HomeMy WebLinkAboutSW7051013_CURRENT PERMIT_20060503STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
SW 7�5ll3
DOC TYPE
� CURRENT PERMIT
❑ APPROVED PLANS
❑ HISTORICAL FILE
DOC DATE
IlJ3
YYYYMMDD
\NATFRQ Michael F. Fasley, Governor
William G. Ross Jr., Secretary
7� North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P,E, Director
Division of Water Quality
May 3, 2006
Mr. Dale Petty
Surf or Sound Realty
PO Box 100
Avon, NC 27915
Subject: Stormwater Permit No. SW7051013
Surf or Sound Realty
High Density Project
Dare County
Dear Mr. Petty:
Th W shington Ri I Office received a complete Stormwater Management Permit Application for
5u�ri or 50'� t ° . Staff review of the plans and specifications has determined that the
project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000.
We are forwarding Permit No. SW7051013 dated May 3, 2006, for the construction of the subject project.
This permit shall be effective from the date of issuance until May 3, 2016, and shall be subject to the
conditions and limitations as specified therein. Please pay special attention to the Operation and
Maintenance requirements in this permit. Failure to establish an adequate system for operation and
maintenance of the stormwater management system will result in future compliance problems.
If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to
request an adjudicatory hearing upon written request within thirty (30) days following receipt of this
permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North
Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447,
Raleigh, NC 27611-7447. Unless such demands are made this permit shall be final and binding.
If you have any questions, or need additional information concerning this matter, please contact Amy
Franklin or myself at (252) 946-6481.
Sincerely,
A tr w
Al Hodge, Reg_22ions pe visor
Surface Water Protection Section
Washington Regional Office
AH/alf
cc: Clay Massey, PE, Massey Design & Associates, PC
Dare County Building Inspections
!/Washington Regional Office
Central Files
N0�thCarolir
" �� attrrll!!y
North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252) 946-9215 Customer Service
Intemet ncwatergualitv.ora 943 Washington Square Mall, Washington, NC 27889 I-877-623-6748
An Equal OpportunitylAfirmabve Action Employer— 50% Recycled110% Post Consumer Paper
State Stormwater Management Systems
Permit No. SW7051013
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES
DIVISION OF WATER QUALITY
STATE STORMWATER MANAGEMENT PERMIT
HIGH DENSITY DEVELOPMENT
In accordance with the provisions of Article 21 of Chapter 143, General Statutes of
North Carolina as amended, and other applicable Laws, Rules, and Regulations
PERMISSION IS HEREBY GRANTED TO
Dale Petty
Surf or Sound Realty Office
Dare County
FORTH E
construction, operation and maintenance of an infiltration basins in compliance with the
provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and
the approved stormwater management plans and specifications and other supporting
data as attached and on file with and approved by the Division of Water Quality and
considered a part of this permit.
This permit shall be effective from the date of issuance until May 3, 2016, and shall be
subject to the following specified conditions and limitations:
I, DESIGN STANDARDS
1. This permit is effective only with respect to the nature and volume of stormwater
described in the application and other supporting data.
2. This stormwater system has been approved for the management of stormwater
runoff as described in Section 1.6 on page 3 of this permit. The stormwater
control has been designed to handle the runoff from 37,006 square feet of
impervious area.
3. The tract will be limited to the amount of built -upon area indicated on the
drainage area table of this permit, and per approved plans.
4. All stormwater collection and treatment systems must be located in either
dedicated common areas or recorded easements. The final plats for the project
will be recorded showing all such required easements, in accordance with the
approved plans.
5. The runoff from all built -upon area within the permitted drainage area of this
project must be directed into the permitted stormwater control system.
6. The following design criteria have been provided in the infiltration basin and must
Page 2of7
be maintained at design condition: -
State Stormwater Management Systems
Permit No. SW7051013
a. Site Area, acres:
b. Drainage Area to' Basins, acres:
C. Total Impervious Surfaces, ftz:
d. Design Storm, inches:
e. Basins Depth, feet:.
f. Bottom Elevation, FMSL:
g. Bottom Surface Area, ft�:
h. Bypass Overflow Elevation, FMSL:
i. Permitted Storage Volume, ft3:
j. Type of Soil:
k. Expected Infiltration Rate, inlhr:
1. Seasonal High Water Table, FMSL:
M. Time to Draw Down, hours
n. Receiving Stream/River Basin:
o. Stream Index Number:
. 1.47.
