Loading...
HomeMy WebLinkAboutSW7050308_HISTORICAL FILE_20070606STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW DOC TYPE ❑CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE DOC DATE YYYYMMDD Consulting Engineers and Land Surveyors (252) 335-1888 Office (252) 338-2913 Office (252) 339.5552 Fax June 5, 2007 Mr. Bill Moore RECIEWE Dept. of Environment and Natural Resources JUN a 6 2007 Water Quality Section 943 Washington Square Mall'�J—���� Washington, NC 27889 Subject: Stormwater Management Permit Coastal Roofing Project # 040475 Dear Mr -,Moore: Enclosed is the original of the executed Designer's Certification for Stormwater Permit No. SW7050838 for Coastal Roofing. If you need additional information or have any questions, please do not hesitate to call this office at (252) 335-1888. CC' file Bill Frasca Sincerely, KimberlyD. Hamb Y Project Manager P. 0. Box 339, Camden, NC 27921 !. m ..... __ , �. r . _ _.. .. .. ._. �(� �: �' �� ..,o _ ,f.: r1, :r .`.5 :._ ;,a:}. .1: � .f .:� ,.. .:'_ ..... 'l::�Hf .. _. -. � J.'� � ',� its.. � ..., _. .� Human & Robev. PC Consulting Engineers and Land Surveyors (252) 335-1888 Office (252) 338-2913 Office (252) 338-5552 Fax Ms. Amy Franklin Dept. of Environment and Natural Resources Water Quality Section 943 Washington Square Mall Washington, NC 27889 Subject: Stormwater Management Permit Coastal Roofing — revised plans Project # 040475 Dear Amy: October 5, 2005 RECEIVED OCT - 7 2005 DWQ-WARD Per our conversation today, I have enclosed a set of revised plans. The swale behind Building A has been routed into a pipe that drains to the forebay of the pond. Also, a note indicating that all runoff from Building B must be routed to the detention pond has been added to the plans. Thank you for your assistance with this project. If you have any questions or require additional information, please do not hesitate to call me at (252) 335-1888. cc: file Sincerely, �f4�Kimberly D. H by Project Manager A D. Box 339, Camden, NC 27921 DETENTION POND ANALYSIS FILE NAME- C:\STORMWATERXPOND\SW7050838 PROJECT#: SW7 050838 REVIEWER- Afranklin PROJECT NAME: Coastal Roofing and Siding, Lighting Protection, Inc. DATE: 17-Oct-05 Receiving Stream: North River Class: SC Drainage Basin: Pasquotank Index No. Site Area 1.92 acres Drainage Area square feet Area = 1.92 acres IMPERVIOUS AREAS Rational C Building 15400.00 square feet Streets 0.00 square feet Parking 23280.00 square feet Other 2005.00 square feet square feet square feet 06 TOTAL square feet Rational Cc= 0.10 SURFACE AREA CALCULATION % IMPERVIOUS 48.65% Des. Depth 6 TSS: 90 VOLUME CALCULATION Rational ?* Des. StormC4 inches Rv= 0.49 Bottom 2 msl Perm. Pool msl Design Pool 9.39 msl Design SA 4020 sf Req. Volume ' ::]I 00 cf Prov. Volume cf ORIFICE CALCULATION Avg. Head = Flow Q2, cfs Flow Q5, cfs No. of Orifices Diameter, inches Drawdown = 0.67 ft 0.020 cfs 0.008 cfs weir H x W days SA/DA Ratio 2,62% Req. SA 2190 sf Prov. SA € € zs'.0`1 i sf * place a "1" in the box if Rational is used. FOREBAY Perm. Pool Volume= 4615 Req. Forebay Volume= 923 Provided Volume= 831.00 Percent= SA @ Elevation= Q2 Area = Q5 Area = Orifice Area Q= n COMMENTS Surface Area , Volume and Orifice are within Design Guideline: 0.72 sq. in. 0.29 sq. in. 0.79 sq. in. 0.022 cfs x F777 in 3 Q FINANCIAL RESPONSIBILITY/OWNERSHIP FORM 8; /ZIP `657— SEDIMENTATION POLLUTION CONTROL ACT No person may initiate a land -disturbing activity on one or more acres as covered by the Act before this form and an acceptable erosion and sedimentation control plan have been completed and approved by the Land Quality Section, NC Department of Environment, and N ' e s type or print and, if question is not applicable, place N/A in the blank). l n '1 Part A. Projedt Name 2 3 Coastal Roofin Location of land -disturbing activity:. County Cur r i t uck City or TownshipPoplar Branch Toisnshipand Highway/Street Approximate date land -disturbing activity will be commenced: L.' AUG 2 3 2005 LAND QUALITY SECTION July 15, 2005 4. Purpose of development (residential, commercial, industrial, etc.): d d�WU=U l'Id 5. Total acreage disturbed or uncovered (including off -site borrow and waste areas): 2.5 AUG 2 6 2005 6. Amount of fee enclosed $ 150.00 ,fir p 7. Has an erosion and sedimentation control plan been filed? Yes X No DWQ-WARO Enclosed X 8. Person to contact should sediment control issues arise during land -disturbing activity. Name Bill Frasca Telephone 252-4.80-0515 9. Landowner(s) of Record (Use blank page to list additional owners): Li Qh t i nQ p Name(s) 2401 Collington Road Current Mailing Address Current Street Address 'dill Devil Hills, NC 27948 City State Zip City State Zip 10. Recorded in Deed Book No. Page No. Part B. Person(s) or firm(s) who are financially responsible for this land -disturbing activity (Use a blank page to list additional persons or firms): William S. Frasca Name of Person(s) or Firm(s) 2401 Collington Road Current Mailing Address Kill Devil Hills, NC 27948 City State Zip City Current Street Address 252-480-0515 Telephone Telephone propev,4,I is LkyA r Confra& for 50t1-e Ccos,1n3 CW -f_ 'Ls State Zip fo 0r1r. j owner^O� pendfn) p-e.rm14 ckpprotxt_.1. (a) If the Financially Responsible Party is not a resident of North Carolina give name and street address of a North Carolina Agent. N7nnc Mailing Address City State Street Address Zip City Telephone Telephone State Zip (b) - If the Financially Responsible Party is a Partnership or other person engaging in business under an assumed name, attach a copy of the certificate of assumed name. If the Financially Responsible Party is a Corporation give name and street address of the Registered