Loading...
HomeMy WebLinkAboutSW7040713_HISTORICAL FILE_20110519STORMWATER DIVISION CODING SHEET_ POST -CONSTRUCTION PERMITS PERMIT NO. SWY-6VO 713 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE DOC DATE c:2ellD YYYYMMDD Thorpe, Roger From: Kim Hamby [kim@hymanrobey.com] Sent: Thursday, May 19, 2011 10:49 AM To: Thorpe, Roger Subject: Ricky Edwards - SW7040713 Attachments: 040215 site plan.PDF; 040215 details.PDF Roger, Good morning. Hope you're doing well. I am emailing you as we have been asked to look into expansion of a site permitted by you in 2004. 1 have attached a copy of the approved plan for your reference so you can review the information before we talk. We permitted the attached site for Ricky Edwards as a small commercial development. At the time of permitting, there was no sewer in site for Camden and the need for a septic system limited the on -site development. This was an odd situation as there was an existing pond on the site that we were allowed to modify for use as a detention pond. Mr. Edwards has sold this parcel and the adjacent parcel containing the mini -storage site. The site is now served by county sewer. The new owner would like to maximize usage of the site and we are trying to determine how much development can occur based on necessary stormwater treatment measures. I would like to discuss with you: what credit can be applied for the existing coverage for the mini -storage site — it is mostly covered by gravel and buildings, • what runoff volume we would have to store for any new development • what type of improvements would be required to the existing pond Please take a look at the site plan and call me for discussion at your convenience. I look forward to talking with you. Thank you, Kim Kimberly D. Hamby Sr. Project Manager Hyman & Robey, PC 252.337.8918 Y" fiKPROJECT'DESCRIPTION Site Plan For Ricky Edwards Camden County - North Carolina 7u1y;15, 2004;�. The Site Plan for Ricky Edwards is a proposed retail/office complex located on a 4.02 acre site on Highway 158 in Camden. The site is bounded by Highway 158 on the east, wetlands on the north, Southern Railroad on the west, and storage units on the south. The site is zoned Highway Commercial. The site will have two drainage areas when it is complete. Runoff form all of the new impervious areas will be collected and routed to a pond. This will be Drainage Area 1. Drainage Area 2 will contain all of the remaining areas of the site, such as the wetlands and the other vacant areas, where the stormwater will be allowed to continue sheet flowing into the wetlands or the existing ditches along the railroad and highway. Drainage Area 1 contains 2 acres. Impervious areas will consist of a new 4800 sf building (0.11 acres) with sidewalks, a dumpster pad, and parking that will contribute another 0.54 acres. All runoff from the impervious surfaces will be allowed to sheet flow across the parking lot to grass -lined swales with 3:1 side slopes. The swales will route the stormwater to an existing pond that will be modified with an outflow weir and draw - down device. The existing pond is a man-made pond that was constructed 10-12 years ago. It is located adjacent to 404 wetlands, but is not considered wetlands. This has been verified by representatives of the USACOE. Drainage Area 2 will contain the rear of the site, far right hand side of the site, and the wetlands on the left of the site. These areas will be allowed to continue sheet flowing the ditches along the railroad and the highway. These ditches drain into the wetlands that make up the remainder of the site. The only impervious area that will exist in Drainage Area 2 is