Loading...
HomeMy WebLinkAboutSW7051106_CURRENT PERMIT_20060112STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW Z6�71M6 DOC TYPE � CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE DOC DATE 4��d2/a YYYYMMDD o�0F wArF9pG Michael F. Easier, Governor William G. Ross Jr., Secretary co 7 North Carolina Department of Environment and Natural Resources Alan W. Klimek. P-E. Director Division of µ-azer Qualm January 12, 2006 Mr. Maurice Slaughter MDS Investments, LLC 3403 High Street Portsmouth, VA 23707 Subject: Permit No. SW7051106 Kitty Hawk Harley Davidson High Density Stormwater Project Currituck County Dear Mr. Slaughter: The Washington Regional Office received a completed Stormwater Application for the subject project on December 14, 2005. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7051106 dated January 12, 2006 to MDS Investments, LLC for the construction and operation of a wet infiltration basin to serve Kitty Hawk Harley Davidson located at 8739 Caratoke Hwy in Powells Point, NC. This permit shall be effective from the date of issuance until January 12, 2016 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the sormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact me or Roger Thorpe at (252) 946-6481. Sipcerely, Al Hodge, Regional Supervisor Surface Water Protection Section Washington Regional Office cc: Coastal Engineering and Surveying Muck County Inspections Wshington Regional Office Central Files tionhCarolina 'IA-allera!!J North Carolina Division of Water Quality Washington Regional Office Phone (252 ) 946-6481 FAX (252) 946-9215 Custoater Service Inlemet: h2e.enr.state.nc.us 943 Washington Square Mall, Washington, NC 27889 I-S,--523-6748 State Stormwater Management Systems Permit No. SV 7051106 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION 1S HERESY GRANTED TO MDS Investments, LLC Kitty Hawk Harley Davidson Currituck County FOR THE construction, operation and maintenance of stormwater management systems in compliance with the provisions of 15A NCAC 21-1.1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit for a wet infiltration basin to serve a proposed Kitty Hawk Harley Davidson located at 8739 Caratoke Hwy in Powells Point, NC. This permit shall be effective from the date of issuance until January 12, 2016 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 2 of this permit, the Project Data Sheet. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. - Project Name: Permit Number: Location: Applicant: Mailing Address: Application Date: Receiving Stream: Classification of Water Body: Total Site Area: Total Impervious Area: Infiltration Basin Storage Depth: Required Storage Volume: Provided Storage Volume: Overflow Elevation: DIVISION OF WATER QUALITY PROJECT DATA Kitty Hawk Harley Davidson SW70511 D5 Currituck County MDS Investments, LLC 3403 High Street Portsmouth, VA 23707 11I3l2005 (original) UT to Currituck Sound Sc 3.26 ac 81,837 sf 2.9 ft 6,479 cf 16,426 cf 7.9 ft 4. No homeowner/lot owner/developer shall be allowed to fill in, alter, or pipe any vegetative practices (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 5. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size b. Project name change C. Transfer of ownership d. Redesign or addition to the approved amount of built -upon area e. Further subdivision of the project area. In addition, the Director may determine that other revisions to the project should require a modification to the permit 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit_ Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. II. SCHEDULE OF COMPLIANCE The permittee will comply with the following schedule for construction and maintenance of the stormwater management system. a. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surfaces except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The facilities must be properly maintained and operated at all times. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency including, but not limited to: a. Semiannual scheduled inspections (every 6 months) b. Sediment removal C. Mowing and revegetation of side slopes d. Immediate repair of eroded areas e. Maintenance of side slopes in accordance with approved plans and specifications f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction and prior to operation of this permitted facility, a certffication must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Mail the Certification to the Washington Regional Office, 943 Washington Square Mail, Washington, !North Carolina, 27889, attention Division of Water Quality. 7. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of five years from the date of the completion of construction. III. GENERAL_ CONDITIONS This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality,. in accordance with North Carolina General Statute 143-215.E(a) to 143-215.6(c). 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 6. An application for permit renewal must be submitted at least 180 days prior the expiration of this permit along with the appropriate processing fee. Permit issued this the 12 th day of ,January, 2006. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Alan W_ Klimek, P. E. Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW7051106 Kitty Hawy Harley Davidson Stormwater Permit No. SW7051106 Designer's Certification I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodicallylweeklylfull time) the construction of the project, for (Project) (Project Owner) hereby state that to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration Number Date Coasi alENGINEERING & ` SURVEYING, INC. Kitty Hawy Harley Davidson 1, Stormwater Permit No. SV 7051106 JUL 1 0 2006 designer's Certification Dye fQ_Wry RO �7T(TO rriiLZ as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe periodicailyMeeklylfuli time) the construction of the project, )A� "C-,j% 06-6-e-►( (Project) for i,�r i C 10.0 c�G�_ir _ (Project Owner) hereby state that to the best of my abilities, due construction such that the construction was oq! the approved plans and specifleatigns. Signature Registration Number Date 7, and diligence was used in the observation of the project J to be built within substantial compliance and intent of �.,r^ OH CA)Y 0. pFsSmay= SEAL�� r 1S07f F. P.O. Box I129 • 934 W. Kitty Hawk Rd. • Kitty Hawk, NC 27949 • (252) 26I-4151 9 Fax. (252) 26I-1333 Coas"al July 6, 2006 ENGINEERING & SURVEYING, INC. Mr. Al Hodge Division of Water Quality Washington Regional Office 943 Washington Square Mall Washington, NC 27889 Re: Permit No. SW7051 106 Dear Mr. Hodge: P, Cry# yED 411f 10 Z006 DWQ-WAS Please find the enclosed completed certification letter for the Kitty Hawk Harley Davidson project. Should you have any questions, please contact us at the phone number listed below. Sincerely, Coastal Engineering & Surveying, Inc. fj�4 "46� Mitchell Halloran Project Manager P.O. Box 1129 • 934 W. Kitty Hawk Rd. 9 Kitty Hawk, NC 27949 , (252) 261-4151 9 Fax: (252) 26I-1333 ROY COOPER MIC CAE L S, REGAN Serrrrmy . S. DANIEL SMITH harrin, fYromp, hIf?Citl I tIA DOE HN,,% EnvironnrcntoI Quality June 5, 2019 M DS Investments, LLC Attention: Maurice Slaughter, Manager 2211 Frederick Blvd. Portsmouth, VA 23704 Subject: Stormwater Permit Renewal Stormwater Management Permit SW7051106 Kitty Hawk Harley Davidson Currituck County Dear Mr. Slaughter: A Division of Energy, Mineral, and Land Resources file review has determined that Stormwater Permit SW7051106 for a stormwater treatment system consisting of a wet infiltration basin serving Kitty Hawk Harley Davidson located at 8739 Carotoke Hwy, Harbinger, NC expires on January 12, 2020. This is a reminder that permit renewal applications are due 180 days prior to expiration. We do not have a record of receiving a renewal application. Please submit a completed permit renewal application along with a $505.00 fee for permit renewal. Permit application forms for renewal can be found on our website at: E IElc 5 j ,l cr._snw,�tk,c. Izr(�t;r��m posh-c(�E�strtEctir�n. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. Failure to maintain a permit subjects the owner to assessment of civil penalties. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you. If you would like, I can e-mail you a copy of the application forms. You can request a copy by e-mailing me at �9g_er.thorpe@ncdenr,�ov_. Sincerely, Roger K Thorpe p Environmental Engineer ®E forth Cprolina i7cpartmen1 of rnvironmental Quallty I Division of rrncrgy, Mineral and Land Rcsourres _ Wiishiuglon Rergk)mil Olflcr I cr43 Washington Square Mali I Washington, Nor;h C;irollna 27889 257446-6481 ° u � u =a a W `=3 OFFICE USE ONLY Date Received Fee Paid Permit Number NOV - 3 2005 DWQ_ ARCS State of North Carolina -f;W.AcK 00-5 Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicants name (specify the name of the corporation, individual, etc. who owns the project): M ' S ✓Ps 7' AkAh • 41- C 2. Print Owner/Signing Official's name and tithe (person legally responsible for facility and compliance): AW 01C t --5 Aa'`.rl l Ar -- IC le-3 iS krY, I _ f 7 Pr 3. Mailing Address for person listed in item 2 above: 3yv3 Y,�+ .-�f- City: A- f lz' o, / _ State: 1/1 Zip: _ J 3 70 7 Telephone Number: 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): �!caT !Y Lwk hby ?p yr r�SOn 5. Location of Project (street address): 813 J Caro �— ��1�, 14--,y City: AweId I�S , N*11 -A � � County: c ur., �vc� 6. Directions to project (from nearest major intersection): '2Y cja ter rA 7. Latitude:T :36 ° oC / v.3 " .- Longitude: y $ ' V 9 / r of project 8. Contact person who can answer questions about the project: Name: -fie i.n C- , /U C" r 1 S _ Telephone Number: JS 6 / II. PERMIT INFORMATION: 1. Specify whether project is (check one): New Renewal Modification Form SWU-101 Version 3.99 Page l of 4 m 2. If this application is being submitt d as the result of a renewal or modification to an existing permit, i t the existing permit number Al and its issue date (if known) /V 3. Specify the type of project (check one): Low Density High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): CAMA Major Sedimentation/Erosion Control 404/401 Permit TNPDES Stormwater Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwa(er will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project . prs,) L�tj;ir� SfrvclW►re. 2. Stormwater runoff from this project drains to the _ L S 9 `) C 4".. t River basin. 3. Total Project Area: 3.) 6, acres 4. Project Built Upon Area: S6 . 'I % 5. How many drainage areas does the project have?� 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name C_ Uri, Receiving Stream Class SG Drainage Area 3 �, Existing Impervious* Area 0 Proposed Impervious*Area 86 -k 4f. % Impervious` Area (total) C.C� r—, Impervious* Surface Area Drainage Area 1 Drainage Area 2 On -site Buildings 3 / _3o S• tc On -site Streets .& On -site Parking b On -site Sidewalks a, 9 g y :51 Other on -site Off -site .