Loading...
HomeMy WebLinkAboutSW7060418_APPROVED PLANS_20060601STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑CURRENT PERMIT P APPROVED PLANS ❑ HISTORICAL FILE DOC DATE c / YYYYMMDD a MEN. AL MISSION ER Q""ALITY KENNETH & REBA TILLER � DB 223, PG 402 / Y i NOOK an iJ i f 40 �A !N�.dll" ---- X1,10 -" )17 E \ I � 4 a � i SEE ENLARGED VIEW THIS AREA SHEET C113 Co -b,y�- JM k XM A11U a pw /0000--�� K.S. SLADE �""`'"�w"' 1.580 Acres S' DB 139, PG 51 ; INK pal a I� Q N ariru-E Q i #E J } 1 � feNR,ll,� Iwo K on= surm JIMMY WAT , � \\ ► _ � J DB418,PGllfi ir WMh ET AL w 3V SOY •' .�' �\ OB 251jG 247�w , a l NAIaN� � ► • � 30 Nam PAWn 11C K UB 251 PG 247 n a �' .'� ► . r a.. *4% 46 :..,.`..E. �u Q11- ooswla �• r a ..� •.. - �-�,� i � - � r i NaNwl r►1Er1 ■r ■� �_ { Q Broad Creek `1� CLASSIFIED SA, HOW, NSW :►� „�ao olsAls anal' NOAR mu to NNW SEE ENLARGh VIEW THIS AREA SHEET C10 34 S SUMiMARY PROJECT32 PROJECT DATA: DEVELOPER: PAMLICO CONSORT, LLC 7 31 PO BOX 181 OWIAL NC 28571 e (25$70e 6787 ooa, OVERALL 91 AREA: 124,794SF, 2.86 ACRES 9 z SITE ZOOG: NONE n dZE UTIUDES SEWER -PRIVATE SEPTIC SYSTEM rs WATER-PAMLICO COUNTY t ELECTRIC-TDELAMD INC m 1ELFPH x-SPRINT re CABLE TELEVSION-COX COMMIUNICATIONS u REFUSE COLLECTION -PAW awTY Ct- TOTAL 1 UNITS 12 " ` L TOTAL PERMEABLE AREA: 38,742 SF, 0,88 AC, 31.04% TOTAL SITE AREA K TOTAL PERWW AREA: 86,052 SF,1.98 AC, 6a96% TOTAL SITE AREA CAMA SUWARY: 15 `" TOTAL SITE AREA WITHIN 75 CAMA AEC=62,623 SF,1.44 ACRES, 50.27% OF TOTAL 911 AREA H TOTAL PROPOSEII ITT -UPON AREA WITHIN 15t CAMA AEC 4,832 SF, 0.11 ACRES, 7.11% OF TOTAL 75 CAMA AEC AREA K NOTES: n 1. ALL STRUCTURES BUILT UPON THE PROJECT SITE SHALL COMPLY WITH THE FEE REWREMENTS SPEM " IN THE WTEREIATIONAL RESIIIENTIAL CODE, WITH NORTH CAMMA AMEITDMENTS, 2002 EDITW g 2. SECTION 404 WETLANDS ARE PRESENT ON THE PROJECT SITE, u � 3. NEUSE RIPARIAN BUFFER AREAS REGULATED UNDER 15A NCAC 02B EXIST ON THE PROJECT SITE. 4. THE RECEIMG WATER COURSE FOR THIS PROJECT IS BROAD CREEK, CLASS SA, HOW, NSW AND COFFEE CREEK CLASS a HOW NSW. H ! rA EXISTING SITE CONDITIONS ---- C1A C1A SCALE: 1"=50' _ NOTE: THE EXISTING MARINA IS BEING RENOVATED UNDER M EXISTING CAMA GENERAL PERMIT. THE CONFIGURATION OF THE EXISTING MARINA AS DEPICTED HEREON SHOWS THE EXISTING SLIP CONFIGURATION AND NOT THE PERMITTED SLIP CONFIGURATION. REFERENCE THE CAMA MAJOR PERMIT FOR AUTHORIZED SLIP CONFIGURATION. Whortonsville, NC US ry .. d?C, �'c e� A Nie w R Suhma -W Pam �L wlk�a bid• t"O V A '�73�7n r �� 402M br:O2MTskAN$ per_ VICINITY MAP NOT TO SCALE SEQUENCE OF OPERATION. 1. SECURE PROJECT PERMITS. 2. CONDUCT PRE -CONSTRUCTION CONFERENCE. 3. INSTALL GRAVEL CONTROL ENTRANCE. 4. INSTALL SILT FENCING, 5. INSTALL STORMWATER INFILTRATION BASINS TO ACT AS SEDIMENT BASIN 6. FINE GRADE & STABILIZE ROAD & DRAINAGE AREAS. 7. INSTALL SITE IMPROVEMENTS 8. SEED AND MULCH ALL DISTURBED AREAS/ESTABLISH PERMANENT VEGETATION 9. RESEED AS NECESSARY TO ESTABLISH VEGETATION. MAINTENANCE PLAN: 1. ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL EVENT AND IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL DEVICES IN THE OPERATING CONDITIONS INTENDED. 2. ALL AREAS WILL BE SEEDED, FERTILIZED, AND RESEEDED AS NECESSARY AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATION PLAN IN ORDER TO ESTABLISH AND MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 3. ANY SEDIMENT TRACKED ONTO THE ADJACENT PUBLIC ROAD SHALL BE REMOVED ON A DAILY BASIS. 4. SEDIMENT SHALL BE REMOVED FROM BEHIND SILT FENCING & CHECK DAMS WHEN THE SEDIMENT ACCUMULATES TO A DEPTH OF ONE FOOT. 5 THE STORMWATER INFILTRATION BASIN SHALL BE CLEANED 0 ANY ACCUMULATED SEDIMENT UPON THE COMPLETION OF CONSTRUCTION. -a SPECIAL SEEDING NOTE: THE CONTRACTOR SHALL PROVIDE A GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION ON EXPOSED SLOPES WITHIN THE SHORTER OF 15 WORKING DAYS OR 30 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING: AND A PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS WITHIN THE SHORTER OF 15 WORKING DAYS OR 90 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. NOTE: ALL FILL MATERIAL NEEDED TO COMPLETE THE PROJECT NOT GENERATED FROM ON SITE GRADING ACTIVITIES SHALL BE OBTAINED FROM A PROPERLY PERMITTED BORROW PIT FACILITY LEGEND SILT FENCE C C7 OUTLET PROTECTION D C7 OUTLET PROTECTION E C7 CHECK DAM F C� INLET PROTECTION G c7 VALVE --& VALVE BOX A C8 2" CLEANOUT rB cs THRUST BLOCK C cs 1' WATER SERVICE D Cs NOTES: 1. SEE DETAIL. A, SHEET C7 FOR TYPICAL PAVEMENT SECTION. 2. REVEGETATE ALL DISTURBED AREAS IN ACCORDANCE WITH THE PROJECT VEGETATION PLAN, SEE DETAIL H, SHEET C7. 