the existing gravel drive that will be utilized as a construction entrance. The soils on site are Yeopim for the high ground areas and Dorovan in the wetland areas. Soil borings were not performed for the detention basin since an existing pond with an established water level is being utilized. The disturbed area for the site is 2 acres. This includes most of the high ground area and will cover all of the land required to be disturbed for development including the septic field area. Human & Robev. PC Consulting Engineers and Land Surveyors (252) 335-1888 Office (252) 338-2913 Office (252) 338-5552 Fax July 20, 2004 Mr. Bill Moore Dept. of Environment and Natural Resources Water Quality Section 943 Washington Square Mall Washington, NC 27889 Subject: Stormwater Management Pennit RMEIVEE) Ricky Edwards' Site Proj. # 040215 JUL 2 1 1UG; Dear Mr. Moore: ®WQ-WARO Enclosed for your review and approval, please find the following items: 1. Two (2) copies of the above referenced plans. 2. The original and one (1) copy of the Stormwater Exemption Application and Wet Detention Basin Supplement. 3. Two (2) copies of the project description and calculations. 4. Check in the amount of $420.00 for the required fee. If you have any questions, please do not hesitate to call this office at (252) 335-1888. cc: file Sincerely, Scan C. Robey, P.EE Kimberly D. Ha by Engineering Assistant 150-A US Highway 158 East, Cain den, NC 27921 TR-55 GRAPHICAL DISCHARGE METHOD VERSION 1.11 Project RICKY EDWARDS' SITE User: KDH Date: 07-2C-04 County CAMDEN State: NC Checked: Date: Subtitle: DRAINAGE TO 15" CULVERT Data: Drainage Area .27 * Acres Runoff Curve Number 86 * Time of Concentration: 0.06 * Hours Rainfall. Type II Pond and Swamp Area NONE Storm Number I 1 2 1 3! 4 1 5 1 6 1 7 ----------------------I-------I------ ------I------I------I------I------1 I Frequency (yrs) I 1! 2! 5 1 10 I 25 I 50 I 100 I I I I I I I I I I 24 -Hr Rainfall. (in) j 3.5 1 4 ! 5. 5 1 6.3 1 7. 1 1 8.3 1 9. 1 j I ! I ! I I I I I I Ia/P Ratio ! 0.09 I 0.08 I 0.06 I 0.05 1 0.05 1 0.04 1 0.04 1 I I E I I I I I 1 I Used 0.10 0.10 I 0.10 I 0.10 1 0.10 0.10 I C.10 I I I I I I I I i Runoff (in) ) 2.10 ! 2.55 I 3. 94 I 4.70 I 5.46 I 6. 62 1 7. 40 1 I I I I I I I I I I Unit Peak Discharge 1.794 ! 1.794 I1. 794 I1. 794 1.794 1.794 1.794 ! I (cfs/acre/in) I I I I I I I I I I I I I I ! I Pond and Swamp Factor) 1.00 I 1.00 I 1.00 I 1.00 1.00 I 1.00 ! 1.00 I 0.0% Ponds Used I I I I ----------------------I------I------I------I------I------I------I------I I Peak Discharge (cfs) 1 1 1 1 1 2 1 2 1 3 1 3! 4 1 - Value(s) provided from TR-55 system routines TR-53 CURVE NUMBER COMPUTATION VERSION 1.11 Project RICKY EDWARDS' SITE User: KDH Date: 07-20-04 County CAMDEN State: NC Checked: Date: Subtitle: DRAINAGE TO 15" CULVERT Subarea : .27 --------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space ( Lawns, parks etc. ) Good condition; grass cover > 75% - - .13(74) - Impervious Areas Paved parking lots, roofs, driveways - - .14(98) - Total Area (by Hydrologic Soil Group) 27 --------------------------------------------------------------------------------- SUBAREA: .27 TOTAL DRAINAGE AREA: .27 Acres WEIGHTED CURVE NUMBER:86* ------------------------------------------------------------------------------- * - Generated for use by GRAPHIC method TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1.11 Project RICKY EDWARDS' SITE User: KDH Date: 07 -20 -04 County CAMDEN State: NC Checked: Date: Subtitle: DRAINAGE TO 15" CULVERT ------------------------------------------------------------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------- Sheet 4 85 .01 A 0.021 Shallow Concent'd 150 .0044 U 0.039 Time of Concentration = 0.06* --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense B Fallow (No Res.) G Grass, Burmuda C Cultivated < 20 % Res. H Woods, Light D Cultivated > 20 % Res. I Woods, Dense F Grass -Range, Short - Generated for use by GRAPHIC method --- Shallow Concentrated --- Surface Codes P Paved U Unpaved Exhibit 12 II ()4ozrs R,-c v` , cc" 5 1 L r 180 10,000 f , 168 I r 8,000 EXAMPLE 156 C15,000 L 6,0oo 0- 36 rnctse. (3.