Loading...
HomeMy WebLinkAboutSW7051123_APPROVED PLANS_20060123STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW ZdJS/Z�3 DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE DOC DATE 9iOl2, 3 YYYYMMDD 0 fa s.p7 / VICINITY MAP NTS SITE DAT 1. CLIENT: JOHNNY F. LAYDEN 104 ENTERPRISE DR. ELIZABETH CITY, NC 27909_ (252) 331-6313 2, LOT COVERAGE: BUILDING 10,000 SF — 11% PAVEMENT 22,450,52 SF = 25% SIDEWALK 1,837.73 SF — 2% OPEN SPACE 54.602.27 SF = 61% TOTAL SITE 88,890 SF = 100% 3. THIS SITE IS LOCATED AT THE NORTHEAST CORNER OF PITTS CHAPEL ROAD AND SAND PfTT ROAD IN ELIZABETH CITY. f TOTAL AREA = 2.04 AC D.B. 685, PG. 151 c 4. PARKING: WHOLESALE/WAREHOUSE 1 SPACE PER 3 EMPLOYEES = 8 SPACES + 2 TRUCKS STOPPED/STORED 10 SPACES REQUIRED PARKING SPACES PROVIDED = 20 (INCLUDES 2 HANDICAP SPACES) / 7. 5. SITE IS ZONED: 1-1 6. SITE IS LOCATED 1N FLOOD ZONE X ACCORDING TO FIRM MAP NUMBER 3720892200J, DATED OCTOBER 05, 2004. 7. SETBACKS: FRONT = 40' REAR = 30' EAST SIDE = 10' WEST SIDE = 20' X7.10 8. THIS IS NOT A BOUNDARY SURVEY. BOUNDARY INFORMATION TAKEN FROM A SURVEY ENTITLED "PROPERTY BEING CONVEYED TO JOHNNY F. LAYDEN" BY EDWARD T. HYMAN, JR.. PLS DATED JANUARY 14, 2002. 9. DISTURBED AREA = 2.13 AC 10. ALL LIGHTING TO BE CUT—OFF STYLE POLE LIGHTS ` DIRECTED INWARD AND DOWNWARD. 11, DURING CONSTRUCTION AND SITE WORK THE SITE SHALL BE SURROUNDED WITH SILT FENCE AS SHOWN ON DETAIL EXCEPT AS NECESSARY FOR INGRESS/EGRESS OF CONSTRUCTION TRAFFIC. CONTRACTOR SHALL MAINTAIN EROSION CONTROL MEASURES AFTER EACH RAIN EVENT OR WEEKLY. 12. SANITARY SEWER FLOWS: 24 EMPLOYEES X 25 GPD/EMPLOYEE = 600 GPD = 1.25 GPM AVG. = 3.13 GPM PEAK 13. DOMESTIC WATER DEMAND: APPROXIMATELY 28 FIXTURE UNITS - 18 GPM 14. THERE ARE NO WETLANDS ON THIS SITE. N /F PHILLIP HARRINGTON x6.62 D.B. 685, PAGE 151 N/F PHILLIP HARRINGTON D.B. 685, PAGE 151 LIMITS OF DISTURBANCE S.R. 1133�- 8 i R- 6.32 6.04 S\ 7.77 /.56 7.41 vx �(mlffI2, ECEIVE NOV 16 2005 MQNVAR0 LEGEND EXISTING FIRE HYDRANT PROPOSED RIP —RAP PROPOSED WATER METER EXISTING WATER METER POWER POLE EXISTING ASPHALT PROPOSED ASPHALT PROPOSED CONCRETE PROPOSED RIP RAP EXISTING GRADES */-10.00 PROPOSED GRADES PROPOSED FLOW DIRECTION EXISTING DITCH PROPOSED DITCH TOP OF BANK (TOB) — — — — — — BUILDING SETBACK (MBL) X PROPOSED CHAIN LINK FENCE PROPOSED CONTOURS PROPOSED SANITARY SEWER LINE PROPOSED WATER LINE CHECK DAM LIMITS OF DISTURBANCE DRAINAGE AREA 1 DRAINAGE AREA 2 DRAINAGE AREA 3 GRAPHIC SCALE 0 10 20 ( IN FEET ) ! inch a 20 ft -- 7.62 APPROVED NORTH CAROLINA ENVIRONMENTAL. !_ MANAGEMENT COMMISSION DIVISION OF WATER QUALITY Date 1/2-3 , 20- Zi, Stormwatar Permit Na .sw 7 aS' /! 23 t I N � 0A a h I h r- i R o QLq Cc Ill mills ,` O ]C V OD O N � � �Wu( t 0 0 i c� a U w o 00 �, Co �1 Rz o � Y Y z W � O U z O � U of m � � 4 C9 z � z z z d J W a. ? 0 O 5 Q W 5 o'r' o ZZ A N �k rmaP 2 Qwo I PARKING LOT ELEV. = 7.0f 1. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE PADS. (SEE DETAIL) 2- INSTALL EROSION CONTROL DEVICES AT SITE DISCHARGE POINTS TO PREVENT OFF SITE SEDIMENTATION. 3. CUT NEW SWALES AND DITCHES AND CONSTRUCTION DETENTION POND. 4. INSTALL THE REMAINING SEDIMENT AND EROSION CONTROL PROTECTION. 5, INSTALL THE STONE BASE AND ASPHALT FOR THE PROPOSED PARKING. 6, PROVIDE A GROUNDCOVER ON EXPOSED SLOPES WITHIN 15 WORKING DAYS OR 30 CALENDAR DAYS (WHICH EVER IS SHORTER), THE FOLLOWING COMPLETION OF ANY PHASE OF GRADING; AND, A PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT 7. REMOVE SEDIMENT FROM DETENTION POND AND RESTORE TO DESIGN DEPTHS. 8. MONITOR AND MAINTAIN THE INSTALLED EROSION CONTROL MEASURES AND REPAIR AS NECESSARY. 9. ONCE VEGETATION IS ESTABLISHED, REMOVE THE CONTROL DEVICES. CONSTRUCTION SEQUENCING INFILTRATION BASIN SECTION NTS 4' THICK 2500 PSI CONCRETE SIDEWALK ===> SLOPE 1/4" PER FOOT 0 o 0o 0 0 i �—III-1I 1=1 11=1 I1=1I 1-1I 1-i i�—i �' COMPACTED EARTH CONCRETE SIDEWALK DETAIL NTS 2" TYPE SF 9.5A ASPHALT MIX 6" ABC STONE BASE SEEDBED PREPARATION THE CONTRACTOR SHALL CUT AND DISPOSE OF WEEDS OR OTHER UNACCEPTABLE GROWTH ON THE AREAS TO BE SEEDED. UNEVEN OR ROUGH AREAS SHALL BE SHAPED AND SMOOTHED TO PROVIDE FOR EFFECTIVE SEEDING AND EASE OF MOWING. THE SOIL SHALL BE SCARIFIED TO A DEPTH OF NOT LESS THAN 5 INCHES. CLODS SHALL BE BROKEN AND THE TOP 3-4 INCHES OF THE SOIL SHALL BE WORKED INTO A SEEDBED BY THE USE OF PULVERIZERS, DRAGS, OR HARROWS. THE PREPARATION OF SEEDBEDS SHALL NOT BE DONE WHEN THE SOIL IS FROZEN OR EXTREMELY WET. LIMESTONE, FERTILIZER, AND SEED LIMESTONE, FERTILIZER, AND SEED SHALL BE APPLIED WITHIN 24 HOURS AFTER COMPLETION OF SEEDBED PREPARATION. LIMESTONE AND FERTILIZER MAY BE APPLIED AS PART OF THE SEEDBED PREPARATION, PROVIDED IT IS WORKED INTO THE SOIL IF NOT SO APPLIED, LIMESTONE AND FERTILIZER SHALL BE DISTRIBUTED UNIFORMLY OVER THE PREPARED SEEDBED AT THE SPECIFIED RATE OF APPLICATION AND THEN HARROWED, RAKED, OR OTHERWISE THOROUGHLY WORKED INTO THE SEEDBED. SEED SHALL BE DISTRIBUTED UNIFORMLY OVER THE SEEDBED AT THE RATE OF APPLICATION SPECIFIED, AND IMMEDIATELY HARROWED, RAKED, OR DRAGGED AS TO COVER THE SEED WITH A LAYER OF SOIL MULCHING ALL SEEDED AREAS SHALL BE MULCHED. GRAIN STRAW MAY BE USED AS MULCH AT ANY TIME OF THE YEAR. MULCH SHALL BE APPLIED WITHIN 24 HOURS AFTER THE COMPLETION OF SEEDING. CARE SHALL BE TAKEN AS TO PREVENT DISPLACEMENT OF SOIL OR SEED FROM THE SEEDBED AREA DURING MULCHING OPERATIONS. MULCH SHALL BE UNIFORMLY SPREAD BY HAND OR MECHANICAL SPREADER. AN ACCEPTABLE APPLICATION WILL BE THAT WHICH WILL ALLOW SOME SUNLIGHT TO PENETRATE AND AIR TO CIRCULATE BUT ALSO PARTIALLY SHADE THE GROUND, REDUCE EROSION AND CONSERVE SOIL MOISTURE. MAINTENANCE AREAS WHERE SEEDING AND MULCHING HAVE BEEN PERFORMED SHALL BE MAINTAINED IN SATISFACTORY CONDITION UNTIL ACCEPTANCE OF THE PROJECT BY THE OWNER. AREA OF DAMAGE OR FAILURE DUE TO ANY CAUSE SHALL BE REPAIRED OR REDONE AS NECESSARY. SEEDING &MULCHING TYPICAL DITCH OR SWALE 