Agent. Name of Registered Agent Mailing Address City State Telephone Street Address Zip City Telephone State Zip The above information is true and correct to the best of my knowledge and belief and was provided by me under oath. (This form must be signed by the financially responsible person if an individual or his attorney -in -fact or if not an individual by an officer, director, partner, or registered agent with authority to execute instruments for the financially responsible person). I agree to provide corrected information should there be any change in the information provided herein. GVi l l iam S . Frasca Owner Type or name Title or Authority Signature Date 7 ;�/_ &- n_ c- , a Notary Public of the County of -Pckscau�C, 'c State of North Carolina, hereby certify that ats C-o, appeared personally before me this day and being duly sworn acknowledged that the above form was executed by him. Witness my hand and notarial seal, this � cis " day of Jam- \ k-\ , - Seal MARIANNE J. COOPER Notary NOTARY PUBLIC PASQUOTANB COUNT( NC My commission expires (_0 H man � R be C Consulting Engineers and Land Surveyors (252) 335-1888 Office (252) 338-2913 Office (252) 338-5552 Fax Mr. Bill Moore Dept. of Environment and Natural Resources Water Quality Section 943 Washington Square Mall Washington, NC 27889 Subject: Stormwater Management Permit Coastal Roofing Project # 040475 Dear Mr. Moore: August 17, 2005 tipECEME"w". AUG 1BM5 DWQ-WARQ Enclosed For your review and approval, please find the following items: l . Two (2) copies of sheets 2-4 of the above referenced plans. 2. The original and one (1) copy of the Stormwater Exemption Application and Wet Detention Basin Supplements. 3. Two (2) copies of the project description and calculations. 4. Check in the amount of $420.00 for the required fee. If you have any questions, please do not hesitate to call this office at (252) 335-1888. cc: file Sincerely, Sean C. Robey, P.E. KimberlyD. ay Project Manager A O. Box 339, Camden, NC 27921 fPR0'JECT' DESCRIPTION,` Coastal Roofing Currituck County - North Carolina May 19, 2005 revised July 27, 2005'' Coastal Roofing is planning to construct two office warehouse buildings on a 1.92 acre site located on Hwy 158 between Foster Forbes Road (SR It 14) and Pinewood Acres Drive (SR 1413). The property is zoned GB (General Business). Construction on site will include the erection of two office warehouse buildings with related parking, septic systems, and drainage. The site will be constructed in two phases as shown on the drawings. The buildings both contain 7,700 sf. The parking and driveways will contribute 23,280 sf of impervious area and the concrete sidewalks and dumpster pad contribute another 2,005 sf. The resulting impervious area is 40,685 sf or 48.65% of the overall site. These areas are designed to sheet flow to grass lined swales with 3:1 side slopes and an underground collection system. All drainage is directed to a wet detention basin designed for 90% TSS removal. Drainage calculations performed utilizing the rational method indicate a pre -development run-off of 4.23 cfs and a post development run-off of 8.47 cfs. The peak discharge from the pond will only be 3.45 cfs. Although the on site soil type of Conetoe would support infiltration, the seasonal high water table at ±elevation 8.0 makes a wet detention basin the most appropriate form of stormwater treatment. Discharge from the detention pond is pipe to an existing ditch that drains under Hwy 158 to the wetlands of North River. The disturbed area for this site will not exceed 2.5 acres. Approximately 1.5 acres will be disturbed during the construction of Phase 1, and less than 1 acre will be disturbed during the construction of Phase 2. �0� W A TE9 `0 � r .liichaeJ F. Fxslap, Gov yv&-gQ Whm G. Ross ire Sew North Carolma Deftaaa= of Farrvi-w=em and Nmnal Resmu Alas W. Klbnp k P1. Director Df`isim of WaterQuality September 21, 2005 Mr. William S. Frasca Coastal Roofing and Siding, Lighting Protection, Inc 2401 Collington Road Kill Devil Hills, NC 27948 Subject:: Stormwater Review SW7050838 Coastal Roofing Curriuck County Dear Mr. Frasca: This office received a Coastal Stormwater permit application and plans for the subject project on August 18, 2005. A preliminary review of your project indicates that before a State Stormwater permit can be issued the following additional information is needed. Please show on plans or discuss in narrative where the roof drains will outlet from building B. Please redesign pond so that a dead area is not created and that the length -to width ratio for each entrance still meets 3:1. > Please include proposed restrictive covenants and or deed restrictions. The above requested information must be received in this office prior to October 21, 2005 or your application will be returned as incomplete. The return of this project will necessitate resubmittai of all required items inciuding the application fee. If you need additional time to submit the required information, please mail or fax your request for time extension to this office at the Letterhead address. You should also be aware that the Stormwater Rules require that the permit be issued prior to any development activity. Construction without a permit is a violation of 15A NCAC 2H.1000 and North Carolina General Statute 143-215.1 and may result in civil penalties of up to 510:000 per day. Please reference the Stormwater Project Number above on all correspondence. If you have questions, please feel free to contact me at (252) 948-3934. cc: VA/ Washington Regional Office Sean C. Robey, PE Sf�ncerely, Amy L Franklin Environmental Engineer Washington Regional