� foot) Q. 66 c!s 6 !44 I I 4,000 � 5. 6. i 32 �� 3,000 o (f e.,) rr r 120 � U W 2,000 0) 1.3 5.4 tz) z.l 6,3 F—5. i08 r4. a e r "— (3) 2.2 6.6 G 'p in tnf I 3. L ¢ L 1,000 — 96 r— 3, IF800 64 ;A - 600 2 L soo r L 400 �L � Z� JI w 72 300 e;L _ 200 Z oa z L t 1.5 If� a Lu I w `L1a0 48 L so 1L/ ❑ Z U 42 60 Ln 50 ., L� 1.0 f 1.0 y j 40 �36 k 30 HW EN7RANCE cr _ w SC _ D L� TYPE w L C'3 20 11) Meaa.oll Q .8 .8 3a (21 WVtersa !o :Vntorn, W 3. 2. 1.5 l.e 9 2 !a naoe !'- .8 _ 27 I (3)cr nrojrcfing I 7 7 a i 8 z _ 24 ,7 - 21 4 18 C 3 2 L I.0 12 6UPEAu OF PU6l.IC POAOS JAN, 1963 To uee sco+e (2) or (31 orol.cr horrtonfall} to eeale (1),!Mn us• strafgpt IncfineC line !Mrougn D anC Q scoln, or rewree as illustrated. HEADWATER DEPTH FOR G. M. PIPE CULVERTS WITH INLET CONTROL VI-12 040 a I- S_- S ... l q y r' PE!ak- = 2 cis -- �- = - 10.5 0 _. lk-V . R os D zs PP Veloct�-� - 2 cis I•�3 SF - (.63 Fp5 �Jo Proe Q41 ors j& q w red ' PERMANENT POOL DETENTION PONDS Hyman & Robey, PC DESIGN OF POND 150-A Hwy 158 East Camden, NC 27921 Ricky Edwards' site (252)-335-1888 10 Yr, 24 Hr Storm ' 07/20/04 DETENTION POND Page SA/DA PERCENTAGES FOR 90% TSS REMOVAL WITHOUT VEGETATIVE FILTER % I M PR V 3.0 FT 3.5 FT 4.0 FT 4.5 FT 5.0 FT 5.5 FT 6.0 FT 6.5 FT 7.0 FT 10% L3 1.0 0.8 0.7 0.6 0.5 0.4 0.3 0.2 20 % 2.4 2.0 1.8 1.7 1.5 1.4 1.2 1.0 0.9 30 % 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 1.1 40 % 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 1.4 50 % 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2.3 1.9 60 % 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 2.4 70 % 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 2.9 80 % 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 3.4 90 % 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 3.9 100 % 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 4.3 WATERSHED AREA: 2 ACRES WATERSHED % IMPERVIOUS: 40 % PERMANENT POOL ELEVATION: 5 FT DESIGN PERMANENT POOL DEPTH: 5 FT SA/DA PERCENTAGE FACTOR: 2.8 % (FROM ABOVE TABLE -TAKEN FROM DESIGN OF STORM WATER POND SURFACE AREA REQ'D: FOREBAY AREA: AT WIDTH = 0.33 LENGTH, WIDTH = 28,5153 LF LENGTH = 85,5458 LF CONTROL. FACILITIES WORKSHOP MANUAL - PENC 1988) 2439 SF 732 SF (BASED UPON MINIMUM SURFACE AREA) Use these dimensions: WIDTH 59.25 LF LENGTH 210 LF VOLUME OF 1 ' RAINFALL Normal Pool Elevation 5 AREA OF ROOFS: 0.11 AC AREA OF PARKING/CONCRETE: 0.54 AC AREA OF GREEN AREAS: 1.35 AC VOLUME OF RUNOFF 3241.59 CF VOL (CF)=1(ROOF*1.0)+(PARKING*.95)k(GRASS*0.2)1*43,560/12 STORAGE DEPTH FOR MINIMUM AREA = 0.26 FT ELEVATION OF 1" RAINFALL = 5.26 DRAWDOWN - WATER QUALITY Q(2 DAYS) = 0.01876 CFS Q(5 DAYS) = 0.0075 CFS 1" RUNOFF STAGE 0.26 FT DEPTH OF DRAWDOWN DEVICE BELOW OUTLET 1.5 FT 1" RUNOFF OUTLET DEVICE: 1.17704 INCH DIA HOLE DIAMETER OF HOLE TO USE: 1.375 INCH DIAMETER 1" STORM RUNOFF DRAWDOWN TIME 2.09366 DAYS A = [QI(Cd*SQRT(2gh))] * 144 Rad.=SQRT(AIPI) Dia.