3. SEE DETAIL E, SHEET C8 FOR TYPICAL TRENCH SECTION. LEGEND EXISTING PROPOSED --5— — — CONTOUR—5- -W-- -- -- WATER MAIN W —D— — — STORM DRAIN D----- SEWER FORCE MAIN F'Md--------- - —OHE-- --- OVERHEAD ELECTRIC CAI?o �j/ • SS • may'% 9 5738 { Q O O w W CD Ln Lna Ln L N CO �-y W z N Cr Lo WN w x E wILL- r{ C Z V .O00 f > cD rT^� W � 0 V O(p �--y > m IN��0N z o o E, Z o U � C\2 O Co � W E-y C1A ) yog 1 AI,, I i L MS `t 'Q n a•e • .. 1 ►. !- J r '1 t ., � f'n y �� , l.l i'. f�•. lwL /`. I':' - �,t!'H T 06015 5 4 3 2 1 0 _1 -2 -3 _4 _5 _6 EXISTING GRADE NORMAL WATER LEVEL +� EXISTING BULKHEAD EXISTING BASIN TO BE REMOVED TO BE FILLED EXISTING B TTOM 0+00 0+50 1 +00 B SECTION THROUGH INLAND BASIN-EXISTIN C2 VVERTICAL CALE: HORIZONTAL-1"-30' - 1 1+50 5 4 3 2 1 0 -1 _2 -3 -4 _5 2+00 5 4 3 2 1 0 _1 _2 -3 _4 -5 -6 O■ aGRADE NEW WOOD BULKHEAD_Oii Flme� -won ■ss�ms�sss�..ssw�■■..�■■ ■ I �11 11 �11®11■ III■II�IIEI■ EXISTING EXISTING GRADE l Iffinim XISTING BULKHEAD 0 BE REMOVED 0+00 0+50 1+00 1+50 (_�C SECTION THROUGH INLAND BASIN -EXISTING CONDITIONS C2 C2 SCALE: HORIZONTAL- 1"=30' VERTICAL - 1 "=3' 34 3.2 5 4 3 2 1 0 _1 -2 -3 -4 -5 2+00 5 4 3 2 1 0 -1 _2 -3 -4 -5 -6 NORMAL WATER LEVEL FINISH GRA 6' 1WIDE FLUSH WOOD WA NE N VINYL SHEET PILING rEXISTINGBOTTOM 0+00 0+50 rD SECTION THROUGH VINYL 12 VSCALE: HORIZONTAL-1"= VERTICAL - 1"=3' 1.5 2" J-r ram. u0 I E 3.9 %� 2 $ T1NG RESIDENCE /� 3.3 9.580 Acres 3.9 1.4 TO REMAIN �0' w 3.3 3.8 3.92.2 v I 3. 1.2 2.3 2.7 ( XISTING GRAVEL DRIVE\ h 313.1 TO REMAIN KENNETH & REBA TILLER / ." . DB 223, PG 402 , ' 4.1 4.2 I / 1.4 j 1.7 � 2.8 t` 2.9 3.7 4.2 CO STIN, OAD&IF SW l/\ j / 2.9 33 3.6 3 5 1` TO RE AIN 3. 2 S 8n3450 1V 2.9 / 154.28' JOE & KEVIN AVOLIS 2.6�♦ /. 3.8 1 iV ' ' 2.7 2.6 / 4.0 3. 2.6 cr w - 2.3 ' 3. 14.1 3.8 Q_ XISTING 6' PVC WATER FAIN -/// ♦� s K.S. SLADE I r- r` I DB 139 PG 51 1 0 h� ! ' f V7 i? 2 V ♦i XISTING SHED s � L� ` f �iLREMA*.6 2. TO BE REMM 1.2 1.8 1 ,! \ ♦% / 4 2 0 II �\ OW BASKTT} MFil!!EA 3.2 N 877743' E 1 I _154.44' (Total) 06 YAM NORMAL WATER LE `� 0 \ 4750 CY�•�TAL MLIX 5 TO BE o LADI O ,7 STING HYDRANT TO BE t i 3.8 TO BE \ EXISTING RIP Rid y \ 99.49' '- \ TO REMAIN\ �.. 1 3 NIN ro.zs' _ TO W � 2.9'�. To \ LUPTON ET AL. /: \ DB 251, PG 247 3.1 XISTING STRUCTURE •A E 4 3 KWAY WH 1 0 -1 _2 3 3 4 5 1 + 00 _KNEAD NEAR D 6' WIDE FLUSH WOOD WALKWAY WHERE INDICATED ON PLAN 1 IRELEASE FOR PERMITS JKA 1 4/24/06 NU. DESCRIPTION BY DATE Revisions III=III 11NOTE. I G =111=1-Tl-I I I-111-_ IF III=IIHII=111-III-III- - IE_7 If= - BULKHEAD SYSTEM SHOWN IS FOR SCHEMATIC I ::,If-ll�lif-Ill=III-III=1lI 11I-'' PURPOSED ONLY. THE FINAL DESIGN OF THE 11=111=111=111=III-111-Ili=1 ' BULKHEAD SYSTEM SHALL BE BY OTHERS. Tl�lll----I f 1=III=1 i I-TI- ' I I -III -I I i-I I i-I I!=1 11- IIJII=III=111=1' DEADMAN PILE TIE BACK ROD NEW WOOD OR VINYL BULKHEADING-SEE PLAN E ENLARGED CROSS SECTION OF BULKHEAD ZWALKWAY C21 C2 NOT TO SCALE 11 JIMMY WAT UN DB 418 PG� 116 ' S8550 3" 12.9 a - I-EXIS G ROADSIDE SW i -4� �`'�• �+ ./ TO REMAIN � \ I / EXISTING BUL IHE } TO EMAIN ` / Ito 3.8OEM om3wm I I TO BE ROM 3.4 NORMAL 7TER LIVE 2"3 � s ��' CT { WE OLp iii TO BE BEHOVED 2.9 / KROM %1.6 1.6 .8 WETLAND UNE ` fY� 3.3 T TO ff �1V / 2.4 n I1.631 L I W N 4r'53'36"- y �:� `♦ 15 EXISTING BULKHEAD N� 2.s\ .-~�-`�„``+�'~r I ♦� •'f TO REMAIN } r 3.3 tia 0.5 r \ l NORMAL WATER LEVE 1 -2 3 WETLAND I q ' • I _ o ; XISiING.C&M SLAB To REMAIN y j 4 EXISTING BULKHEAD � � p 4 . TO REMAIN DELINEATEU'CA#A N 1 1 NORMAL WATER LIVE 1 TO BE l�FI D Brood Creek 1 CLASSIFIED SA, HOW, NSW 1 A SITE AYOUT PLAN C1B C1B SCALE 1»=30' EXISTING DOCK TO REMAIN f M. 0 0 f rt 2, a.7 PAMLICO ONSORT LC DB 251 PG 247 r fu 7'10 46 E" > 60.00 ' 2.3 : a' I 3.6 TAw A RAP ' �� 2.6 � 4.2 J 2.6 __�\ `j 1 o / r l l 2.5 ♦`�4.2� .7 AS T / TO BE REi10NED 3.23.6 2. ♦` 4.0 4-,,. �J wood wAtxlrAr 4.J TO BE REIIOVEA / 1 3.4 IY83.09-50 "E MAL WATER LEVEL saes�- 113.20' 12.66¢3 E EXISTING BULKHEAD NORMAL WATER LEVE TO REMAIN n O XISTING BOAT RAMP \ TO REMAIN 46 45 44 43 NORMAL WATER LEVEL 42 41 o �co 40 39 o' Z 38 37 v 1 CSTING BULKHEAD ? REMAIN SEQUENCE OF OPERATION- 1. SECURE PROJECT PERMITS. 2, CONDUCT PRE -CONSTRUCTION CONFERENCE. 3. INSTALL GRAVEL CONTROL ENTRANCE. 4. INSTALL SILT FENCING. 5, INSTALL STORMWATER INFILTRATION BASINS TO ACT AS SEDIMENT BASIN 6, FINE GRADE & STABILIZE ROAD & DRAINAGE AREAS. 7. INSTALL SITE IMPROVEMENTS 8. SEED AND MULCH ALL DISTURBED AREAS/ESTABLISH PERMANENT VEGETATION 9. RESEED AS NECESSARY TO ESTABLISH VEGETATION. MAINTENANCE PLAN: 1. ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL EVENT AND IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL DEVICES IN THE OPERATING CONDITIONS INTENDED, 2. ALL AREAS WILL BE SEEDED, FERTILIZED, AND RESEEDED AS NECESSARY AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATION PLAN IN ORDER TO ESTABLISH AND MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER" 3. ANY SEDIMENT TRACKED ONTO THE ADJACENT PUBLIC ROAD SHALL BE REMOVED ON A DAILY BASIS. 4. SEDIMENT SHALL BE REMOVED FROM BEHIND SILT FENCING & CHECK DAMS WHEN THE SEDIMENT ACCUMULATES TO A DEPTH OF ONE FOOT. 5 THE STORMWATER INFILTRATION BASIN SHALL BE CLEANED OF ANY ACCUMULATED SEDIMENT UPON THE COMPLETION OF CONSTRUCTION. SPECIAL SEEDING NOTE: THE CONTRACTOR SHALL PROVIDE A GROUNDCOVER SUFFICIENT TO RESTRAIIH EROSION ON EXPOSED SLOPES WITHIN THE SHORTER OF 15 WORKING DAYS OR 30 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING: AND A PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS WITHIN THE SHORTER OF 15 WORKING DAYS OR 90 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. NOTE: ALL FILL MATERIAL NEEDED TO COMPLETE THE PROJECT NOT GENERATED FROM ON SITE GRADING ACTIVITIES SHALL BE OBTAINED FROM A PROPERLY PERMITTED BORROW PIT FACILITY LEGEND SILT FENCE C UC, OUTLET PROTECTION D C7 Eg OUTLET PROTECTION E C7 CHECKDAM F C7 INLET PROTECTION rG c� VALVE & VALVE BOX A c$ 2" CLEANOUT 8 11-Ij �11 THRUST BLOCK C C$ (D-" 1" WATER SERVICE p C8 NOTES: 1. SEE DETAIL A, SHEET C7 FOR TYPICAL PAVEMENT SECTION. 2. REVEGETATE ALL DISTURBED AREAS IN ACCORDANCE WITH THE PROJECT VEGETATION PLAN, SEE DETAIL H, SHEET C7. 3. SEE DETAIL E, SHEET C8 FOR TYPICAL TRENCH SECTION. C O Q � O E­ O U E, I� U pew-1�OW C�U�Q Q 0-)L°o C ��n L N CD a) I UM CD W z N Iz L0 ET p wC\j +' m W V �x �j L LJ o od C Q0o w L0o o(-0 m N 0 H o o E­ Z CDE, E4 C\2 Z o E-a O U TCT-�♦ V1 w 06015 �� 2 '� I� '.���;I� i �I ' ty , 1� ,1 �.,, Ltl :.� y.. i'•� ,i�'3ti��I: ''�. �, e!�.i 75' CAMA AEC LIMIT~- --�-- ry` LIMITS OF ZONE 2 RIPARIAN BUfFER77- LIMITS OF ZONE 1 RIPARIAN EDGE Of OVERHANG OF NLW DOCKHOUSE STRUCTURE EDGE Of EXISTING CONCRETE SLI TO REMAIN 1 PLAN VIEW @ NEW DOCKHOUSE ON EXIS C2 I C2 SCALE: 1"-30' KENNETH & REBA TILLER DB 2231 PG 402 4- NORMAL WATER LEVEL- ROOF GUTTERS SHALL BE PROVIDED ON THE NEW DOCKHOUSE FACILITY WHICH SHALL DIRECT ALL ROOF RUNOFF INTO THE RIP RAP FLOW SPREADING DEVICE. SEE SHEET C3 'AL IMPACTS CAMA AEC = 1,766 SF AL IMPACTS ZONE 2 = 733 SF AL IMPACTS ZONE 1 = 1,033 SF 7.580 Acres EXISTING GRAVEL DRIVE TO REMAIN 4f S 88'53'43- W 14:'o 154.28' s>V5�9• W EXISTING RIP RAP TO REMAIN'�� >r 4 N 65-21'06` IN tum, f � I sJ,y ti\ EXISTING B TO REMAIN NORMAL WATER o � � y tjn U� o� EXISTING B 2 TO REMAIN NORMAL WATER (_ASITE LAYOUT PLAN C2 C2 SCALE: 1„=30' r K.S. SLADE L DB 139, PG 51 a V W N 8717'43' £ ! 5i! 154,44' Total 512 a 15 Sg. . A d d a N8553b31 v 15W 137.24' ° v a 87'03 6" w �5R 3R 99.49d T d v d v ° dv o 5R a 24' TYP v a d a INFILTRATION BASIN 11 d 1 501i 1 Q " 1 v 1 1 1 15'R ' d 4 d Q a �,�_ • ON- v v 15k 1 1 d a ` 1 4 1 i 1 - 0 1 WETLAND LINE \ W N 41-53.36" i o 6.43' ��._ 1�L1!`3-Rgf58 ram --ram tat 2-.N �N EVE ' IWETLAND NE ! t • A iTING•Cdft SLAB TO REMAIN • W EXISTING BULKHEAD TO REMAIN DELINEATED CAMA LINE NORMAL WATER LLVE Brood Creek CLASSIFIED SA, HQW, NSW f � 1 JSTIN kADSIDE SW E I RE N :�) 4 V� N O XISTING 6' PVC WATER FAIN r— i° i i a 0 A�EXISTING HYDRANT k � JIMMY WATSON DB 418, PG 116 R XIS NG R ADSIDE SWALE j o TO f LMAJII cn I/ z INFILTRATION BASIN #2 i S85'50r23"W 12.90' W a o � Z XISTING BOAT RAMP TO REMAIN 46 ' 45 15Ti t I � 44 15'R f NEW 6' WID FLUSH WOOD vt 4 a 5R 43 WALKWAY a a-� ORMAL WATER LEVEL i 5R 42 41 d ° l •` c� q 40 NEW 6' WI FLUSH WOOD Z C I 1 WALKWAYJSEE DETAIL D& E. �1 1 SHEET C 39 a^� 38 37 o LW 6' WIDE FLUSH WOOD (i T WALKWAY XISTING BULKHEAD TO REMAIN OiMiTWE 31.18' ORMAL WATER LEVEL se+s? 113.20' NEW 90 LF VINYL BULKHEAD 1zs643 D& E, SHEET C1B EXISTING BULKHEAD NORMAL WATER LEVEI EXISTING DOCK TO REMAIN TO REMAIN 1 36 2 SEQUENCE OF OPERATION: 1. SECURE PROJECT PERMITS. 2. CONDUCT PRE -CONSTRUCTION CONFERENCE. 3. INSTALL GRAVEL CONTROL ENTRANCE. 4. INSTALL SILT FENCING. 5, INSTALL STORMWATER INFILTRATION BASINS TO ACT AS SEDIMENT BASIN 6. FINE GRADE & STABILIZE ROAD & DRAINAGE AREAS. 7. INSTALL SITE IMPROVEMENTS 8. SEED AND MULCH ALL DISTURBED AREAS/ESTABLISH PERMANENT VEGETATION 9. RESEED AS NECESSARY TO ESTABLISH VEGETATION. MAINTENANCE PLAN: 1, ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL EVENT AND IN NO CASE LESS THAN ONCE EVERY WEEK, ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL DEVICES IN THE OPERATING CONDITIONS INTENDED. 2. ALL AREAS WILL BE SEEDED, FERTILIZED, AND RESEEDED AS NECESSARY AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATION PLAN IN ORDER TO ESTABLISH AND MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 3. ANY SEDIMENT TRACKED ONTO THE ADJACENT PUBLIC ROAD SHALL BE REMOVED ON A DAILY BASIS. 