Office DW NWhcamb AiotllS czarina Dismaa of Wzr Qmbay W Repoml 0ffkc Phaac (252) %6-(A$1 FAX (252) 9WW i 5 C>mk=ff Savicc met b2"ff_nk*MM 943 washinr &w= MA W&4imm NC 27M lam_62u,ix Coastal Roofing Currituck County - North Carolina May 19 ' 2005 revised July. 27' 2005' 'Coastal Roofing is planning to construct two office warehouse buildings on a 1.92 acre site located on Hwy 158 between Foster Forbes Road (SR 1114) and Pinewood Acres Drive (SR 1413). The property is zoned GB (General Business). Construction on site will include the erection of two office warehouse buildings with related parking, septic systems, and drainage. The site will be constructed in two phases as shown on the drawings. The buildings both contain 7,700 sf. The parking and driveways will contribute 23,280 sf of impervious area and the concrete sidewalks and dumpster pad contribute another 2,005 sf. The resulting impervious area is 40,685 sf or 48,65% of the overall site.- These areas are designed to sheet flow to grass lined swales with 3:1 side slopes and an underground collection system. All drainage is directed to a wet detention basin designed for 90% TSS removal. Drainage calculations performed utilizing the rational method indicate a pre -development run-off of 4.23 cfs and a post development run-off of 8.47 cfs. The peak discharge from the pond will only be 3.45 cfs. Although the on site soil type of Conetoe would support infiltration, the seasonal high water table at ±elevation 8.0 makes a wet detention basin the most appropriate form of stormwater treatment. Discharge from the detention pond is pipe to an existing ditch that drains under Hwy 158 to the wetlands of North River. The disturbed area for this site will not exceed 2.5 acres. Approximately 1.5 acres will be disturbed during the construction of Phase 1, and less than 1 acre will be disturbed during the construction of Phase 2. DESC_RIPTIONr� Coastal Roofing Currituck County - North Carolina May 19,.2005 revised July 27, 2005 'Coastal Roofing is planning to construct two office warehouse buildings on a 1.92 acre site located on Hwy 158 between Foster Forbes Road (SR 1114) and Pinewood Acres Drive (SR 1413). The property is zoned GB (General Business). Construction on site will include the erection of two office warehouse buildings with related parking, septic systems, and drainage. The site will be constructed in two phases as shown on the drawings. The buildings both contain 7,700 sf. The parking and driveways will contribute 23,280 sf of impervious area and the concrete sidewalks and dumpster pad contribute another 2,005 sf. The resulting impervious area is 40,685 sf or 48.65% of the overall site. These areas are designed to sheet flow to grass lined swales with 3:1 side slopes and an underground collection system. All drainage is directed to a wet detention basin designed for 90% TSS removal. Drainage calculations performed utilizing the rational method indicate a pre -development run-off of 4.23 cfs and a post development run-off of 8.47 cfs. The peak discharge from the pond will only be 3.45 cfs. Although the on site soil type of Conetoe would support infiltration, the seasonal high water table at ±elevation 8.0 makes a wet detention basin the most appropriate form of stormwater treatment. Discharge from the detention pond is pipe to an existing ditch that drains under Hwy 158 to the wetlands of North River. The disturbed area for this site will not exceed 2.5 acres. Approximately 1.5 acres will be disturbed during the construction of Phase 1, and less than 1 acre will be disturbed during the construction of Phase 2. CIE PDj EAllr-. 2005 LAND QUALITY SECT U 1 WASHINGTON REGIONAL OFFICE PERMANENT POOL DETENTION PONDS Hyman & Robey, PC DESIGN OF POND P. 0. Box 339 Camden, NC 27921 Coastal Roofing (252)-335-1888 10 Yr, 24 Hr Storm 08/17/05 DETENTION POND Page 1 SAIDA PERCENTAGES FOR 90% TSS REMOVAL WITHOUT VEGETATIVE FILTER % IMPRV 3.0 FT 3.5 FT 4.0 FT 4.5 FT 5.0 FT 5.5 FT 6.0 FT 6.5 FT 7.0 FT 10 % 1.3 1.0 0.8 0.7 0.6 0.5 0.4 0.3 0.2 20% .2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 0.9 30 % 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 40 % 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 50 % 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2.3 1.9 60 % 7.0 6.0 5.3 4.8 4.3 3,9 3.4 2.9 2.4 70 % 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 80 % 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 90 % 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 100 % 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 4.3 WATERSHED AREA: 1.92 ACRES WATERSHED % IMPERVIOUS: 48 % PERMANENT POOL ELEVATION: 8 FT DESIGN PERMANENT POOL DEPTH: 6 FT SAIDA PERCENTAGE FACTOR: 2.7 % (FROM ABOVE TABLE - TAKEN FRONS DESIGN OFSTOR\I WATER POND SURFACE AREA REQ'D: FOREBAY AREA: AT WIDTH = 0.33 LENGTH, WIDTH = 27.4357 LF LENGTH = 82.3071 LF CONTROL FACILITIES WORKSHOP MANUAL - PENC 1998) 2258 SF 677 SF (BASED UPON MINIMUM SURFACE AREA) Use these dimensions: WIDTH 30.72 LF LENGTH 93.22 LF VOLUME OF 1 ' RAINFALL AREA OF ROOFS: 0.35 AC AREA OF PARKING/CONCRETE: 0.58 AC AREA OF GREEN AREAS: 0.99 AC VOLUME OF RUNOFF 3989.37 CF STORAGE DEPTH FOR MINIMUM AREA = ELEVATION OF V RAINFALL = 9.39 Normal Pool Elevation VOL (CF)=1(ROOF-1.0)+(PARKING '.95)+ 1.39 FT 0 1'43,560/12 DRAWDOWN - WATER QUALITY Q(2 DAYS) = 0.02309 CFS Q(5 DAYS) = 0.00923 CFS 1" RUNOFF STAGE 1.39 FT DEPTH OF DRAWDOWN DEVICE BELOW OUTLET 1.5 FT 1" RUNOFF OUTLET DEVICE: 0,85868 INCH DIA HOLE A=[QI(Cd*SQRT(2gh))]*144 Rad.=SQRT(A/PI) Dia.