=2*Rad. INFLOW HYDROGRAPH Return Year Storm 10 Yr Qp = Peak Discharge = 12 cfs Tc = Time of Concentration = 8.4 min Calculation of Tp (Time to Peak) From SCS NEH 4 , page 15-7 Eqn. 15.4 Lag Time (L) = (1" 0.8*(S+l)"0.7)1(1900*Y"0.5) for Lin Hrs where: 1 = hydraulic length of watershed (ft) S = (1000/CN)-10 CN = approximately same CN from TR-55 Y = avg. watershed land slope in % S = (10001CN)-10 = 2.19512 L= 0.2455 hrs From SCS NEH 4 , page 16-7 Eqn. 16.7 Tp=D/2+L where : D = unit of excess duration rainfall (hrs) L = Lag Time (hrs) From SCS NEH 4 , page 16-8 Eqn. 16.12 D = 0.133 tc where: Te = Time of Concentration (hrs) - (See Tr-55 Printout) THEREFORE: D = 0.01862 hrs Tp = 0.25481 hrs — 15.2885 min Volume under Hydrograph = 1.39 * Qp * Tp w 15300.7 Cubic Feet 515 2.19512 82 0.51 Inflow Hydrograph SCS Dimensionless Hydrograph Time Discharge Time Discharge Volume Ratio ----------- Ratio hr ---- ---- cfs ---- cf ---- ----------- 0.00 ---- ---- 0.00 0.00 ---- 0 ---- _ 0.10 0.03 0.03 0 33 0.20 0.10 0.05 1 110 0.30 0.19 0.08 2 209 0.40 0.31 0.10 4 341 0.50 0.47 0.13 6 517 0.60 0.66 0.15 8 727 0.70 0.82 0.18 10 903 0.80 0.93 0.20 11 1024 0.90 0.99 0.23 12 1090 1.00 1.00 0.25 12 1101 1.10 0.99 0.28 12 1090 1.20 0.93 0.31 11 1024 1.30 0.86 0.33 10 947 1.40 0.78 0.36 9 859 1.50 0.68 0.38 8 749 1.60 0.56 0.41 7 616 1.70 0.46 0.43 6 506 1.80 0.39 0.46 5 429 1.90 0.33 0.48 4 363 2.00 0.28 0.51 3 308 2.20 0.21 0.56 2 456 2.40 0.15 0.61 2 324 2.60 0.11 0.66 1 236 2.80 0.08 0.71 1 170 3.00 0.06 0.76 1 121 3.20 0.04 0.82 0 88 3.40 0.03 0.87 0 64 3.60 0.02 0.92 0 46 3.80 0.02 0.97 0 33 4.00 0.01 1.02 0 24 4.50 0.01 1.15 0 28 5.00 0.00 1.27 0 0 Volume under hydrograph = 14533 cf Based upon runoff volume = 15300.7 cf Depth req'd for minimum area = 1.22971 STAGE STORAGE FUNCTION OF POND (FOR RECTANGULER DETENTION POND ONLY) Minimum surface area taken at normal water level BASIN AREA ]NCR ACCUM VOLUME VOLUME STAGE in s S z sf cf cf ft Pond Side Slope (M) = In Z Z est Elevation 12443 0 0 0 Surface area at normal pool 5 13259 6425 6425 0.5 8.77 -0.69 0.56 5.5 14094 6838 13264 1 9.49 0.00 1.04 6 14947 7260 20524 1.5 9.93 0.41 1.52 6.5 15818 7691 28215 2 10.25 0.69 2.01 7 16706 8131 36346 2.5 10.50 0.92 2.50 7.5 17613 8580 44926 3 10.71 1.10 3.00 8 18538 9038 53963 3.5 10.90 1.25 3.52 8.5 19481 9505 63468 4 11.06 1.39 4.06 9 20441 9980 73448 4.5 11.20 1.50 4.60 9.5 21420 10465 83914 5 11.34 1.61 5.17 10 Regression Output: Constant 9.34346 Ks = S/Z"b = 12646.49 Std Err of Y Est 0.00969 R Squared 0,99962 No. of Observations 7 Degrees of Freedom 5 X Coefficient(s) 1.15215 = b Std Err of Coef. 0.01009 FOR VERTICAL SIDED DETENTION POND SET b=0, AND Ks = SURFACE AREA (SF) Page 4 STAGE DISCHARGE (FOR RISERIBARRELL SPILLWAY W EMERGENCY WEIR) RISER Dr - 18 Riser Dia. (in) Etop = 20.00 Elev. Top Riser (ft) 6.23 Cwr 3.33 Riser weir coeff Cdr = 0.60 Riser orifice coeff H 1 n - 5 Number of Holes Hld - 2 Hole Dia. (in) EH 1 = 20.00 Elev. Holes (1) H2n = 5 Number of Holes H2d = 2 Hole Dia. (in) EH2 = 20.00 Elev. Holes (2) H3n = 0 Number of Holes H3d = 2 Hole Dia. (in) EH3 = 20.00 Elev. Holes (3) BARREL: Db = 15 Barrel Dia. (in) Einv = 200.00 Elev Invert Barrel (ft) Barrell Adjustment Factor Cdb - 0.60 Barrel orifice coeff 3 EMERGENCY WEIR Page 5 Cw = 3 Weir coeff Ecr = 6.00 Elev weir coeff (ft) Lw = 3 Weir Length (ft) Riser Riser Riser Elevation Hole Hole Hole Riser Riser Barrel Principal Emergcy (1) (2) (3) (weir) (orifice) Spillway Weir 5.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 5.