4, SEDIMENT SHALL BE REMOVED FROM BEHIND SILT FENCING & CHECK DAMS WHEN THE SEDIMENT ACCUMULATES TO A DEPTH OF ONE FOOT, 5 THE STORMWATER INFILTRATION BASIN SHALL BE CLEANED OF ANY ACCUMULATED SEDIMENT UPON THE COMPLETION OF CONSTRUCTION. SPECIAL SEEDING NOTE: THE CONTRACTOR SHALL PROVIDE A GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION ON EXPOSED SLOPES WITHIN THE SHORTER OF 15 WORKING DAYS OR 30 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING: AND A PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS WITHIN THE SHORTER OF 15 WORKING DAYS OR 90 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. NOTE: ALL FILL MATERIAL NEEDED TO COMPLETE THE PROJECT NOT GENERATED FROM ON SITE GRADING ACTIVITIES SHALL BE OBTAINED FROM A PROPtRLY PERMITTED BORROW PIT FACILITY LEGEND SILT FENCE rc C7 OUTLET PROTECTION D C7 OUTLET PROTECTION E UC7 CHECK DAM E C7 INLET PROTECTION G C7 VALVE & VALVE BOX rA CS . 2" CLEANOUT B C8 THRUST BLOCK C (I C8 0— 1" WATER SERVICE O iC8 "J NOTES: 1. SEE DETAIL A, SHFET C7 FOR TYPICAL PAVEMENT SECTION. 2. REVEGETATE ALL DISTURBED AREAS IN ACCORDANCE WITH THE PROJECT VEGETATION PLAN, SEE DETAIL H, SHEET C7. 3. SEE DETAIL E, SHEET C8 FOR TYPICAL TRENCH SECTION. Cr1Alfl�f� '(kk ... ROB . ESSI ` r AL =_ 15738 'co= LO O Q QD O��+ CD E-1 4-1 p, T­_ K�Q0o � Ln .\ • � N CD tv U r� w z 0 w-� � wu m �x C Z o - �s- .. aq ��D C Q0o w In WWII CID o O0 0C'4 �i � oCD 0 Q E— E� O E"4 Q � O CD r � C\2 O W E— � O I-1 4--�I 06015 -111, _11 4 �Ifz o SQL. ,m_r 77- T,T y� ... i � L.�. LLB. , ..� •... .., ._-....,. , .. ., __ - 1.4 1.2 KENNETH &REB�]A TILLER DB 22 3❑C � i 40L f 1.4 j 17 ip 4p 2,7 /6 f f t.s XISTING SHED \ \ �QREMAIN2.6 \2,6 a%5, NORMAL WATER LEVE EXISTING IF, \ TO REMAIN 10 26' a� 4 1 s �s- EXISTING BU HE, __- TO [MAIN / 2.3 i NORMAL 71IR LEIF Ln �1 EXISTING BULKHEAD 7 TO REMAIN \ NORMAL WATER LE 1 1 1 1 t 1 1 1 t A SITE GRADING PLAN C3 C3 SC LE- 1 "- 30' I f , 88 3.4 '3-2 3.3 w µ 3 \ �9 2.9 2.9/2.7 2.8 2.6 LO� 1 9 i ' V / 1.2 1.8 / 24 4 -0!5t 6.0 b 5 SEE Esc �.9 a D a 3.2 7.580 Acres 3.3 30' NOTE: THE LIMITS OF DISTURBANCE ARE DELINEATED BY THE SET FENCING EXCLUDING WATER DEPENDENT STRUCTUcES. 3.9 3.9 3.8 3.9 XISTINC GRAVEL DRIVE\ TO REMAIN 4.2 Jr 4.2 383 3.6 3.5 �. 0 S 88 03 W �28: � 3.8 I C6 3.8 4.0 K.S. SLADE DB 139, PG 51 � = a 5�a a f 54 15 11XT 11 d 99.49 6 - - 5.7 a 3 f d 3.81NV a 4 a 5.8 5.8 2u 15 156 a 8 .6 (ra 1 �um w» 5.8 5. s,Koaesrlta 5.8 5.8 a 8 a d a d 1 \ 5.6 BRAN FIB (a ARIA AT 80101= �a , T81 POO E1fYAA01 - i T 5. a AiiEA AT TOP 4762 3 4011E = to �C EkfT 5.71 f d f a a ' d d 2.8 a � 5.1 ! 3 5- 3-- 5,7 _ EL W SPREADER SO a 111 AIL 3 SHEET C5 TATED BUF R • a a ENLARGED-� ' 9 $ 2 1 ` o t� .a WETLAND LINE 1.6 V � � 6' PYC FROM NEW D N 41'53'36-At GUTTERS o r5 ,.ate 2\ • � + \ f +r N 1 `�..-� 3.3 r T fl,5 VEL `2 3 \ WETLAND I 1.2 08 . XISTING-CMW SLAB y TO R[MAIN • r EXISTING BULKHEAD __ pp TO REMAIN DELINEATED'�A#A L N + NORMAL WATER LEVEL ` '4` . Bro o o Cre eTk -E CLASSIFIED SA, HOW, NSW III I Cb XISTIN �OADSIL SW E REk AIN 0-17 3s XISTING 6' PVC WATER MAIN I vl I NOTE- 1 THE MONTE DRIVE AM Ti E[ ROIUTM HWGH THE PMECT STORM DRININ SYSTEM. � I 01 4 / ' T �IISTINI HYDRANT IL€ I t £S �, CRAWL CONTROL ENW B a LC6 �1 7fttttttt�■ �, ■ pop 1N t „ , Dili .r-�.�C!A•��.�.�������t.���.r��i�'.S_�� I 1p 5- 2 ip 2.7 -18' RII I RAP 0 J FILT R"`� nt sN' looms r rra 31.18' ~ ORMAL WATER EVEL S84 NEW 90 LF VIP BULKHEAD D& SHEET CIB EXISTING BULKHEAD EXISTING DOCK TO REMAIN TO REMAIN L:36 2 L 13.20' NORMAL WATER LEVEL JIMMY WAT UN B418 PC116 lie S85'50 3129 f c� d N f = f I EXISTING BOAT RAMP f TO REMAIN a� 46 LT EENCI 45 44 43 NORMAL WATER LEVEL 42 � L 41 ti o 40 �J z 39 C 37 �� D "1 EXISTING BULKHEAD TO REMAIN SEQUENCE OF OPERA [ION: 1. SECURE PROJECT PERMITS. 2. CONDUCT PRE -CONSTRUCTION CONFERENCE. 3, INSTALL GRAVEL CONTROL ENTRANCE. 4, INSTALL SILT FENCING. 5. INSTALL STORMWATER INFILTRATION BASINS TO ACT AS SEDIMENT BASIN 6. FINE GRADE & STABILIZE ROAD & DRAINAGE AREAS. 7. INSTALL SITE IMPROVEMENTS 8. SEED AND MULCH ALL DISTURBED AREAS/ESTABLISH PERMANENT VEGETATION 9. RESEED AS NECESSARY TO ESTABLISH VEGETATION. MAINTENANCE PLAN: i. ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL EVENT AND IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL DEVICES IN THE OPERATING CONDITIONS INTENDED. 2. ALL AREAS WILL BE SEEDED, FERTILIZED, AND RESEEDED AS NECESSARY AND MULCHED ACCORDING TO SPECIFICATIONS IN THE 'I"-GETATION PLAN IN ORDER TO ESTABLISH AND MAINTAIN: A VIGOROUS, DENSE VEGETATIVE COVER. 3. ANY SEDIMENT TRACKED ONTO THE ADJACENT PUBLIC ROAD SHALL BE REMOVED ON A DAILY BASIS. 