Loading...
HomeMy WebLinkAboutSW7040517_HISTORICAL FILE_20190812STORMWATER DIVISION CODING SHEET POST -CONSTRUCTION PERMITS PERMIT NO. SW�(i�(%��7 DOC TYPE ❑ CURRENT PERMIT ❑ APPROVED PLANS HISTORICAL FILE DOC DATE ,21,91,9�/9 " WYYMMDD Thorpe, Roger From: Genero, George <ggenero@cecinc.com> Sent: Monday, August 12, 2019 11:43 AM To: Thorpe, Roger Subject: [External] RE: Stormwater permits - First National Bank External email. Do not click links or open attachments unless you verify. Send all suspicious email as -an attachment to report.spam@nc.gov Roger, Thanks for looking into these sites for us. We will start coordinating on the sites below with FNB to renew and transfer the permit. Is there a way to pull the actual stormwater permit from the NC DEQ Permits & Rules webpage? Thanks, George A. Genero, P.E. / Principal Civil & Environmental Consultants, Inc. 530 Howell Rd. • Suite 203 • Greenville, SC 29615 Office: (864) 626-3140 - Fax: (864) 626-3135 Mobile: (864) 230-0274 • http:/Zwww.cecinc.com Senior Leadership - Integrated Services - Personal Business Relationships From: Thorpe, Roger <roger.thorpe@ncdenr.gov> Sent: Monday, August 12, 2019 11:04 AM To: Genero, George <ggenero@cecinc.com> Subject: Stormwater permits- First National Bank George Sorry we have missed each other by telephone. Here is some information on srormwater permits that I am aware of that need action. Permit SW7000502 — Currituck County. Permit expires 6/3/2004. This permit needs to be transferred to First Nation Bank (FNB) but does not need to be renewed at this time. Permit SW7041102 — Southern Shores, NC. This permit expired 3/3/2019. This permit needs to be renewed and tra nsferred. Permit SW7040517 — Hertford, NC. This permit expired 6/28/2018. This permit needs to be renewed and transferred. Each application (both renewal and transfer) requires a separate fee of $505.00. Our office covers the Northeast part of the State and therefore, I am only looking at facilities in the 21 counties that we serve. These were East Carolina Banks and are the only ones that I am aware of at this time that need action in this region. If FNB took over other banks (besides East Carolina Bank), there may be others that need action. We have a Wilmington regional office that may have some facilities that need action. You can contact Georgette Scott, Supervisor in that office at 910-796-7215 to see if there are affected facilities in her region. have tried to send you applications as an attachment, but your e-mail service rejects them as spam. If you have questions, please call. Roger Roger K. Thorpe Environmental Engineer Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality 252-948-3923 office roger,thorpe(@ncdenr.gov Washington Regional Office 943 Washington Square Mall Washington, NC 27889 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Thorpe, Roger From: Thorpe, Roger Sent: Monday, July 22, 2019 3:26 PM To: Westbrook, Kimberly Subject: First National Bank Stormwater Permit. Kimberly I have found a couple of other First National Banks that have similar issues with stormwater permits not being transferred. Can you provide me with a name and address of a corporate contact that I can use to send Notices of Violation. It looks like we may be headed toward an enforcement action. Thanks Roger Roger K. Thorpe Environmental Engineer Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality 252-948-3923 office roger.thorpe@ncdenr.gov Washington Regional Office 943 Washington Square Mail Washington, NC 27889 N-`Z. !--Nothing Compares._--,_. