Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW7051109_APPROVED PLANS_20060130
STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW!/lam DOC TYPE ❑ CURRENT PERMIT APPROVED PLANS ❑ HISTORICAL FILE DOC DATE���/ YYYYMMDD b L O pmthurst Dr coll?ge Ct E CONege Cf 30ft "�� 0�900ft 9� [fa- G f� G�� Shinn cock Cl� 0 (> et pkv+*{ .0 Cardbal Rd 70'' G, ee� Gt �••~a � �j�h ry•Ni. ne Q C 3 LgmtinIi 17 '� Lavenitia+m Rd ,n q s � e)l Rd , m m w �mYr Dr r e Fr 7- Lovves�l.4d Cn oAlill c n TWA Rd aBtleS Way ey n`'Wooff FRrrn+r �c Qr O � eVh'ie ?1305 �Aaoouest cnm. °rsr �'+ 7{y�5 ?ele Atlas lid Li AfACA,Wrlc PROJECT SUMMARY PROJECT DATA: NOTE'x. OWNER/DEVELOPER: ARBOR GREEN, LLC 1 THE PROJECT IS LOCATED WITHIN A ZONE X FLOOD ZONE ACCORDING TO THE FEDERAL 604 FAST MAIN STREET EMERGENCY AGENCY FLOOD INSURANCE MAP PANEL 5469, NEW BERN DATED JULY 2, 2004. HAVELOCK, NC (252)441-0865 2. ALL STRUCTURES BUILT UPON THE PROJECT SITE SHALL COMPLY WITH THE FIRE REQUIREMENTS SPECIFIED OVERALL SITE AREA: 484,801 SF, 11.13 ACRES IN THE INTERNATIONAL RESIDENTIAL CODE, WITH NORTH CAROLINA AMENDMENTS, 2002 EDITION. TAX PARCEL ID'. 8-207-1295 NO SECTION 404 WETLANDS ARE PRESENT ON ]HE PROJECT SITE. SITE ZONING: C-3 UTILITIES: SEWER -CITY OF NEW BERN WATER -CITY OF NEW BERN 4. NO NEUSE RIPARIAN BUEFER AREAS REGULATED LENDER 15A NCAC 02B EXIST ON THE PROJECT SITE. ELECTRIC -CITY OF NEW BERN/PROGRESS ENERGY (CUSTOMER OPTION) TELEPHONE -SPRINT CABLE TELEVISION -COX COMMUNICATIONS 5. NO STRUCTURES SHALL BE BUILT OUTSIDE OF THE BUILDING SETBACKS SHOWN WITH THE EXCEPTION OF FENCES, REFUSE COLLECTION -CITY OF NEW BERN DRIVES, OR WALKWAYS. LENGTH OF STREETS: 1772 LF 6 ALL DRAINAGE AND UTILITY EASEMENTS CARRY THL RIGHT -OF -ACCESS BY THE CITY OF NEW BERN FOR THE TOTAL #LOTS: 104 LOTS (102 DUPLEX LOTS, 2 COMMERCIAL LOTS) MAINTENANCE AND REPAIR OF DRAINAGE AND UTILITY STRUCTURES. TOTAL AREA IN COMMERCIAL LOTS: 100,916 SF, 2.32 ACRES TOTAL AREA IN RESIDENTIAL LOTS: 1fi7,012 SF, 3.84 AC. (AVERAGE LOT SIZE = 648 SF) 7. EXISTING TREES SHOULD RE RETAINED ALONG ALL PUBLIC ROADS EVERY 30 FEET ALONG EACH SIDE. TOTAL OPEN AREA: 238,319 SE, 5.47 AC, 49.15% OF THE TOTAL SITE AREA THESE TREES SHALL BE LOCATED WITHIN A ZONE 50 FEET PARALLEL TO THE CENTERLINE OF THE PUBLIC TOTAL AREA RIGHT-OF-WAYS: 94,607 SF, 2.17 AC. STREETS. THE TREES RE?AIhJED SHALL BE Al LEAST 2 INCHES IN CALIPER. TOTAL LOT DFNSlTY - 11.58 UNITS/ACRE (RESIDENTIAL) 8. THE DEVELOPER SHALL RLTAIN AT LEAST 167 TREES ON THE ENTIRE TRACT (15 TREES PER ACRE) RESIDENTIAL DENSITY: 9. ALL FRONT & REAR PROPERTY LINES ARE SUBJECT 10 A 15' UTILITY AND DRAINAGE EASEMENT. ALL SIDE LOT LINES ARE SUBJECT TO A 7' DRAINAGE AND UTILTIY EASEMENT CENTERED ON THE PROPERTY LINES. GROSS LAND AREA = 8.82 Ac., 384,199 SF EXCLUSIVE OF PARCI=LS A & B ) ALL UTITLITY EASEMENTS CARRY A RIGHT -OF -ACCESS TO THE CITY OF NEW BERN. DUPLEX REORES 5000 SF FOR FIRST UNIT AND 2000 SF FOR SECOND UNIT, 10. T}1E RECEIVING WATER COURSE FOR THIS PROJECT IS NLSON CREEK, CLASS C, SW, NSW. 7000 SF PER BUILDING TOTAL f DUPLEX BUILDINGS ALLOWED = 384.199 SF/7000 SF = 55 BUILDINGS 11. ALL RESIDENTIAL UNITS ARE DUPLEX CONSTRUCTION WITH EACH UNIT TO BE CONVEYED INDIVIDUALLY, TOTAL I DUPLEX BUILDING PROVIDED = 51 BUILDINGS OR 102 UNITS. 12. ALL STRUCTURES BUILT ON PARCELS A & B SHALL CONFORM TO THE REQUIREMENTS FOR THE US HIGHWAY 17 ENTRANCE CORRIDOR AS DEIINATED IN THE CITY OF NEW BERN LAND USE ORDINANCE. 13 PARKING SHALI. BE ALLOWED ON ONE SIDE ONI.r ALONG ARBOR GRFEN WAY. 20' LANDSCAPE BUFFER EASEMENT BIORETEN110N BASIN #2 I BOTTOV= 21.0' OVERFLOW-22.0' EX STi G DRIVEWAY - - 1 TC BE REMOVED PARCEL . r , 53,29T SF 122 AC - •I ILL' o L� W Li 1 COMMERCIARCLLL Q - I - cn z O T()NED C3 I Q L - EXI STIN DRIVEWAY- ! T TO BE EMOVED 10Y0' SIGHT TR C TANEE(TYPICAL)! - - ---' s r -- -� I �7 B p 218.00' r -� c� N05'04'44"W B i 145.50' 144.0(' LIMITS OF CONSTRUCTION/ LIMITS OF DISTURBANCE in, PROPOSED STORMWATER POND I A C1 C CARD[INA TELEPHONE ZONED C-3 779.30' 20' LANDSCAPE BUFFER EASEMENT SEOIlENCF OF OPERATION: 1. SI CURE PROJECT PERMITS. 2. CONDUCT PRE -CONSTRUCTION CONFERENCE. 3. INSTALL GRAVEL CONTROL ENTRANCE. 4. INSTALL SILT FENCING, 5. INSTALL STORMWATLR RETENTION POND TO ACT AS SEDIMENT BASIN 6, FINE GRADE & STABILIZE ROAD & DRAINAGE AREAS. 7, INSTALL SITE IMPROVEMENTS 8. SI ED AND MULCH ALL DISTURBED AREAS/ESTABLISH PERMANENT VEGETATION 9. RLSEED AS NECESSARY TO ESTABLISH VEGETATION, MAINTENANCE PLAN: 1. AIL EROSION AND SEDIMENTATION CONTROL DEVICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL FVFNT AND IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL DEVICES IN THE OPERATING CONDITIONS INTENDED. 2. ALL AREAS WILL BE SEEDED, FERTILIZED, AND RESEEDED AS NECESSARY AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATION PLAN IN ORDER TO FSTABLISH AND MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. J. ANY SFDIMFNT TRACKED ONTO THE ADJACENT PUBLIC ROAD SHALL BE REMOVED ON A DAILY BASIS. 4, SEDIMENT SHALL BE REMOVED FROM BEHIND SILT FENCING & CHECK DAMS WHEN THE SEDIMENT ACCUMULATES TO A DEPTH OF ONE FOOT. 5 THE STORMWATER RETENTION POND SHALL BE CLEANED OF ANY ACCUMULATED SEDIMENT UPON THE COMPLETION OF CONSTRUCTION. 1 RELEASE FOR PERMITS JKA 10/5/05 NJ. DESC RIPTI❑N BY DATE Revisiols SPECIAL SEEDING NOTE: THE CONTRACTOR SHALL PROVIDE A GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION ON EXPOSED SLOPLS WITHIN IHE SHORTER OF 15 WORKING DAYS OR 30 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING: AND A PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS WITHIN THL SNORTER OF 15 WORKING DAYS OR 90 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. NOTE: ALL FILL MATERIAL NEEDED TO COMPLETE THE PROJECT NOT GENERATED FROM ON SITE GRADING ACTIVITIES SHALL BE OBTAINED FROM A PROPERLY PERMITTED BORROW PIT FACILITY DUPLEX CONSTRUCTION SHALL BE TOWNHOUSE TYPE CONSTRUCTION, EACH LOT WILL BE CONVEYED INDIVIDUALLY. 20' LANDSCAPE BUFFER EASEMENT CD � 10 11 12 13 u 5 1s 0 OO ® 0 D 2z 0 0 © ® � ® C ® 0 © C� 64 ST w 9 618 SF 618 r 6487 618 3 48 SF w Sl w 1 648 9 618 7 618 A { 618 4 m 7 64 sr 648 A 618 5 6951 618 Sr W 7 618 6E 6411 648 SF 648 Sf 60 sr 6r8 Y 618 ( 618 5! 