Loading...
HomeMy WebLinkAboutSW7050938_CURRENT PERMIT_20051214STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE � CURRENT PERMIT ❑ APPROVED PLANS ❑ HISTORICAL FILE DOC DATE AZ5-19* YYYYMMDD ��F W A rE9Q Michael F. Easley, Governor ' `kko G William G. Ross Jr„ Secretary rNorth Carolina Department of Environment and Natural Resources p Y Alan W. Klimek, P.E. Director Division of Water Quality DIVISION OF WATER QUALITY December 14, 2005 Mr. Elwood H. Perry M.P.B. Enterprises 1 Plantation Drive Hertford, NC 27944 Subject: Permit No. SW7050938 Albemarle Plantation Village Square High Density Stormwater Project Perquimans County Dear Mr. Perry: The Washington Regional Office received a completed Stormwater Application for the subject project on December 7, 2005. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7050938 dated December 14, 2005 to H.P.B. Enterprises for a wet detention pond to serve the proposed Albemarle Plantation Village Square located at the intersection of Albemarle Boulevard and SR 1429 in Perquimans County. This permit shall be effective from the date of issuance until December 14, 2015 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. The issuance of this permit does not resolve any previous violations of the stormwater rules for construction without a permit. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Roger Thorpe or me at (252) 946-6481. Si erely ^. ,L,, jam. Al Hodge, Regiona Supervisor Surface Water Protection Section Washington Regional Office cc: Bissell Professional Group Perquimans County Inspections Washington Regional Office Central Files Cana No. )h.Caraliiz� North Carolina Division of Water Quality Washington Regional Office Phone (252) 946-6481 FAX (252) 946-9215 Customer Service Internet: h2o.enr.state.nc.us 943 Washington Square Mail, Washington, NC 27889 1-877-623-6748 State Stormwater Management Systems Permit No. SW7050938 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO H.P.B. Enterprises Albemarle Plantation Village Square Perquimans County FOR THE construction, operation and maintenance of stormwater management systems in compliance with the provisions of 15A NCAC 2H.1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit for a wet detention pond to serve the proposed Albemarle Plantation Village Square located at the intersection of Albemarle Boulevard and SR 1429 in Perquimans County. This permit shall be effective from the date of issuance until December 14, 2015 and shall be subject to the following specified conditions and limitations: DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. This stormwater system has been approved for the management of stormwater runoff as described on page 2 of this permit, the Project Data Sheet. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit, DIVISION OF WATER QUALITY PROJECT DATA Project Name: Albemarle Plantation Village Square Permit Number: SW7050938 Location: Perquimans County Applicant: H.P.B. Enterprises Mailing Address: 1 Plantation Drive Hertford, NC 27944 Application Date: 10/4/2005 (original) Receiving Stream: UT to Yeopim Creek Classification of Water Body: SC Total Site Area: 27.39 ac Total Impervious: 15.03 ac Wet Pond Depth: 4.0 ft Required Storage Volume: 54,098 cf Provided Storage Volume: 60,399 cf Required Surface Area: 57,264 sf Provided Surface Area: 58,816 sf Controlling Orifice: 3.0 inch @ elevation 5.0 ft 4. No homeowner/lot ownerldeveloper shall be allowed to fill in, alter, or pipe any vegetative practices (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 5. The following items will require a modification to the permit: a. Any revision to the approved plans, regardless of size b. Project name change C. Transfer of ownership d. Redesign or addition to the approved amount of built -upon area e. Further subdivision of the project area. In addition, the Director may determine that other revisions to the project should require a modification to the permit. 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. II. SCHEDULE OF COMPLIANCE The permittee will comply with the following schedule for construction and maintenance of the stormwater management system. a. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surfaces except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 2. The facilities must be properly maintained and operated at all times. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency including, but not limited to: a. Semiannual scheduled inspections (every 6 months) b. Sediment removal C. Mowing and revegetation of side slopes d. Immediate repair of eroded areas e. Maintenance of side slopes in accordance with approved plans and specifications f. Debris removal and unclogging of outlet structure, orifice device and catch basins and . piping. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Mail the Certification to the Washington Regional Office, 943 Washington Square Mall, Washington, North Carolina, 27889, attention Division of Water Quality, 7. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of five years from the date of the completion of construction. III. GENERAL CONDITIONS 1. This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6(a) to 143-215.6(c). 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. in the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 6. The Permittee, at least six (6) months prior to the expiration of this permit, shall submit in writing a request for an extension along with appropriate application fee. Permit issued this the 14 th day of December, 2005. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION for Alan W. Klimek, P.E. Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW7060938 Albemarle Plantation Village Square Stormwater Permit No. SW7050938 Designer's Certification I, , as a duly Registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, for Project) (Project Owner) hereby state that to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration Number Date IZOY COOPER Goo vi oi» MICHAt L S. REGAN Secretary S. DANIEL. SMITH haulm Oirertn, NORI-14 C'AROi. INA. Fnv;t-onaacntat Quality May 7, 2019 Perquimans Development, LLC Attention Mr. William G. Garner, Manager P.O. Box 3435 Hertford, NC 27836 Subject: Stormwater Permit Renewal Stormwater Management Permit SW7050938 Albemarle Plantation Village Square Perquimans County Dear Mr. Garner: A Division of Energy, Mineral, and Land Resources file review has determined that Stormwater Permit SW7050938 for a stormwater treatment system consisting of a wet detention pond to serve a proposed development called Village Square to be located at the intersection of Albemarle Boulevard and Holiday Lane in Perquimans County expires on December 14, 2019. Renewal applications are due 180 days prior to expiration. The stormwater permit was originally issued to H.P.B. Enterprises. The Perquimans County Tax maps show that Perquimans Development, LLC now owns this property. If you would like to keep this stormwater permit active, please submit a completed permit renewal application along with a $505.00 fee for permit renewal and an ownership change application along with another $505.00 fee. Permit application forms for renewal and ownership change can be found on our website at: littl:�s_��cic a r c. ~c�/��lx>r�i �livi5 nV � R- _r��iller al-1 r��cl re5ou� cc4 encr r _-mineral-]arid-, rules stol'tnwater-pr gram ost-construction. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit if it is developed. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you, If you would like, I can e-mail you a copy of the application forms. You can request a copy of the application forms by e-mailing me at roger.thorpe07ncdenr.gov. If you do not wish to maintain this stormwater permit, please let me know. Sincerely, Ro er K. Thorpe Environmental Engineer D ��� North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Washington Regional Ofrice 1943 Washington Square Mail I Washington, North Carolina 27881) TN t;N MrM 252.946.6481 State of North Carolina ®UII,,AAII Q-WARUepartment of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This firm malt' be photocopied for use us an original 1. GENERAL INFORMATION . Applicants name (specify the name of the corporation, individual, etc. who owns the project): H.P.B. Enterprises OFFICE USE ONLY Date Received I'ce Paid Permit 9umber SWACK 2. Print Owner/Signing Official's name and title (person legally responsible for facility and compliance): Woody Perry 3. Mailing Address for person listed in item 2 above: 201 Ocean Hwy S. City Hertford State NC Telephone Number: 252-426-1128 Zip: 27944 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans. specifications, letters, operation and maintenance agreements, etc.): Albemarle Plantation, Village Square 5. Location of Project (street address): At the intersection of Albemarle Boulevard and Holiday Lane (NCSR 1429) City Bethel Township County: Perquimans 6. Directions to project (from nearest major intersection): Intersection of Albemarle Boulevard and Holiday Lane. (NCSR 1429). About 4/10ths of a mile south of the roadway intersection of the end of Holiday Island Rd. (NCSR 1347) and the beginning of Holiday Lane towards Holiday Island. 7. Latitude 36.100N Longitude: 8. Contact person who can answer questions about the project: Name: Mark S. Bissell P.E. II. PERMIT INFORMATION: 1. Specify whether project is (check one' X New. 76.390W of project Telephone Number: (252) 261-3266 Renewal Modification Farm SWU-101 Version 3.99 Page I of'4 2. If this application is being submitted as a result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Speci fy the type of project (check one): Low Density x High Density Redevelop General Permit Other 4. Additional Project Requirements (check applicable blanks): CAMA Major X Sedimentation/Erosion Control 404/401 Permit NPDES S Information on required state permit can be obtained by contacting the Customer Service Center at 1-877-623-6748 Ill. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project. Stormwater runoff from all impervious surfaces will be collected and directed by a convc ence system outletting to a proposed wet detention pond. 2. Stormwater runoff from this project drains to the Pasquaotank River Basin 3. Total Project Area: 27.39 acres 4. Project Built Upon Area: 54.89% 5. How many drainage areas does the project have? 1 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basiat. Information . ..� Dt ainage. Area ]; . `` ,� '. �Draina >e Area 2 b. r ,E;Drainae Area-3,! ,.; Receiving Stream Name Yeopim Creek Receiving Stream Class Sc Drainage Area 1192,995 sq.ft.127.39a Existing Impervious* Area 0 Proposed Impervious* Area 654,822 sq.ft. 1 15.03ac. Impervious* Area (total) 54.89% Impervious Surfacc, Area Draina�e,jArea,l_ � a � T Drainage Area'2 , r _ . f , Dra triage Area 3; Future On -Site Buildings 84,749 sq.ft. / 1.95 ac. On -Site Streets included in parking On -Site Parking 481,861 sq.ft. / 11.06 ac Other On -Site 88,212 sq.ft. / 2.03 ac. Off' -Site 0 % Impervious* Area (total) 54.89% *1ntpervlous area is defined cis the built upon area including, but not li»titer to, buildings, roadv, parking areas, sidewalks, gravel tweas, etc. form SWU-101 Version 3,99 Page 2 of 4 7. l-low was the off -site impervious area listed above derived'! NIA IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built -upon area for each lot must be provided as an attachment. I. The following covenants are intended to ensure ongoing compliance with state stormwater management permit number as issued by the Division of Water Quality. These covenant: may not be changed or delted without consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brick, stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessray to provide driveway crossings. 4. Built -upon area in excess of the permitted amount requires a state stormwater management permit modification prior to construction. 5. All permitted runofffrom outparcels orfitture development shall he directed into the permitted stormwater control system. These connections to the stormwater control System shall be performed in a manner that maintains the integrity and performance of the system cis permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable state stormwater management permit supplement form(s) listed below must be submitted for each BMP specified for this project. Contact the Stormwater and General Permits Unit at (919) 733-5083 for the status and availability of these forms. Form SWU-102 Wet Detention Basin Supplement Form SWU-103 Infiltration Basin Supplement Form SWU-104 Low Density Supplement Form SWU-105 Curb Outlet System Supplement Form SWU-106 Off -Site System Supplement Form SWU-107 Underground Infiltration Trench Supplement Norm SWU-108 Neuse River Basin Supplement Form SWU-109 Innovative Best Management Practice Supplement Form SWU-101 Version 3.99 Page 3 of 4 VI. SUBMITTAL, REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the appropriate DWQ Regional Office. Please indicate that you have provided the following required information by initaling in the space provided next to each item. Initi • Original and one copy of the Stormwater Management Permit Application Dorm DMK • One copy of the applicable Supplement Form(s) for each BMP FMB • Permit application processing fee of $420 (payable to NCDENR) DMK • Detailed narrative description of stormwater treatment/management DMK • Two copies of plans and specifications, including: • DMK - Development/Project Name - Engineering and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands delineated, or a note on plans that none exist - Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VI AGENT AUTHORIZATION If you wish to desginate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): Bissell Professionai Group Mailing Address: P.O. Box 1068 City Kitty I-lawk Slate: NC Phone: (252) 261-3266 VIII APPLICANT'S CERTIFICATION Zip Fax 27949 252 261-1760 I, (print or type name ofper.son listed in General Information, item 2) 1— f1A)A certify that the information included on this permit application farm is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requuirements of 15A NCAC 2H .1000. Signature: Date: Fonnn SWU-101 Version 399 Page 4 of 4 Permit No. (t0 he provided e! Y DJ 17Q) State of North Carolina Department of Environment and Natural Resources Division of Water Quality InECEI VEIL-1 STORMWATER MANAGEMENT PERMIT APPLICATION FORM WET DETENTION BASIN SUPPLEMENT OCT — 4 2005 This form rnay be photocopied for use as an original D ` `1f�jvf ,Q_W ` YAR O DWO Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name : Albemarle Plantation Village Square Contact Person: Mark. S. Bissell, Bissell Professional Group Phone Number: (252) 261-3266 For projects with multiple basins, specify which basin this workshcet appliest to: Basin #1 elevations Basin Bottom Elevation ,p .24 ft. Permanent Pool Elevation 5.0 ft. Temporary Pool Elevation 6.0 ft. (floor of the basin) (elevation of the orifice) (elevation of the discharge stucture overflox) areas Permanent Pool Surface Area 58,816 sq. ft. (water surface area at the orifice elevation) Drainage Area 27.39 ac. (on -site and off -site drainage to the