4. SEDIMENT SHALL BE REMOVED FROM BEHIND SILT FENCING & CHECK DAMS WHEN THE SEDIMENT ACCUMULATES TO A DEPTH OF ONE FOOT, 5 THE STORMWATER INFILTRATION BASIN SHALL BE CLEANED O ANY ACCUMULATED SEDIMENT UPON THE COMPLETION OF CONSTRUCTION. SPECIAL SEEDING NOTE: THE CONTRACTOR SHALL PROVIDE A GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION ON EXPOSED SLOPES WITHIN THE SHORTER OF 15 WORKING DAYS OR 30 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING: AND A PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS WITHIN THE SHORTER OF 15 WOFKING DAYS OR 90 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. NOTE: - ALL FILL MATER' '%L NEEDED TO COMPLETE THE PROJECT NC GENERATED FROM ON ':-)'I I E GRADING ACTIVITIES SHALL BE OBTAINED F- om A PROPERLY PF"MITTED BORROW PIT FACILITY LEGEND -CDCXD- SILT FENCE C C7 !� OUTLET PROTECTION D ` C7 OUTLET PROTECTION E C7 CHECK DAM F c� INLET PROTECTION G C7 VALVE & VALVE BOX A C8 0 2" CLEANOUT B C8 THRUST BLOCK C CS &- I" WATER SLRVICL p � C8 NOTES: 1. SEE DETAIL A, SHEET C7 FOR TYPICAL PAVEMENT SECTION. 2. REVEGETATE ALL DISTURBED AREAS IN ACCORDANCE WITH THE PROJECT VEGETATION PLAN, SEE DE TAIL H, SHEET C7, 3. SEE DETAIL E, SHEET C8 FOR TYPICAL TRENCH SECTION. ���1lttllq CA . y9r 9 E0-- AL 16738 6, NN I', 1 llilf1111 Lo oQ o O oo O�E, ral rf Q Q o � N I � v � �y L LJ z (N W L LJ C\I x Ld L,_ -00 > C Q0o LLJd-o U O (-D I j N � O � � Z (:D O Z � Q E, ::!rl c0 � OCD 06015 - g-gt F1h Q 0-)GL. MJ", ---�._-1 7 � -'..` Li �5--'f!r` x - - r t ''� j. i''y-Trf �,.' •I isF� 'I,. 11;,r '; i „ ,1 � t�i ti a 1� ti r ' I CLEAN ACCUMULATES SEDIMENT WHEN IT REACHES A DEPTH OF 0.90' RESTORE TO DESIGN DEPTH SEE PLANS TEMPORARY POOL LEVEL TEMP POOL ELEVATION = 5.0' SEDIMENT CLEANOUT ELEVATION = 4.1 • BOTTOM ELEVATION = 3.8• \ f _ AVERAGE EXISTING GRADE = 3.2' s - OVER EXCAVATION ELEVATION =0.87' -CLEAN SAND FILL 10"± ORANGE SANDY CLAY LAYER TO BE REMOVED AND REPLACED WITH CLEAN SAND FILL NOTF: THE PROJECT ENGINEER SHALL DIRECT THE REMOVAL OF THE CONFINING SOIL LAYER AS DESIGNATED ABOVE. NO FILL SHALL BE PLACED IN THE EXCAVATION UNTIL DIRECTED TO DO SO BY THE PROJECT ENGINEER. 1 CROSS SECTION --INFILTRATION BASIN #1 ('5 C5 % NOT TO SCALE 5.5 e 5OR zl Q 1 5.� rA INFILTRATION BASIN W1 t C5 C5)S� ALE: 1 "�10, 9/h a UC . 5 }� Q 5. LF 12 R - - 5'R 3.8 INV- �g Ns� (2) 8x8 SPT LANDSCAPE TIMBERS ANCHORED WITH 5/8" DOWELS 012" OC INFILTRATION BASIN #1 BOTTOM ELEVATION = 3.8' AREA AT BOTTOM = 37490 SF TEMP POOL ELEVATION = 5.0 AREA AT TEMP POOL - 4,362 SF VOLUME = 4,711 CUBIC FEET 44 3. I I II.� I5.8 C1 a 24' TYP CLEAN ACCUMULATES SEDIMENT WHEN IT REACHES A DEPTH OF 0,75' RESTORE TO DESIGN DEPTH SEE PLANS TEMPORARY POOL LEVEL TEMP POOL ELEVATION = 5.0' 4 t 4 • • - .� 1 0 U-) - 1 �. SEDIMENT CLEANOUT ELEVATION = 4.25' •. ' _ ' ' BOTTOM ELEVATION =4.0' • AVERAGE EXISTING GRADE = 3.8' OVER EXCAVATION ELEVATION=-0.20' CLEAN SAND FILL 20"f ORANGE SANDY CLAY LAYER TO BE REMOVED AND REPLACED WITH CLEAN SAND FILL NOTE: THE PROJECT ENGINEER SHALL DIRECT THE REMOVAL OF THE CONFINING SOIL LAYER AS DESIGNATED ABOVE. NO FILL SHALL BE PLACED IN THE EXCAVATION UNTIL DIRECTED TO DO SO BY THE PROJECT ENGINEER. TC5C5)NOT CROSS SECTION -INFILTRATION BASIN #2 TO SCALE PSIDE SWALE i2 a d d a a d 4 D R O: RIM = 5.3' INVERT = 4.0' TO BASIN) INVERT = 2.5 �!0 BYPASS) BOTTOM = 0.3'(SEDIMENT STORAGE) WEIR FI E1fATlAN = 5 0' 5- -5 + 51' Q s NOTE: THE CONTRACTOR SHALL NOT PLACE OR USE ANY HEAVY EARTH MOVING EQUIPMENT IN THE INFILTRATION BASIN AREAS TO AVOID COMPACTION OF THE UNDERLYING SOILS. S"85050 P 3 "w , I f 1 r r r (2) 8x8 SPT LANDSCAPETIMBERS ANCHORED / WITH 5/8 DOWELS 0 12' OC ' / INFILTRATION BASIN #2 ; , J IN BOTTOM ELEVATION = �.o AREA AT BOTTOM = ,842 SF / TEMP POOL FLEVATI = 5.0' 3.8 I N V AREA AT TEMP PO = 2 580 SF VOLUME = 21211 G BIC FEET j f ' a 1 ULF 121 RCP & (1 F • 0 ; ' If 5.6 ' + 5.8 4 i ......... Z-A 8• 5.4/ 15, -- a 5 8 42 2 "T 5' 5kr 5r8 / , Q I 1 5.8.8 5.8 5. 4 B INFILTRATION BASIN #2 C5 C5 SCALE: 1"=10' 1 RELEASE FOR PERMITS 2 NCDENR COMMENTS N[I. DESCRIPTIDN Revisions JKA 4/24/06 JKA 5/26/06 BY DATE SEQUENCE OF OPERATION: 1. SECURE PROJECT PERMITS. 2, CONDUCT PRE -CONSTRUCTION CONFERENCE. 3. INSTALL GRAVEL CONTROL ENTRANCE, 4. INSTALL SILT FENCING. 5. INSTALL STORMWATER INFILTRATION BASINS TO ACT AS SEDIMENT BASIN 6. FINE GRADE & STABILIZE ROAD & DRAINAGE AREAS. 7. INSTALL SITE IMPROVEMENTS 8, SEED AND MULCH ALL DISTURBED AREAS/ESTABLISH PERMANENT VEGETATION 9. RESEED AS NECESSARY TO ESTABLISH VEGETATION. MAINTENANCE PLAN: 1. ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL EVENT AND IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL DEVICES IN THE OPERATING CONDITIONS INTENDED. 