1.47
37,006
1.5
1.2
4.00
3,147
5.2
5,123
Corolla Sand
8
2.0
2.2
Pamlico Sound/ Pasquotank
30-22
P. Classification of Water Body: "SA:HQW"
II. SCHEDULE OF COMPLIANCE
1. The stormwater management system shall be constructed in its entirety,
vegetated and operational for its intended use prior to the construction of any
built -upon surface. .
2. During construction, erosion shall be kept to a minimum and any eroded areas of
the system will be repaired immediately.
3. The permittee shall at all times provide -the operation and maintenance
necessary to assure the permitted stormwater system functions at optimum
efficiency. The approved Operation and Maintenance Plan must be followed in
its entirety and maintenance must occur at .the scheduled intervals including, but
not limited to:
a. Semiannual scheduled inspections (every 6 months).
b. Sediment removal.
C. Mowing and revegetation of slopes and the vegetated filter.
d. Immediate repair of eroded areas.
e. Maintenance of all slopes in accordance with approved plans and
specifications.
f. Debris removal and unclogging of bypass structure, infiltration media, flow
spreader, catch basins, piping and vegetated filter.
g. A clear access path to the bypass structure must be available at all times.
4. Records of maintenance activities must be kept and made available upon
request to authorized personnel of DWQ. The records will indicate the date,
Page 3of7
State Stormwater Management Systems
Permit No. SW7051013
activity, name of person performing the work and what actions were taken:
5. The facilities shall be constructed as shown on the approved plans. This permit
shall become voidable unless the facilities are constructed in accordance with
the, conditions of this permit, the approved plans and specifications, and oth&
supporting data.
6. Upon completion of construction, prior to issuance of a Certificate of Occupancy,
and prior to operation of this permitted facility, a certification must be received
from an appropriate designer for the system installed certifying that the permitted
facility has been installed in accordance with this permit, the approved plans and
specifications, and other supporting documentation. Any deviations from the
approved plans and specifications must be noted on the Certification. A
modification may be required for those deviations.
7. If the stormwater system was used as an Erosion Control device, it must be
restored to design condition prior to operation as a stormwater treatment device,
and prior to occupancy of the facility.
8. Access to the stormwater facilities shall be maintained via appropriate
easements at all times.
9. The permittee shall submit.to the Director and shall have received approval for
revised plans, specifications, and calculations prior to construction, for any
modification to the approved plans, including, but not limited to, those listed
below:
a. Any revision to any item shown on the approved plans, including the
stormwater management measures, built -upon area, details, etc.
b. Project name change.
C. Transfer of ownership.
d. Redesign or addition to the approved amount of built -upon area or to the
drainage area.
e. Further subdivision, acquisition, lease or sale of all or part of the project
area. The project area is defined as all property owned by the permittee,
for which Sedimentation and Erosion Control Plan approval or a CAMA
Major permit was sought.
f. Filling in, altering, or piping of any vegetative conveyance shown on the
approved plan.
10. The permittee shall submit final site layout abd grading plans for any permitted
future areas shown on the approved plans, prior to construction.
11. A copy of the approved plans and specifications shall be maintained on file by
the Permittee for a minimum of ten years from the date of the completion of
construction.
12. The Director may notify the permittee when the permitted site does not meet one
or more of the minimum requirements of the permit. Within the time frame
specified in the notice, the permittee shall submit a written time schedule to the
Director for modifying the site to meet minimum requirements. The permittee
shall provide copies of revised plans and certification in writing to the Director
that the changes have been made.
Page 4 of 7
State Stormwater Management Systems
Permit No. SW7051013
III. GENERAL CONDITIONS
This permit is not transferable except after notice to and approval by the Director.