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH lnlerim Director Ms. Kimberly Westbrook, First National Bank P.O. Box 5 Hertford, NC 27944 Dear Ms. Westbrook. VV01Rd NORTH CAROLINA Environmental Quality January 29, 2019 Branch Manager Subject: Stormwater Permit Renewal Stormwater Management Permit SW7040517 First National Bank, formerly East Carolina Bank Hertford, NC, Perquimans County Thank you for speaking with me today concerning the stormwater permit renewal for the bank in Hertford. Permit SW7040517 for a stormwater treatment system consisting of a wet detention pond was originally issued to The East Carolina Bank located on Harvey Point Road in Hertford, NC. This permit expired on June 28, 2018. Permits are not automatically transferred when property changes hands. North Carolina General Statutes and the Coastal Stormwater rules require that this property be covered under a stormwater permit. The permit needs to be transferred and renewed. Please submit a completed permit transfer application with a $505.00 application fee and a permit renewal application along with another $505.00 fee for permit renewal. Permit application forms for renewal can be found on our website at: https://dQgnc.gov/about/divisions/energy-mineral-land-resoui-ces,Lenergy-mineral-land= rules!stormwater-program/ post-constructioil. For your convenience I am sending these forms to you electronically. If you have questions, please feel free to contact me at (252) 948-3923. 1 will be glad to discuss this by phone or meet with you. Sincerely, Roger K. Thorpe Environmental Engineer North Carolina De»ariment of environmental Quality � Division of Energy, Mineral and Land Itesonrees Washingtun Regional Office 1 943 Washington Square. Mall 1 Washington, North Carolina 7.7889 151.946.6481 € ,� •1�� �! � �+{ k' �tli� :t t�tdt. t�7f 4 g- l i� fE �i isf ... fit ""i'��. 33 r qA�4;iA c. i . x .� i yy'`�.'.� { I� E '���f : I�.r MOW E•'} l R ��.rS .r., }{',l r5+.:5J -i ..Y iV. : -...:8 .. ,.fil _bd4. ` Thorpe, Roger From: Westbrook, Kimberly <WestbrookK@fnb-corp.com> Sent: Tuesday, January 29, 2019 4:03 PM To: Thorpe, Roger Subject: [External] RE: Stormwater Permit Renewal and Transfer - First National Bank, Hertford, NC Roger, Asa follow up to our conversation, the point of contact for this matter is Rachelle Vopal. Her email address is: Realestate@fnb-corp.com. I have sent her the information that you provided tome this morning and she will be handling from this point. Please let me know if you have any problems or this situation is not resolved in a timely manner. Thank you, Kimberly limberly Westbrook Hertford Branch Manager III NMLS * 664483 First National Sank 1103 Harvey Point Road Hertford, NC 27944 Office Phone, 252.426—W9 Cell Phone: 252.619.6090 Fags: 2.52--426.3861 v.estbrookkra,Fnb-crnp.00m From: Thorpe, Roger <roger.thorpe@ncdenr.gov> Sent: Tuesday, January 29, 2019 10:59 AM To: Westbrook, Kimberly <WestbrookK@fnb-corp.com> Subject: Stormwater Permit Renewal and Transfer - First National Bank, Hertford, NC 1 WARNING - External email; exercise caution when opening attachments or clicking any links. Kimberly Thank you for speaking with me this morning. Attached is a letter, a renewal application, a transfer application, and a new Operation and Maintenance agreement. I realize that this may look complicated, but I will be glad to assist whoever completes the forms. Thanks Roger Roger K. Thorpe Environmental Engineer Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality 252-948-3923 office roger. thorpe(c)_r1cde_nr.gov Washington Regional Office 943 Washington Square Mall Washington, NC 27889 Nt'C'. -::>-Nothtng Compares Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. CONFIDENTIALITY AND DISCLAIMER NOTICE: This email transmission and any attachment thereto is privileged and confidential and is only intended for review by the party to whom it is addressed or to whom it was intended to be addressed. If you have received this email in error, please immediately REPLY to the sender to notify him/her of the error and delete it and any attachments from your system. The contents of this email and any attachment thereto may be