0.01 AC 601 Ac 001 AC 0,0 AC 0.01 AC 0.01 AC OR AC com AC 0 AC 001 AC 0.01 AC 0.01 AC 0.9 AC 0.01 f, AC 1,Of AC off AC a01 AC 0,01 AC 0.0 AC Rv AC 0.01 AC w a01 AC 001 AC 0.41 AC 0.01 AC 00T AC aQl AC 3615.0 ARBOR GREEN, WAY (61' R/W, 31' B/B, PUBLIC) 0 Irs i UYLK[LUYr=L4.V // �•t r,v ry rnL Q01 -- - I °04'44" golf 16 ffil 130111 t .00 18.01 oIfv ,a.aa ® ® off. + 'E 113.13 Q ® ® ® o � 00 5I i6 q 6115, air AC i / V WAY fit R W 31' B B, PUBLi R�- o�. s o ® �� 0 k � �. w SF o o o Ac i Aca. t ti 61853 C 0.01 AC la. 8 C) 46 4.7 �h Rol AC 36M 4 a �. �0 ~ N12°24'04"W 4.73� --�- a _ _ a Doi AC N^ o ell G� N fl o� I ON AC o U1 AC CW 1.no , .00 �.oa I N 4 4 �a \ > > 20 .75 1a.ao 18 ,� s1s g 64 sr 0o us64 f ,a.oa l8 1 4(i © 6+ 401 ABC aal Ac 0.01 AC u 618A-0.01k� - Ac 1 1a.oa © o orn Agc _ 6.6 Ac Q c c .00 ® 6® Vs SF J Aur am Ac C21 69 �• t&t14 C 618 $( 60l AC AC 22n 648 SF� ri 1 . 1 pC 62 6181� - o� �• - om Ac 0 ® ® ,a.00 , .o0 1 .aa 0.01 AC r 18. 6l 618 T a01 AC on l8 1 40 18.00 65 ® ® 61B Y a0 Ac W ® ® 618i 001ACo 641 ON Ac oar �� nn o lac, ,a.ao laooy 1 AC _20 IABDSCA4E BUFFER EASEI�EN1 COMMON AREA 02Afl , .00 __ f 22J,181 SF TOTAL , 5.12 AC TOTAL 11111 29 LANDSCAPE BUFFER EASEI�EEIT 4'04„N 1029.68 LIMITS OF CONSTRUCTION/ LIMITS OF DISTURBANCE FOODS UNLIM11D, INC DP 1849/608 ZONED C-3 18.00 1&00 CD 0 1' 1 TYPICAL LAYOUT NOT TO SCALE PROPERTY LINE ALONG AIRGAP UNIT A UNIT B 0 CDGARAGE � GARAGE PARTY WALL/ FIRE WALL 18.00 18.00 10 10' fiA1NFS, ET AL. ZONED C-3 LIMITS OF CONSTRUCTION/ LIMITS OF DISTURBANCE CRAVEN COUNTY BOARD OF EDUCATION ZONED C-3 APPROVED NORTH GAROLfNA Eti���l�: ,.�; 7;,, OAF. ,�. R4.il".# �� '' �_•_� (} 40 44 40 80 o 05075 LEGEND SILT FENCE E �+ 1" WATER SERVICE 0c, C3 C1 QC "{ OUTLET PROTECTION F FIRE HYDRANT D L� C3 C10 C3 C11 CHECK DAM _ G a SEWFR SERVICE E C3 C10 C3 C11 wi INLET PROTECTION H,I , THRUST BLOCK F CATCH BASIN C3 C10 C3 C11 N VALVE & VALVE BOX A O MANHOLE G C3 C11 C3 C11 PERMANENT 2" BLOWOFF B C3 C11 NOTES: I. SEE DETAIL A, SHEET C10 FOR TYPICAL PAVEMENT SECTION. 2. SEE DETAIL C, SHEET CIO FOR NEW PAVEMENT SECTION. 3. SEE DETAIL J, SHEET C10 FOR SIDEWALK CONSTRUCTION. 4. REVEGETATL ALL DISTURBED AREAS IN ACCORDANCE WITH THE PROJECT VEGETATION PLAN, SEE DETAIL L, SHEET C10. 5.'-')EE DETAIL H, SHEET C11 FOR TYPICAL TRENCH SECTION. MANHOLE TABLE MANHOLE ID RIM INVERT IN INVF.:RT IN INVERT OUT COMMENTS MH 1 21.78± 13.00 - 11.26+ BUILT OUVER MANHOLE MH 2 22.7-± 16.39 MH # 15 17.33 MH 3 16.38 MH 3 23.11± 17.85 - 17,84 MH 4 25,67±- 18.29 - 18.28 MH 5 25.32± 18.62 18.61 MN 6 26.32± 19.44 - 19,43 MH 7 26.67± 19.76 - 19.75 _ MH 8 26.75± _ - _ 20.00 MH 9 26.67± - - 19.50 MH 10 26.44± 19.17 - 19.16 MH 11 26.20± 18.83 - 18.82 MH 12 26.231 18.15 - 18.14 MH 13 24.84± 17.34 17.33 MH #L4 24.131 17.00 16.99 MH 15 23.42± 16.66 - 16.65 SPECIFIC WORK ITEMS: 1Q ROUTE NEW SEWER MAIN BELOW NEW STORM DRAIN PIPE, C72 ROUTE NEW WATER MAIN BELOW NEW STORM DRAIN PIPE, PROVIDE 24" MIN. VERTICAL SEPARATION. (3 ROUTE NEW WATER MAIN BELOW NEW SEWER MAIN. PROVIDE 24" MINIMUM VERTICAL SEPARATION. PROVIDE 201E DUCTILE IRON WATER AND SEWER MAIN CENTERED AT CROSSING. 0(2) PVC ELECTRICAL CONDUITS TO BE SUPPLIED BY CITY OF NEW BERN TO BE INSTALLED BY CONTRACTOR AT 36" BURY & TAPE ENDS. ®ROUTE NEW WATER MAIN ABOVE NEW SEWER MAIN. PROVIDE 18" MINIMUM VERTICAL SEPARATION, PROVIDE 201-F DUCTILE IRON WATER AND SEWER MAIN CENTERED AT CROSSING. "1AGN�TIC LIMITS OF CONSTRUCTION/ CARINA TELEPHONE i LIMITS OF DISTURBANCE ZONED C-3 -�--------------------- ------------------------------------__-_-------------- --------------------------------------------------------- ' � 20' LANDSCAPE Bl1FEfR EASEMENT � � �E'lfFl�C� 1-8i1FFE'�E'IC�EIaERr � � - - - - - _� - - -- BIORETENTION BASIN #2 -EASEI�ENT BOTTOM=21.0' Q o- - OVERFLOW=22.0' j - - - , CD © OO 10 It 0 q-) CD �s I� 0 � 19 Cm � m � �{ © @ cm ® m 1D � m (9) (3!) IF 1 EXISTING 8" PVC WAT1R MAIN0- 7 7 4 ! - H 3 11 S S 5 z I S z 0 S 8 12 1 M H 6 O o�� c.� n ARBOR NFLN WAY 61i R Ww31a B B, PUBIC 4 �®0 0 H 7f o H# - w - \ S 1 NE 8" V W TF Q 1 XIS 111NG 8 PVC ® CPS EW R MAIN INSTALL 4 -o �- ...... - - � INSTALL 4 0 22 1 /2° ELBOW ® as �) O 22-1/2° ELBOW 1 $ TAPPING ADDLE ( o (1) 8 VALVE - _ -- - - - - - - - S - ® S �1 6" PVC SEWER -` # (1) THRUST BLOC MH 1 - SE�VI E I o Io % H r NEW 8' PVC WATER o w I - - 1 - z � � f -- .- - - ' N BOTTOM-23.0 BASIN #4 4 Borro�+=23.0' OVERFLOW = 24.0' O W C� 3 �3 I 1 0 o e 4 �_� � S �M # $ H 22-1/2° ELBOW o - - ---� --- - S fNSTALL (4) c, o 2 1 - 4 ® 22-1 /2° ELBOW 2 76 --INSTALL o +s 22-1 /2° 0 i NEW 8" PVC WATER S _ - .oc NE 8 V W TE - 6" PVC EWER--- - - 1 �0 f - SRVICEI z1 (1) THRUS LOCK s M14 W W _ 4 o 20 S -� S 19 BIORFTFNr10N BASIN #3 - I : 11 1718 80ITOM= 200' 13OVERFLOW=?1.0'1 -- 71 S � A11 - - _ - p 15 11 - (STING M NHOLE RI 19.32 11 V =10.37 j I 4 7a V BENCH 10,86 ! - - - 62 61 p r : I1 f_ BIORETEN BASIN #1 I i ASI BOTTOM-1 0'- I - - OVERFLO - 4.0' RAINES, E1 AL. - - J ZONED C-3 I - _ LIMITS OF CONSTRUCTION/ FOODS UNLIMITED, INC LIMfTS OF DISTURBANCE D9 1849 c/308 1 JoNES i i D$ 11711244 VERALL INATER & SEWER L YOU4 ZONED c 3 LIMITS OF CONSTRUCTION/ LIMITS OF DISTURBANCE CRAVEN COUNTY BOARD OF EDUCATION ZONED C-3 SALE: 1" 40' 80 0 40 40 40 SEAL 15738 �.,y°•. GiNE.• O� O Q to O w (D O P, O W �4 O 0-4 p, , U-) o C 1n N c0 I (D U � w z L( x Q z -Q 00 > -ziQ0 c (-Qo _.. , LL o o-0 _> m N Ln Z � O W � Q �--� Cod d I � �10- � � w W W O ry o Is 05075 L T 1 WATER -LFRYICL I , _r , cli Iii> PRCTD- 1101h FRL HYDRANT D C4 i!F(K DAV ---Fvv,FR SFRVIcl-- 'I "o) H I TIIDY�)� MOCK C 4 �4 I MANH01. 1 vo VL N V�% C4.11 G I/ p r:� v-v r 0WOF-FI/ I C - , - 4 t! F I tj I- U�� T Wk."Al. F'AVWtll I N. UN. L U AII F(j-T [CTI0N. NFW PAVEM[I'll SECTION. F L'—')'L I AI,_ �I FOR SIDEWALK CON` 'TRUCLION. A IT R VL �) I— Al 0 1 S IJ I,. IN ACCORDANCL ,�,vI fi-j 1 H 1 f,)J I VL I A t10,,N� H AN, SFIL 1-j! 1%h I , )'I'I E t 101. F -f — IT I I I FA) TYPICAL k' I HCTION, I j —j L-A CCU C L DRAINAGE S I p UTU L STRUCTURE RIM INVFRT IN INWR i o;, _ I I I V E "R -I G j.J 1 "'T P j 1) S 22,7J+ 20.1 U, 7T I N L L T 2 2,411 - Z- 20,5 JH), 1f111 LT 20. Z Z-, 4 4 J- )0_� (DS#2/#5) 2U. 3 L) SI-L z0.21,-0+ 20�20 Z-20 E T P A Ds#5 22,44+ 2 G, 5 2 0. 5 J. !NL T /7 Fl- H �-T DS �6 22. /H 20.- -T D S) # 1 25, 6 J' -1 8 N I 25,63 1- 2 F) r), IN;, z s # 21 5. -5 0 + 2 J 2- 3,1 (B YP yl "IRF N E TA , 1)sp 0 2 5.5 0 22, 91 2 2A Y,;YF,,`[-') LET `'CUD CUVEF -/cOLTL CO V R 0 2. 1) F) Jfi [ i J L)S�l 1 2' 21 R L �12 2 4. 3 0 + 2 2.,-'� 2 2. Jz LFT -0 J v r LA R D I (I IP 2 3 1 2 A J 2 J. 7 - (Byp 2 1"All 2 J, 4 R I. r T 2 7. 1) Y A IQD . NLE J 1BYPAS" 1� s Z 21 1 . B Y P Ac,,� S.) D5#17 z Z T[ 2,5, 1) 21.1 21,1 (FA K I Ds# 11 0 2 3, 00 1 18, 'h) 2i BY11-1 B T -1 D lk� F 11 4 DS//] 9 )2,51 18,01 18. 