� Total: 3� Total: * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas. sidewalks, gravel areas, etc. Form SWU-101 Version 3.99 Page 2 of 4 7. Now was the off -site impervious area listed above derived?, IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the wa ter surface of swimming pools. 3. Swales shall not be filled in. piped, or altered except as necessary to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Form SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initials • Original and one copy of the Stormwater Management Permit Application Form One copy of the applicable Supplement Form(s) for each BMP • Permit application processing fee of $420 (payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Two copies of plans and specifications, including: Development/Project name Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VIL AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): y-rd-%/i C,^)cCC- -aS At, 5 r✓�y ��� Mailing Address: Z /-� !k � T City: H( !-TWA State: AJ7 Zip: 6/ 4 Phone: J OC; Fax: VIIL APPLICANT'S CERTIFICATION I, (print or type name ofperson listed in General Information, item 2) _/' L Arl+- S � .,, 64. a -correct that the information included on this permit application form is, to the best o my y knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H J 00 , Signature:Y u Form SWU-101 Version 3.99 Page 4 of 4 Date: 3� d l- Permit No. (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM ECEi'ED, WET DETENTION BASIN SUPPLEMENT NOV - 3 2005 This form may be photocopied for Use as an original D Y 114-WA RO DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes an application form, a wet detention basin supplement for each basin, design calculations, and plans and specifications showing all basin and outlet structure details. I. PROJECT INFORMATION Project Name: e,'H/ 11-1-wK /D1, v/Acrn Contact Person: Zn G 1\16rrf C'ou_sZa/ .;) Phone Number: (?SQ_ _LG I - 14 l�`l For projects with multiple basins, specify which basin this worksheet applies to:1 elevations Basin Bottom Elevation U ft. (floor of the basin) Permanent Pool Elevation . s ft. (elevation of the orifice) Temporary Pool Elevation 9 . U ft. (elevation of the discharge structure overflow) areas Permanent Pool Surface Area '3�60 sq. ft. (water surface area at the orifice elevation) Drainage Area M0 0S`d ac. (on -site and off -site drainage to the basin) Impervious Area _go 83 ac. (on -site and off -site drainage to the basin) volumes Permanent Pool Volume J77 q83 •S cu. ft. (combined volume of main basin and forebay) Temporary Pool Volume /330 1, G' cu. ft. (volume detained above the permanent pool) Forebay Volume S�/5`b . s cu. ft. (approximately 20% of total volume) Other parameters 0 SA/DA1 .2. 710 (surface area to drainage area ratio from DWQ table) Diameter of Orifice /, o in. (2 to S day temporary pool draw -down required Design Rainfall 3 : S in. Design TSS Removal Z 9 0 % (minimum 85% required) Farm SWU-102 Rev 3.99 Page I of 4 Footnotes: 1 When using the Division SAIDA tables, the correct SAIDA ratio for permanent pool si2ing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the correct value for non- standard table entries. Z In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and W/o TSS removal. I1. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. Applicants Initials a. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). b. The forebay volume is approximately equal to 20% of the basin volume. c. The temporary pool controls runoff from the design storm event. d. The temporary pool draws down in 2 to 5 days. e. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) f. The basin length to width ratio is greater than 3:1. g. The basin side slopes above the permanent pool are no steeper than 3:1. h. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). i. Vegetative cover above the permanent pool elevation is specified. j. A trash rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right- of-way. A//A 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. --fvm. A mechanism is specified which will drain the basin for maintenance or an emergency. Ir III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) 0 does 0 does not incorporate a vegetated filter at the outlet. This system (check one) 0 does A does not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 Maintenance activities shall be performed as follows: After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. S When the permanent pool depth reads feet in the main pond, the sediment shall be removed. When the permanent pool depth reads JkW feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blankv) Permanent Pool Elevation 7.5' Sediment R oval El. 0- 6as ♦ 75 0 ___ __ Sediment Removal Elevation 0,6�5 75% BottomEle anon Igo % ----------------------------------------------- ------- Bottom Elevation �' 25% FOREBAY MAIN POND 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. 6. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Dorm SWU-102 Rev 3.99 Page 3 of 4 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: — Title: /%-Q Y Address: 3'163 ff�%ti S�, �rr`Sruou �{i �3?a-�t Signature: '73 / A .)LaS—. ,, ayA—I— -/— Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, Lkn 13 . l c�t .� , a Notary Public fort-�}a State of t�7o � �'� I County of DO- -' , do hereby certify that hon_t l ��C e— personally appeared before me this 31S-� day of (D C,+O17 e.r , ate, and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, o OTAR i 4• p y B L. 1 T r Or Cj Vol • . �• ,•..• �r V,`/z'r n U" � NI�`````1 �►�� SEAL My commission expires lYl a-y 1 � , a O O 7 Form SWU-102 Rev 3.99 Page 4 of