considered material non- public or forward -looking information and your unintended review may subject you to the requirements of federal securities laws and regulations. Even if you have authorized access to the intended recipients email, you should refrain from discussing or disclosing the contents of this email or any attachment thereto. Any unintended or unauthorized receipt by you of this email or any attachment thereto shall not constitute a waiver of any applicable privilege. For more information regarding our policy and practices pertaining to email, text messaging and other electronic communications please click here-. Email/Text and Other Electronic Messaging Disclosure AVI Thorpe, Roger From: Westbrook, Kimberly <WestbrookK@fnb-corp.com> Sent: Tuesday, January 29, 2019 4:03 PM To: Thorpe, Roger Subject: [External] RE: Stormwater Permit Renewal and Transfer - First National Bank, Hertford, NC o [E- f ri al6. ail D'on3ot'click ink�sy openLattachments unless you venfy;tSend all suspicious email as an attachment'to :. rye' rt:s am n ou �+ 4 ., �: a�•.• �; Roge r, As a follow up to our conversation, the point of contact for this matter is Rachelle Vopal. Her email address is: Realestate@fnb-corp.com. I have sent her the information that you provided to me this morning and she will be handling from this point. Please let me know if you have any problems or this situation is not resolved in a timely manner. Thank you, Kimberly 147mberly Westbrook Hertford Branch Manager III NMLS * 664483 First National Bank 1103 Haney Point Road Hertford, NC 277934 Office Phone: 232 426.3939 Cell Phone: 252.619.6090 Fax: 232-426.3861 Wei tb(0okhfa7 fnb-CoSp.Cm From: Thorpe, Roger <roger.thorpe@ncdenr.gov> Sent: Tuesday, January 29, 2019 10:59 AM To: Westbrook, Kimberly <WestbrookK@fnb-corp.com> Subject: Stormwater Permit Renewal and Transfer - First National Bank, Hertford, NC 1 WARNING - External email; exercise caution when opening attachments or clicking any links. Kimberly Thank you for speaking with me this morning. Attached is a letter, a renewal application, a transfer application, and a new Operation and Maintenance agreement. I realize that this may look complicated, but I will be glad to assist whoever completes the forms. Thanks Roger Roger K. Thorpe Environmental Engineer Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality 252-948-3923 office roger.thorpeencdenr.gov Washington Regional Office 943 Washington Square Mall Washington, NC 27889 N_ " a - Nothing Compares., Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. CONFIDENTIALITY AND DISCLAIMER NOTICE: This email transmission and any attachment thereto is privileged and confidential and is only intended for review by the party to whom it is addressed or to whom it was intended to be addressed. If Kit? have received this email in error, please immediately REPLY to the sender to notify him /her of the error and delete it and any attachments from your system. The contents of this email and any attachment thereto may be considered material non- public or forward -looking information and your unintended review may subject you to the requirements of federal securities laws and regulations. Even if you have authorized access to the intended recipients email, vou should refrain from discussing or disclosing the contents of this email or any attachment thereto. Any unintended or unauthorized receipt by you of this email or any attachment thereto shall not constitute a waiver of any applicable privilege. For more information regarding our policy and practices pertaining to email, text messaging and other electronic communications please click here. Email/Text and Other Electronic Messaging Disclosure .. F W A TF Michael F. Easley, Governor 0 qpG William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Coleen Sullins, Deputy Director Division of Water