0 D5�20 22.5 17.5 i Z L L T UACIVPTJ(' 20' LUSCAPI H(1FW1ATkWBIORETENTiON BASIN BOTTOM 7 0' - 04RFLOW 22. 21.1 — — — — — — — — — — — — —' j 4�— — — f SEE ENLARGED MEW—H DETAIL B, SHEET C9 1. I 'UR L r F''-. ( 1 PERMIT:; I �CT 2 , C',1Nf)11 "T N �)- T ON CUdhl`FI'LNCE. CONTROL ENTRANCE ,t 'I%4,JA-LL --Il F IL H! CI N 5 N'.;TALL r)l r�1`NATFR I-)1TFI`,,'TM1 POI"ID TO ACT EI.IMEfJ T BASYI!PJ k SIABIIJZL ROAD & DRAINAGE AF,,I- T[ ;N`;Ik IVPROVEVEN 8. 1` 1- D A N I-) I CH AI. I DISTURBED AREA�/`I-,-,TAU,-) 1 'LMivANENT VEGETATION 11 F I SE E D A`, 10 ES-IABIIqd VFC,LiATION, cl.AN: AND KDHVENTATIM CONTROL HVIC'FS SHALL I C-T 1 61[T K '1 UKF, I AND OPERATION FOLIOWING y RAM ALI [VENT AND IN NO —v i I'Y RIJNOrF 11, I�, ` CA.""F !ESS THAN ONCE EVERY WEEK, ANY NFFDFP HE AHS WILL HE 1.1ADE IMMEDIATELY 10 MAINTAIN ALL IN THE OPERATING CONDIIIC)INS) INTENDED 2. AD AREAS WILL BE SEEDED, FERTIL17FID, AND RE',-FEDFD A`, 'JE-L-FS)SARY AI0 MULCHED ACU)RDIN-, F0 C:Fi iN THE VEGETATION PLAN IN CULP TO SI-I A0 MAINTAIN A VIGOROUS, DEN.-)F VFGFTATIVE cu,.:R. F D I f4 A N S1 -NI TRA(-'KF[) CJflO IHL ADJACFNI PUK'(-' K',-) )HALL BE REMOVED ON A DAILY BASIS. -'ALL 131 REMOVLD FROM HKI-IIND SILT I IJ CI N G 4. )�-I �,I-NT I� & � `.:_ -�K NT ACCUIVU ATE) TO DAI`),� WHFN TIHL HDAIL A TTH OF ONE FOU 1-, Tj 1[ it ?MWATER PET-FMION POND 'JHALL BE CL'r-A[%iEI) (-JF A I A-1IMUL,-'JFD SEDIMENT UPON THE COVIFTION OF <J C- TIO N. LIIIT() 01 1 R U C I 10 N TFr LIVITS PIS IUkHANCI N L j P4 K ix 1 21.4 r- Ls 7 2 1 Kp 17) L ZO 6 C6 (7 ,1 FID 1, 1F 0 T 120 8 W—f INV. [IT 5: 1 VF TAT D f. m r, 4 1 C -7 L C) ) LX) 14+00 E N 'k,'�, 31Y (�j 1' k 1W k H, 1-)JRD(.11 01' J� % W 1J'RY k (1) FE — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — —fJEW 64 [ F /') 4 eluk� �� NTION� BASIN #4 ill C) BW10M 2AU F & (2) 171,S. JVUFLOW-24 0' , — — — — — — — — — — — — — — — — — — — — — — — — — — — — ACE 1f1 FL()-N kNE SEE ENLARGED f I F DITCH DETAIL D, SHEET N-, ------ -- T IN iO 2 + 0, r, DS#2 J— — —j— J I RIN, , , 01 wv f, 6 T m , m, —1 e 1 A\ X CK) I (6� o4') I (-- 'JUJAL NQI-F- THIL SHALL PROVIDE ')VFI,' F 1. .1. � � I TO RIF'STRAIN ON [X[POHI" ��L WIT111,4 OF 1 01ORKII'l- DAYS '0 'k—,'ALENIJAR DAYS'i FOLL", C�'FOM0ff FF/�M L Fld I GFONDCOVER —0� A� 11�—TIJRKD i'kPF,`\- '—7I IJTHE `�)HORT1F) OF IA r "--), WO KING N G AY—) F' 0 CALL. NDAF NiN COVI"Ll Tel OF CONS IRUC10N OR V'--I D1 t L —OHvIlL N T T A-11 F11 I IvIATFRIAL E I F E 'i'L,j N TF THE PP(',-T.CJ Hc -V �d�\IFD FT"Cii"' 11 S ;I -All PT Ali; "Y' A �,R n,- P [ FlY P E R �,vl TIES 7-707770777 6ASEWIN-f CD I Cl,') m -J CONTROL/ r IN V. WRANJ 17�V INV. 1(!l F Rc L �-J C-) W� 1 II 12t SEE ENLARGED MEW N) DETAIL A, SHEET C9 NINE IN PASIN BOTT 0, owpE 0 -19t, -AA LC_X JRh 1, vFi-,FTATFF) i N M11244 SWAT.{ C 4 C 10 C-3 _/ A I T F (), R A r) I N -'r, & I— R 0 1--) N c (1) N T R 0 1 JPI.AN I SLF 15"RT--, X, v co % 7 TE ENLARGQD MEW O%RFt 20 --------------- UETA U, �)HttT�iCg ---------------- 17 /1.- 1'.1" P4, 000000� - ---Zmmm— -- - I LLJ 7t— --77� LLJ C40) -ul Q-2) j \ C 4r LLJ (44 j-'4. 0 — — -- — -- — -- , —L—a 1 11 ,- _ _ = - --j ---- 21 .5 --- - - -- ---- �I c J: 1 VFG3 UAT[ J) ASALE — f �\ = / - IMIT' I !MIT' /(-Y! P, C. "011 ll`� TI"N C 70�lfj) L L - �,. 4VO - vwmiplmm�� off.um 14 0 0 U 0 j W 0 46 �7 05075 �Al LEGEND SILT FENCE E 1" WATER SERVICE C C5 CIO C5 CI1 OUTLET PROTECTION 'F FIRE HYDRANT rDt C5 C10 x C5 C1� CHECK DAM G o-_ EC5SEWER SERVICE I1 INLET PROTECTION H,I , THRUST BLOCK F CATCH BASIN C5 C'0 C5 LI/ VALVE & VALVE BOX A ® MANHOLE ,5(tc O PERMANENT 2" RL.OWOFF B C�C 11 NOTES: I SEE DETAIL A, SHEET C10 FOR TYPICAL PAVEMENT SECTION. 2. SEE DETAIL C, SHEET CIO FOR NEW PAVEMENT SECTION. .. SEE DETAIL J, SHEET CIO FOR SIDEWALK CONSTRUCTION. ,t. REVFGLTATE ALL DISTURBED AREAS IN ACCORDANCE WITH THE PROJECT VEGETATION PLAN, SEE DETAIL E, SHEET CIO. 5. SEE DETAIL IE, SHEET C11 FOR TYPICAL TRENCH SECTION. A PLAN -ARBOR GREEN WAY C5 C5 SCALE: 1 `40' B PROFILE -ARBOR GREEN WAY C5 C5 HORIZONTAL SCALE: 1"-40' VORTICAL SCALE: 1"=4' MANHOLE TABLE MANHOLE ID RIM INVERT IN INVERT IN INVERT OUT COMMENTS MH 1 21.781 13.00 - 11.26± BUILT OLIVER MANHOLE MHJ2 22.7± 16.39LH 15 17.33 MH 3 16.38 MH 3 23.11 ± 17.85 17.84 M1� 25.67± 18.29 - 18.28 MH 5 25.32± 18.62 - 18.61 MH 6 26.321 19.4,- - 19.43 MHO 26.671 19.7(_, - 19.75 M � 26.75± - _ - 20.00 MH 9 26.67± - 19.50 MI-1 10 26.44± 19.17 - 19.16 MH 11 26.20± 18.8_` - 18.82 MH 12 26.23± 18.15 - 18,14 MH #13 24.84± 17.34 17,33 MH 14 24.13± 17.OG 16.99 MH 15 23.42+ 16,66 116.65 DRAINAGE STRUCTURE TABLE STRUCTURE RIM INVERT IN INVERT OUT INVERT OUT WEIR ELEV. REMARKS DS 1 22.731 20.7 - CURB INLET DS 2 22.44± 20.5 20.5 - - CURB INLET DS 3 22.44± 20.3OS#2/0) 20.3 - - CURB INLLT DS 4 21.30± 20.20 20.20 21.0 YARD INLET BYPASS DS 5 22.44± 20.5 20.5 CURB INLET DS 6 22.73± - 20.7 - - CURB INLET DS 7 25.63± - _ 23.8 - - CURB INLET DS 8 25.63± 23.6 - 23.6 - CURB INLET DS 9 25.50± 23.1 23.1 (BASIN) 23.1 (BYPASS) 24.00 YARD INLET BYPASS DS 10 25.501 22.9 22.9 - - YARD INLET SOLID COVER DS 11 25.30± 22.6 22.6 - - YARD INLET SOLID COVER DS 12 24.30± 22.3 22.3 - - YARD INLET SOLID COVER DS 13 25.03± 23.3 23.3 (BASIN) - - CURB INLET pS 14 25.031 23.4 23.4 (BASIN) 23.4 (BYPASS) - CURB INLET DS 15 23.90± 23.0 23.0 - 24.00 YARD INLET BYPASS DS 16 24.0± - 21.5 (BASIN) 21.5 (BYPASS) 22.0 CURB INLET DS 17 23.5± 21.1 21.1 (BASIN) 21.1 (BYPASS) 22.0 YARD INLET SOLID COVER DS 18 23.001 - 18.2 (BASIN) 18.2 (BYPASS) 19.00 CURB INLET SPECIFIC WORK ..®ROUTE ITEMS: NEW SEWER MAIN BELOW NEW STORM DRAIN PfPE. PROVIDE 24" MIN. BURY SEPARA110rI. O2 ROUTE NEW WATER MAIN BELOW NEW STORM DRAIN PIPF. PROVIDL 24" MIN, SEPARATION, Q3 ROUTE NEW WATER MAIN BELOW NEW SEWER MAIN, PROVIDE 24" MINIMUM VERTICAL SEPARATION, PROVIDF 20LF DUCTILE IRON WATER AND SEWER M,kN CENTERED AT CROSSING. 4Q (2) PVC ELECTRICAL CONDUITS 10 BL SUPPLIED BY CITY OF NEW BERN TO BE INSTALLED BY CON TRACTOR AT 36" BURY & TAPE ENDS. 5 ROUTE NEW WATER MAIN ABOVE NEW SEWER MAIN. PROVIDE 24" MINIMUM VERTICAL SEPARATION. PROVIDE 20LF DUCTILE IRON WATER AND SEWER MAIN CENTERED AT CROSSING. i I O r --- I� - , 1-71 z - a --.120.0 C� � o r I 1 0 CO a 0� I INV. � � 77 I` H bl' 1.6 I (1) 8" TAPPING ADDL o O+a01 (1) I $" Af_VE 44„ W 00 _ (1) THR ST BLOC _ - 1 I I z t„ - o - - - - CD - - 19.6 - UMI TS OF CO qSTRUC ION,'- ��� - BRAVE-_ WNTROL - -D. O° INV. LIMI S OF DI TURBAN E I I - €N+RANGE C5 CIO STA. J'+ 74,56 ARBOR GHEE Y I STA. 18+121'�0 ARBO GF?E AY - ... . I _ 10FF 15` RCP 5.0 cD L NEW 8" PVC WATF )5` )4_44'W IN J 't T777F 15" RCP \,20.0 INV. (1) 8„ BIORETFNTION A BOUOM=200' lam/ OVERFLOW=21 0' I S�EOIUFNCE OF OPERATION: I. SECURE PROJECT PERMITS, 2. CONDUCT PRE -CONSTRUCTION i3ONFERENCE. 