of a rain event. The
required storage volume for Drainage Area 3 is 7,848 cf. The basin will actually store
16,491 cf or the equivalent of runoff from 2.1" of rain. In addition to the storage in the
basin, the swale will provide additional storage. The basin bottom is at elevation 6.0.
This provides 24" of separation between the seasonal high water table (estimated at 4.0)
and the bottom of the basin. The storage elevation is 7.0. Using the minimum
infiltration rate for this soil of 0.6 infhr for the soils, the water in the basin should draw
down in approximately 20 hours. Runoff in excess of the 2.1" will discharge through a
vegetated filter. From the vegetated filter, it will sheet flow to the wetlands of the
Albemarle Sound. The peak discharge from this basin should not exceed 1 cfs during the
10 year storm.
Drainage Area 4 contains 4.36 acres that make up the portions of the site that are
not directed to the infiltration basins. There will be no impervious area in this drainage
area. Runoff from this area will continue to sheet flow away from the future yard area to
the rear of the site. Swales will intercept the runoff to prevent it from entering the
infiltration basins. They will route the stormwater around the stockpile location to the
swale that runs somewhat parallel to the rear property line. This swale serves as a level
spreader to insure that any runoff from this tract continues to sheet flow onto the
adjoining property instead of concentrating the flow in any location.
Construction sequencing and notes on the plan direct the contractor to construct
the infiltration basins and leave them "off-line" until construction is complete.
Temporary swales will route stormwater around the infiltration basins until construction
is complete.
On August 19, 2005, soil borings were made on the site by GET Solutions, Inc.
The results support the soils maps designation of Munden, which has a minimum
permeability rate of 0.6 in/hr. The borings determined that the water table was 5' below
the surface in each boring. The seasonal high water table is estimated at 1.5' above the
water table at the time the borings were performed. Based on this information, the
seasonal high water table in the area of the front basin is 9.0 and in the area of the rear
basin it is 3.5. In addition, on July 21, 2006, we performed hand auger borings at
multiple locations on the site. Our results support the 9.0 elevation for the seasonal high
water table at the front, but we found the soil coloration in the rear of the site to support a
seasonal high water table closer to elevation 4.0. Soil characteristics noted in the soils
report and verified by our office support the soil type Munden as mapped by the USDA-
NRCS. Munden soils are sandy and have a moderate to moderately rapid permeability
rate with the minimum rate of 0.6-2.0 inches per hour between 14 and 32 inches of depth.
The soil maps also 'indicate an area of Conetoe soils. This soil type occurs in the vicinity
of the building and septic system.
The disturbed area for this development will not exceed 15 acres. Limits of
disturbance have been shown on the plans.
-Hyman & Robey, PC
Consulting Engineers and Land Surveyors (252) 335-1888 Office
(252) 338-2913 Office
(252)338-5552 Fax
Scott Vinson, Environmental Engineer
Division of Water Quality -Surface Water Section
Washington Regional Office
943 Washington Square Mal
Washington, NC 27889
Subject: Stormwater Management Permit
Express Permitting
Ferguson Enterprises, hic
Project # 050635
Dear Mr. Vinson:
August 17, 2006
P",�7i�����`�i�k�J
AUG 18 2006
N��-�NAR0
Enclosed for your review and approval, please find the following items:
1. Two (2) copies of sheets 1 - 6 for the above referenced project.
2. The original and one copy of the Stormwater Permit Application and
required attachments.
3. Two (2) copies of the project description and calculations.
4. Printout from NC Dept. OF Secretary of State showing NC registered agent
for Ferguson Enterprises.
5. Check in the amount $4000.00 for the required fee.
If you have any questions, please do not hesitate to call this office at
(252) 335-1888.
cc: file
Kevin Humphrey
Sincerely,
Seap C. Robey, P.E.
Kimberly D. Hamby
Project Manager
F. O. Box 339, Camden, NC 27921
1 -1
11age 1 of I
North Carolina
Flaine CEFAR M N FVL�i.'f}tL
Secretary 1 E C R ETA «Y C71= STAT�
PC.) Bc x 2�,$22 Relri�rh, NC 7.7�32ti r1+?22 i91�3jRC17-27(1 ;
Col por,-tlions
"Corporations Home
"important Notice
"Corporations FAQ
"Tobacco Manufacturers
'Dissolution Reports
*Non -Profit Reports
Verify Certification
"Online Annual Reports
"KBBE B2B Annual Reports
Links
*Secretary Of State Home
"Register for E-Procurement
"Dept. of Revenue
Legislalion
*1999 Senate Bills
02001 Bill Summaries
"Annual Reports 1997
"Corporations 1997
Search
"By Corporate Name
"For New Corporation
"By Registered Agent
Online Orders
'Start An Order
"New Payment Procedures
Conlact Us
*Corporations Division
"Secretary of State's web site
Print
"Printable Page
Dale: 8/17/2006
Click here to:
View Document Filings I
71 Print apre-populated Annual Report Form I Annual Report Count I Fil
an Annual Report I
Corporation Names _
Name Name Type
NC Ferguson Enterprises, Legal AUG 18 2006
Inc. of Virginia
0 Ferguson Enterprises, Home State
Inc.
NC Wolseley Hughes Prev Legal
Acquisition Company, Inc.