In the event of a change of ownership, or a name change, the permittee must
submit a formal permit transfer request to the Division of Water Quality,
accompanied by a completed name/ownership change form, documentation
from the parties involved, and other supporting materials as may be appropriate.
The approval of this request will be considered on its merits and may or may not
be approved. The permittee is responsible for compliance with all permit
conditions until such time as the Division'approves the transfer request.
2. Failure to abide by the conditions and limitations contained in this permit may
subject the Permittee to enforcement action, by the Division of Water Quality, in
accordance with North Carolina General Statute 143-215.6A to 143-215.6C.
3. The issuance of this permit does not preclude the.Permittee from complying with
any and all statutes, rules, regulations,.or ordinances, which may be imposed by
other government agencies (local, state, and federal) having -jurisdiction.
4. In the event that the facilities fail to perform satisfactorily, including the creation
of nuisance conditions, the Permittee shall take immediate corrective action, .
including those as may be required by this Division, such as the construction of
additional or replacement stormwater management systems.
5. The perrimittee grants DENR Staff permission -to enter the property d6ring normal
business hours for the purpose of inspecting all components of the permitted
stormwater management facility.
6. The permit may be modified, revoked and reissued or terminated for cause. The
fling of a request for a permit modification, revocation and reissuance or
termination does not stay any permit condition.
7. Unless specified elsewhere, permanent seeding requirements for the stormwater
control must follow the guidelines established in the North Carolina Erosion and
Sediment Control Planning and Design Manual.
8. Approved plans and specifications for this project are incorporated by reference
and are enforceable parts of the permit.
9. The permittee shall notify the- Division of any name, ownership or mailing
address changes within 30 days.
Permit issued this the V day of May 2006.
NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION
or Alan W. Klimek, P.E., Director
Division of Water Quality
By Authority of the Environmental Management Commission
Page 5 of 7
State Stormwater Management Systems
Permit No. SW7051013
Surf or Sound Realty Office
Stormwater Permit No. SW7051013
Designer's Certification
I, . , as a duly registered
in the State of North Carolina, -having been authorized to observe (periodically/ weekly/
full time) the construction of the project,
(Project)
for (Project Owner) hereby state that, to the
best of my abilities, due care and diligence was used in the observation of the project
construction such that the construction was observed to be built within substantial
compliance and intent of the approved plans and specifications.
The checklist of items on page 2 of this form is included in the Certification.
Noted deviations from approved plans and specification:
Signature
Registration Number
Date
SEAL
Page 6 of 7
State Stormwater Management Systems `
Permit No. SW7051013
Certification Requirements:
1. The drainage area to the system contains approximately the permitted
acreage.
2. The drainage area to the system contains no more than the permitted
amount of built -upon area.
3. All the built -upon area associated with the project is graded such that the
runoff drains to the system.
4. All roof drains are located such that the runoff is directed into the system.
5. The bypass structure weir elevation is per the approved plan.
6. The bypass structure is located per the approved plans.
7. A Trash Rack is provided on the bypass structure.
8. All slopes are grassed with permanent vegetation.
9. Vegetated slopes are no steeper than 3:1
.10. The inlets are located per the approved plans and do not cause short-
circuiting of the system.
11. The permitted amounts of surface area and/or volume have been
provided.
12. All required design depths are provided.
13. All required parts of the system are provided.
14. The required system dimensions are provided per the approved plans.
cc: NCDENR-DWQ Washington Regional Office
Dare County Building Inspections
Page 7 of 7
ROY COOPER
Governor
MICHAEL S. REGAN
Srrretary
S. DANIEL SMITH
interim D;rrrtor
Mr. Dale Petty
Surf or Sound Realty
P.O. Box 1667
Manteo, NC 27954
NORTH CAROLINA
Environmental Quality
November 18, 2019
Vvo,#�, d
Subject. Stormwater Permit No. SW7051013 Renewal
Surf or Sound Realty - Salvo, NC
High Density Stormwater Project
Dare County
Dear Mr, Petty:
A Division of Energy, Mineral, and Land Resources file review has determined that
Stormwater Permit SW7051013 for a stormwater treatment system consisting of
infiltration basins to serve a proposed Surf or Sound Realty Office to be located on NC
Hwy 12 in Salvo, NC expires on May 3, 2020. This is a reminder that permit renewal
applications are due 180 days prior to expiration. We do not have a record of receiving
a renewal application.