3. INSTALL GRAVEL CONTROL ENTRANCE. 4. INSTALL SILT FENCING. 5. INSTALL STORMWATER RETENTION POND TO ACT AS SEDIMENT BASIN 6. FINE GRADE & STABILIZE ROAD & DRAINAGE AREAS. /. INSTALL SITE IMPROVEMENTS 8. SEED AND MULCH ALL DISTURBED AREAS/ESTABLISH PERMANENT VEGETATION 9, RESEED AS NECESSARY TO FS �ABLISH VEGETATION. MAINTENANCE PLAN: 1 ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHALL BE CHECKED FOR STA31UTY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL EVENT AND IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL DEVICES IN THE OPERATING CONDITIONS INTENDED. 2. ALL AREAS WILL BE SEEDED, FERTILIZED, AND RESEEDED AS NECESSARY AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATION PLAN IN ORDER TO ESTABLISH AND MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 3. ANY SEDIMENT TRACKED ONTO THE ADJACENT PUBLIC ROAD SHALL BE REMOVED ON A DAILY BASIS. 4. SEDIMENT SHALL BE REMOVED I ROM BEHIND SILT FENCING & CHECK DAMS WHEN THE SEDIMENT ACCUMULATES TO A DEPTH OF ONE FOOT. 5 THE STORMWATER RETENTION POND SHALL BE CLEANED OF ANY ACCUMULATED SEDIMENT UPON THE COMPLETION OF CONSTRUCTION. I Sy5°04441 DO -- -_ NEW PVC TE 0 VE IT BL = 50,08'55" R=100 00 BIORETENTION RAN #4 T- 46. , 9 B0110M=23-C' L-87.:>3 oVERFE0w=24.0' A-57'22'53" INSTALL (4) 22-1/2° FLBOW T=54,7 L=100 `L 1 1 RELEASE IOR PERMITS ND. I DESCR'IPTIDN Revisions SPECIAL SEEDING NOTE: THE CONTRACTOR SHALL PROVIDE A GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION ON EXPOSED SLOPES WITHIN THE SHORTER OF 15 WORKING DAYS OR 30 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING: AND A PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS WITHIN THE SHORTER OF 15 WORKING DAYS OR 90 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. NOTE: ALL FILL MATERIAL NEEDED TO COMPLETE THE PROJECT NOT GENERATED FROM ON SITE GRADING ACTIVITIES SHALL BE OBTAINED FROM A PROPERLY PERMITTED BORROW PIT EACILI l-Y . 61�a y. �� r _ 'r• O 7 _ ++ 17LF 15 RCP � MH 4 MH 5 STA. 5+98.81 STA. 6+70.37 �! Q!cll� N CNco 0+00 1+00 2+00 3+00 4+00 STA. 3+74.56 (Q ARBOR GREEN WAY} STA. 18+12.10 (C ARBOR GREEN WAY) V -t �Ico � N� Nj t��V � �N 5-+ 00 6+00 7+00 1 JKA 10/05/05 BY i DATE Bo 0 40 40 40 N .a SEAL 15733 ►!lIIt11'1.f� w Q 0 rD o c �� i c) ( c9 � I U� .� W 7N Q:�Ln wN x w� z .O � � w o 'j m CV ®USN E- �o O w z� o w+ �U' w 'Z o 4� o O O o w wo O w � 0+ w � ao �o ZE4 E 050'75 1 I RELEASE FOR PLRMITS JKA 10/05/05 LEGEND SILT FENCE gE 1" WATER SERVICE C � C6 C11 "j OUTLP PROTECTION_ DF FIRE HYDRANT -C6 c11 ® CHFCK DAM @cd a,,,,_SEWER SERVICE C6 C11 INLET PROTECTION 06i, THRUST BLOCKF CATCH BASIN C6 C11 VALVE & VALVE BOX _ A O MANHOLE G _. - - C6 C11 C6 C11 Q PERMANENT 2' BLOWOFF B C6 C11 NOTES: 1. SEE DETAIL A, SHEET CIO FOR TYPICAL PAVEMENT SECTION. 2, SEE DETAIL C, SHEET C10 FOR NLW PAVEMENT SECTION. 3. SEE DETAIL J, SHEET C10 FOR SIDEWALK CONSTRUCTION. 4. REVEGFTATE ALL DISTURBED AREAS IN ACCORDANCE WITH THE PROJECT VEGETATION PLAN, SEE DETAIL L., SHEET CIO. 5. SEE DETAIL H, SHEET C11 FOR TYPICAL TRENCH SECTION. MANHOLE TABLE MANHOLE ID RIM INVERT IN INVERT IN INVERT OUT COMMENTS MH 1 21.78± 13.00 11.26± BUILT OLIVER MANHOLE MH 2 22.7� 16.39 MH 15 17.33 MH 3 16.38 MH 3 23.11± 17.85 17.84 MH 4 25.6 ,'± 18.29 MH 5 25.32± 18.62 18.61 MH 6 26.32± 19,44 - 19,43 MH 7 26.6 7± 19.76 - 19.75 MH 8 26.75+ - - 20.00 MH 9 26.671 - 19.50 MH 10 26.44± 19.17 - 19.16 MH 11 26.20± 18.83 - 18.82 MH 12 26.23±- 18.15 - 18.14 MH 13 24.84± 17.34 17.33 MH 14 24.13± 17.00 16.99 MH 15 23.42± 16.66 - 16.65 DRAINAGE STRUCTURE TABLE STRUCTURE RIM INVERT IN INVERT OUT INVERT OU1 WEIR ELEV. REMARKS DS 1 22.73± 20.7 - - CURB INLET DS 2 22.44± 20.5 20.5 - - CURB INLET DS 3 22,44± 20.3(DS#2/#5) 20.3 CURB INLET D5 4 21.30± 20.20 20.20 21.0 YARD INLET BYPASS DS 5 22.44± 20.5 20.5 - CURB INLET DS 6 22.73± - 2C.7 - CURB INLET DS 7 25.63± - 23.8 - CURB INLET DS 8 25.63± 23.6 - 23.6 - CURB INLET DS 9 25.50±- 23.1 23.1 (BASIN) 23.1 (BYPASS) 24.00 YARD {NEST BYPASS DS 10 25.50± 22.9 22.9 - - YARD INLET SOLID COVEF' DS 11 25.30± 22.6 22.6 - YARD INLET/SOLID COVET' DS 12 24.30± 22.3 22.3 - - YARD INLET SOLID COVFF' DS 13 55.03± 23.3 23.3 (BASIN) - CURB INLET DS 14 25.03± 23.4 23.4 (BASIN) 2 3. 4 (BYPASS) - CURB INLET DS 15 23.90± 23.0 23.0 - 24.00 YARD INLET BYPASS DS 16 24 0± - 21.5 (BASIN) 21.5 (BYPASS) 22.0 CURB INLET DS 17 23.5+ 21.1 21.1 (BASIN) 121.1 (BYPASS) 22.0 YARD INLET SOLID COVER DS 18 1100± - 18.2 (BASIN) 18.2 (BYPASS) 19.00 CURB INLET A PLAN -ARBOR GREEN WAY Ub6 SCALE: 1"=40' i B PR OFILE-ARBOR GREEN WAY C6 C6 HORIZONTAL SCALE: 1"=4a' 'VERTICAL SCALE: 1"=4' SPECIFIC, WORK ITEMS: 1Q ROU I E NEW SEWER MAIN BELOW NEW STORM DRAIN PIPE, PROVIDE 24" MIN. EURY SEPARATION. U2 ROUTE NEW WATER MAIN BELOW NEW STORM DRAIN PIPE, PROVIDE 24" MIN. SEPARATION. Q3 ROUTE NEW WATER MAIN BELOW NEW SEWER MAIN. PROVIDE 24" MINIMUM VERTICAL SEPARATION. PROVIDE 20LF DUCTILE IRON WATER AND SEWER MAIN CENTERED AT CROSSING. 4Q(2) PVC ELECTRICAL CONDUITS TO BE SUPPLIED BY CITY OF NEW BERN TO BE INSTALLED BY CONTRACTOR AT 36" BURY & TAPE ENDS. QQ ROUTE NEW WATER MAIN ABOVE NEW SEWER MAIN. PROVIDE 24" MINIMUM VERTICAL SEPARATION, PROVIDE 20LF DUCTILE IRON WATER AND SEWER MAIN CENTERED AT CROSSING. MH 7 MH 8 MH 9 STA. 9+55.121 STA, 1 Q+12.1 Q STA. 1 Q+6Q.55 150.00' VC PUI STA = 9+87.10 PVI ELEV = 27.0 CD SFQUENG'E OF OPERATION,- 1. SECURE PROJECT PERMITS, 2. CONDUCT PRE -CONSTRUCTION CONFERENCE. 3, INSTALL GRAVEL CONTROL ENTRANCE. 4. INSTALL SILT FENCING. 5. INSTALL STORMWATER RETENTION POND TO ACT AS SEDIMENT BASIN 6. FINE GRADE & STABILIZE ROAD & DRAINAGE AREAS. 7, INSTALL SITE IMPROVEMENTS 8. SEED AND MULCH ALL DISTURBED AREAS/ESTABLISH PERMANENT VEGETATION 9. RESEED AS NECESSARY TO ESTABLISH VEGETATION, MAINTENANCE PLAN: 1. ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL EVENT AND IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL DEVICES IN THE OPERATING CONDITIONS INTENDED. 2, ALL AREAS WILL BE SEEDED, FERTILIZED, AND RESEEDED AS NECESSARY AND MULCHED ACCORDING TO SPFCII ICATIONS IN THE VEGETATION PLAN IN ORDER TO ESTABLISH AND MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 3. ANY SEDIMENT TRACKED ONTO THE ADJACENT PUBLIC ROAD SHALL BE REMOVED ON A DAILY BASIS. 