=2*Rad. DIAMETER OF HOLE TO USE: 1 INCH DIAMETER l" STORM RUNOFF DRAWDOWN TIME 2.10667 DAYS INFLOW HYDROGRAPH Return Year Storm 10 Yr Qp = Peak Discharge = S.5 cfs Tc Time of Concentration = 22.8 min Calculation of Tp (Time to Peak) From SCS NEH 4 , page 15-7 Eqn, 15.4 Lag Time (L) = (1" 0.8*(S+ 1)" 0.7)1(1900*Y"0.5) for L in Hrs where: 1 = hydraulic length of watershed (ft) S = (1000/CN)-10 CN = approximately same CN from TR-55 Y = avg. watershed land slope in % S = (10001CN)-10 = 2.65823 L= 0.191 hrs From SCS NEH 4 , page 16-7 Eqn. 16.7 Tp=D12+L where : D = unit of excess duration rainfall (hrs) L = Lag Time (hrs) From SCS NEH 4 , page 16-8 Eqn. 16.12 D = 0.133 tc where: Tc = Time of Concentration (hrs) - (See Tr-55 Printout) THEREFORE: D = . 0.05054 hrs Tp = 0.21627 hrs = 12.9762 min Volume under Hydrograph = 1.39 * Qp * Tp = 9198.82 Cubic Feet 460 2.65823 79 = 0.85 ID 'SEAL 18550 sFgtiC �... R4 0-k . ni ii���rlrrftt0v Inflow Hydrograph SCS Dimensionless Hydrograph Time Discharge Time Discharge Volume Ratio Ratio hr cfS cf 0.00 0.00 0.00 0 0.10 0.03 0.02 0 20 0,20 0.10 0.04 1 66 0.30 0,19 0.06 2 126 0.40 0.31 0.09 3 205 0.50 0.47 0.11 4 311 0.60 0.66 0.13 6 437 0.70 0.82 0.15 7 543 0.80 0.93 0.17 8 615 0.90 0.99 0.19 8 655 1.00 1.00 0.22 9 662 1.10 0.99 0.24 8 655 1.20 0.93 0.26 8 615 1.30 0.86 0.28 7 569 1.40 0.78 0.30 7 516 1.50 0.68 0.32 6 450 1.60 0.56 0.35 5 371 1.70 0.46 0.37 4 304 1.-80 0.39 0.39 3 258 1.90 0.33 0.41 3 218 2.00 0.28 0.43 2 185 2.20 0.21 0.48 2 274 2.40 0.15 0.52 1 195 2.60 0.11 0.56 1 142 2.80 0.08 0,61 1 102 3.00 0.06 0.65 0 73 3.20 0.04 0.69 0 53 3.40 0.03 0.74 0 38 3.60 0.02 0.78 0 28 3.80 0.02 0.82 0 20 4.00 0.01 0.87 0 15 4.50 0.01 0.97 0 17 5.00 0.00 1,08 0 0 Volume under hydrograph = 8738 cf Based upon runoff volume = 9198.82 cf Depth req'd for minimum area = 3.21219 ESSI". E A L _ 165S0 '1 i �, •`cyOfNES •' C�Il at'����\\`�. STAGE STORAGE FUNCTION OF POND (FOR RECTANGULER DETENTION POND ONLY) Minimum surface area taken at normal water level BASIN AREA INCR ACCUM VOLUME VOLUME STAGE In s S Z sf cf cf ft Page 4 Pond Side Slope (M) = In Z Z est Elevation 2864 0 0 0 Surface area at normal pool 8 3245 1527 1527 0.5 7.33 -0.69 0.50 8.5 3643 1722 3249 1 8.09 0.00 0.97 9 4060 1926 5175 1.5 8.55 0.41 1.45 9.5 4495 2139 7314 2 8.90 0.69 1.96 10 4948 2361 9674 2.5 9.18 0.92 2.50 10.5 5419 2592 12266 3 9.41 1.10 3.07 11 5907 2832 15098 3.5 9.62 1.25 3.68 11.5 6414 3080 18178 4 9.81 1,39 4.32 12 6939 3338 21516 4.5 9.98 L50 5.00 12.5 7482 3605 25122 5 10.13 1.61 5.72 13 Regression Output: Constant 9.34346 Ks = S/Z"b - 3366.193 Std Err of Y Est 0,00969 R Squared 0.99962 No. of Observations 7 Degrees of Freedom 5 X Coefficient(s) 1.15215 = b Sid Err of Coef. 0.01009 FOR VERTICAL SIDED DETENTION POND SET b=0, AND Ks = SURFACE AREA (SF) STAGE DISCHARGE (FOR RISER/BARRELL SPILLWAY W EMERGENCY WEIR) RISER Dr = 18 Riser Dia. (in) Etop = 9.39 Elev. Top Riser (ft) Cwr = 3.33 Riser weir coeff Cdr = 0.60 Riser orifice coeff Hln = 5 Number of Holes H 1 d = 2 Hole Dia. (in) EH1 - 20,00 Elev, Holes (1) H2n - 5 Number of Holes H2d = 2 Hole Dia. (in) EH2 = 20.00 Elev. Holes (2) H3n - 0 Number of Holes H3d = 2 Hole Dia. (in) EH3 - 20.00 Elev. Holes (3) BARREL: Db = 12 Barrel Dia. (in) Einv = 8.00 Elev Invert Barrel (ft) Cdb = 0,60 Barrel orifice coeff 11.21 Bartell Adjustment Factor 91 EMERGENCY WEIR Page 5 Cw = 3 Weir coeff Ecr = 20.00 Elev weir coeff (ft) Lw = 3 Weir Length (ft) Riser Riser Riser Elevation Hole Hole Hole Riser Riser Barrel Principal Emergcy (1) (2) (3) (weir) (orifice) Spillway Weir 8.00 6.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 8.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 8.01 0.0 0.0 0.0 0.0 0.0 0.0 0,00 0.0 8.04 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 8.09 0.0 0.0 0.0 0.0 0.0 0.1 0.00 0.0 8.16 0.0 0.0 0.0 0.0 0.0 0.2 0.00 0.0 8.26 0.0 0.0 0.0 0.0 0.0 0.4 0.00 0.0 8,40 0.0 0.0 0.0 0.0 0.0 0.7 0.00 0.0 8.55 0.0 0.0 0.0 0.0 0.0 1.1 0.00 0.0 8,72 0.0 0.0 0.0 0,0 0.0 1.7 0.00 0.0 8.90 0.0 0.0 0.0 0.0 0.0 2.3 0.00 0.0 9.07 0.0 0.0 0.0 0.0 0.0 2.9 0.00 0.0 9.24 0.0 0.0 0.0 0.0 0.0 3.2 0.00 0.0 9.39 0.0 0.0 0.0 0.0 0.0 3.6 0.00 0.0 9.53 0.0 0.0 0.0 0.8 3.1 3.8 0.79 0.0 9.64 0.0 0.0 0.0 1.9 4.2 4.0 1.91 0.0 9.71 0.0 0.0 0.0 2.8 4.8 4.1 2.81 0.0 9.74 0.0 0.0 0.0 3.3 5.1 4.2 3.30 0.0 9.75 0.0 0.0 0.0 3.5 5.1 4.2 3.46 0.0 9.75 0,0 0.0 0.0 3.4 5.1 4.2 3.42 0.0 9,74 0.0 0.0 0.0 3.3 5.0 4.2 3.26 0.0 9.71 0.0 0.0 0.0 2.8 4.8 4.2 2.82 0.0 9.67 0.0 0.0 0.0 2.3 4.5 4.1 2.31 0.0 9.63 0.0 0.0 0.0 1.8 4,2 4.0 1.84 0.0 9.59 0.0 0.0 0.0 1.5 3.9 4.0 1.45 0.0 9.56 0.0 0.0 0.0 1.1 3.6 3.9 1.15 0.0 9.54 0.0 0.0 0.0 0.9 3.3 3.8 0.91 0.0 9.52 0.0 0.0 0.0 0,7 3.0 3.8 0.72 0.0 9.50 0.0 0.0 0.0 0.6 2.8 3.8 0.57 0.0 9.49 0.0 0.0 0.0 0.5 2.6 3.7 0.46 0.0 9.47 0.0 0.0 0.0 0.4 2.4 3.7 0.37 0.0 9.45 0.0 0.0 0.0 0.2 2.0 3.7 0.21 0.0 9.43 0.0 0.0 0.0 0.1 1.7 3.6 0.13 0.0 Page 6 ROUTING OF INFLOW HYDROGRAPH THROUGH POND AND OUTFLOW DEVICE Total Riser Riser Riser Barrel Emerg Time Inflow Storage Stage Outflow Holes (weir) (orifice) Spillway t (hr) cfs cf Elevation cfs (1 + 2 * 3) cfs cfs cfs cfs cfs 0.000 0 0 8.00 0.00 0.00 0.00 0.0o 0.00 0.00 0.022 0 0 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0,043 1 19.8536 8.01 0.00 0.00 0.00 0.00 0.00 0.00 0.065 2 86,0321 8.04 0.00 0.00 0.00 0.00 0.02 0.00 0.087 3 211.771 8.09 0.00 0.00 0.00 0.00 0.07 0.00 0.108 4 416.925 8.16 0.00 0.00 0.00 0.00 0.18 0.00 0.130 .6 727.964 8.26 0.00 0.00 0.00 0.00 0.36 0.00 0.151 7 1164,74 8.40 0.00 0.00 0.00 0.00 0.67 0.00 0.173 8 1707.41 8.55 0.00 0.00 0.00 0.00 1.11 0.00 0.195 8 2322.87 8.72 0.00 0.00 0.00 0.00 1.65 0.00 0.216 9 2978.03 8.90 0.00 0.00 0.00 0.00 2.28 0.00 0.238 8 3639.82 9.07 0.00 0.00 0.00 0.00 2.85 0.00 0.260 8 4294.99 9.24 0.00 0.00 0.00 0.00 3.24 0.00 0.281 7 4910.45 9.39 0.00 0.00 