Please submit a completed permit renewal application along with a $505.00 fee for
permit renewal. Permit application forms for renewal can be found on our website at:
https: //den.nc.2ov/about./divisions/etiergy-minera l-land-resQui-ce!/cnei gy-mineral-land-
rulea/stormwater-program/post-construction. North Carolina General Statutes and the
Coastal Stormwater rules require that this property be covered under a stormwater
permit if developed. If this project has not been built and you do not intend to build it,
please advise and we can rescind the permit.
If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to
discuss this by phone or meet with you. If you would like, I can e-mail you a copy of the
application forms. You can request a copy by e-mailing me at roger.thorpe(@_ncdenr.cov.
Sincerely,
Roger K. Thorpe
Environmental Engineer
EQ� North Carolina Department of Gnvlronmental Qualisy I Division of Energy, Mineral and Land Resrnu-res
_ Washington Regional 0f5C,' 1 943 Washington Square Mail I Washington, North Carolina 17889
T
�\ � 252.946.6481
OFFICE USE DNLY
Hate Received Fee Paid Permit Number
o s -
��Q-�NA� State of North Carolina
partment of Environment and Natural. Resources
Division of Water Quality
sw4cK
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This form may be photocopied for use as an original
I. GENERAL INFORMATION
1. Applicants name (specify the name of the corporation, individual, etc. who owns the project):
r--jUR,F OR S0t31'Jiy REAL
2. Print Owner/Signing Official's name and title (person Legally responsible for facility and compliance):
bALe. P�i�y , l�rzCsiDE,,jT
3. Mailing Address for person listed in item 2 above:
PQgo)e IOC)
City:- Mo _.... � � _ State: Zip: Z79 1
Telephone Number. (Z$ 7- ) `7 1 y y 9
4. Project Name (subdivision, facility. or establishment name - should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
rauo- aid SOUND aAI.T- j O t:tc
566
5. Location of Project (street address):
Lo 1 :5p90 Pkux 5ubblrtsk>o 1�n, 0&4112.98559B _ (' #J°,..aMAW Ytr
City: SALVO _ County: DA1LE
8. Directions to project (from nearest major Intersection):
Nc- knr- 1-2- b4w►4 Rem K-rL 14A?—
7. Latitude: 36.54 Longitude: 7.S• 9 -i of project
8. Contact person who can answer questions about the project:
Name: C I P.-Mn t. M A 55F4 _ � Telephone Number: (7 S7 } 4 O x.
II, PERMIT INFORMATION:
1, Specify whether project is (check one): New Renewal Modification
Form SWU-101 Version 3.99 Pagel of 4
i
2. If this application is being submitted the result of a renewal or modification to an existing permit, list the
existing permit number N r A and its issue date (if known)_
3. Specify the type of project (check one):
Low Density High Density Redevelop V General Permit Other
4. Additional Project Requirements (check applicable blanks):
_CAMA Major Sedimentation/Erosion Control _404/401 Permit /NPDES Stormwater
Information on required state permits can be obtained by contacting the Customer Service Center at
1-877-623-6748. '
III. PROJECT INFORMATION
1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative
(one to two pages) describing stormwater management for the project.
7LrAJ4V-&6,, VDA51NS om, st- F— . WI
lcveiinq pipes NE+wprt.k
2. Stormwater runoff from this project drains to the PAMLICa SOON_ __ Itixc�
3. Total Project Area: i , 3 (.-1 acres
4. Project Built Upon Area: (Ca %
5. How many drainage areas does the project have?---
6. Complete the following information for each drainage area. If there are more than two drainage areas in the
project, attach an additional sheet with the information for each area provided in the same format as below.