4. SEDIMENT SHALL BE REMOVED FROM BEHIND SILT FENCING & CHECK DAMS WHEN THE SEDIMENT ACCUMULATES TO A DEPTH OF ONE FOOT, 5 THE STORMWATER RETENTION POND SHALL BE CLEANED OF ANY ACCUMULATED SEDIMENT UPON THE COMPLETION OF CONSTRUCTION. MN A.D = -0.85 � MH 1Q MN 11 °° STA. 8+8Q.11 STA. 11+37.89 STA. 12+14.81 30 KI - 175.84 o to 30 triw cn� 28 - -- -- - ---- FINISH GRADE_ - m m -- 4.._ -- w --. r- WISH .GR'ADE _._ --- - 28 [XISTING GRADE EXI TING GRADE _ - -0.31� 26 - 55�0 I 26 � - EW 15" CP r 24 J VC WATER MAIN 8 PVCWATRA 24 22 - - -- - -- I -- - - - - _ 22 1 1 8" PV 4 0,4 81 LF m 8 PVC Ld 0.4% 61 LI~ 8 PAC � - _- 83 !F 8" PVC -. C& 0.4 20 2C @ 0 4% Lo 18 -.. - - I _- - -- - -� - - - CL4� 18 'r U -tu! - - -- - - - - -- - -- - - ,1, cn -- -- 1 12 f - - ----' -- -- - _._. _ �. - - - -- II -- �___ _ 1+ 12 N 10 10 - _2 cn z g --. - - t _._ __ . - - --... _ _ _ -- - .. _ -- -. Ff V f 8 LLJ U J I J 1 m Ln r� Co Lc-) O r � CD aQ, N aL, CD00 o� "71 tLn L.f� N c9 cQ Ln « LS c0 cD N N CD N N N Cam! N N N CV ni N N N N N N [�I i 8+00 9+00 10+00 11+00 12+00 NE1. DESCPIPTI❑N BY I DATE Revisions SPECIAL SEEDING NOTE: THE CONTRACTOR SHALL PROVIDE A GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION ON EXPOSED SLOPES WITHIN THE SHORTER OF 15 WORKING DAYS OR 30 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING: AND A PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS WITHIN THE SHORTER OF 15 WORKING DAYS OR 90 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. NOTE: ALL FILE MATERIAL NEEDED TO COMPLETE THE PROJECT NOT GENERATED FROM ON SITE GRADING ACTIVITIES SHALL BE OBTAINED FROM A PROPERLY PERMITTED BORFOW PIT FACILITY Q 40 40� 40 80 �C A RO Q' •''ESSIp' . ?�''•� c� 1_ 5733 0F G'I oQ � C) w o c �Ln y z� CT 00 � LLJ N �Lo CN 11� r� z o L -cb d L-Li O 0 i� 0 + o z cv Q �0 oc/5 C 'C4d -� 0-1 Q DO w + cd z 0 0 E-4 .94 rn 05075 EFGFND SILT FENCE E 1" WATER SERVICE C c7 C10 c7 c11 OUTLET PROTECTION F FIRE HYDRANT D c7 cla c7 t�11 ® CHECK DAM C ;EWER SERVICE E C7 C10/ C/ �;11 INLET PROTECTION FI,I THRUST BLOCK E CATCH BASIN C7 C1Q C7 )11 VALVE & VALVE BOX A O MANHOLE G C7 C11 C7 t'11 PERMANENT 2" BLOWOFF B C7 C11 rR)TES: I. SEE DETAIL A, SHEET CIO FOR TYPICAL PAVEMENT SECTION. . SEE DETAIL C, SHEET CIO FOR NEW PAVEMENT SECTION. 5. SEE DETAIL J, SHEET C10 FOR SIDEWALK CONSTRUCTION. 4. REVEGETATE AI..E DISTURBED AREAS IN ACCORDANCE WITH THE PROJECT VEGETATION PLAN, SEE DETAIL L, SHEET CIO. 5. SEE DETAIL H, SHEET C11 FOR TYPICAL TRENCH SECTION. SPF CIF1C WORK ITEMS: O ROU TE NEW SEWER MAIN BELOW NEW STORM DRAIN PIPE. PROVIDE 24" MIN. BURY SFPARA1ION. Q ROUTE NEW WATER MAIN BELOW NEW STORM DRAIN PIPE. PROVIDE 24" MIN. SEPARATION. Q ROUTE NEW WATER MAIN BELOW NEW SEWER MAIN. PROVIDE 24" MINIMUM VERTICAL SEPARATION, PROVIDE 20LF DUCTILE IRON WATFR AND SEWER MAIN CENTERED AT CROSSING. d (2) PVC ELECTRICAL CONDUITS TO BE SUPPLIED BY CITY OF NEW FERN TO BE INSTALLED BY CONTRACTOR AT 36" BURY & TAPE ENDS. 5 ROUTE NEW WATER MAIN ABOVE NEW S_FWFR MAIN. PROVIDE 24" MINIMUM VERTICAL SEPARATION. PROVIDE 20LF DUCTILE IRON WATER AND SEWER MAIN CENTERED AT CROSSING. vEOUENCE OF OPERA IION: 1. SECURE PROJECT PERMITS. 2. CONDUCT PRE -CONSTRUCTION CONFERENCE. �. INSTALL GRAVEL CONTROL ENTRANCE. 4 INSTALL SILT FENCING. 5. INSTALL SIORMWAIE R RETENTION POND TO ACT AS SEDIMENT BASII,1 6. FINE GRADE & STABILIZE ROAD & DRAINAGE AREAS. 7. INSTALL SITE IMPROVEMENTS 8. SEED AND MULCH ALL DISTURBED AREAS/ESTABLISH PERMANENT VEGETATION 9. RESEED AS NECESSARY TO ESTABLISH VEGETATION, qAPLAN-AR_BOR GREEN WAYCALE: 1'-40' - - B PROFILE --ARBOR GREEN WAY C7 C7� HORIZONTAL_ SCALE: 1"=40' VERTICAL SCALE: 1"=4' MAINTENANCE PLAN: 1. ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL EVENT AND IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL DEVICES IN THE OPERATING CONDITIONS INTENDED, 2. ALL AREAS WILL BE SEEDED, FERTILIZED, AND RESEEDED AS NECESSARY AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATION PLAN IN ORDER TO ESTABLISH AND MAINTAIN A VIGOROUS, DENSF VEGETATIVE COVER, 3. ANY SEDIMENT TRACKED ONTO THE ADJACENT PUBLIC ROAD SHALL BE REMOVED ON A DAILY BASIS. 4, SFDIMFNT SHALL B- REMOVED FROM BEHIND SILT FENCING & CHECK DAMS WHEN THE SEDIMENT ACCUMULATES TO A DEPTH OF ONE [COT. 5 TIME STORMWATER RETENTION POND SHALL BE CLEANED OF ANY ACCUMULATED SEDIMENT UPON THE COMPLETION OF CONSTRUCTION. SPECIAL SEEDfNG NOTE: THE CONTRACTOR SHALL PROVIDE A GROUNDCOVER SUEEI,CiEN I TO RESTRAIN EROSION ON EXPOSED SLOPES WITHIN THE SHORTER OF 15 WORKING DAYS OR 30 CALENDAR DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING: AND A PERMAPJENT GROUNDCOVER FOR ALL DISTURBED AREAS WITHIN THE SHORTER OF 15 WORKING DAYS OR 90 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVLI OPMENT NOTE: ALL FILE MATERIAL NEEDED �O COMPLE I L THE PROJECT NOT GENERATED FROM ON SITE GRADING ACTIVITU)' SHAD BE OBTAI(,,IED FROM A PROPERLY PERMITTED BORROW PI I FACILITY 100.00' VC 100.00' Vc PVI STA = 13+12.10 PVI STA - 14+12.10 PVI EEEV = 26.0 w PVI FLEV = 26.5 A.D. = 0.81 M A.D. _ -1 41 DRAINAGE STRUCTURE TABLE STRUCTURE RIM INVERI IN INVERT OUT INVERT OUT WEIR EEEV. REMARKS CURB INLET DS#1 22.73± - 20..7 -- DS 2 22.44± 20.5 20.5 - - CURB INLET DS 3 _ 22.44± 20. 3 (0s#2/#-9) 20.20 20.3 20.20 - - CURB INLET DS 4 21.30± 21.0 YARD INLET BYPASS DS#5 22 44± 20.5 20.5 - _ - CURB INLET DS 6 22.73± - 20 7 i CURB INLET DS 7 25.63± 23,8 - - - CURB INLET DS 8 25.63± 23.6 - 23.6 CURB INLET DS 9 25.501 23.1 23.1 (BASIN) 23.1 (BYPASS) 24.00 YARD INLET BYPASS DS 10 25.50+ 22.9 22.9 - YARD INLET SOLID COVER DS 11 25.30± 22.6 22.6 - _ - YARD INLET SOLID COVER DS 12 24.301 22.3 22.3 - - YARD INLET SO_ HD COVER DD Sj 13 25.03± 23.3 23.3 (BASIN) - - CURB INLET DS 14 25.03± 23.4 23.4 (BASIN) 73.4 (UP AS-3) - CURB INLET DS 15 23.90± 23.0 23.0 - _ 24.00 YARD INLET BYPASS DS 16 24.01 7.1.5 (BASIN) 21.5 (BYPASS) 22.0 CURB INLET DS 17 23.5± 21.1 21.1 (BASIN) 21.1 (BYPASS) 22.0 YARD INLET SOLID COVER DS 18 23.00± 18.2 (BASIN) 18.2 (B)PASS) 19.00 CURB INLET _o K = 123.81 C-, CD K = 7C.67 o MF! 13 MH 14 ' N STA. 15+82.81 STA. 16+60.01 30 �, _ - _.._ CN MF# 1 2 QD STA. 13+82.81 �� 28 _. 14 � o - - LO 12 -- - 10 V, L 8 -----. 