2. ALL AREAS WILL BE SEEDED, FERTILIZED, AND RESEEDED AS NECESSARY AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATION PLAN IN ORDER TO ESTABLISH AND MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 3. ANY SEDIMENT TRACKED ONTO THE ADJACENT PUBLIC ROAD SHALL BE REMOVED ON A DAILY BASIS. 4. SEDIMENT SHALL BE REMOVED FROM BEHIND SILT FENCING & CHECK DAMS WHEN THE SEDIMENT ACCUMULATES TO A DEPTH OF ONE FOOT. 5 THE STORMWATER INFILTRATION BASIN SHALL BE CLEANED Of ANY ACCUMULATED SEDIMENT UPON THE COMPLETION OF CONSTRUCTION, SPECIAL SEEDING NOTE: THE CONTRACTOR SHALL PROVIDE A GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION ON EXPOSED SLOPES WITHIN THE SHORTER OF 15 WORKING DAYS OR 30 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING: AND A PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS WITHIN THE SHORTER OF 15 WORKING DAYS OR 90 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. NOTE - ALL FILL MATERIAL NEEDED TO COMPLETE THE PROJECT NOT GENERATED FROM ON SITE GRADING ACTIVITIES SHALL BE OBTAINED FROM A PROPERLY PERMITTED BORROW PIT FACILITY LEGEND SILT FENCE C c7 w� OUTLET PROTECTION D c7 OUTLET PROTECTION E C7 CHECK DAM F e7 INLET PROTECTION G c7 VALVE & VALVE BOX A c8 2" CLEANOUT B Q-C-,-,) lopTHRUST BLOCK( rc C8 1" WATER SERVICE D "Id �cl NOTES: I. SEE DETAIL A, SHEET C7 FOR TYPICAL PAVEMENT SECTION, 2. REVEGETATE ALL DISTURBED AREAS IN ACCORDANCE WITH THE PROJECT VEGETATION PLAN, SEE DETAIL H, SHEET C7. 3. SEE DETAIL E, SHEET C8 FOR TYPICAL TRENCH SECTION. 0� • 2 " AL 5738 �'��,�; • G1N1r�P. ' .. O Q CD Q Z U� ?- E­ W (D Ixu� 12. co Q Q O'� o L 00U-) " Q0 a) v c 0-) I C w ZN mLn 6 � w m W (D x E w¢ Cz o _ -00 � >�(jo C L'j�o � M PI)Cf)_0QD � •j U m N a 06015 1 - ...• i . + ;, I ` r ' ':�1 � �, � i t u:� `CN'y T`, �,'",'a•.�l�.'sar jr, rr�.Mt- f �; �•� r 1 I f 1 fi• .. � .!r � 1� :l , I`'�i 1 f'. 1}1'.4=. �/ ''. I ' I , �I1 i•r r i `�,r(17 �1 + �. .. 1 � I I RELEASE FOR PERMITS JKA 1 4/24/06 8 7 6 4 3 2 1 - H 0 _2 EXISTING GRADE EXISTING 36" CMP AT COFFE CREEK / TO REMAIN L--ROUTE NEW 2" PVC FORCE MAIN BELOW EXISTING CULVERT. PROVIDE MIN, 24" VERTICAL SEPARATION NEW 2" SEWER FORCE MAINS � B ROUTE 2° PVC SEWER FORCE MAINS PROFILE -FORCE MAIN CROSSING AT EXISTING CULVERT BELOW STORM DRAIN. PROVIDE �� �� SCALE: 1 =30 24" MIN VERTICAL SEPARATION. SEE PROFILE THIS SHEET XISTING 6' PVC WATER MAIN ROUTE SEWER FORCE MAINS BELOW----/ EXISTING WATER MAIN -PROVIDE MIN, 24" VERTICAL SEPARATION I } I a I .P1.11z-!r (�A OFF -SITE SEWAGE DISPOSAL AREA CD11SCALE: 1 "=60' WILLLIAM ADRIANN WH )RE F C8 1 I EXISTING 6" PVC WATER MAIN (7) 2° PVC FORCE MAINS TO REMOTE SEPTIC FIELD AREAS. LOCATE 5-10' OFF EDGE OF PAVEMENT. PROVIDE MINIMUM 36" BURY. SEE SHEET C4 FOR CONTINUATION EXI NG 6" PVC WATER MAIN SEE SHEET C4 FOR CONTINUATION (7) 2° PVC FORCE MAINS TO REMOTE SEPTIC FIELD AREAS. LOCATE 5-10' OFF EDGE OF PAVEMENT. PROVIDE MINIMUM 36" BURY. SEE SHEET C4 FOR CONTINUATION m lff lw OF mw ARf AIE F LIE OF If OFF 511E DM KA MARINA SYSTEM REPAIR AREA \ok, ARINA SYSTEM REPAIR ARE\ SYSTEM AREA #1 � CHRIS MACHLE / � � \ \ SYSTEM AREA 12 / TING 36 CULVERT SYSTEM AREA �5 TO MAIN `-30LF 1LT FF CE AT TOP OF BANK WILLLIAM ADRIAN WHORTON \ �p \ SYSTEM AREA 13 '--COFFEE EK jg ro a_ SYSTEM AREA 14 ic— m \ \ SYSTEM AREA #6 \ \ �s SEE PAMLICO COUNTY IMPROVEMENT PERMIT FOR SPECIFIC CONSTRUCTION REQUIREMENTS FOR SEWAGE DISPOSAL AREAS ? 2" PVC FORCE MAINS TO REMOTE SEPTIC LLD AREAS. LOCATE 5-10' OFF EDGE OF VEMENT. PROVIDE MINIMUM 36° BURY. E SHEET C4 FOR CONTINUATION N❑, DESCRIPTI❑N BY DATE Revisions SEQUENCE OF OPERATION: 1. SECURE PROJECT PERMITS. 2. CONDUCT PRE -CONSTRUCTION CONFERENCE. 3. INSTALL GRAVEL CONTROL ENTRANCE. 4. INSTALL SILT FENCING. 5. INSTALL STORMWATER INFILTRATION BASINS TO ACT AS SEDIMENT BASIN 6. FINE GRADE & STABILIZE ROAD & DRAINAGE AREAS. 7. INSTALL SITE IMPROVEMENTS 8. SEED AND MULCH ALL DISTURBED AREAS/ESTABLISH PERMANENT VEGETATION 9, RESEED AS NECESSARY TO ESTABLISH VEGETATION. MAINTENANCE PLAN: 1. ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL EVENT AND IN NO CASE LESS THAN ONCE EVERY WEEK, ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL DEVICES IN THE OPERATING CONDITIONS INTENDED, 2. ALL AREAS WILL BE SEEDED, FERTILIZED, AND RESEEDED AS NECESSARY AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATION PLAN IN ORDER TO ESTABLISH AND MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 3. ANY SEDIMENT TRACKED ONTO THE ADJACENT PUBLIC ROAD SHALL BE REMOVED ON A DAILY BASIS, 4. SEDIMENT SHALL BE REMOVED FROM BEHIND SILT FENCING & CHECK DAMS WHEN THE SEDIMENT ACCUMULATES TO A DEPTH OF ONE FOOT, 5 THE STORMWATER INFILTRATION BASIN SHALL BE CLEANED OF ANY ACCUMULATED SEDIMENT UPON THE COMPLETION OF CONSTRUCTION, SPECIAL SEEDING NOTE: THE CONTRACTOR SHALL PROVIDE A GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION ON EXPOSED SLOPES WITHIN THE SHORTER OF 15 WORKING DAYS OR 30 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING- AND A PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS WITHIN THE SHORTER OF 15 WORKING DAYS OR 90 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. NOTE: ALL FILL MATERIAL NEEDED TO COMPLETE THE PROJECT NOT GENERATED FROM ON SITE GRADING ACTIVITIES SHALL BE OBTAINED FROM A PROPERLY PERMITTED BORROW PIT FACILITY LEGEND SILT FENCE C C7 OUTLET PROTECTION D C7 OUTLET PROTECTION E C7 CHECK DAM F C7 INLET PROTECTION G c7 N VALVE & VALVE BOX A C8 • 2" CtEANOUT B Q-91) THRUST BLOCK C C8 1" WATER SERVICE (io NOTES: 1, SEE DETAIL A, SHEET C7 FOR TYPICAL PAVEMENT SECTION. 2. REVEGETATE ALL DISTURBED AREAS IN ACCORDANCE WITH THE PROJECT VEGETATION PLAN, SEE DETAIL H, SHEET C7. 3. SEE DETAIL E, SKEET C8 FOR TYPICAL TRENCH SECTION. �r�� �� •'C AD��i�i � .• Si�.C�2� 2 SEAL r: =o�e LO 0 Q � 0 E— O vD E-, O �Lo Go Ln E N Cp Q) I Z �3 Z 00 w Z cv rr to p W� [n c: X Z o - �_ - ao > �O (.Do � w Lno U� o � cp h�--4 > m j OU O� W C Q � � O o U 0 O H E~ ZJ C,�,2 o W � � w o C a Q 06015 i �' - �-lti Ii7 �t 1, I, T'—�; 7 s T `S• i °��,� 'f5,1�. �S �fi i n �•r f e 4 !. �? 4e .'a 1 ! r 1, �. I I " CC n C,h ACC)"AI T CI IC?CAf F COURSE =f I =I _ — —� 16 SELECT FILL PUBLIC ROAD NEW PAVEMENT SECTION NOT TO SCALE �-- 20' t °0 0 6 LAYER OF COARSE AGGREGATE O °O °O OVER 12" LAYER OF STONE BASE O 0 o 0 COARSE O O O 50' O°O°O O°o°O o O 0°©°0 10' °° O o O o°O°o°o 10 EDGE OF EXISTING ROADWAY PAVEMENT ("'_B GRAVEL CONTROL ENTRANCE ���17NOT TO SCALE 3' 3' SELF ANCHORING METAL POST @ 6' O.C. MAX 12 GUAGE 6 X 6 WIRE MESH FILTER FABRIC FLOW C SILT FENCE C7 NOT TO SCALE NOTES: 3 1. VEGETATE IN ACCORDANCE WITH VEGETATION PLAN. D 1 VEGETATED SWALE C7 / NOT TO SCALE N 0 0 00 ° p°000 ° 0000 °000280 OUTLET PI o00°0 0 ° ° °000 A 00 0 00 A 000 0 T00 0 e A FLOWS 000 RIP RAP ° ID t°O ,cs'O O b°°�0 0 PLAN FILTER FABRIC SECTION A-- A 0 0° 0 0 Or., 0 0 00C()°00o0 00000 r ©© r r fall mom rE___ OUTLET PROTECTION C7 NOT TO SCALE 4' -12" THICK LAYER OF #57 STONE ON UPSTREAM END OF CHECK DAM 0000 3 4' oO°o 00°0°�000 o°moo°8,c) 3,0 o0°o 00°°000 0000 O0C6 0 C o000 °°Foo°O000 _CDO°�� oo°0000b°O O 0 00 0 0O 0 00 O 0 000000 00000 0000 FLOW �\ DIRECTION / F CHECK DAM C� NOT TO SCALE 6'1 THICK NCDOT #57 STONE AROL PERIMETER E NOTES: 1. CONSTRUCT CHECK DAM OF RIP RAP STONE PLACED IN ACCORDANCE WITH DETAIL.. 2. SEDIMENT BEHIND THE CHECK DAM SHALL BE REMOVED ONCE THE LEVEL IS WkTHIN 6" OF THE CENTERLINE CREST OF THE DAM. 3. SHOULD SCOUR DEVELOP AT THE DOWNSTREAM END, IT SHALL BE REPAIRED IMMEDIATELY, 4. PROVIDE 12" MIN. FINE GRAVEL ON UPSTREAM END OF CHECK DAM. NOTE; PROVIDE SEDIMENT TRAP AT ALL CATCH BASINS & DROP INLETS. rG __� SEDIMENT TRAP C7 / NOT TO SCALE 211 X 3' WOOD POST NCDOT #57 STONE - FABRIC 5 WIRE MESH C 2" X 3' WOOD POST 3URY FABRIC ink VEGETATIVE SEEDING AFTER COMPLETION OF GRADING ACTIVITIES AND THE CONSTRUCTION OF SWALES, ALL EXPOSED AREAS SHALL BE SEEDED TO THE FOLLOWING SPECIFICATIONS: SEED BED LIME 1-1/2 TON PER ACRE FERTILIZER 1/2-TON PER ACRE SEED RYE GRAIN 50 LBS PER ACRE TALL FESCUE 100 LBS PER ACRE MAY THROUGH AUGUST: CENTIPEDE 5 LBS PER ACRE PROCEDURE STRAW MULCH SHALL BE APPLIED AT A RATE WHICH WILL INSURE APPROXIMATELY 75% COVERAGE OF THE SEEDED AREA, THE STRAW AND SOWN SEED WILL BE LIGHTLY DISCED INTO THE BED TO GIVE IT FURTHER RESISTENCE TO BLOWING AND WASHING, THE CONTRACTOR SHALL GUARANTEE A FULL STAND OF GRASS OVER THE ENTIRE DISTURBED AREA, IF NECESSARY THE CONTRACTOR WILL WET DOWN THE AREAS TO ASSIST IN SEED GERMINATION OR AID IN GROWTH IN TIMES OF EXCESSIVELY DRY WEATHER. A STAND OF GRASS WILL BE CONSIDERED ACCEPTABLE WHEN THE ENTIRE STAND OF GRASS IS AT LEAST FOUR INCHES HIGH AND HAS ACHIEVED AT LEAST 95% COVERAGE OF DISTURBED AREAS. RESEEDING WILL BE REQUIRED AS NECESSARY BY THE CONTRACTOR TO OBTAIN THE SPECIFIED STAND OF GRASS. THE CONTRACTOR SHALL PROVIDE A GROUNDCOVER SUFFICENT TO RESTRAIN EROSION ON EXPOSED SLOPES WITHIN THE SHORTER OF 15 WORKING DAYS OR 30 CALENDER DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING: AND PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS WITHING THE SHORTER OF 15 WORKING DAYS OF 90 CALENDER DAYS FOLLOW#NG COMPLETION OF CONSTRUCTION OR DEVELOPMENT, H VEGETATION PLAN C7 NOT TO SCALE OUTLET PIPE TO BASIN -SIZE AS INDICATED 8" SOLID CMU WIER RIM ELEVATION #5 @ 6" OC EACH WAY TOP OF WEIR FRAME & GRATE OVER