6:1 SIDESLOPE NTS THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE REQUIRMENTS OF THE EROSION AND SEDIMENT CONTROL STANDARDS AND SPECIFICATIONS OF THE DEPARTMENT OF NATURAL RESOURCES AND COMMUNITY DEVELOPMENT. SOIL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE PROVIDED ON ALL AREAS OF THE SITE WHICH ARE DISTURBED OR GRADED. CONTRACTOR SHALL PROVIDE GROUND COVERS SEE SCHEDULE W WITHIN 30 { BELOW) CALENDAR DAYS AFTER COMPLETION OF CONSTRUCTION WITHIN THE SPECIFIC AREAS. THE CONTROL MEASURES SHALL BEGIN PRIOR TO ANY LAND DISTURBING ACTIVITY INCLUDING CLEARING; SHALL CONTINUE DURING THE CONSTRUCTION AND SHALL CONTINUE WITH THE NECESSARY MAINTENANCE UNTIL THE DISTURBED LAND IS STABILIZED. COMPLIANCE WITH LOCAL AND/OR STATE SOIL EROSION AND SEDIMENTATION CONTROL LAWS SHALL BE THE ENTIRE RESPONSIBILITY OF THE CONTRACTOR. THIS PARAGRAPH IS INTENDED TO SERVE ONLY AS A GUIDE TO THE CONTRACTOR FOR COMPLIANCE WITH SUCH LAWS. ORDERS, RULES AND REGIJLA11ONS CONCERNING EROSION AND SEDIMENTATION CONTROL PROTECTION OF EXISTING STRUCTURES AND FACILITIES FROM SEDIMENTATION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ITEMS TO BE PROTECTED SHALL INCLUDE, BUT ARE NOT LIMITED TO CATCH BASINS. NATURAL WATERWAYS, DRAINAGE DITCHES, WALKS, DRIVES, ROADS, LAWNS, AND STREAMS. EROSION CONTROL MEASURES SEED MIXTURE RATE OPTIMUM PLANTING DATES 1. KENTUCKY 31 FESCUE 5 #/1ODO SF MAR_ 15 - MAY 1 AUG. 15 - OCT. 15 2. COMMON BERMUDAGRASS 2 #/1000 SF MAY 1 - JUNE 30 (HULLED) 3. PEARL MILLET 2 0/1000 SF MAY 1 - OCT. 1 4. FESCUE 5 #/1000 SF OCT. 15 - MAR. 15 SEEDING SCHEDULE SECTION TOP Top OF DITCH BANK BOTTOM OF DjTCjj LAYER OF #5 - WASHED STONE 4' THICK PROFILE — ASS B STONE REMOVE SEDIMENT WHEN IT ACCUMULATES To 1/2 THE HEIGHT OF THE DAM FILTER DAM IS TO BE IN PLACE UNTIL GRASS IS ESTABLISHED IN BOTTOM OF DITCH SUFFICIENT TO PREVENT EROSION CHECK DAM DETAIL N75 A. NCDOT 115 OR #57 WASHED STONE SHALL BE USED. PAD TO BE 50' X 20' X 6" DEPTH MIN. B. TURNING RADIUS SUFFICIENT TO ACCOMODATE LARGE TRUCKS TO BE PROVIDED. C. ENTRANCE(S) SHALL BE LOCATED TO PROVIDE FOR MAXIMUM UTILITY BY ALL CONSTRUCTION VEHICLES. D. PAD MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR DIRECT FLOW OF MUD ONTO STREETS. PERIODIC TOPDRESSING WITH STONE WILL BE NECESSARY. E. ANY MATERIAL WHICH IS TRACKED ONTO ADJACENT ROAD SHALL BE REMOVED IMMEDIATELY. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE NTS CLASS "B" EROSION CONTROL STONE STONE DEPTH = 22.5" PIPE 0 TOP OF BANK a �O z m i 4 4 u 4 /j 4 0 O O L 4 pi 4 •}4 � w CL H 3 4 U4Z 01T 411 yZ 0 m 4 4 ti O TOP OF BANK 1$' DITCH BOTTOM I" EROSION CONTROL STONE DEPTH TO FLUSH WITH OF DITCH YER OF FINE GRAVEL OR WOVEN GEO-TEXTILE RIP -RAP OUTLET APRON NTS 00 - °° 00 N 10\ � o e r aD �rrrrrrr Y U V)Ld 0 6t a q r G a A 0O N o p N 11'S LLJ Y Z N F 2 9 a 0 U O V Q q � 0 a.+ Q ti A cq : A .. i -i L ate.. ." .: ; . _ .�..' �.:- _, -.,.� ,.� ,:.t..: ►�... -a :, a .-r . - ".:c: s: �, �._. - - -�, _�. �' z