0.00 0.00 3.56 0.00 0.303 7 5479.58 9.53 0.79 0.00 0.79 3.14 3.83 0.00 0.324 6 5934.24 9.64 1.91 0.00 1.91 4.22 4.02 0.00 0,346 5 6235.43 9.71 2.81 0.00 2.81 4.79 4.15 0.00 0.368 4 6387.41 9.74 3,30 0.00 3.30 5.06 4.21 0.00 0.389 3 6434.93 9.75 3,46 0.00 3.46 5.14 4.23 0.00 0,411 3 6423.76 9.75 3.42 0.00 3.42 5.12 4.23 0.00 0.433 2 6375.8 9.74 3.26 0.00 3.26 5,04 4.21 0.00 0.476 2 6238.58 9.71 2.82 0.00 2.82 4.80 4.15 0.00 0.519 1 6073.77 9.67 2.31 0.00 2.31 4.49 4.08 0.00 0.562 1 5908.13 9.63 1.84 0.00 1.84 4.16 4.01 0.00 0.606 1 5763.39 9.59 1.45 0.00 1.45 3.85 3.95 0.00 0.649 0 5638.88 9.56 1.15 0.00 1.15 3.56 3.90 0.00 0.692 0 5533.06 9.54 0.91 0.00 0.91 3.29 3.85 0.00 0.735 0 5445.03 9.52 0.72 Mo 0.72 3.04 3.81 0.00 0,779 0 5371.48 9.50 0.57 0100 0.57 2.82 3.78 0.00 0.822 0 5309.87 9.49 0.46 0.00 0.46 2.63 3.75 0.00 0.865 0 5257.87 9.47 0.37 0.00 0.37 2.45 3.72 0.00 0,973 0 5149.15 9.45 0.21 0.00 0.21 2.02 3.67 0.00 1.081 0 5084.37 9.43 0.13 0.00 0.13 1.71 3.64 0.00 9,75486 = maximum stage elevation 3.45845 = maximum discharge Coastal Roofing Currituck County 10 yr STORM :Cft 8 7 M 6 (D 5 INFLOW (cfs) co 4 m OUTFLOW (cis) 3 q W 0 2 a \M 0 0.000 0,200 0,400 0.600 0.800 1.000 1,200 Time (hrs) ✓ 18550 qN C. POND VOLUME CALCULATIONS FOR S:IHyman & Robey '04W40475 - COASTAL ROOFING4ExcellPOND VOLUME CALCULATIONS (1 POND)040475.xls POND CALCULATIONS AREA Fz PERMANENT POOL SURFACE AREA 2,864.27 MAIN BASIN SURFACE AREA 1.987.73 FOREBAY SURFACE AREA 876.54 AREA'A'f EDGE OF MAIN BASIN SHELF 678.86 AREA OF MAIN BASIN BOTTOM 40.56 AREA AT EDGE OF FOREBAY SHELF 65.45 AREA OF FOREBAY BOTTOM 1.70 SURFACE AREA AT 1" STORAGE 4,020.31 ELEVATIONS PP ELEVATION ELEVATION AT EDGE OF MAIN BASIN SHELF ELEVATION OF MAIN BASIN BOTTOM ELEVATION AT EDGE OF FOREBAY SHELF ELEVATION OF FOREBAY BOTTOM ELEVATION OF 1" STORAGE VOLUME CALCULATIONS MAIN BASIN VOLUME FOREBAY VOLUME PERMANENT POOL VOLUME FOREBAY PERCENTAGE OF TOTAL PERMANENT POOL VOLUME TEMP. STORAGE VOLUME (1" RUNOFF) F 8.00 6.33 2.00 6.33 5.00 9.39 F3 3,784.15 831.22 4,615.36 18.01 % 4,784.78 TEMPORARY STORAGE OFFSET SLOPE (EX: IF 3:1 ENTER 3) 3.00 OFFSET FROM PP 4.17 BASIN DIAGRAM CALC MAIN POND SEDIMENT REMOVAL ELEVATION PP DEPTH READS ... SEDMENT SHALL BE REMOVED FOREBAY SEDIMENT REMOVAL ELEVATION PP DEPTH READS ... SEDMENT SHALL BE REMOVED 08/17/2005 4:09 PM 3.50 4.50 5.75 2.25 PAGE 1 OF 1 P>JR ANENT POOL DETENTION PONDS Hyman & Robey, PC DESIGN OF POND P. O. Box 339 Camden, NC 27921 Coastal Roofillo (252)-335-1888 10 Yr, 24 Hr Storm 08/17/05 DETENTION POND Page 1 SAIDA PERCENTAGES FOR 90% TSS REMOVAL WITHOUT VEGETATIVE FILTER % IMPRV 3.0 FT 3.5 FT 4.0 FT 4.5 FT 5.0 FT 5.5 FT 6,0 FT 6.5 FT 7.0 FT 10 % 1.3 1.0 0.8 0.7 0.6 0.5 0.4 0.3 0.2 20% 2A 2.0 1.8 1.7 1.5 1A 1.2 1.0 0.9 30 % 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 40 % 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 50 % 5.6 5.0 4.3 3.9 3.5 3.1 2.7. 2.3 1.9 60 % 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 70 % 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 80 % 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 90 % 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 100 % 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 4.3 WATERSHED AREA: WATERSHED % IMPERVIOUS: PERMANENT POOL ELEVATION: DESIGN PERMANENT POOL DEPTH SAIDA PERCENTAGE FACTOR: POND SURFACE AREA REQ'D: FOREBAY AREA: AT WIDTH = 0.33 LENGTH, WIDTH = 27.4357 LF LENGTH = 82.3071 LF 1.92 ACRES �'-' 48 % 8 FT1-- 6 FTr/ ?.7 % `/ (FROM ABOVE TABLE - TAKEN FROM DESIGN OF STORM WATER CONTROL FACILITIES WORKSHOP .MANUAL - PENC 0881 2258 SF 677 SF (BASED UPON MININIUM SURFACE AREA) Use these dimensions: WIDTH 30.72 LF LENGTH 93,22 LF VOLUME OF 1 " RAINFALL AREA OF ROOFS: 0.35 AC AREA OF PARKING/CONCRETE: 0.58 AC AREA OF GREEN AREAS: 0.99 AC VOLUME OF RUNOFF 3989.37 CF STORAGE DEPTH FOR MINIMUM AREA = ELEVATION OF 1" RAINFALL = 9.39 Normal Pool Elevation VOL (CF)=[(ROOF' 1.0)+(PARKING".95) 1.39 FT 0 ,' ALf 0 �+ INE6P /,f // '441!.1 I R(164ck 8 '0.2)1'43,560/12 DRAWDOWN - WATER QUALITY Q(2 DAYS) = 0.02309 CFS Q(5 DAYS) = 0.00923 CFS 1 " RUNOFF STAGE 1.39 FT DEPTH OF DRAWDOWN DEVICE BELOW OUTLET 1.5 FT 1" RUNOFF OUTLET DEVICE: 0,85868 INCH DIA HOLE A=(QI(Cd*SQRT(2gh))]*144 Rad.=SQRT(AIPI) Dia.=2*Rad. DIAMETER OF HOLE TO USE: 1 INCH DIAMETER 1 " STORM RUNOFF DRAWDOWN TIME 2.10667 DAYS INFLOW HYDROGRAPH Return Year Storm 10 Yr Qp = Peak Discharge = 8.5 cfs Tc = Time of Concentration = 22.8 min Calculation of Tp (Time to Peak) From SCS NEH 4 , page 15-7 Eqn, 15.4 Lag Time (L) = (1"0.8*(S+1)" 0.7)1(1900*Y" 0.5) for L in Hrs where: 1 W hydraulic length of watershed (ft) S = (1000/CN)-10 CN = approximately same CN from TR-55 Y = avg. watershed land slope in Fo S = (1000/CN)-10 = 2.65823 L= 0.191 hrs From SCS NEH 4 , page 16-7 Eqn. 16.7 Tp=D12+L where : D = unit of excess duration rainfall (hrs) L = Lag Time (hrs) From SCS NEH 4 , page 16-8 Eqn. 16.12 D = 0.133 tc where: Tc = Time of Concentration (hrs) - (See Tr-55 Printout) THEREFORE: D = , 0.05054 hrs Tp = 0.21627 hrs — 12.9762 min Volume under Hydrograph = 1.39 * Qp * Tp = 9198.82 Cubic Feet 60 2,65823 79 0.85 0 Inflow Hydrograph SCS Dimensionless Hydrograph Time Discharge Time Discharge Volume Ratio Ratio hr cfs cf 0.00 0.00 0.00 0 0.10 0.03 0.02 0 20 0.20 0.10 0.04 1 66 0.30 0.19 0.06 2 126 0:40 0.31 0.09 3 205 0.50 0.47 0.11 4 311 0.60 0.66 0.13 6 437 0.70 0.82 0.15 7 543 0.80 0.93 0.17 8 615 0.90 0.99 0.19 8 655 1.00 1.00 0.22 9 662 1.10 0.99 0.24 8 655 1.20 0.93- 0.26 8 615 1.30 0.86 0.28 7 569 1.40 0.78 0.30 7 516 1.50 0.68 0.32 6 450 € .60 0.56 0.35 5 371 1.70 0.46 0.37 4 304 1.180 0.39 0.39 3 258 1.90 0.33 0.41 3 218 2.00 0.28 0.43 