Quality O DIVISION OF WATER QUALITY June 28, 2004 Mr. Dorson White, Executive Vice President The East Carolina Bank 1001 Red Banks Road Greenville, NC 27858 Subject Permit No. SW7040517 The East Carolina Bank - Hertford High Density Stormwater Project Perquimans County Dear Mr. White: The Washington Regional Office received a completed Stormwater Application for the subject project on May 13, 2004. Staff review of the plans and specifications has determined that the project, as proposed, will, comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW7040517 dated June 28, 2004 to The East Carolina Bank for the construction and operation of grassed swales and a wet detention pond to serve the proposed East Carolina Bank located on Harvey Point Road in Hertford, NC. This permit shall be effective from the date of issuance until June 28, 2014 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stonnwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a wrMen petition, conforming to Chapter 150B of the North Carolina General Statutes, and, filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714, Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Roger Thorpe at (252) W-6481, extension 214. Sincerely, `Jim Illigan Water Quality Regional Supervisor Washington Regional Office CC: Hyman & Robey, PC Perquimans County Inspections Washington Regional Office Central Files Washington Regional Office 943 Washington Square Mall, Washington NC 27889 252,946.6481(telephone), 252.946.9215(faz) State Stormwater Management Systems Permit No. SW7040517 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO The East Carolina Bank Perquimans County FOR THE construction, operation and maintenance of stormwater management systems in compliance with the provisions of 15A NCAC 2H.1000 (hereafter referred to as the "stormwater rules" j and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit for grassed swales and a wet detention pond to serve the proposed East Carolina Bank located on Harvey Point Road in Hertford, NC. This permit shall be effective from the date of issuance. until ,tune 28, 2014 and shall be subject to the following specified conditions and limitations: DESIGN STANDARDS This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described on page 2 of this permit, the Project Data Sheet. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. Project Name: Permit Number: Location: Applicant Mailing Address: Application Date: Receiving Stream: Classification of Water Body: Total Site Area: Total Impervious: Wet Pond Depth: Required Storage Volume: Provided Storage Volume: Required Surface Area: Provided Surface Area: Controlling Orifice: DIVISION OF WATER QUALITY PROJECT DATA The East Carolina Bank - Hertford SW7040517 Perquimans County The East Carolina Bank 1001 Red Banks Road Greenville, NC 27858 5/13/2004 UT to Perquimans River SC 2.0 ac 0.78 ac 4.0 ft 3,594 cf 4,064 cf 3,049 sf 4,084 sf 1.0 inch @ elevation 11.8 ft 4. No homeowner/lot owner/developer shall be allowed to fill in, alter, or pipe any vegetative practices (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. The following items will require a modification to the permit a. Any revision to the approved plans, regardless of size b. Project name change C. Transfer of ownership d. Redesign or addition to the approved amount of built -upon area e. Further subdivision of the project area. In addition, the Director may determine that other revisions to the project should require a modification to the permit. 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. II. SCHEDULE OF COMPLIANCE The permittee will comply with the following schedule for construction and maintenance of the stormwater management system. a. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surfaces except roads. b. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. The facilities must be properly maintained and operated at all times. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency including, but not limited to: a. Semiannual scheduled inspections (every 6 months) b. Sediment removal C. Mowing and revegetation of side slopes d. Immediate repair of eroded areas e. Maintenance of side slopes in accordance with approved plans and specifications f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 5. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Mail the Certification to the Washington Regional Office, 943 Washington Square Mail, Washington, North Carolina, 27889, attention Division of Water Quality. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of five years from the date of the completion of construction. III. GENERAL CONDITIONS This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6(a) to 143- 215.6(c). 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. .Permit issued this the 28 th day of June, 2004. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION ►—Alan W. Klimek, P.E. Director Division of Water Quality By Authority of the Environmental Management Commission Permit Number SW7040517 N The East Carolina Bank — Hertford, NC Stormwater Permit No. SW7040517 Designers Certification 1, , as a duly Registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. Signature Registration Number Date H man & RobeRober, PC Consulting Engineers and Land Surveyors (252) 335-1888 Office (252) 338-2913 Office (252) 338-5552 Fax May 10, 2004 Mr. Bill Moore Dept. of Environment and Natural Resources RECEIVED Water Quality Section 943 Washington Square Mall MAY 1 3 2004 Washington, NC 27889 DWQ-WARQ Subject: Stormwater Management Permit The East Carolina Bank In Hertford Proj. # 040009 Dear Mr. Moore: Enclosed for your review and approval, please find the following items: 1. Two (2) copies of the above referenced plans. 2. The original and one (1) copy of the Stormwater Exemption Application and Wet Detention Basin Supplement. Two (2) copies of the project description and calculations. 4. Check in the amount of $420.00 for the required fee. If you have any questions, please do not hesitate to call this office at (252) 335-1888. cc: file Gene Rackley Sincerely, Sean C. Robey, P.E. !Kimberly, D. Engineering Assistant 150-A US Highway 158 East, Camden, NC 27921 PERMANENT POOL DETENTION PONDS Hyman & Robey, PC DESIGN OF POND 150-A Hwy 158 East Camden, NC 27921 East Carolina Bank of Hertford (252)-335-1888 10 Yr, 24 Hr Storm 04/15/04 DETENTION POND SA/DA PERCENTAGES FOR 90% TSS REMOVAL WITHOUT VEGETATIVE FILTER % IMPRV 3.0 FT 3.5 FT 4.0 FT 4.5 FT 5.0 FT 5.5 FT 6.0 FT 6.5 FT 10 % 1.3 1.0 0.8 0.7 0.6 0.5 0.4 0.3 20 % 2A 2.0 1.8 1.7 1.5 1.4 1.2 1.0 30 % 3.5 3.0 2.7 2.5 2.2 1.9 1.6 1.3 40 % 4.5 4.0 3.5 3.1 2.8 2.5 2.1 1.8 50 % 5.6 5.0 4.3 3.9 3.5 3.1 2.7 2.3 60 % 7.0 6.0 5.3 4.8 4.3 3.9 3.4 2.9 70 % 8.1 7.0 6.0 5.5 5.0 4.5 3.9 3.4 80 % 9.4 8.0 7.0 6.4 5.7 5.2 4.6 4.0 90 % 10.7 9.0 7.9 7.2 6.5 5.9 5.2 4.6 100 % 12.0 10.0 8.8 8.1 7.3 6.6 5.8 5.1 nECEIVED MAY Z 3 2004 Page IDWQ-WARO 7.0 FT 0.2 0.9 1.1 1.4 1.9 2.4 2.9 3.4 3.9 4.3 WATERSHED AREA. 2 ACRES WATERSHED % IMPERVIOUS: 40 % PERMANENT POOL ELEVATION: 11.8 FT DESIGN PERMANENT POOL DEPTH: 4 FT SAIDA PERCENTAGE FACTOR: 3.5 % (FROM ABOVE TABLE - TAKEN FROM DESIGN OF STORM WATER POND SURFACE AREA REQ'D: FOREBAY AREA: AT WIDTH = 0.33 LENGTH, WIDTH = 31.881 LF LENGTH = 95.6431 LF CONTROL FACILITIES WORKSHOP .MANUAL . PENC 1988) 3049 SF 915 SF (BASED UPON MINIMUM SURFACE AREA) Use these dimensions: WIDTH 24 LF LENGTH 170.17 LF VOLUME OF I" RAINFALL AREA OF ROOFS: 0. l AC AREA OF PARKING/CONCRETE: 0.68 AC AREA OF GREEN AREAS: 1.22 AC VOLUME OF RUNOFF 3593.7 CF STORAGE DEPTH FOR MINIMUM AREA = ELEVATION OF i" RAINFALL = 12.68 Normal Pool Elevation 11.8 VOL (CF)=I(ROOF*1.0)+(PARK.ING-.95)f(GRASS*0.2)]*43,560/12 0.88 FT DRAWDOWN - WATER QUALITY Q(2 DAYS) = 0.0208 CFS Q(5 DAYS) = 0.00832 CFS I" RUNOFF STAGE 0.88 FT DEPTH OF DRAWDOWN DEVICE BELOW OUTLET 1.5 FT 1" RUNOFF OUTLET DEVICE: 0.91418 INCH DIA HOLE DIAMETER OF HOLE TO USE: 1 INCH DIAMETER 1" STORM RUNOFF DRAWDOWN TIME 2.3878 DAYS A=(Q/(Cd*SQRT(2gh))]* 144 Rad.