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 5.01 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 5.02 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 5.04 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 5.08 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 5.13 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 5.20 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 5.27 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 5.36 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 5.44 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 5.53 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 5.61 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 5.68 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 5.75 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 MI 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 5.87 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 5.91 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 5.94 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 5.97 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 6.00 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 6.04 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.1 6.07 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.2 6.09 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.2 6.10 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.3 6.11 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.3 6.12 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.4 6.12 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.4 6.12 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.4 6.12 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.4 6.11 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.3 6.11 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.3 6.10 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.3 Page 6 ROUTING OF INFLOW HYDROGRAPH THROUGH POND AND OUTFLOW DEVICE Total Riser Riser Miser Barrel Emerg Time Inflow Storage Stage Outflow Holes (weir) (orifice) Spillway t(hr) cfs cf Elevation cfs (1+2+3) cfs cfs cfs cfs cfs 0.000 0 0 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.025 0 0 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.051 1 33.0231 5.01 0.00 0.00 0.00 0.00 0.00 0.00 0.076 2 143.1 5.02 0.00 0.00 0.00 0.00 0.00 0.00 0.102 4 352,247 5.04 0.00 0.00 0.00 0.00 0.00 0.00 0.127 6 693.486 5.08 0.00 0.00 0.00 0.00 0.00 0.00 0.153 8 1210.85 5.13 0.00 0.00 0.00 0.00 0.00 0.00 0.178 10 1937.36 5.20 0.00 0.00 0.00 0.00 0.00 0.00 0.204 11 2839.99 5.27 0.00 0.00 0.00 0.00 0.00 0.00 0.229 12 3863.71 5.36 0.00 0.00 0.00 0.00 0.00 0.00 0.255 12 4953.47 5.44 0.00 0.00 0.00 0.00 0.00 0.00 0.280 12 6054.24 5.53 0.00 0.00 0.00 0.00 0.00 0.00 0.306 11 7144.01 5.61 0.00 0.00 0.00 0.00 0.00 0.00 0.331 10 8167.72 5.68 0.00 0.00 0.00 0.00 0.00 0.00 0.357 9 9114.39 5.75 0.00 0.00 0.00 0.00 0.00 0.00 0.382 8 9972.99 5.81 0.00 0.00 0.00 0.00 0.00 0.00 0.408 7 10721.5 5.87 0.00 0.00 0.00 0.00 0.00 0.00 0.433 6 11337.9 5.91 0.00 0.00 0.00 0.00 0.00 0.00 0.459 5 11844.3 5.94 0.00 0.00 0.00 0.00 0.00 0.00 0.484 4 12273.6 5.97 0.00 0.00 0.00 0.00 0.00 0.00 0.510 3 12636.9 6.00 0.00 0.00 0.00 0.00 0.00 0.00 0.561 2 13253.3 6.04 0.08 0.00 0.00 0.00 0.00 0.08 0.612 2 13695 6.07 0.17 0.00 0.00 0.00 0.00 0.17 0.663 1 13987 6.09 0.25 0.00 0.00 0.00 0.00 0.25 0.713 1 14177 6.10 0.30 0.00 0.00 0.00 0.00 0.30 0.764 1 14290.9 6.11 0.34 0.00 0.00 0.00 0.00 0.34 0.815 0 14350.2 6.12 0.36 0.00 0.00 0.00 0.00 0.36 0.866 0 14373.1 6.12 0.36 0.00 0.00 0.00 0.00 0.36 0.917 0 14370.4 6.12 0.36 0.00 0.00 0.00 0.00 0.36 0.968 0 14350.3 6.12 0.36 0.00 0.00 0.00 0.00 0.36 1.019 0 14318.2 6.11 0.35 0.00 0.00 0.00 0.00 0.35 1.147 0 14220.3 6.11 0.32 0.00 0.00 0.00 0.00 0.32 1.274 0 14103 6.10 0.28 0.00 0.00 0.00 0.00 0.28 6.11748 = maximum stage elevation 0.3624 = maximum discharge Ricky Edwards' site Camden County 10 yr STORM 14 - , - -, , - 12 ; INFLOW (cfs) m • OUTFLOW (cfs) s 6 , i. 4 !I 2a �: p .++���+�+�+tee++►�e�oJ+ ., -aY r-�: u a._=r—�-� 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 Time (hrs)