basin) Impervious Area 15.03 ac. (on -site and off -site drainage to the basin) volumes Permanent Pool Volume 150,860 cu. ft. (combined vloume of main basin and forebay) Temporary Pool Volume 60,399 cu. ft. (volume detained above the permanent pool) Forebay Volume 30,845 cu. ft. (approximately 20% of total volume) other parameters SA/DA 4.6 % Diameter of Orifice 3 in. Design Rainfall 1.0 in. Design TSS Removal 85 % (surface are to drainage area ratio from DWQ table) (2 to 5 day temporary pool draw -down required) (minimum 85% required) * See attached narrative for explanation Page 1 of 4 Form SWU-102 Rcv.3.99 Footnotes: l When using the Division SA/DA tables, the correct SA/DA ratio for permanent pool sizing should be computed based upon the actual impervious % and permanent pool depth. Linear interpolation should be employed to determine the convect value for non- standard table entries. 2 In the 20 coastal counties, the requirement for a vegetative filter may be waived if the wet detention basin is designed to provide 90% TSS removal. The NCDENR BMP manual provides design tables for both 85% TSS removal and 90% TSS removal. II. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (N.C. Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H .1008. Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. If a requirement has not been met, attach justification. The permanent pool depth is between 3 and 6 feet (required minimum of 3 feet). Tht,forebay volume is approximately equal to 20% of the basin volume. The temporary pool controls runoff from the design storm event. The temporary pool draws down in 2 to 5 days. If required, a 30-foot vegetative filter is provided at the outlet (include non -erosive flow calculations) The basin length to width ratio is greater than 3:1. basin side slopes above the permanent pool are no steeper than 3:1. A submerged and vegetated perimeter shelf with a slope of 6:1 or less (show detail). Vegetative cover above the permanent pool elevation is specified. h rack or similar device is provided for both the overflow and orifice. k. A recorded drainage easement is provided for each basin including access to nearest right- JV if of -way. 1. If the basin is used for sediment and erosion control during construction, clean out of the basin is specified prior to use as a wet detention basin. M. A mechanism is specified which will drain the basin for maintenance or an emergency. III. WET DETENTION BASIN OPERATION AND MAINTENANCE AGREEMENT The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one) V"dioes 0 does not incorporate a vegetated filter at the outlet. This system (check one) woes 0 does not incorporate pretreatment other than a forebay. Form SWU-102 Rev 3.99 Page 2 of 4 _ _ Maintenance activities shall be performed as follows: 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the wet detention basin system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the orifice of any obstructions such that drawdown of the temporary pool occurs within 2 to 5 days as designed. 2. Repair eroded areas immediately, re -seed as necessary to maintain good vegetative cover, mow vegetative cover to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, swales, riprap, etc.) quarterly to maintain proper functioning. 4. Remove accumulated sediment from the wet detention basin system semi-annually or when depth is reduced to 75% of the original design depth (see diagram below). Removed sediment shall be disposed of in an appropriate manner and shall be handled in a manner that will not adversely impact water quality (i.e. stockpiling near a wet detention basin or stream, etc.). The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads O. fh51- feet in the main pond, the sediment shall be removed. When the permanent pool depth reads P.75 FMrc feet in the forebay, the sediment shall be removed. Sediment Bottom El. -K flfl ------------ on 2.0 FMv. FOREBAY BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 5.00 Sediment Removal Elevations 7C rAfl- Bottom Elevation 2.0 F,46t- MIMI DIM 75% 25% 5. Remove cattails and other indigenous wetland plants when they cover 50% of the basin surface. These plants shall be encouraged to grow along the vegetated shelf and forebay berm. b. If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain shall be minimized to the maximum extent practical. Form SWU-102 Rev 3.99 Page 3 of 4 7. All components of the wet detention basin system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures Iisted above. I agree to notify DWQ of any problems with the system or prior to am changes to the system or responsible party. Print name:-_ E 1 oY-Y)A ' Lc �! . Title: I)O(A Itr Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, 12-� Q C CO l �Cc I Q , a Notary Public for the State of NQ �h oa r f�l, County of Ci rIS , do hereby certify that El t,c-)ood. H Pe+e r personally appeared before me this Co`�` day of Njo-1�, 05 , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, C?-�_ {{�� SEAL ax-yzol C My commission expires (.0 DCP Form SWU-102 Rev 3.99 Page 4 of 4