=SQRT(A/PI) Dia.=2*Rad. INFLOW HYDROGRAPH Return Year Storm 10 Yr Qp = Peak Discharge = 7 cfs Tc = Time of Concentration = 36.6 min Calculation of Tp (Time to Peak) From SCS NEH 4 , page 15-7 Eqn. 15.4 Lag Time (L) = (1"0.8*(S+1)"0.7)/(1900*Y"0.5) for L in Hrs where: I = hydraulic length of watershed (ft) S = (1000/CN)-10 CN = approximately same CN from TR-55 Y = avg. watershed land slope in % S = (1000/CN)-10 = 2.04819 L = 0.22599 hrs From SCS NEH 4 , page 16-7 Eqn. 16.7 Tp=D/2+L where : D = unit of excess duration rainfall (hrs) L = Lag Time (hrs) From SCS NEH 4 page 16-8 Eqn. 16,12 D = 0.133 tc where: Tc = Time of Concentration (hrs) - (See Tr-55 Printout) THEREFORE: D = 0.08113 hrs Tp = 0.26656 hrs = 15.9933 min Volume under Hydrograph = 1.39 * Qp * Tp = 9336.91 Cubic Feet 626 2.04819 83 0,77 Inflow Hydrograph SCS Dimensionless Hydrograph Time Discharge Time Discharge Volume Ratio Ratio hr cfs cf 0.00 0.00 0.00 0 0.10 0.03 0.03 0 20 0.20 0.10 0.05 1 67 0.30 0.19 0.08 1 128 0.40 0.31 0.11 2 208 0.50 0.47 0.13 3 316 0.60 0.66 0.16 5 443 0.70 0.82 0.19 6 551 0.80 0.93 0.21 7 625 0.90 0.99 0.24 7 665 1.00 1.00 0.27 7 672 1.10 0.99 0.29 7 665 1.20 0.93 0.32 7 625 1.30 0.86 0.35 6 578 1.40 0.78 0.37 5 524 1.50 0.68 0.40 5 457 1.60 0.56 0.43 4 376 1.70 0.46 0.45 3 309 1.80 0.39 0.48 3 262 1.90 0.33 0.51 2 222 2.00 0.28 0.53 2 188 2.20 0.21 0.59 1 278 2.40 0.15 0.64 1 197 2.60 0.11 0.69 1 144 2.80 0.08 0.75 1 L03 3.00 0.06 0.80 0 74 3.20 0.04 0.85 0 54 3.40 0.03 0.91 0 39 3.60 0.02 0.96 0 28 3.80 0.02 1.01 0 20 4.00 0.01 1.07 0 15 4.50 0.01 1.20 0 17 5.00 0.00 1.33 0 0 Volume under hydrograph = 8869 cf Based upon runoff volume = 9336.91 cf Depth req'd for minimum area - 2.28617 STAGE STORAGE FUNCTION OF POND (FOR RECTANGULER DETENTION POND ONLY) Minimum surface area taken at normal water level BASIN AREA INCR ACCUM VOLUME VOLUME STAGE In s S Z sf cf cf ft Pond Side Slope (M) = In Z Z est Elevation 4084 0 0 0 Surface area at normal pool 11.8 4676 2190 2190 0.5 7.69 -0.69 0.50 12.3 5285 2490 4680 1 8.45 0.00 0.96 12.8 5913 2799 7480 1.5 8.92 0.41 1.45 13.3 6558 3118 10597 2 9.27 0.69 1.96 13.8 7222 3445 14042 2.5 9.55 0.92 2.50 14.3 7903 3781 17823 3 9.79 1.10 3.07 14.8 8603 4126 21950 3.5 10.00 1.25 3.68 15.3 9320 4481 26430 4 10.18 1.39 4.33 15.8 10056 4844 31274 4.5 10.35 1.50 5.01 16.3 10809 5216 36491 5 10.50 1.61 5.73 16.8 Regression Output: Constant 9.34346 Ks = S/Z"b - 4885.93 Std Err of Y Est 0.00969 R Squared 0.99962 No. of Observations 7 Degrees of Freedom 5 X Coefficient(s) 1.15215 = b Std Err of Coef. 0.01009 FOR VERTICAL SIDED DETENTION POND SET b=0, AND Ks = SURFACE AREA (SF) Page 4 STAGE DISCHARGE (FOR RISER/BARBELL SPILLWAY W EMERGENCY WEIR) RISER Dr = 23 Riser Dia. (in) Etop = 12.68 Elev. Top Riser (ft) 14.09 Cwr = 3.33 Riser weir coeff Cdr = 0.60 Riser orifice coeff Hln = 5 Number of Holes Hld = 3 Hole Dia. (in) E141 = 20.00 Elev. Holes (1) H2n = 5 Number of Holes H2d = 2 Hole Dia. (in) EH2 - 20.00 Elev. Holes (2) H3n = 0 Number of Holes H3d = 2 Hole Dia. (in) EH3 = 20.00 Elev. Holes (3) BARREL: Db = 15 Barrel Dia. (in) Einv - 11.80 Elev Invert Barrel (ft) Barrell Adjustment Factor Cdb = 0.60 Barrel orifice coeff 3 EMERGENCY WEIR Page 5 Cw = 3 Weir coeff Ecr = 20.00 Elev weir coeff (ft) Lw = 10 Weir Length (ft) Riser Riser Riser Elevation Hole Hole Hole Riser Riser Barrel Principal Emergcy (1) (2) (3) (weir) (orifice) Spillway Weir 11.80 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 11.80 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 11.81 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 