1 I RELEASE FOR PERMITS JKA 10/05/05 N❑, DESI RIPTI❑N BY DATE Revisions MANHOLE TABLE MANHOLE ID RIM INVERT IN INVERT IN INVERT OUT COMMENTS MH 1 21.78± 13.00 - 11.261 BUILT OUVER MANHOLF MH 2 22.7± 16.39 MH 15 17.33 MH 3 16.38 MH 3 23.111 17.85 - 17.84 MH 4 25.67± 18.29 - 13.28 MH 5 25.32-±- 18.62 18.61 MH 6 26.32± 19.44 - 19.43 MiH#7 26.67± 19.76 - 19,75 MN 8 26.75± - - 20.00 MH 9 26.67± - - 19,50 MH 10 26.44± 19.17 - 111.16 MH 11 26.20± 18.83 - 18-82 ft12 26.23± 18.15 - 16.14 MH 13 24.841 11.34 1 ?.33 MH 14 24.13± 17.00 1t3.99 MH 15 23.42± 16.66 - 16-65 - MH#15 MH 2 STA. 17+37.20 1 STA.18+02.10 30 28 26 - - -- - 24 22 I 8 65LF 8`PV - 16 I� - - 12 " PVC WATER MAIN 00 N � - `t O OQ --Y A N t 0 Ln N C9 CO N C9 Cal N N �? N N C11 N i� N N CV CN CV N N N N N N N CY N 1 13+00 14+00 15+00 16+00 17+00 18+00 STA. 18+12.10 (iL ARBOR GREEN WAY) 80 o ao ao 40 STA. 3+74.56 (CE ARBOR GREEN WAY - OLn Q (Z) O E, Q � w 0 _ 00 L ) f� .�ZQ0 w 7 cN (y ET-1 6 � x �� � w� o z o0 Ln ° o� U o N ® a- 001 O w �00 W0 QE4 Q �o Imo__ + w� I Q w�waz 0 o� E--4 � � Z� E a 050'75 . w, A F [\J I A R C, I r-) W `)TORMWAIFR RETENTION POND LLLVATI ON= 1 6.0'—\ FOREDAY [LE'v,'ATIjN= UO' Tl-_[ 1v1WATER DETENTION POND CROSS. -SECTION C81 C81'1-1) I TO SCALE I L-1 I J I1lF PERMANENT POOL ELEVATION — 17,0' POND B0 I" (� TT'M ELEVAPO.N= 11 0' TYPHA LATIFOLIA (COMMON CATTAIL (u T)_ O.C. EACH 'NAY it SAFETY LFrG7F 10 SLO.UENCL., ) [ OP R A T 1. SECURE Pf<.ij,'[,_'l 2 CONDUF_1 111-1 COPJS 1 R U C I I i tl l L I H F. ,4 3 INSTALL AU CCJ1''TPOL L I TF, I,'(-'E. c- F L N Gh � 4. 1 1 T ALL i L 1j, `, INSTALL I `1FI`vtVAT[F RFIL Nhi-1 Pf-rlq'- 10 ACI A (EDIMIFNI I-)ASh 6. HU GRAL)l & `)iABUZL ROAD k ''P`JACZ A R F A 7, 1N'_JIALL L 1iMP,,-,,0VLMFHTQJ 8. SEED AND PJ'LkOH 41-L MTURRFI) 'fl PrrVANLNT VECLFTAII,0N 9. PFSFFD Ac fdE +.;F S ^�.RY TO V, ) I SL ALL [R&_F`J AND EDIMEIJT�L',_`� BE CHILC'Kt I )R ',rJABU i Y f1A1lJ) EVERY R� I l"� �'il i - PRF)DUCI I'Al I "I 'Al I FVI'L,',] " AND CN NO CA'IIAN �`N(l L'VLRI,,,LLK. ANY NEEDED RIEPAIRS WILL HL VALL IC Vl"INTAIL, ALL DEVISES IN H1 CLFER)ATNT[NDLD. 2. ALL ARFH`_, AILL UL `_,ELDLD, AND RF'�ELDLD AC N[Cf AND V1,110HI'D 1`0_. FT) I 1 J 1-, 10, S PE U F11 C A N !LIE VLC, L T A I H I 'I A N 1 0 R 1.—) r r% TO L`J'TAB VJD MAINTAIN VI 0 JDEI`1_)F VLGLIAIIVF COVI R. 3, A IN Y `_') E IL) I M 11 TRACKED GtITO TIIE_ ADJAC[NI PUI�LIC RIV�VLD ;-)N A ! U Y BASIS. ROAD '��'N I 1 0 � , . "iN 4. SLDULtJ I LA, 1 BF RFVOVID F"1,1 `F1 111Jr) SLI FENCING) & CHECK I)AVS WHEN THE c�TLDIMFIIT A(_'('_UMJLAT,'1__, TO A N-PTH OF CAf FOCIT, 5 THE C10IR'U141IR F`LIENTION PCI'111 _flALL BE CLEANED CIF ANY AC( _'�,VULATFIJ `)EDUUJr UPON 1�:1— r`_'MP1FP0N Gi CON S-T 71t LE.VAIION-17 C' SPEUAL SHIM6 NOTE: THE CONTRA,]01) SHALL PROVIDL A (_-,ROUNDC0VLR SUFFICIEN I `ON CH LXPO' [D SLOPES 4MM THE '-:I 1ORTER TO RES-MN-MN EROS! -) I - OF 15 WORKING DAYS OR .-2)0 CALENDAR DAYS) I'0LL(.,&NG U �� r J ANY PHA7 OF GRADING- A PLFMANr�,Ji All'i FTIMI -) I GROUNDCOV[It FOR ALL DI'-)TURBFD AREI, S W!IHIN THE SHORTER OF WORKW, )AY() OR 90 -Al FNDAR DAYS I (_)LMMIPI FTION VV'�No OF (,f -IN(_-Ij,,I_j�%TION OR Df_VFL0PVFNT- _N 0 TE - L L F 11L IL V A T L R) L N E E P F 1) 10 C 01�� IP [_ L I- F 1[ R'_`JE(-'T T`GT GLNERATED FROM ON SITE 'R, A A C ILI V, -IFQ `HALL. BE OD 1AINED � ROM �Ty A PROPERI-Y PERM 1T TFD BORROW FT1 F/-,\CiL 1RA'_)H SCREEN- #4 RFBAR @_r 6" O.C.) rrA.('H WAY NFIL0h) 10 FRAME AND ATTACHFID 10 EACH OVERFLOW WEIR OPENING R I ELEVATION OVERI I ()'N WEIR - 184 INVERT 2 (_)F1r_10E/ OUTLET FLFIE — 17,',-)' I INVE R-1 _1�NL_L ;_ PIP[ — 16.0' TOP [-')F F(-)1_jTING — 1_').0' �.j IXA 0 F 2 NCTUT/SJORMbI,\TM L0P M L. N T SI J K, A 5 .. 7 N [J, FIN Rev', oils I 1_61 N I 1[ T FILNC: L.POILF _4 717 TC1 01 R. 11 H" v 1 P, 41T.1TIJI-T Cl CHECK DAM f' S- E WE R F C -_T-. 1 1111ET I H F 1 0 C" K , CATCH PA�jlN 7-j VALVE & K VF -BOX O P-f-d'JANINT 2" BL0VV0rF( B C L L �' 1, F I I.' I - TAIL A, H FL f' I �' FOR 71 (I'l C_A L PA V[ 'M,. I [ I F 11011 2. A IF DETAIL Hff fi C11 0 F 1UvV PAV[I`v11L E.! ir J' PCIJ. S. `_11 F)L TAIL J, ')HLL I C1 0 I OR �_X)LWALK 4. RFVUETATF ALL DISTURBED AKA','J !% Aff"Mmi(I 'NJH THE PROJECT VEGETA11I()N FTAh, 'SEE DETAIL L, SIfi E I C-10 L '7� .j. J� F Id i ! DETAIL H, cl I I F T, 11 1 -1 F', L! 1 A L , , � I . . -, - ., .-1 -1 - . . ... . . .. - PLAN AST IRON HD AND FRAME MARKED "STORM DRAIN" 6" THICK CAP 1 1J, 3 4 12 " G C. F A C H W A Y 3" WIDE x 1/4" THICK Mlir I AL STRAPS 24 0 0_ ANCH01,!FP) 'fl CONCRLfE 12" MIN. 8" kmND BFAM (TYPICAL OF 4' CLEAR (TYP)-j 5' CLEAR 6" DIA GALV PIPE WELDED TO 1/11" STEEL PLATE ATTACH TO WAIL WITH (4) 112" DIA. [XPANAON BOLTS HAPDW� Ak[ NID STAINI.F` !.EE_L_ STPAp 4 4 14 4 I F------ 8" CU-CONCRETE FILE A[L CELL #5 DOWEL 5( 16" O.C. PROVIDE 9" BEND 7'x 7' \—J3 CO 12 O.C'. EACH WAY 2OU TL F _T_ Q TR U C TU F,'J' U L NW 10 HALF 'J L & 0 FF", 0 L F r,') P R I A T i 0 I'vIETAL FJ'L & 30" FF'_ x 182 111IK COk"RETE ANCHOPAIGE FOP PIPE JAN 13 2006 py" CD U I 1l. j X j X H-) 0 LL w key O z 0 z 0 114 F4 F-4 O E4 to 0 O >0 40 0 (, 5 A 1 0 -- - I 16.1 INV 15' Kll IT II q _-�C C PI UG FX'END +r NV. �-�/ 4 AB')VE MULCH LAYER (TYP LE ti / II ,� -CLE N )I T & PLI_IG-EX iEN{) I cJn 4" A V_ LCH LAYER (TYP OF 3) ii \ HmRLTFNTIfrN BASIN.i } 1 S1.7TTOM=li1_Q' c� II [. ) II L i - OVL4Zf LOW-21 0' z li L� pit V 1 1,8 INV _--�_P[R[ORATED PI PIPE r 1 u tl + 8.. 1 G Jill 6" E FO SATED P I (1 -- _-____- ___=� 1 /. 5 NVCD 1 11 rr I+ A I[ V 17. 7 I N `J �c' CD cyo II 17_8 INV 18,, I$ vI 68, 00 --- Er !y, II 1 li ii - - C PERfORATED Pf PIPE (1YP) it it x'u 1 /.J INV u - - I I�u i n ENI ARCED VIEW - BIORCTENTION BASIN #3 rc ll C4 C9 SCAB F: 1" 20' (1.�. IIdV� 2 7.(_) �r 16. 5 INV, A ENLARGED Vi[ `,N BIOR� T[ NTION BASIN 1 ,-Cl LANOUT & PLUG -EXTEND 4" ABOVE MIDI CH LAYER (TYP OF 6) ------- - - - - - - - - - - - - - - - - - - - - - - - - - - --- C_7C?C'C�C�C"K_X ��[�C�X7C:-� z�c �•=��C�?C C'�C_Y�C.X>C�CX�CX �C= �C�C 7C=7C �C7" �C���C�C �C�C�� �`X�x �C��C�C�C�." x-�c x X �CX .�C7C?OC���C�%C��C r .�C=x.=: __ _.� _� :X-���. I 77 INV-- �- � ---_ I NfGRE. iEN-11(tl HASIN #2- 18.4 1 Nv _ C-4 BOT Tt IV - 21. ()' II 0 T2 OL PFRFORA,FF1 PE PIPF (TYP) OVERT I.OW22 0' 18J INV II I - 21 � INV. � 12~J. 12.39 I C"4 6" PERFORATED PE PIPE (TYP) - -1 I =U t t� I PARCH.. R 8. 1 V 6, 1V,7 �� D S#1 } J)1( �- - - �- -- J 'C T ' PF IRA . I TION CO F I ; 21. .5'R I INV, B ENLARGED VFW - EiIGRH'TENTION BASIN #2 C4 C9 `:HALE. 1"=20' U/i 1 UNG(TYI) ti '�FPiLSF F P A I N FOR D I W N SI0NS THMPTARY T )!�I I FVFL x S' MUCH LAYER ? 