2 185 2.20 0.21 0.48 2 274 2.40 0.15 0.52 1 195 2.60 0.11 0.56 1 142 2.80 0.08 0.61 1 102 3.00 0.06 0.65 0 73 3.20 0.04 0.69 0 53 3.40 0.03 0.74 0 38 3.60 0.02 0.78 0 28 3.80 0.02 0.82 0 20 4.00 0.01 0.87 0 15 4.50 0.01 0.97 0 17 5.00 0.00 1.08 0 0 Volume under hydrograph = 8738 cf Based upon runoff volume = 9198.82 cf Depth req'd for minimum area = 3.21219 1n Ssso i ...... N C 10g STAGE STORAGE FUNCTION OF POND (FOR RECTANGULER DETENTION POND ONLY) Minimum surface area taken at normal water level BASIN AREA INCR ACCUM VOLUME VOLUME STAGE In s S Z sf cf cf ft Page 4 Pond Side Slope (M) = In Z Z est Elevation 2864 0 0 0 Surface area at normal pool 8 3245 1527 1527 0.5 7.33 -0.69 0.50 8.5 3643 1722 3249 1 8.09 0.00 0,97 9 4060 1926 5175 1.5 8.55 0.41 1.45 9.5 4495 2139 7314 2 8.90 0.69 1.96 l0 4948 2361 9674 2.5 9.18 092 2.50 10.5 5419 2592 12266 3 9.41 1.10 3.07 11 5907 2832 15098 3.5 9.62 1.25 3.68 11.5 6414 3080 [8178 4 9.81 1.39 4,32 12 6939 3338 21516 4.5 9.98 1.50 5.00 12.5 7482 3605 25122 5 10.13 1.61 5.72 13 Regression Output: Constant 9.34346 Ks = SIZ" b - 3366.193 Sid Err of Y Est 0.00969 R Squared 0.99962 No. of Observations 7 Degrees of Freedom 5 X Coefficient(s) 1.15215 = b Sid Err of Coef. 0.01009 FOR VERTICAL SIDED DETENTION POND SET b=0, AND Ks = SURFACE AREA (SF) STAGE DISCHARGE (FOR RISER/BARBELL SPILLWAY W EMERGENCY WEIR) RISER Dr = 18 Riser Dia. (in) Etop = 9.39 Elev. Top Riser (ft) Cwr = 3.33 Riser weir coeff Cdr = 0.60 Riser orifice coeff Hln = 5 Number of Holes Hld - 2 Hole Dia. (in) EH1 - 20.00 Eiev. Holes (1) H2n = 5 Number of Holes H2d = ? Hole Dia. (in) EH2 = 20.00 Elev. Holes (2) H3n = 0 Number of Holes H3d = 2 Hole Dia. (in) EH3 - 20.00 Elev. Holes (3) BARREL: Db = 12 Barrel Dia. (in) Einv = 8,00 Elev Invert Barrel (ft) Cdb = 0.60 Barrel orifice coeff 11.21 - iaoo� 1p ICE t iV0 Barrell Adjustment Factor 3 EMERGENCY WEIR Page 5 Cw = 3 Weir coeff Ecr = 20,00 Elev weir coeff (ft) Lw = 3 Weir Length (ft) Riser Riser Riser Elevation Hole Hole Hole Riser Riser Barrel Principal Emergcy (1) (2) (3) (weir) (orifice) Spillway Weir 8.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 8.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 8.01 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 8.04 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 8.09 0.0 0.0 0.0 0.0 0.0 0.1 0.00 0.0 8.16 0.0 0.0 0.0 0.0 0.0 0.2 0.00 0.0 8.26 0.0 0.0 0.0 0.0 0.0 0.4 0,00 0.0 8.40 0.0 0.0 0.0 0.0 0.0 0.7 0.00 0.0 8.55 0.0 0.0 0.0 0.0 0.0 1.1 0.00 0.0 8.72 0.0 0.0 0.0 0.0 0.0 1.7 0.00 0.0 8.90 0.0 0.0 0.0 0.0 0.0 2.3 0.00 0.0 9.07 0.0 0.0 0.0 0.0 0.0 2.9 0.00 0.0 9.24 0.0 0.0 0.0 0.0 0.0 3.2 0.00 0.0 9.39 0.0 0.0 0.0 0.0 0.0 3.6 0.00 0.0 9.53 0.0 0.0 0.0 0.8 3.1 3.8 0.79 0.0 9.64 0.0 0.0 0.0 1.9 4.2 4.0 1.91 0.0 9.71 0.0 0.0 0.0 2.8 4.8 4.1 2.81 0.0 9.74 0.0 0.0 0.0 3.3 5.1 4.2 3.30 0.0 9.75 0.0 0.0 0.0 3.5 5.1 4.2 3.46 0.0 9.75 0.0 0.0 0.0 3.4 5.1 4.2 3.42 0.0 9.74 0.0 0.0 0.0 3.3 5.0 4.2 3.26 0.0 9.71 0.0 0.0 0.0 2.8 4.8 4.2 2.82 0.0 9.67 0.0 0.0 0.0 2.3 4.5 4.1 2.31 0.0 9.63 0.0 0.0 0.0 1.8 4.2 4.0 1.84 0.0 9.59 0.0 0.0 0.0 1.5 3.9 4.0 1.45 0.0 9.56 0.0 0.0 0.0 Li 3.6 3.9 1.15 0.0 9.54 0.0 0.0 0.0 0.9 3.3 3.8 0.91 0.0 9.52 0.0 0.0 0.0 0.7 3.0 3.8 0.72 0.0 9.50 0.0 0.0 0.0 0.6 2.8 3.8 0.57 0.0 9.49 0.0 0.0 0.0 0.5 2.6 3.7 0.46 0.0 9.47 0.0 0.0 0.0 0.4 2.4 3.7 0.37 0.0 9.45 0.0 0.0 0.0 0.2 2.0 3.7 0.21 0.0 9.43 0.0 0.0 0.0 0.1 1.7 3.6 0.13 0.0 �y C. i RoO Page 6 ROUTING OF INFLOW HYDROGRAPH THROUGH POND AND OUTFLOW DEVICE Total Riser Riser Riser Barrel Emerg Time Inflow Storage Stage Outflow Holes (weir) (orifice) Spillway t (hr) cfs cf Elevation cfs (1+2+3) cfs cfs cfs cfs cfs 0.000 0 0 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.022 0 0 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.043 1 19.8536 8.01 0.00 0.00 0.00 0.00 0.00 0.00 0.065 2 86.0321 8.04 0.00 0.00 0.00 0.00 0.02 0.00 0.087 3 211.771 8.09 0.00 0.00 0.00 0.00 0.07 0.00 0.108 4 416.925 8.16 0.00 0.00 0.00 0.00 0.18 0.00 0.130 6 727.964 8.26 0.00 0.00 0.00 0.00 0.36 0.00 0.151 7 1164.74 8.40 0.00 0.00 0.00 0.00 0.67 0.00 0.173 8 1707.41 8.55 0.00 0.00 0.00 0.00 1.11 0.00 0.195 8 2322,87 8.72 0.00 0.00 0.00 0.00 1.65 0.00 0.216 9 2978.03 8.90 0.00 0.00 0.00 0.00 2.28 0.00 0.238 8 3639.82 9.07 0.00 0.00 0.00 0.00 2.85 0.00 0.260 8 4294.99 9.24 0.00 0.00 0.00 0.00 3.24 0.00 0.281 7 4910.45 9.39 0.00 0.00 0.00 0.00 3.56 0.00 0.303 7 5479.58 9.53 0.79 0.00 0.79 3.14 3.83 0.00 0.324 6 5934.24 9.64 1.91 0.00 1.91 4.22 4.02 0.00 0.346 5 6235.43 9.71 2.81 0.00 2.81 4.79 4.15 0.00 0.368 4 6387.41 9.74 3.30 0.00 3.30 5.06 4.21 0.00 0.389 3 6434.93 9.75 3.46 0.00 3.46 5.14 4.23 0.00 0.411 3 6423.76 9.75 3.42 0.00 3.42 5.12 4.23 0.00 0.433 2 6375.8 9.74 3.26 0.00 3.26 5.04 4.21 0.00 0.476 2 6238.58 9.71 2.82 0.00 2.82 4.80 4.15 0.00 0.519 1 6073.77 9.67 2.31 0.00 2.31 4.49 4.08 0.00 0.562 1 5908.13 9.63 1.84 0.00 1.84 4.16 4.01 0.00 0.606 1 5763.39 9.59 1.45 0.00 1.45 3.85 3.95 0.00 0.649 0 5638.88 9.56 1.15 0.00 1.15 3.56 3.90 0.00 0.692 0 5533.06 9.54 0.91 0.00 0.91 3.29 3.85 0.00 0.735 0 5445.03 9.52 0.72 0.00 0.72 3.04 3.81 0.00 0.779 0 5371.48 9.50 0.57 0.00 0.57 2.82 3.78 0.00 0.822 0 5309.87 9.49 0.46 0.00 0.46 2.63 3.75 0.00 0.865 0 5257.87 9.47 0.37 0.00 0.37 2.45 3.72 0.00 0.973 0 5149.15 9.45 0.21 0.00 0.21 2.02 3.67 0.00 1.081 0 5084.37 9.43 0.13 0.00 0.13 1.71 3.64 Mo 9.75486 = maximum stage elevation 3,45845 = maximum discharge I UP50 i HRH C. g0s,k ���\N '//000(iiItitt0\\ fl 6 U a� 5 21 `° 4 L U 3 O "h 1 0 •+_4 0.000 Coastal Roofing Currituck County 10 yr STORM AMAd, 1 ®� a M, f "4. °"a--®- �- 0.200 0.400 0.600 0.800 1.000 1.200 Time (hrs) - a-- INFLOW (cfs) �* OUTFLOW (cfs) / kz K 18550 _ ✓ f8550 �,• ��NGrNEtiP•� `�� C. 4i0oo POND VOLUME CALCULATIONS FOR S:Hyman & Robey '041040475 - COASTAL ROOFINGIExceAPOND VOLUME CALCULATIONS (1 POND)040475.xfs POND CALCULATIONS AREA PERMANENT POOL SURFACE AREA MAIN BASIN SURFACE AREA FOREBAY SURFACE AREA AREA'AT EDGE OF MAIN BASIN SHELF AREA OF MAIN BASIN BOTTOM AREA AT EDGE OF FOREBAY SHELF AREA OF FOREBAY BOTTOM SURFACE AREA AT 1" STORAGE ELEVATIONS PP ELEVATION ELEVATION AT EDGE OF MAIN BASIN SHELF ELEVATION OF MAIN BASIN BOTTOM ELEVATION AT EDGE OF FOREBAY SHELF ELEVATION OF FOREBAY BOTTOM ELEVATION OF 1" STORAGE VOLUME CALCULATIONS Fz L,iit74.Lf 1.987,73 876.54 678,86 40.56 65.45 1.70 4,020.31 F 8.00 6,33 2.00 6.33 5.00 9.39 F3 MAIN BASIN VOLUME 3,784.15 FOREBAY VOLUME 831.22 PERMANENT POOL VOLUME 4,615.36 FOREBAY PERCENTAGE OF TOTAL PERMANENT POOL VOLUME 18,01% TEMP. STORAGE VOLUME (1" RUNOFF) 4,784.78 TEMPORARY STORAGE OFFSET SLOPE (EX: IF 3:1 ENTER 3) 3.00 OFFSET FROM PP 4.17 BASIN DIAGRAM CALC MAIN POND SEDIMENT REMOVAL ELEVATION PP DEPTH READS ... SEDMENT SHALL BE REMOVED FOREBAY SEDIMENT REMOVAL ELEVATION PP DEPTH READS ... SEDMENT SHALL BE REMOVED 08/17/2005 4:09 PM 3.50 4.50 5.75 2.25 PAGE i OF 1 �luu�■ PERMANENT POOL DETENTION PONDS Hyman & Robey, PC DESIGN OF POND P. 0. Box 339 Camden, NC 27921 Coastal Roofing (252)-335-1888 10 Yr, 24 Hr Storm 08/17/05 DETENTION POND Page 1 SA/DA PERCENTAGES FOR 90% TSS REMOVAL WITHOUT VEGETATIVE FILTER % IMPRV 3.0 FT 3.5 FT 4.0 FT 4.5 FT 5.0 FT 5.5 FT 6.0 FT 6.5 FT 7.0 FT 10 % 1.3 1.0 0.8 0.7 0.6 0.5 0.4 0.3 0.2 20 % 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 0.9 30 % 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 Ll 40 % 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 50 % 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2.3 1.9 60 % 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 70 % 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 80 % 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 90 % 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 100 % 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 4.3 WATERSHED AREA: 1.92 ACRES WATERSHED % IMPERVIOUS: 48 % PERMANENT POOL ELEVATION: 8 FT DESIGN PERMANENT POOL DEPTH: 6 FT SA/DA PERCENTAGE FACTOR: 2.7 % (FROST ABOVE TABLE - TAKEN FROM DESIGN OF STORM WATER CONTROL FACILITIES WORKSHOP M ANUAL - PENC 198& POND SURFACE AREA REQ'D: 2258 SF FOREBAY AREA: 677 SF AT WIDTH = 0.33 LENGTH, WIDTH = 27.4357 LF (BASED UPON MINIMUM SU LENGTH = 82.3071 LF Use these dimensions: WIDTH 30.72 LF LENGTH 93.22 LF VOLUME OF 1 " RAINFALL Normal Pool Elevation AREA OF ROOFS: 0.35 AC AREA OF PARKING/CONCRETE: 0.58 AC AREA OF GREEN AREAS: 0.99 AC VOLUME OF RUNOFF 3989.37 CF VOL (CF)={(ROOF*1.0)�(PARKING*.95) STORAGE DEPTH FOR MINIMUM AREA = 1.39 FT ELEVATION OF 1" RAINFALL = 9.39 AUG 33 2005 LAND QUALITY SECTION WASHINGTON REGIONAL OFFICE r1EAL 550 i ��''��', OINEEF:' • �� ca0161C 1 2)1*43,560112 DRAWDOWN -WATER QUALITY Q(2 DAYS) = 0.02309 CFS Q(5 DAYS) = 0.00923 CFS I" RUNOFF STAGE 1.39 FT DEPTH OF DRAWDOWN DEVICE BELOW OUTLET 1.5 FT 1" RUNOFF OUTLET DEVICE: 0.85868 INCH DIA HOLE A=(Q/(Cd*SQRT(2gh))]*144 Rad.=SQRT(A/Pi) Dia.=2*Rad. DIAMETER OF HOLE TO USE: I INCH DIAMETER I" STORM RUNOFF DRAWDOWN TIME 2.10667 DAYS INFLOW HYDROGRAPH Return Year Storm 10 Yr Qp = Peak Discharge = 8.5 cfs Tc = Time of Concentration = 22.8 min Calculation of Tp (Time to Peak) From SCS NEH 4 , page 15-7 Eqn. 15.4 Lag Time (L) = (1"0.8*(S+1)"0.7)/(1900*Y" 0.5) for L in Hrs where: 1 = hydraulic length of watershed (ft) S = (1000/CN)-10 CN = approximately same CN from TR-55 Y = avg. watershed land slope in S = (1000/CN)-10 = 2.65823 L = 0.191 hrs From SCS NEH 4 , page 16-7 Eqn. 16.7 Tp=D/2+L where : D = unit of excess duration rainfall (hrs) L = Lag Time (hrs) From SCS NEH 4 , page 16-8 Eqn. 16.12 D = 0.133 tc where: Tc = Time of Concentration (hrs) - (See Tr-55 Printout) THEREFORE: D = 0.05054 hrs Tp = 0.21627 hrs = 12.9762 min Volume under Hydrograph = 1.39 * Qp * Tp = 9198.82 Cubic Feet 460 2.65823 79 0.85 Inflow Hydrograph SCS Dimensionless Hydrograph Time Discharge Time Discharge Volume Ratio Ratio hr cfs cf 0.00 0.00 0.00 0 0.10 0.03 0.02 0 20 0..20 0.10 0.04 1 66 0.30 0.19 0.06 2 126 0:40 0.31 0.09 3 205 0.50 0.47 0.11 4 311 0.60 0.66 0.13 6 437 0.70 0.82 0.15 7 543 0.80 0.93 0.17 8 615 0.90 0.99 0.19 8 655 1.00 1.00 0.22 9 662 1.10 0.99 0.24 8 655 1.20 0.93 0.26 8 615 1.30 0.86 0.28 7 569 1.40 0.78 0.30 7 516 1.50 0.68 0.32 6 450 1.60 0.56 0.35 5 371 1.70 0.46 0.37 4 304 1:80 0.39 0.39 3 258 1.90 0.33 0.41 3 218 2.00 0.28 0.43 2 185 2.20 0.21 0.48 2 274 2.40 0.15 0.52 1 195 2.60 0.11 0.56 1 142 2.80 0.08 0,61 l 102 3.00 0.06 0.65 0 73 3.20 0.04 0.69 0 53 3.40 0,03 0.74 0 38 3.60 0.02 0.78 0 28 3.80 0.02 0.82 0 20 4.06 0.01 0.87 0 15 4.50 0.01 0.97 0 17 5.00 0.00 1.08 0 0 Volume under hydrograph = 8738 cf Based upon runoff volume = 9198.82 cf Depth req'd for minimum area = 3.21219 ' J�EAL / 18550 i rrm1 STAGE STORAGE FUNCTION OF POND (FOR RECTANGULER DETENTION POND ONLY) Minimum surface area taken at normal water level BASIN AREA INCR ACCUM VOLUME VOLUME STAGE In s S z sf cf cf ft Pond Side Slope (M) = In Z Z est Elevation 2864 0 0 0 Surface area at normal pool 8 3245 1527 1527 0.5 7.33 -0.69 0.50 8.5 3643 1722 3249 1 8.09 0.00 0.97 9 4060 1926 5175 1.5 8.55 0.41 1.45 9.5 4495 2139 7314 2 8.90 0.69 1.96 10 4948 2361 9674 2.5 9.18 0.92 2.50 10.5 5419 2592 12266 3 9.41 1.10 3.07 11 5907 2832 15098 3.5 9.62 1.25 3.68 11.5 6414 3080 18178 4 9.81 1.39 4.32 12 6939 3338 21516 4.5 9.98 1.50 5.00 12.5 7482 3605 25122 5 10.13 1.61 5.72 13 Regression Output: Constant 9,34346 Ks = S/Z"b - 3366.193 Std Err of Y Est 0.00969 R Squared 