INLET CHAMBER ONLY I 1 INLET CHAMBE I I BYPASS C CHAMBER 6' 11 I \-BYPASS PIPE -SIZE AS INDICATED PLAN FRAME & GRATE OR MANHOLE COVER -SEE PLAN 1 1RELEASE FOR PERMITS JKA 4/24/06 N11 DESCRIPTI❑N BY DATE Revisions PROVIDE CENTIPEDE SOD ON ENTIRE LEN NTH OF LEVEL FLOW SPREADER MAKYUM DEPTH/ELEVATION OF RUNOFF VEGETATED OUTLET AREA SPILL AT ELEVATION=1.5 FLOW --- \-q SWALE/SPREADER ELEVATION=1.0 LEVEL FLOW SPREADER OUTLET AREA C6 NOT TO SCALE 8" THICK CONCRETE TOP 8" CMU-GROUT FILL ALL CELLS INVERT TO BYPASS PIPE INLET FLUSH PIPE TYPE & SIZE WITH INSIDE WALL AS INDICATED INVERT TO BASIN #5 DOWEL @ 16" OC EACH SIDE 7'x7' SECTION A -A I STORMWATER BYPASS STRUCTURE SEE SITE PLAN FOR STRUCTURE NOT TO SCALE ELEVATION DATA PROVIDE CENTIPEDE SOD ON ENTIRE VEGETATED OUTLET AREA 0 0 � oLn c� �(�D I COI,� N N-) U � �j z N Ln M•-�I N W °m< W w Ewe ..� z o �'0I w � r� Ln X N ° o m� z 0 o� o �4 � I � w o 1.4 N W Q Srh o QC)(- Ms I I RELEASE FER PERMITS JKA 14/26/06 4" THICK CONCRETE COLLAR 6" HEAVY DUTY CAST IRON SCREW TYPE VALVE BOX AND COVER, MARKED WATER _ COMMON BRICK - AT 1 /3 POINTS `VALVE 1 CUBIC FOOT THRUST BLOCK q VALVE AND VALVE BOX 1 8 NOT TO SCALE CAST IRON - METER BOX CONCRETE COLLAR—'"2 VALVE BOX WATER MAIN WATER MAIN PLUG TWITH 2" TAP BRASS NIPPLE 2" BALL VALVE SCH 80 PVC COUPLINGS 2" PVC SCH. 40 PIPING PERMANENT 2" BLOWOFF ASSEMBLY NOT TO SCALE PLAN D/2 (MIN} d d 17 (MIN) C IN) UNDISTURBEL EARTH ELEvaTIaN UNDISTURBED FOR BENDS EARTH 2" BRASS PLUG PLAN FOR TEES THRUST BLOCK DIMENSION D IN FEET NOM. P}PE DIA, DEAD END 90' BEND 45• BEND 221/2• BEND 11 1/4• BEND 2" 1.0 1.2 1.0 0.7 0.7 4" 1.3 1.5 1.2 0.9 0.8 C TYPICAL THRUST BLOCK SIZES C8 NOT TO SCALE 2" FEMALE COUPLING BURIED DETECT{ON WIRE — FOR NON-METALLIC PIPE - SEE SPEC FOR BURY REQUIREMENTS END S EACH END 5' BACK OF CURB OR SIDEWALK1'- 1" SERVICE TUBING F CAST IRON METER BOX +4 METER STOP - BRICK SUPPORTS (4 EACH) EEP LINE SLACK- ------PLASTIC STIFFNER ---CORPORATION STOP TAPPING SADDLE WATER MAIN D 1 INCH WATER SERVICE C8 NOT TO SCALE TO 8" IN. DEPTH i SERVICE TO RESIDENCE METER -BY OTHERS SEE SPECS FOR BURY REQUIREMENTS FBURIED WARNING AND IDENTIFICATION TAPE FINAL BACKFILL \i 9 LIFTS MAX INITIAL BACKFILL 6" LIFTS MAX -UTILITY MAIN SIZE AS INDICATED 12" O, D. OFL 12" f+ ^.rPIPE `l PIPE TRENCH WITHOUT BEDDING E PIPE TRENCH SECTION C8 NOT TO SCALE ENCASEMENT PIPE SIZE UTILITY MAIN DIAMETER ENCASEMENT PIPE DIAMETER 6" 10" 8" 12" PAVFMFNT WIF)TH Q2� w i ITV Y,LIL av, , VIN , rr/ SPACERS AT 5' O.C. MINIMUM, F UTILITY BORE C8 NOT TO SCALE TREATED WOOD SUPPORT LENGTH = PIPE O.D,+12" 00 -� (TYPICAL OF 3) CARRIER PIPE �Q i� ENCASEMENT PIPE STEEL STRAPPING L PIPE BELL. TO BE CLEAR OF CASING SECT'JN A -A UTILITY MAIN-Z ?E AS INDICATED PIPE INVERT AS INDICATED ON 1�-AN PIPE -SEE SIZE r� PROVIDE RED FLASHING LIGHT FOR ALARM CONDITION AND AUDIBLE ALARM WITH SILENCE SWITCH _,-LOCKABLE CONTROL PANEL MOUNTED AT REQUIRED HEIGHT W/HIGH LEVEL ALARM & SILENCER --PUMP WIRING INSTALLED IN 3/4" CONDUIT -MIN 18" BURY 6" THICK CONCRETE COLLAR - RIM ELEVATION = +15,0' Tl� N 00 4" INLET FROM SEPTIC TANK SCH 40 PVC , 36" FIBERGLASS PUMP BASIN HIGH WATER "ALARM" = +2.6' PUMP "ON" LEVEL = +2,5 PUMP "OFF" LEVEL = +1,0 BOTTOM = 0 REFERENCE) C L 1 2 " 42" SQUARE N❑l DESCRIPTI❑N BY DATE Revisions BASIN COVER STRUCT• PLASTIC 2" STAINLESS STEEL VENT WITH BIRD SCREEN BOLT DOWN STAINLESS STEEL FASTENERS JUNCTION BOX STRUCT. PLASTIC LIFT -OUT CHAIN STAINLESS STEEL 2" BALL VALVE, TRUE UNION, PVC W/ 90° ELBOW 2" DIA. SCH 40 PVC EFFLUENT PIPE 2" NPT PVC CHECK VALVE 2" EFFLUENT PUMP PUMP INV, OUT ROUT FILLETS NOTES: 1. SUBMERSIBLE EFFLUENT PUMP SHALL BE 1 "i2HP, 10, 230V, 60HZ 3450 RPM, 20 GPM @ 51' TDH, 2• PUMP SHALL HAVE DOUBLE CARBON AN-- CERAMIC FACED SHAFT SEALS. SHAFT SHALL BE 416 STD NLESS STEEL. 3. MOTOR SHALL BE OIL FILLED WITH HEAT SENSOR THERMOSTAT AND OVERLOAD PROTECTI0% THERMOSTAT SHALL RESET AUTOMATICALLY WHEN THE MOTOR COOLS TO A SAFE OPERATING TEMPERATURE. 4. MOTOR SHALL HAVE A CAST IRON HOUD',-G RATED CLASS 30, ASTM A48, 5, PUMP SHALL HAVE A REPLACEABLE VOLT. -E SEAL RING, rG GRINDER PUMP :k BASIN �dc 8 NOT TO SCALE 2" PVC FORCE MAIN CA LESS/�•�iy'.� r• • • 15738 o o� C� Q) ,0 U z N F--� ry c W LO - N Z� �- 1T� m I_l._ E W ►- 0 � .° z � CD �LLn w I O X N O W �z O a- Q ~ o� � o O ono � o� Q C9 E, r�o 0 C) 06015 --'— -[ ; T rl - r7 - r r , • � t � _ T � ! r .. T-' _. l' -7-l-r -T t ' } l 1i.� S � li ji • • 'gyp' �� t `' r.. f'"�. � � '� i:[- t :,.a + !.! .. > f. i.. .>a:t... 5. .!l�f :}..f ►{�i ts, ttA4 t.s �z.. � yli', r.'. .. - .. ' . ., � . ,�, .�. .. ... .... � 4 n. i.. !!. � .. .. .. - ., .. .. - •' --�+ ... f'.�y.t r;I, 1'8•fi. 4414, •.....� tit l'l.Y`