1 r 18" IHICK P€ IPWFU VY /SAND LAYER -CFI `17 IFICATON BELOW E CRAE FII TFRF,*mr �1 V UNDERDRAIN TRENCH-`,EE DE iAIE EXISTING SOIL/SUBCRADE SFFCiFIi ATION S: PRFPARFD `QI1. SAND SPFI'iFICATION! iHF PRFPARID SO! / ,ANC} IAYER SHALL CONSIST OF SOIL MkIURE CONSISiING O� 85-88% CLEAN _ONSTRIICTICiTd SAND 8-12% SILT OR CLAY AND 3 5% ORCANI�' MATTER. THE SOILS SHALL BE MIXED TI IOROUGHLY TO PRO`v'IDF A UNIFORM CONSISTENCY, SOIL PFI. NI iROGE_N, AND PHOSPHOROUS LEVELS `;HALL BF ADJUSTED BY TI IE LANDSCAPE CONTRACTOR FOR 11-IF PLANTS SF[ FCTFD. SOIL ADDITIVES '-flA[[- BE ADDED TO ADJLI T SOIL VALUFS TO RCCOMMC_ND(:) VAIXS. AI[ SQI[ MIXING;, TESTING AND SUPP[FMFNTATI(!N SH/I H.. BE SUPERVISED BY A LICENSE[) NORTH CARGIINA LANDSCAPE CONTRACTOR MkJL CH ,` AR'F S! RLDDED [TARD'+1v0; �D, ACED 6 MONTHS MINIMUM PFRFORATFD-PIPE CON11CH A 2000 PLF'FORMW PIPL, NET 1.98 SQ. INCHES OPENING AREA PFR LINEAR FOOT. ,ONFORMING TO ASTM F9/19 AND INFLOW GIOVETRY OF AASh 10 M252. PV'-PIPE A' -'TM D 1 785, SCH Dll[_E 40 `1iONF NC,D()T 'VF #67 OR APPROVFD FC)[IAI. FII TFR FAFFIt, III IER FAERiC: TREVTRA SPULIBOUND #1150 NONWOVEN (16 O. //Sy) �1(TO `-ECTION - BIORETENTION AREA (IMILAR LACE F A'-- � C I .NOT TO SCALE. - - - - - - �, NOTE: THE CONTRACTOR SHALL NOT PLACE OR USE ANY HEAVY EARTH MOVING EQUIPMENT IN THE BIORETENTION AREA TO AVOID COMPACTION OF THE UNDERLYING SOILS. - -- -- _ _ J25.94 10 ------ . 1 - - CFLANUU i & PLUG-LX I EN'9 �' ?119 INv �4" ABOVE MULCH LTYP Of AYER + j 11 I� PVC. TO P[_ iRAN WITH COUPL[NG(TYP) BI/�ORETENTION BASIN �! B0TTOM - 2J.0' r li 1 / 6„ i,Vt 20.8 INV 21 7 I17 1 20Ei INV o� c) A I1 1 20.7 1NV - 6" PER PE PIPE (TYP) 21.7 INV t _ - _ ----------- [_IV -- -� �,i / ' � ��-WA (61 /w, 31 B/B, PUJ -, c) ---I11E II-) Pi � _--=1- w�.l o' rj4 E JI ARGF��_-VTeV�- BI(iRI TE F3ASiN #4 �- �--� : - -� - - _ - _ _ - -- - rA 1 k ('AI -F: 1 "= 20' 1 #9 D'V 10 i�5#1 �`- L, �MULCH '[AYFR 18 THICK PREM111) SoliI AE,JD L+- FR SFE TION FT, OW HI IFR TAPRJC GRAVEL BED % 1 lL ' "-ES011./S,JFi!,RADL 6" PER F, PIPE- 51 E PLANS I ()I, INVi R IN`TAI':. PFFFC,PAIII)N IN LIP Pxi ITaON �J cTCTN� ,DOP[ EI'I N':H RGTTi�lY TO 'LOIN" IE)E WITH FIE, SLOPE SEQUENCE OF CO ST\CI]ON FOR, BI(=)RE T ENTION AREA: 1, THE BIURETFNTION AR[ --A SHA[-E BF EXCAVATED TO PROVIDE A 1 FOOT STC)F,A-E DEPTH TBF BIORETEN T ION AREA SHALL BE UTILIZED AS A SEDIMENT TRAP D� RIfJt t:ONSTf UC III i[.J. INSTALL it-1 STORPvI DRAIN P'PING SYSTEM TO ROUTE ALL RUNOFF TO THE DIORETENTIr-1'`; ��I1k 2. k ] E R INSTAI-EATIOi''J 0 ASI�HA1-_1 PAf KING AREA, rdf.. BIORETEN 10[''J AREA `; II riLL BE EXCAVAl [ D TO THE FINAL 50B(JRADE ELE VAT N, . HE OP �" O� TI It SUBCRADE QHALL BE SCARIFIED VVI TI I A RO-I f"dRY TI[-1 \, 4. 1111 UNI-LRIJRAIN SYSTEM ')Hi 1. l BE INSTAL_[ f- D, IHL SJIL/SAND MIXTURE SHALE BE INSIALL[0. 6, Al 1. P!.ANTS SHALE BE INSTALLED. , 11HE IVJ�__CH LAYER ;HALE BE I kjjffl, LECEND ~Il i FNCI E 1" WATER SERVICE C C9 C11� CUTLET PF'OTECTION F FIRE HYDRANT D �C9 C10 C9 Cl ® CHLCK D4+ G o- SEWER SERVICE -E C9 C10 ,;C9�C11 INUT PRO ECTION/ Il,l` THRU ,T FLOCK F CATCH PA`IIN 09�(,10 C9 Lc11 VA[VF & IALVE BOX A S MANHOLE -- - /_. \c-`1 C11 O CI C11 PERMANENT 2" BLOWOFF B �_ c�T c11 NQTE 1. SEE DETAIL A, SHFFT CIO FOR TYPICAL PAVFVFNT SF( 10N. 2. SEE DETAIL F', SHEET C10 F(JR NEW PAVEMENT SECTION. 3. `ALL DL J AIL J, `IIIL 1 C1 D 1 01,' `jDLWALK CUN', I RUE; i ION. .1 RFV� (SETA TE ALL DISTURB[.-D AREAS IN ACCORDANCE WITH THE P` ,)JFCT VFGLTATION PLAN, SFF DETAIL L, `-,i 1TET ('110. 5. SEE DETAIL H, SHEET C11 FOR TYPICAL TRENCH SECTION. SPECIAL SEEDING) HOTS THE CONTRACTOR SHALL PROVIDE A GR0IJNDC0\, R, 3-UFr1Elk T 10 RFSWIN FROSS ON ON EXPOSED SLOPES WITI{I[,J 1HF H+:=iRTFR OF 15 WORKING DAYS OR 30 CALENDAR DAYS FOI LOWING COMPLETION OF Al-JY PHASE OF GRADING: AND A PERMANLN 1 CROUNDCOVER FOR ALL DISTURF3ED AREAS WTI-IIN THE SH(=)RTLR OE 15 WORKING DAYS OR 90 CALENDAR DAYS FOL.Lo WING COMPLETION OF CONSTRUCTION OR DEVF[_OPMFN T NOTE. ,ALL FILL MATERIAL NEEDED TO €1P'v1P1__E�_E THE PROJECT NOT GENFRATEO [ ROM CIN SITE CRADI('JG ACTI`VMES S)HAEE BE DLL > AINED FR M TV A P[ U'll� LY P\��, TTM BORROW PH FA(7I, I I JAN 1, 3 20J6 DWQ PSKJ # 4 zn D 2f. 2 � U) €- w � N � W c A w y r-- �J t ul a.T z �i 0 05075 R/W JU W DUI LURE OC ',_�U I ICI\' UL I!-iIL L, 1711.7 JI ILL I DC10ANEW PAVEMENT SECTION NOT TO SCALE 30" 1" 6„ 2" RADIUS 111,=_IIIi�1lllllllll�-IIIII p PAVEMENT 0 =I I 1 s l �— '—I I - P CONCRFT 7 1 /2». CURB & GUTTERW. ABC STONE �a NOTES: 1, CONTRACTION JOINTS SHALT_._ BE PLACED 10 -0" O.C. TO A MINIMUM DEPTH OF 1 -1 /2". 2. CONTRACTION JOINTS SHALL BE FILLED COMPLETELY WITH A JOINT FILLER SUITABLE FOR THE APPLICATION. 3. EXPANSION JOINTS SHALL_ BE PLACED 80' O.C. AND ADJACENT TO ALL FIXED OBJECTS (WALLS, WALKS, ETC.) 4. PROVIDE AT ELEVATIONS SHOWN. SLOPE CURB & CUTTER EVENLY BETWEEN SPOT ELEVATIONS. g CURB AND GUTTER C10 NOT TO SCALE 9" cF n �,A AcpuAI T QIIDCAiT COURSE T � 16„ SFLECI TILL PUBLIC ROAD C�I NEW PAVEMENT SECTION C10 NOT TO SCALE 0000 06 LAYER OF COARSE AGGREGATE OVER 12" LAYER OF STONE BASF 0 0 0 0 0 COARSE 0 0 0 °° 0 0 0 50' 0°0°0 0 0 o0 0-0 00 10 °°0 0°0°0°0 10 EDGE OF EXISTING ROADWAY PAVEMENT f) GRAVEL CONTROL EN TRANCE 10 NOT TO SCALE R/W SELF ANCHORING METAL POST @ ()' O.C. MAX 12 GUAGE 6 X 6 WIRE MESH 3' FiLTER FABRIC 8 FLOW \\ -. 3' E SILT FENCE C10 NOT TO SCALE O O 00 °000�'o 00 00000 0000 O O o 0 0000 0 0000 OUTLET PI% o000 ° ° 000 A 00 O 0 00 00 A 7d IR A o 0° FLOWS 0 0 RI 0 D RAP o 00 0 goo o O o 00 �00o0O 0 00 00 °0(60000 PLAN RC� C SECTION A ---A A B C D E MAX. RIP RAI' SIZE 15„ 5' 8' 8' 12„ 9„ 18" 5' 8' 8' 12" 9" - 24" 7 .5' 12' 12' 18" 14" FjFC OUTLET PROTECTION 0 NOT TC SCALE 12 THICK LAYER OF #57 STONE ON UPSTREAM END OF CHECK DAM 7�%� O000o ooaooaaog�oo o (�00000 //�%/� / O c0 8 0 NOTES: 4' 4' 1. CONSTRUCT CHECK DAM OF RIP RAP STONI_ PLACED IN ACCORDANCE 00 WITH DETAIL, O O 00000000 000 000 00 000 �000 O 2. SEDIMENT BEHIND THE CHECK DAM 000 0 0000000 00o SHALL BE REMOVED ONCE THE LEVEL 000000000000 0000000 IS WITHIN 6" OF THE CENTERLINE 0�00000o°oOOo°o0o000°0o CREST OF THE DAM. 0069 00000000000000 O 3. SHOULD SCOUR DEVELOP AT THE 00000000 DOWNSTREAM END, IT SHALL BE REPAIRED IMMEDIATELY. FLOW PRECTION 4. PROVIDI= 12" MIN. FINE GRAVEL ON UPSTRI-AM END OF CHECK DAM. G CHECK DAM CH NOT TO SCALE 6" THICK NCDOT --\ #57 STONE AROUND PERIMETER RIM ELEVATION Q e ^" TYR d a INVERT OUT 1 RELEASE FMR PERMITS IO/05/05 -------------- 2" X 2" X 3' WOOD POST JKA �—- NCDOT #57 STONE EROSION CONTROL FABRIC ON 12 GUAGE 6x6 WIRE MESH r 2" X 2" X 3' WOOD POST 18" `-BURY FABRIC CATCH BASIN NOTE; PROVIDE SEDIMENT TRAP AT ALL CATCH BASINS & DROP INLETS, H SEDIMENT TRAP CIO NOT TO SCALE CURB INLET FRAME/ COVER ROAD 24" MINIMUM 10" 6 8" CONCRETE �- GROUT ENTRANCE 4 STORM DRAIN