11.83 0.0 0.0 0.0 0.0 0.0 0.0 0.00 0.0 11.87 0.0 0.0 0.0 0.0 0.0 0.1 0.00 0.0 11.92 0.0 0.0 0.0 0.0 0.0 0.1 0.00 0.0 11.99 0.0 0.0 0.0 0.0 0.0 0.3 0.00 0.0 12.09 0.0 0.0 0.0 0.0 0.0 0.5 0.00 0.0 12.21 0.0 0.0 0.0 0.0 0.0 0.9 0.00 0.0 12.33 0.0 0.0 0.0 0.0 0.0 1.3 0.00 0.0 12.46 0.0 0.0 0.0 0.0 0.0 1.8 0.00 0.0 12.58 0.0 0.0 0.0 0.0 0.0 2.3 0.00 0.0 12.71 0.0 0.0 0.0 0.1 2.2 2.9 0.08 0.0 12.82 0.0 0.0 0.0 1.0 5.1 3.4 1.01 0.0 12.90 0.0 0.0 0.0 2.1 6.5 3.9 2.08 0.0 12.96 0.0 0.0 0.0 2.9 7.3 4.2 2.93 0.0 12.99 0.0 0.0 0.0 3.4 7.7 4.3 3.42 0.0 13.00 0.0 0.0 0.0 3.6 7.8 4.4 3.56 0.0 12.99 0.0 0.0 0.0 3.5 7.7 4.3 3.47 0.0 12.98 0.0 0.0 0.0 3.3 7.6 4.3 3.26 0.0 12.96 0.0 0.0 0.0 3.0 7.4 4.2 3.01 0.0 12.93 0.0 0.0 0.0 2.5 6.9 4.0 2.47 0.0 12.89 0.0 0.0 0.0 2.0 6.4 3.8 1.97 0.0 12.86 0.0 0.0 0.0 1.5 5.9 3.7 1.55 0.0 12.83 0.0 0.0 0.0 1.2 5.5 3.5 1.22 0.0 12.81 0.0 0.0 0.0 1.0 5.0 3.4 0.95 0.0 12.79 0.0 0.0 0.0 0.8 4.6 3.3 0.75 0.0 12.78 0.0 0.0 0.0 0.6 4.3 3.2 0.59 0.0 12.76 0.0 0.0 0.0 0.5 4.0 3.2 0.47 0.0 12.75 0.0 0.0 0.0 0.4 3.7 3.1 0.38 0.0 12.74 0.0 0.0 0.0 0.3 3.5 3.1 0.31 0.0 12.72 0.0 0.0 0.0 0.2 2.8 3.0 0.17 0.0 12.71 0.0 0.0 0.0 0.1 2.4 2.9 0.10 0.0 Page 6 ROUTING OF INFLOW HYDROGRAPH THROUGH POND AND OUTFLOW DEVICE Total Riser Riser Riser Barrel Emerg Time Inflow Storage Stage Outflow Holes (weir) (orifice) Spillway t (hr) cfs cf Elevation cfs (1f2t3) cfs cfs cfs cfs cfs 0.000 0 0 11.80 0.00 0.00 0.00 0.00 0.00 0.00 0.027 0 0 11.80 0.00 0.00 0.00 0.00 0.00 0.00 0.053 1 20,1516 11.81 0.00 0.00 0.00 0.00 0.00 0.00 0.080 1 87.3236 11.83 0.00 0.00 0.00 0.00 0.02 0.00 0.107 2 214.95 11.87 0.00 0.00 0.00 0.00 0.06 0.00 0.133 3 423.184 11.92 0.00 0.00 0.00 0.00 0.14 0.00 0.160 5 738,892 11.99 0.00 0.00 0.00 0.00 0.29 0.00 0.187 6 1182.23 12.09 0.00 0.00 0.00 0.00 0.53 0.00 0.213 7 1733.04 12.21 0.00 0.00 0.00 0.00 0.87 0.00 0.240 7 2357.74 12.33 0.00 0.00 0.00 0.00 1.30 0.00 0.267 7 3022.74 12.46 0.00 0.00 0.00 0.00 1.79 0.00 0.293 7 3694.46 12.58 0.00 0.00 0.00 0.00 2.33 0.00 0.320 7 4359.46 12.71 0.08 0.00 0.08 2.23 2.89 0.00 0.347 6 4976.2 12.82 1.01 0,00 1.01 5.12 3.43 0.00 0.373 5 5457.36 12.90 2.08 0.00 2.08 6.53 3.87 0.00 0.400 5 5781.72 12.96 2.93 0.00 2.93 7.32 4.17 0.00 0.426 4 5957.49 12.99 3.42 0.00 3.42 7.71 4.33 0.00 0.453 3 6005.07 13.00 3.56 0.00 3.56 7.81 4.38 0.00 0.480 3 5972.22 12.99 3.47 0.00 3.47 7.74 4.35 0.00 0,506 2 5901.53 12.98 3.26 0.00 3.26 7.59 4.28 0.00 0.533 2 5810.01 12.96 3.01 0.00 3.01 7.38 4.19 0.00 0.586 1 5609.16 1293 2.47 0.00 2.47 6.91 4.01 0.00 0.640 1 5414.04 12.89 1.97 0.00 1.97 6.41 3.83 0.00 0.693 1 5232.78 12.86 1.55 0.00 1.55 5.92 3.66 0.00 0.746 1 5079.37 12.83 1.22 0.00 1.22 5.46 3.52 0.00 0.800 0 4949.63 12.81 0,95 0.00 0.95 5.03 3.40 0.00 0,853 0 4840.42 12.79 0.75 0.00 0.75 4.65 3.31 0.00 0.906 0 4750.09 12.78 0.59 0.00 0.59 4.30 3.23 0.00 0.960 0 4674.9 12.76 0.47 0.00 0.47 3.99 3.16 0.00 1.013 0 4612.08 12.75 0.38 0.00 0.38 3.71 3.11 6.00 1.066 0 4559.17 12.74 0.31 0.00 0.31 3.45 3.06 0.00 1.199 0 4448.7 12.72 0.17 0.00 0.17 2.84 2.96 0.00 1.333 0 4383.12 12.71 0.10 0.00 0.10 2.41 2.91 0.00 12.996 = maximum stage elevation 3.56235 = maximum discharge The Fast Carolina Bank Hertford, NC 10 yr STORM liz 6 i+1JIJ � % t } ' J ��l �'�t _ i y�.r� n' tis [4 %� 7�, �:• rt � I .. -+�,' =1 F) 4 �� i 3 � a r 77 0 C7rr tnr'�gS119r�tj�s',ry;i.5 s!Er'r" �6♦O i�F ..