099962 No. of Observations 7 Degrees of Freedom 5 X Coefficient(s) 1.15215 = b Std Err of Coef. 0,01009 FOR VERTICAL SIDED DETENTION POND SET b=0, AND Ks = SURFACE AREA (SF) STAGE DISCHARGE (FOR RISER/BARRELL SPILLWAY W EMERGENCY WEIR) RISER Dr - 18 Riser Dia. (in) Etop = 9.39 Elev. Top Riser (ft) Cwr = 3.33 Riser weir coeff Cdr = 0.60 Riser orifice coeff H 1 n = 5 Number of Holes H 1 d = 2 Hole Dia. (in) EHI = 20.00 Elev. Holes (1) H2n = 5 Number of Holes H2d - 2 Hole Dia. (in) EH2 = 20.00 Elev. Holes (2) H3n = 0 Number of Holes H3d = 2 Hole Dia. (in) EH3 = 20.00 Elev. Holes (3) BARREL: Db - 12 Barrel Dia. (in) Einv = 8.00 Elev Invert Barrel (ft) Cdb = 0.60 Barrel orifice coeff 11.21 Page 4 -6EAL SFaN Barrell Adjustment Factor 3 EMERGENCY WEIR Page 5 Cw - 3 Weir coeff Ecr = 20.00 Elev weir coeff (ft) Lw - 3 Weir Length (ft) Riser Riser Riser Elevation Hole Hole Hole Riser Riser Barrel Principal Emergcy (1) (2) (3) (weir) (orifice) spillway Weir 8.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 8.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 8.01 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 8.04 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 8.09 0.0 0.0 0.0 0.0 0.0 0.1 0.00 0.0 8.16 0.0 0.0 0.0 0,0 0.0 0.2 0.00 0.0 8.26 0.0 0.0 0.0 0.0 0.0 0.4 0.00 0.0 8.40 0.0 0.0 0.0 0.0 0.0 0.7 0.00 0.0 8.55 0.0 0.0 0.0 0.0 0.0 1.1 0.00 0.0 8.72 0.0 0.0 0.0 0.0 0.0 1.7 0.00 0.0 8.90 0.0 0.0 0.0 0.0 0.0 2.3 0.00 0.0 9.07 0.0 0.0 0.0 0.0 0.0 2.9 0.00 0.0 9.24 0.0 0.0 0.0 0.0 0.0 3.2 0.00 0.0 9.39 0.0 0.0 0.0 0.0 0.0 3.6 0.00 0.0 9.53 0.0 0.0 0.0 0.8 3.1 3.8 0.79 0.0 9.64 0.0 0.0 0.0 1.9 4.2 4.0 1.91 0.0 9.71 0.0 0.0 0.0 2.8 4.8 4.1 2.81 0.0 9.74 0.0 0.0 0.0 3.3 5.1 4.2 3.30 0.0 9.75 0.0 0.0 0.0 3.5 5.1 4.2 3.46 0.0 9.75 0.0 0.0 0.0 3.4 5.1 4.2 3.42 0.0 9.74 0.0 0.0 0.0 3.3 5.0 4.2 3.26 0.0 9.71 0.0 0.0 0.0 2.8 4.8 4.2 2.82 0.0 9.67 0.0 0.0 0.0 2.3 4.5 4.1 2.31 0.0 9.63 0.0 0.0 0.0 1.8 4.2 4.0 1.84 0.0 9.59 0.0 0.0 0.0 1.5 3.9 4.0 1.45 0.0 9.56 0.0 0.0 0.0 1.1 3.6 3.9 1.15 0.0 9.54 0.0 0.0 0.0 0.9 3.3 3.8 0.91 0.0 9.52 0.0 0.0 0.0 0.7 3.0 3.8 0.72 0.0 9.50 0.0 0.0 0.0 0.6 2.8 3.8 0.57 0.0 9.49 0.0 0.0 0.0 0.5 2.6 3.7 0.46 0.0 9.47 0.0 0.0 0.0 0.4 2.4 3.7 0.37 0.0 9.45 0.0 0.0 0.0 0.2 2.0 3.7 0.21 0.0 9.43 0.0 0.0 0.0 0.1 1.7 3.6 0.13 0.0 M SEAL � 18550 �i`PF,gy'C. R9j% /�����11lI i 111t11111� Page 6 ROUTING OF INFLOW HYDROGRAPH THROUGH POND AND OUTFLOW DEVICE Total Riser Riser Riser Barrel Emerg Time Inflow Storage Stage Outflow Holes (weir) (orifice) Spillway t (hr) cfs cf Elevation cfs (1+2+3) cfs cfs cfs cfs cfs 0.000 0 0 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.022 0 0 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.043 1 19.8536 8.01 0.00 0.00 0.00 0.00 0.00 0.00 0.065 2 86.0321 8.04 0.00 0.00 0.00 0.00 0.02 0.00 0.087 3 211.771 8.09 0.00 0.00 0.00 0.00 0.07 0.00 0.108 4 416.925 8.16 0.00 0.00 0.00 0.00 0.18 0.00 0.130 6 727.964 8.26 0.00 0.00 0.00 0.00 0.36 0.00 0.151 7 1164.74 8.40 0.00 0.00 0.00 0.00 0.67 0.00 0.173 8 1707.41 8.55 0.00 0.00 0.00 0.00 1.11 0.00 0.195 8 2322.87 8.72 0.00 0.00 0.00 0.00 1.65 0.00 0.216 9 2978.03 8.90 0.00 0.00 0.00 0.00 2.28 0.00 0.238 8 3639.82 9.07 0.00 0.00 0.00 0.00 2.85 0.00 0.260 8 4294.99 9.24 0.00 0.00 0.00 0.00 3.24 0.00 0.281 7 4910.45 9.39 0.00 0.00 0.00 0.00 3.56 0.00 0.303 7 5479.58 9.53 0.79 0.00 0.79 3.14 3.83 0.00 0.324 6 5934.24 9.64 1.91 0.00 1.91 4.22 4.02 0.00 0.346 5 6235.43 9.71 2.81 0.00 2.81 4.79 4.15 0.00 0.368 4 6387.41 9.74 3.30 0.00 3.30 5.06 4.21 0.00 0.389 3 6434.93 9.75 3.46 0.00 3.46 5.14 4.23 0.00 0.411 3 6423.76 9.75 3.42 0.00 3.42 5.12 4.23 0.00 0.433 2 6375.8 9.74 3.26 0.00 3.26 5.04 4.21 0.00 0.476 2 6238.58 9.71 2.82 0.00 2.82 4.80 4.15 0.00 0.519 l 6073.77 9.67 2.31 0.00 2.31 4.49 4.08 0.00 0.562 1 5908.13 9.63 1.84 0.00 1.84 4.16 4.01 0.00 0.606 1 5763.39 9.59 1.45 0.00 1.45 3.85 3.95 0.00 0.649 0 5638.88 9.56 1.15 0.00 1.15 3.56 3.90 0.00 0.692 0 5533.06 9.54 0.91 0.00 0.91 3.29 3.85 0.00 0.735 0 5445.03 9.52 0.72 0.00 0.72 3.04 3.81 0.00 0.779 0 5371.48 9.50 0.57 0.00 0.57 2.82 3.78 0.00 0.822 0 5309.87 9.49 0.46 0.00 0.46 2.63 3.75 0.00 0.865 0 5257.87 9.47 0.37 0.00 0.37 2.45 3.72 0.00 0.973 0 5149.15 9.45 0.21 0.00 0.21 2.02 3.67 0.00 1.081 0 5084.37 9.43 0.13 0.00 0.13 1.71 3.64 0.00 9.75486 = maximum stage elevation 3.45845 = maximum discharge Coastal Roofing Currituck County 10 yr STORM 9 Nift 7 4 6 a) 5 INFLOW (cfs) N- 4 OUTFLOW (cfs) 3 2 4. 0.000 0.200 0.400 0.600 0.800 1,000 1.200 Time (hrs) WMEAL ..I N EOk" ........ NN c. fo)o POND VOLUME CALCULATIONS FOR S:1Hyman & Robey '041040475 - COASTAL ROOFING1ExceAPOND VOLUME CALCULATIONS (1 POND)040475.x1s POND CALCULATIONS AREA F2 PERMANENT POOL SURFACE AREA 2,864.27 MAIN BASIN SURFACE AREA FOREBAY SURFACE AREA AREA'A"f EDGE OF MAIN BASIN SHELF AREA OF MAIN BASIN BOTTOM AREA AT EDGE OF FOREBAY SHELF AREA OF FOREBAY BOTTOM SURFACE AREA AT 1" STORAGE ELEVATIONS PP ELEVATION ELEVATION AT EDGE OF MAIN BASIN SHELF ELEVATION OF MAIN BASIN BOTTOM ELEVATION AT EDGE OF FOREBAY SHELF ELEVATION OF FOREBAY BOTTOM ELEVATION OF 1" STORAGE VOLUME CALCULATIONS MAIN BASIN VOLUME FOREBAY VOLUME PERMANENT POOL VOLUME FOREBAY PERCENTAGE OF TOTAL PERMANENT POOL VOLUME TEMP. STORAGE VOLUME (1" RUNOFF) 1.987.73 876.54 678.86 40.56 65.45 1.70 4.020.31 F 8.00 6.33 2.00 6.33 5.00 9.39 F3 3,784.15 831.22 4,615.36 18.01 % 4,784.78 TEMPORARY STORAGE OFFSET SLOPE (EX: IF 3:1 ENTER 3) 3.00 OFFSET FROM PP 4.17 BASIN DIAGRAM CALC MAIN POND SEDIMENT REMOVAL ELEVATION PP DEPTH READS ... SEDIMENT SHALL BE REMOVED FOREBAY SEDIMENT REMOVAL ELEVATION PP DEPTH READS ... SEDMENT SHALL BE REMOVED 08/17/2005 4:09 PM 3.50 4.50 5.75 2.25 PAGE 1 OF 1 �rremuru