Basin Information
Drainage Area 1
Drainage Area 2
Receiving Stream Name
N IA
Receiving Stream Class
N I A
Drainage Area
16 sp
Existing Impervious* Area
36
Proposed Impervious*Area
3Z. 30
% Impervious* Area (total)
Saj-
Impervious* Surface Area
Drainage Area I
Drainage Area 2
On -site Buildings
On -site Streets
On -site Parking
S4 M-7 SP 1
On -site Sidewalks
Other on -site
.�
Off -site
/
Total: 3 0 V 5 it
Total:
' Impervious area Is defined as the built upon area including, but not limited to, buildings, roads, parking areas,
sidewalks, gravel areas, etc.
Form SWU-101 Version 3.99 Page 2 of 4
7. How was the off -site impervious area listed above derived?
N. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
The following italicized deed restrictions and protective covenants are required to be recorded for all
subdivisions, outparcels and future development prior to the sale of any lot. if lot sizes vary significantly, a table
listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment.
The following Covenants are intended to ensure ongoing compliance with state stormwater management permit number
as issued by the Division of Water Quality. These covenants may not be
changed or deleted without the consent of the State.
2. No more than square feet of any lot shall be covered by structures or impervious materials.
,impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood
decking or the water surface of swimming pools.
3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings.
4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to
construction.
5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control
system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity
and performance of the system as permitted.
By your signature below, you certify that the recorded deed restrictions and protective covenants for this project
shall include all the applicable items required above, that the covenants will be binding on all parties and persons
claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted
without concurrence from the State, and that they will be recorded prior to the sale of any lot.
V. SUPPLEMENT FORMS
The applicable state stormwater management permit supplement form(s) listed below must be submitted for each
BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status
and availability of these forms.
Form SWU-102
Wet Detention Basin Supplement
Form SWU-103
Infiltration Basin Supplement
Form SWU-104
Low Density Supplement
Form SWU-105
Curb Outlet System Supplement
Form SWU-106
Off -Site System Supplement
Form SWU-107
Underground Infiltration Trench Supplement
Form SWU-108
Neuse River Basin Supplement
Form SWU-109
Innovative Best Management Practice Supplement
Form SWU-101 Version 3.99 Page 3 of 4
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. The complete application package should be
submitted to the appropriate DWQ Regional Office.
Please indicate that you have provided the following required information by initialing in the space provided
next to each item.
Initials
• Original and one copy of the Stormwater Management Permit Application Form GKM
• One copy of the applicable Supplement Form(s) for each BMP cern
• Permit application processing fee of $420 (payable to NCDENR) ZEt^
• Detailed narrative description of stormwater treatment/management 66y'
• Two copies of plans and specifications, including: GEM
- Development/Project name
- Engineer and firm
-Legend
- North arrow
Scale
- Revision number & date
- Mean high water line
- Dimensioned property/project boundary
Location map with named streets or NCSR numbers
- Original contours, proposed contours, spot elevations, finished floor elevations
- Details of roads, drainage features, collection systems, and stormwater control measures
Wetlands delineated, or a note on plans that none exist
Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations
- Drainage areas delineated
Vegetated buffers (where required)
VII. AGENT AUTHORIZATION
If you wish to designate authority to another individual or firm so that they may provide information on your
behalf, please complete this section.
Designated agent (individual or firm): MASSC-1 1ESIWN AnC &56 PiiF�5 � PL l CIAY MAS660
Mailing Address: I S& I BV A'pr'09"1> RDy' bL7 � <ri s n q _
City: %IZG1Nlaa TeALH ",A State: VA Zip: Z3Li 55"
Phone: ( IS'] ) A&4-- NOR— Fax: 7
Gl Al (! h1As5C7 P`. CO M,
VIII. APPLICANT'S CERTIFICATION
1, (print or type name of person listed in General Information, item 2) DAB 12 %_r"
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in nformance with the approved plans, that the required deed restrictions
and protective covenants vXlll be red rd d, and that the proposed project complies with the requirements of 15A
NCAC 214.1000. �y/� % //
Date:AaZz
Form SWU-101 Version 3.99 Page 4 of 4