�, —1i i —"�—"`■—"- 0.000 0.200 0.400 0.600 0.800 1.000 1.200 1.400 Time (hrs) - ®— INFLOW (cfs) + OUTFLOW (cfs) 'RECEIVED DESCRIPTION ,MAY 3 2004 ­­-..,­,—,­-PROJECTb wi. J� °M 4 The East Carolina Bank ®WQ-WARO Perquimans County - North Carolina The East Carolina Bank is proposing construction of a new branch office on Lot 1 — Section C — Perquimans Commerce Centre. This is a vacant, 2 acre lot located on the corner of Harvey Point Road (SR 1336) and Commerce Drive. Public water and sewer service are available to this lot. Development on this site will include a 2,784 sf building with a covered porch and a canopy for the drive through and related parking and drainage. A future parking expansion of 1,431 sf has been included in all stormwater design calculations. The total future impervious area will be 34,051 sf or 39.08% of the site. All stormwater will sheet flow across the parking lot to a curb and gutter collection system. The curb and gutter will discharge into a flat, grassed swale with 3:1 side slope. The swale will provide pre- treatment and storage area for the stormwater that it routes to a detention pond designed for 90% TSS removal. The soils on site are Augusta. While the permeability rate could possibly support the use of an infiltration basin, the high water table makes a wet detention basin the more logical choice for stormwater treatment on this site. The disturbed area for development is approximately 2 acres. FRECEIVED MAY 1 3 2004 * _Generated for use by GRAPHIC method DINQ-WARO TR-55 GRAPHICAL DISCHARGE METHOD VERSION 1.11 Project EAST CAROLINA BANK (HERTFORD) User: KDH Date. 03-01 -04 County PERQUIMANS State: NC Checked: Date: Subtitle: DRAINAGE TO DETENTION POND Data: Drainage Area 2 * Acres Runoff Curve Number 83 Time of Concentration: 0.61 * Hours Rainfall Type II Pond and Swamp Area NONE Storm Number 1 1 1 2 1 3 1 4! 5 1 6 1 7 1 I----------------------I------1-------I------I------1------I------I------I I Frequency (yrs) I 1 1 2 1 5 1 10 1 25 1 50 1 100 1 I I I I I I I I I 24 -Hr Rainfall (in) I 3. 5 1 4 I 5.5 1 6. 3! 7. 1 1 8.3 1 9. 1 1 I I I I I 1 I I I 1 la/P Ratio 1 0.12 I 0.10 1 0.07 1 0.07 1 0.06 1 0.05 1 0.05 1 I I I I I I I I I Used I 0.12 1 0.10 1 0.10 1 0.1C I 0.10 1 0.10 1 0.10 i I I I I I I I I I I Runoff ( in) I 1.86 1 2.29 1 3.63 I 4.37 1 5.12 1 6.26 1 7.03 1 I I I I I I I I I Unit Peak Discharge f 0. 733 1 0. 742 10.744 1 0. 744 1 0. 744 1 0. 744 10. 744 1 I { c£s/acre/in) I 1 f I I I I I I I I I I I 1 I I Pond and Swamp F'actorl 1.00 j 1.00 I 1.00 1 1.00 1 1.00 1 1.00 I 1.00 1 I 0.0% Ponds Used I 1 I I I I I 1----------------------1------I------I------I------I------I------I------I I Peak Discharge (cfs) I 3 1 3 1 5 1 7 1 8 1 9 1 10 1 * - Value(s) provided from TR-55 system routines * - Value(s) provided from TR-55 syste TR-55 CURVE NUMBER COMPUTATION VERSION 1.11 Project EAST CAROLINA BANK (HERTFORD) User: KDH Date: 03-01-04 County PERQUIMANS State: NC Checked: Date: Subtitle: DRAINAGE TO DETENTION POND Subarea : 2 ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ----------------------------------_--_----------------------_-------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space ( Lawns, parks etc. ) Good condition; grass cover > 75% - - 1.22(74) - Impervious Areas Paved parking lots, roofs, driveways - - 0. 78( 98) - Total Area (by Hydrologic Soil Group) 2 ------------------------------------------------------------------------------- SUBAREA: 2 ------------------------------------------------------------------------------- TOTAL DRAINAGE AREA: 2 Acres WEIGHTED CURVE NUMBER:83* * - Generated for use by GRAPHIC method TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1.11 Project EAST CAROLINA BANK (HERTFORD) User: KDH Date. 03 -01 -04 County PERQUIMANS State: NC Checked: Date: Subtitle: DRAINAGE TO DETENTION POND ------------------------------------------------------------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------- Sheet 4 16 .0012 F 0.151 Sheet 50 .01 A 0.014 Shallow Concent'd 250 .0026 P 0.067 Shallow Concent'd 310 .0002 U 0.377 Time of Concentration = 0.611 --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense --- Shallow Concentrated --- B Fallow (No Res.) G Grass, Burmuda --- Surface Codes --- C Cultivated < 20 % Res. H Woods, Light P Paved D Cultivated > 20 % Res. T Woods, Dense U Unpaved E Grass -Range, Short