PIPE SIZ-AS INDICATED KEY 6" COMPACTED STONE #5 ,4 12" Q.C. E.W. NOTE; PROVIDE SEDIMENT TRAP AT ALL CATCH BASINS. Ca1 CATCH BASIN l TO SCALE 4' 2' 2.' ' ASPHALT SIDEWALK MEDIAN CUUTTER PAVEMENT SLOPE TOWARD C/G 1 4":1' 2" 4" 6x6 WWI_ 10/10 11 SIDEWALK C10 NOT I0 —SCALE NEW 1 1 /2" ASPHALT — O __ O f.. -0 O 1' f N❑, DESCRIPTI❑N - I BY i DATE Revisions VEGETATIVE SEEDING AFTER COMPLETION OF GRADING ACTIVITIES AND THE CONSTRUCTION OF SWALES, ALL EXPOSED AREAS SHALL BE SEEDED TO THE FOLLOWING SPECIFICATIONS: SEED BED LIME 1-1/2 TON PER ACRE FLRTL17ER 1/2-TON PER ACRE SEED RYE GRAIN 50 LBS PER ACRE TALL FESCUE 100 LBS PER ACRE MAY THROUGH AUGUST: CENTIPEDE 5 LBS PER ACRE PROCEDURE STRAW MULCH SHALL BE APPLIED AT A RATE WHICH WILL INSURE APPROXIMATELY 75% COVERAGE OF THE SI EDED AREA, THE STRAW AND SOWN SEED WILL BE LIGHTLY DISCED INTO THE BED TO GIVE IT FURTHER RESISTENCE TO BLOWING AND WASHING. THE CONTRACTOR SHALL GUARANTEE A FULL STAND OF GRASS OVER THE ENTIRE DISTURBED AREA. IF NECESSARY THE CONTRACTOR WILL WET DOWN THE AREAS TO ASSIST IN SEED GERMINATION OR AID IN GROWTH IN TIMES OF EXCESSIVELY DRY WEATHER. A STAND OF GRASS WILL BE CONSIDERED ACCEPTABLE WHEN THE ENTIRE STAND OF GRASS IS AT LEAST FOUR INCHES HIGH AND HAS ACHIEVED AT LEAST 95% COVERAGE OF DISTURBED AREAS. RESEEDING WILL BE REQUIRED AS NECESSARY BY THE CONTRACTOR TO OBTAIN THE SPECIFIED STAND OF GRASS, SPECIAL SEEDING NOTE. THE CONTRACTOR SHALL PROVIDE A GROUNDCOVFR SIJIHCENT TO RESTRAIN EROSION ON EXPOSED SLOPES WITHIN THE SHORTER OF 15 WORKING DAYS OR 30 CALENDER DAYS FOLLOWING COMPLETION OF ANY PHASE OF GRADING: AND PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS WITHTNG THE SHORTER OF 15 WORKING DAYS OF 90 CALFNDER DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 8" SOLID CMU WIER BYPASS P111 F11M—\ UPSTREAM SYSTEM SIZE AS INDICATED L VEGETATION PLAN C10 NOT TO SCALE SEED AND MULCH TOP OF BANK TO TOP OF BANK FOR ENTIRE LENGTH OF SWALE 3 OR 5 3 OR 5 M VEGETATED SWALE C1q NOT TO SCALE OUTLET PIPE TO BASIN-SIZF AS INDICATED FRAME & GRATE OVER INLET CHAMBER ONLY INLET PIPE -SIZE AS INDICATED It 1 _ - I FILET CHAMBF� I BYPASS N CHAMBER 6' PLAN #5 4 6" OC EACH WAY PIPE INLET FLUSH — WITH INSIDE WALL RIM ELEVATION EXISTING ASPHALT TOP Or WEIR INVERT TO BYPASS INVERT TO BASIN EXISTING 6" STONE BASE NEW 6" STONE BASE COMPACTED SU13GRADE CONNECTION TO EXISTING ASPHALT NOT TO SCALE 8" MIN BYPASS PIPE -SIZE AS INDICATED FRAME & GRATE 8" THICK CONCRETE TOP 8" CMU-GROUT FILL ALL CELLS PIPE TYPE & SIZE AS INDICATED #5 DOWEL 0 16" OC EACH SIDE L I'd 14 SECTION A -A STQRMWATER BYPASS STRUCTURE SEE DRAINAGE STRUCTURE SUMMARY TABLE NOT TO SCALE FOR STRUCTURE ELEVATION DATA 0 o� Ln �COr-) N r4-) �0� z C" Tn �14wz� �w x Q � a � E LL� 00 zo 0 E (0 I L w Ln r , cf) �x� ° o `n > mN � U o w �z o U� » E-� E W Q W O O o E-- O O_ O W � W � W UD Qrl Q O � r Q O c 0 i I i 1 05075.DWG I. GRAVITY SEWER k AI rIllhl, CONCRETE COLLAR DUTY CAST IRON TYPE VALVE BOX OVER, MARKED WA1LR NMON BRICK 1 /3 POINTS E 31C FOOT THRUST BLOCK A VALVE AND VALVE BOX jv NOT TO SCALE CAST IRON - METER BOX J. CONCRETE COLLAR' ' VALUE BOX------- WATER MAIN oWATER MAIN PLUG f WITH 2" TAP 1 L BRASS NIPPLE 2" BALL VALVE SCH 80 PVC COUPLINGS 2" PVC SCH. 40 PIPING B PERMANENT 2" BLOWQFF ASSEMBLY C 1 1 N O T TO SCALE ----------- _ ___ _. __.-- BACK OF CURB OR SIDEWALK ` CAST IRON 1" SERVICE TUBIf-,1GMETER BOX +4a / KEEP LINE SLACK �PEASTIC STIFFNER —CORPORATION STOP J TAPPING SADDLE WATER MAIN C V, WATER SERVICE C11� NET TF1 SCALE 2" BRASS PLUG 2" FEMALE GRAVL COUPLING SEWER BRICK SUPPORTS T❑ 8METER-BY OTHERS PIN. DEPTH 0 I SERVICE TO RESIDENCE BRICK SUPPORTS (4 EACH) FACE PUMPER CONNECTION 10 STREET 4 ® 2„ 6" VALVE AND VALVE BOX 3' -6" FURY 2 Cl THRUST BLOCK 2 CUBIC FOOT' THRUST BLOCK ITEE - HYDRANT DRAIN HOLES WATER MAIN DO NOT BI OCK 3/4" TIE RODS BACK TO MAIN 2 OF #57 GRAVEL D TIRE HYDRANT ASSEMBLY C11 NOT TO SCALE PAVEMENT RUBBER CAP 4„ T7IJ OUT 0 PLAN 2' BACK OF CURB OR SIDEWALK ' CLEAN OUT TO BE SET 24" ABOVE FINISH GRADE CURB AND GUTTER 3" 8„ i 2'- 0" 8„ 4' MINIMUM --CAST-M-PLACE STEPS 0 4" MIN. / RIM LLEVATIOW_ih --MANHOLE FRAME AND COVER COMBINATION WYE RUBBER CAP AND 1/8 BEND a L�j L 7,i ° ° Q \/ MIN. /2° BEND STUB OUT 1' PAST WYE /\ • • • • STUB 40 PVC DWV SEWER SERVICE AT 1% MIN. GRADE (ASTM D-2665, D-1785) SECTION PVC SANITARY SEWER SERVICE NOT TO SCALE C IIN) UNDISTURBE, PLAN EARTH D/2 (MIN) a n (MIN) 'llll! IIE — ELEVATION I UNDISTURBED FLIP BENDS EARTH PLAN FQR TEES THRUST BLOCK DIMENSION D IN FEET NOM, PIPE DIA. DEAD END 90' BEND 45' BEND 22 1/2° BEND 11 1/4' BEND 2" 1.0 1.2 1.0 0.7 0.7 4" 1.3 16 1.2 0.9 0.8 6" 2.1 2.3 1 7 1. 8" 2.5 1 2.8 21 1.5 1.0 1 18 1.4 F TYPICAL THRUST BLOCK SIZES C11 NOT TO SCALE 6"x6" 6 6 WWF IN CENTER THIRD F WALL AND IN TONGUE AND GROOVE, TAPERED LIFTING HOLE RUBBER BOOT INV. IN -SHAPED MH INVERT OF CONCRETE -GROUT 3" MIN. THICKNE i /\\%/\\�-. . COMPACTED SUBGRADESEE NOTE 3 xAA��\���\/�A�///////�VA/V// 5" 5" 6" MIN. GRAVEL #4 @ 1 Z" 0. C. BASE EACH WAY rG PRECAST MANHOLE C11 NOT TO SCALE SEE SPECS FOR BURY REQUIREMENTS FBURIED WARNING AND IDIENTIFICATION TAPE FINAL BACKFILL 9" LIFTS MAX BURIED DETECTION WIRE FOR NO)N-METALLIC PIPE - SEE SPECS FOR BURY RCQUIi,EVIENTS POLYETHYLENE ENCASEMENT INITIAL BACKFILL ON METALLIC PIPE ONLY 6" LIFTS MAX 0 0 0 o°o°o 000c —UTILITY MAIN Ooo°o°o°000 o°o°,� SIZE AS INDICATED Orl O O O O O O �— GRANULAR PIPE 6" MIN 12" O.D. OF 12" BEDDING 1 j 2" PIPE O.D. PIPE PIPE TRENCH WITH BEDDING '\,"A T L R I A L (_H PIPE TRENCH SECTION C11 NOT TO SCALE END SE EACH END ENCASEMENT PIPE SIZE UTILITY MAIN DIAMETER ENCASEMENT Pls'E DIAMETER 8" 12„ 10" 18„ rf-\lJVluE JUF F L/f\ I VY/ SPACLR`� AT 5 O.C. MINIMUM. BURIED DETECTION WIRE FOR NON-METALLIC PIPF- SEE SPEC FOR BURY REQUIREMENTS 1 KELLASL I IUk PERMITS JKA 10/05/05 N0 DESCRPTI❑N BY DATE Rev] Sions SEE SPECS FOR BURY REQUIREMENTS FBURIED WARNING AND IDENTIFICATION TAPE FINAL BACKFILL V\� 9" LIFTS MAX INITIAL BACKFILL 6" LIFTS MAX -UTILITY MAIN SIZE AS INDICATED 12" O.D. OE 12" PIPE � I PIPE TRENCH WITHOUT BEDDING TREATED WOOD SUPPORT LENGTH = PIPE O.D.+12" (TYPICAL OF 3) CARRIER PIPE ENCASEMENT PIPE STEEL STRAPPING PIPE BELL TO BE CLEAR OF CASING SECTION A A TILITY MAIN -SIZE S INDICATED PIPE INVERT AS INDICATED ON PLAN _NT PIPE -SEE R SIZE 0 � oLn c:c� — a Ldx w M Q cc a � � w co > �LoP) �D I w�� x N oCID >m� CV ®� .z � o IL � O w � � O O W I � � W W � � GI UTILITY MAIN ENCASI MENT NOT TO SCALE 05075.DWG