Business Corporation Information
SOSID:
0052324
Status:
Current -Active
Date Formed:
1/31/1983
Citizenship:
Foreign
State of Inc.:
VA
Duration:
Perpetual
Registered Agent
Agent Name:
Registered Office Address
Registered Mailing
Address:
Principal Office Address:
Principal Mailing Address:
Stock
Corporation Service Company
327 Hillsborough Street
Raleigh NC 27603
327 Hillsborough Street
Raleigh NC 27603
12500 Jefferson Avenue
Newport News VA 23601
12500 Jefferson Avenue
Newport News VA 23601
Class Shares No Par Value Par Value
99 SEE CERT 0 0
For questions or comments about the North Carolina Secretary of State's web site, please send e-mail to webmaster.
httf�://�vw�v.secretary.stare.��c.us/corporations/Carp.aspx?I'iternIci=�I819935 8/17/2006
1 SOSID:0052324
Date Filed: 5/1412002 1:57 PM
CO-479 (40) Business Corporation Elaine F. Marshall
North Carolina Secretary of State
g °° North Carolina Annual Rep( 2002 134 00187
(Name of Corporation: FERGUSON ENTERPRISES INC.
State of Incorporation: VA
Secretary of State Corp. ID Number: 0052324 Fiscal Year Ending: 07 31 01
Month / Day r Year
Federal Employer ID Number: 541211771
If this is the initial annual report filing, please complete the entire form. If your business corporation's
information has not changed since the previous report, check the box and complete Line 8 only.
1 . Registered agent & registered office mailing address Agent: CORPORATION SERVICE COMPANY
Mailing Address: 327 HILLSBOROUGH ST
2. Street address & county of registered office Street Address: RALEIGH, NC 27 6 03
County: WAKE
3. If registered agent changed, signature of new agent:
(sipnaturo constitutes conwni to the'rppbintmmtl
4. Enter principal office address here:
5. Enter principal office telephone number here:
6, Enter name, title and business address of principal officers here:
Name: Title:
Address:
City; See Statement 1 Slate: Zip:
Name: Title:
Address:
City: State: Zip'.
Name) Title:
Address:
city: State; Zip:
7, Briefly describe the nature of business:
8. Certifica�n of annual report must be completed by all corporations
�-
Signalura (loan mull t e sicn. by an officer of corswrawnl Date
n039311% 4.4100 Type or Pnnt Name Title
FEI 05/03/2002 11:29:10 V0.10.01 54-1211771 1
NCDENR
North Carolina Department of Environment and Natural Resources �7i G U ED
943 Washington Square Mall, Washington NC 27889 (252) 946-6481 FAX (252)975-37-15 � li
Request for Express Permit Review AUG 18 2006
FILL-IN all information below and CHECK required Permit(s). PIAKI I Al Please include this with the application package upon submittal. Project application received after 12 noon wil! be
stamped in the following work day. Thank youl Lyn Hardison lyn.hardison@ncmail.net
APPLICANT Name Ne;1_1.-8Qqer5;yp iiities pea,
Company
B�rg= Inc -
Address 1?5n ,jeffar�rn Aim CitylState , }fA Zip 4
Phone 757--874--7795 Fax Email
PROJECT Name pm2:1r,�,�zrises, rnc. Countya=ituck
PROJECT LOCATION ADDRESS
ENGINEER/CONSULTANT
Company
Address p_r? a)x339 CitylState ,, rr Zip 27921
Phone 252-3335 Fax 252—-5552 Email
State or National Environmental Policy Act (SEPA, NEPA) — EA or EIS Required ❑Yes ® No
❑ STREAM ORIGIN Determination; # of Stream calls; Stream Name
❑ STORMWATER ❑ Low Density ❑ High Density -Detention Pond ❑ High Density -Other
❑ Low Density -Curb & Gutter ❑ High Density -Infiltration ❑ Off Site
PROJECT SYSTEM(S) TRIBUTARY TO cjirHt-1rk & Alhmarip STREAM NAME e�,=ntadk RIVER BASIN
---------------------------------------------------------- ScLiD3---------------------------------- ----------------------------------------------------------------------
❑ COASTAL ❑ Excavation & Fill ❑ Bridges & Culverts ❑ Structures Information
MANAGEMENT ❑ Upland Development ❑ Marina Development ❑ Urban Waterfront
® LAND QUALITY g Erosion and Sedimentation Control Plan with IS acres to be disturbed. CK # a4qi_(,9
❑ WETLANDS (4011) ❑ No Wetlands on Site (letter from COE) ❑Wetlands Delineated/No JD
❑ Greater than 0.1 AC Wetlands Impacted ❑Jurisdictional Determination has been done
❑ Less than 0.1 AC Wetlands Impacted []Greater than 0.5 AC Wetlands Impacted
CIRCLE YIN: 401 Application ❑Yes ❑ No 404 Application in Process wlUSCOE ❑Yes ❑ No
The legislation allows additional fees, not to exceed 50% of the original Express Review permit application
fee, to be charged for subsequent reviews due to the insufficiency of the permit applications.
CHECK #
SUBMITTAL. DATES:
SW 2
CAMA
LQS
401
�� I D �Db For DENIM use only
Fee Split for multiple permits:
Total Fee Amount $ 4a�rD